Correction to Amendment No. 197, Request for Changing Certain TS SRs Frequency from 18 Months to 24 Months
ML16287A443
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 10/18/2016
From: James Kim
Plant Licensing Branch IV
To:
Entergy Operations
Kim J, NRR/DORL/LPLIV-2, 415- 4125
References
CAC ME9764
Download: ML16287A443 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 18, 2016 Vice President, Operations Entergy Operations, Inc.

Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150

SUBJECT:

GRAND GULF NUCLEAR STATION, UNIT 1 - CORRECTION TO AMENDMENT NO. 197 RE: CHANGE TECHNICAL SPECIFICATION SURVEILLANCE REQUIREMENT FREQUENCIES FROM 18 MONTHS TO 24 MONTHS (CAC NO. ME9764)

Dear Sir or Madam:

By letter dated December 26, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13343A109), the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 197 to Facility Operating License No. NPF-29 for the Grand Gulf Nuclear Station, Unit 1 (GGNS). This amendment consisted of changes to the Technical Specifications (TSs) in response to Entergy Operations, lnc.'s application dated October 2, 2012 (ADAMS Accession No. ML122770130), as supplemented by letters dated April 26, June 4, August 15, September 24, September 26, October 14, November 12, December 5, and December 11, 2013 (ADAMS Accession Nos. ML13119A102, ML13162A201, ML13232A057, ML13267A218, ML13270A056, ML13288A179, ML13323A548, ML13340A773, ML13346A283, respectively).

The amendment revised the TSs for GGNS to support operation with 24-month fuel cycles.

Specifically, the change revised the frequency of certain TS Surveillance Requirements (SRs) from "18 months" to "24 months," in accordance with the guidance of NRC Generic Letter (GL) 91-04, "Changes in Technical Specification Surveillance Intervals to Accommodate a 24-Month Fuel Cycle,"

Subsequent to issuance of the amendment, typographical errors were discovered on TS pages 3.3-56 and 3.3-72 of the amendment. On TS page 3.3-56, Function 3c.,

"RCIC Steam Supply Line Pressure - Low, the Allowable Value should be ~ 57 psig instead of~ 53 psig. The Allowable Value of~ 57 psig was approved in Amendment No. 194 (ADAMS Accession No. ML13157A029); however, the changed TS page 3.3-56 was inadvertently not replaced in the authority file. This error was carried forward in Amendment No. 197. On TS page 3.3-72, the symbol'"¢" in Allowable Values for SRs 3.3.6.5.3a and 3.3.6.5.3b should be replaced with the symbol"+/-." These corrections are editorial in nature and do not affect the previously issued safety evaluation of the amendments.

Enclosed are the revised TS pages 3.3-56 and 3.3-72. If you have any questions regarding this matter, please contact me at 301-415-4125 or by e-mail at James.Kim@nrc.gov.

Sincerely,

. r~o r~

James Kim, Project Manager Plant Licensing IV-2 and Decommissioning Transition Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-416

Enclosure:

Corrected TS pages 3.3-56 and 3.3-72 for Amendment No. 197 cc w/encl: Distribution via Listserv

Primacy Containment and Drywell Isolation Instrumentation .

3 .3.6. l Table 3.3.6.1-1 (page 3 of 5)

Primary Containment and Drywell Isolation Instrumentation APPLICABLE CONDITIONS MODES OR RE~RED REFERENCED OTHER CHA ELS FROM SPECIFIED PER TRIP REgUIRED SURVEILLANCE ALLOWABLE FuNCTION CONDITIONS SYSTEM ACT ON C.l REQUIREMENTS VALUE

3. Reactor Core Isolation Cooling (RCIC) System Isolation.* * *
a. RCIC Steam Line 1,2,3 F SR 3.3.6.I.l S:: 64 inches Flow~ High. SR 3.3.6.1.2 water SR 3.3.6.1.3 SR 3.3.6. l.7 SR 3.3.6.1.8 I

. b. RCIC Steam Line Flow 1,2,3 F SR 3.3.6.l.2 ~ 3 seconds and

. TimeDelay SR 3.3.6. l .4 S 7 seconds SR 3.3.6. l.8

c. Rpc Steam Su~ply l ,2(d) ,3(d) F SR 3.3.6.1.l ~ 57 psig Lme Pressure - ow SR 3.3.6.1.2 SR 3.3.6.1.3 SR 3.3.6.l.7 SR 3.3.6.1.8
d. RCfC Turbine Exhaust 1,2,3 2 F SR 3.J.6.l.l S20 psig Di~hragm Pressure - SR 3.3.6.1.2 Hi . . SR 3.3.6. 1.3 SR 3.3.6. l. 7 SR 3.3.6.1.8
e. . RCI<:; Equipment Room l,2,3 F SR 3.3.6.l.l S 191°F Ambient Temperature~ SR 3.3.6.1.2 High SR 3.3.6.1.5 SR 3.3.6.1.8
f.
g. Main Steam Line* . l,2,3 F SR 3 .3 .6.1.2 S 30 minutes Tunnel Temperature SR 3.3.6.1.4 Timer . SR J:J.6.T.8

. h. RHR'. E~u~ment Room . 1,2,3 I per room F SR 3.3.6.1.1 5 171°F Ambien emperature - SR 3.3.6.J.2 High . SR 3.3.6.1.5 SR 3.3.6.1.8

i. RCIC/RHR Steam Line 1,2,3 F' SR 3.3.6.1.1 S 43 *inches
  • Flow- High*

.<dl N~t required to be OPERABLE in MODE 2 or 3 with reactor steam dome pressure less than 150 psig during reactor startup.

GRAND GULF 3.3-56 Amendment No. 1-9.lf 197

Relief and LLS Instrumentation 3.3.6.5 SURVEILLANCE REQUIREMENTS


NOTE-------------------------------------

When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, provided the associated Function maintains LLS or relief initiation capability, as applicable.

SURVEILLANCE FREQUENCY SR 3.3.6.5.1 Perform CHANNEL FUNCTIONAL TEST. 92 days SR 3.3.6.5.2 Calibrate the trip unit. 92 days SR 3.3.6.5.3 Perform CHANNEL CALIBRATION. The 24 months Allowable Values shall be:

a. Relief Function Low: 1103 +/- 15 psig Medium: 1113 +/- 15 psig High: 1123 +/- 15 psig
b. LLS Function Low open: 1033 +/- 15 psig close: 926 +/- 15 psig Medium open: 1073 +/- 15 psig close: 936 +/- 15 psig High open: 1113 +/- 15 psig close: 946 +/- 15 psig SR 3.3.6.5.4 Perform LOGIC SYSTEM FUNCTIONAL TEST. 24 months GRAND GULF 3.3-72 Amendment No. -RO, 197

Enclosed are the revised TS pages 3.3-56 and 3.3-72. If you have any questions regarding this matter, please contact me at 301-415-4125 or by e-mail at James.Kim@nrc.gov.

Sincerely, IRA/

James Kim, Project Manager Plant Licensing IV-2 and Decommissioning Transition Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-416

Enclosure:

Corrected TS pages 3.3-56 and 3.3-72 for Amendment No. 197 cc w/encl: Distribution via Listserv DISTRIBUTION:

PUBLIC LPL4-2 R/F RidsACRS_MailCenter Resource RidsNrrDorllpl4-2 Resource RidsNrrLAPBlechman Resource RidsNrrPMGrandGulf Resource RidsRgn4MailCenter Resource ADAMS Accession No.: ML16287A443 OFFICE NRR/DORL/LPL4-2/PM NRR/DORL/LPL4-2/LA NRR/DORL/LPL4-2/BC(A) NRR/DORL/LPL4-2/PM NAME JKim PBlechman SKoenick JKim DATE 10/17/16 10/17/16 10/17/16 10/18/16 OFFICIAL AGENCY RECORD