Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20083J1656 January 1984Rev 2 to Vols 1 & 2 of Environ Qualification Rept for Class IE Equipment
ML20079E2625 January 1984Quality Confirmation Program, Monthly Rept for Dec 1983Fire Barrier
Coatings
ML20083E41131 December 1983Revised Audit of Program to Verify Quality of Const & Continuation of Const Plan
ML20083J1779 December 1983Vol 1 of Environ Qualification Rept for Mechanical Equipment
ML20083F9128 December 1983Quality Confirmation Program, Monthly Status Rept for Nov 1983Coatings
ML20082K53231 October 1983Quality Confirmation Program, Monthly Rept for Oct 1983Safe Shutdown
Coatings
ML20083A14028 October 1983Rev 25 to Natl Board Tasks ReptNon-Destructive Examination
Hydrostatic
Nondestructive Examination
ML20079F15410 October 1983Technical Proposal PR-6194, Independent Design Review of Zimmer Nuclear Power Station
ML20080R38430 September 1983Rev 24 to Natl Board Tasks ReptNon-Destructive Examination
Hydrostatic
Nondestructive Examination
ML20081F29130 September 1983Quality Confirmation Status Package as of 830930Coatings
ML20078C43216 September 1983Rev 23 to Natl Board Tasks ReptsNon-Destructive Examination
Hydrostatic
Nondestructive Examination
ML20076G91831 August 1983Amend 18 to Zimmer Power Station Mark-II Design Assessment Rept
ML20081F23731 August 1983Quality Confirmation Status as of 830831Coatings
ML20078A57619 August 1983Rev 21 to Natl Board Tasks ReptNon-Destructive Examination
Hydrostatic
Nondestructive Examination
ML20076A9995 August 1983Rev 20 to Natl Board Tasks ReptNon-Destructive Examination
Hydrostatic
Nondestructive Examination
ML20076G23315 July 1983Structural Analysis of GE Spent Fuel Racks for Zimmer Nuclear Power StationEarthquake
ML20076J22430 June 1983Quality Confirmation Program Status as of 830630
ML20072D28010 June 1983Independent Review of Zimmer Project Mgt, Biweekly Status Rept 3,for 830521-0603
ML20071P7141 June 1983Wh Zimmer Nuclear Power Station,Unit 1,Heavy Loads Rept
ML20076J22031 May 1983Quality Confirmation Program Status as of 830531Coatings
Scaffolding
ML20071N08818 May 1983Rev 4 to Transport of Toxic Chemicals & Control Room Habitability Study. One Oversize Graph Encl.Aperture Card Is Available in PDRCoatings
ML20073B9961 April 1983Rev 11 to Natl Board Tasks Rept
ML20072U79131 March 1983Independent Mgt Review of Zimmer 1 Nuclear Plant Project Proposal to Cincinnati Gas & Electric CoNondestructive Examination
ML20076E20524 March 1983Rev 1 to Task V Radiographic Confirmation ReptNondestructive Examination
Liquid penetrant
ML20069E64614 March 1983Quality Confirmation Program Status, Monthly Rept for Feb 1983FLEX
Scaffolding
ML20072C66424 February 1983Quality Confirmation Program Status,Jan 1983Scaffolding
ML20070R91927 January 1983Quality Confirmation Program,Status as of 821231Scaffolding
ML20070L67628 December 1982Wh Zimmer Nuclear Power Station Seismic Qualification of Equipment,Supplemental Info. W/Three Oversize Drawings. Aperture Cards Are Available in PDR
ML20027C5547 October 1982Seismic Qualification Rept on Ite Series 5600 Motor Control Ctr, Revision 1Safe Shutdown
Safe Shutdown Earthquake
Operating Basis Earthquake
ML20067C25431 August 1982Public Version of Revision 1 to Design Submittal - Emergency Response Facilities
ML20065Q19630 August 1982Seismic-Stress Analysis of Horizontal PumpsHydrostatic
ML20063N14422 June 1982Requalification of 20-Inch Gpe Vacuum Breaker Valve Components Due to LOCA Conditions
ML20073M1144 June 1982Seismic Qualification of Reactor Core Cooling Bench Board, Equipment Number 1H13-P601
ML20090M8311 May 1982Quality Improvement Program Status Rept,820501
ML20090M82630 April 1982Quality Confirmation Program Status as of 820430
ML20042C12824 March 1982BWR Control Rod Drive Sys Vessel Inventory Makeup Rate Aspects of NUREG-0619.Safe Shutdown
Reactor Vessel Water Level
Fire Barrier
Earthquake
ML20052B2538 March 1982Seismic Qualification Analysis for Differential Pressure Unit,Itt Barton Model 224.
ML20040H15528 February 1982Amend 17 to Mark II Containment Design Assessment Rept.Safe Shutdown Earthquake
Hydrostatic
Earthquake
ML20004F18830 June 1981Conceptual Design Submittal,Emergency Response Facilities.Health Physics Network
Earthquake
ML20005A80730 June 1981Amend 16 to Mark II Containment Design Assessment Rept
ML19352B24722 June 1981Response to Control of Heavy Loads. Eleven Oversize Drawings Encl.Aperture Cards Will Be in PDRControl of Heavy Loads
ML20004B92331 May 1981Amend 15 to Mark II Containment Design Assessment Rept.Fatigue Rule
ML20003H3241 May 1981Response to NRCs Human Factors Engineering Control Room Design Review/Audit Rept.
ML20003F74321 April 1981NSSS Equipment Qualification Rept.Safe Shutdown
Anchor Darling
Finite Element Analysis
ML20003F73921 April 1981Summary of Equipment Qualification.Safe Shutdown Earthquake
Anchor Darling
Finite Element Analysis
ML20003F73821 April 1981Required Response Spectra Used for Equipment Qualification.Operating Basis Earthquake
Design basis earthquake
Earthquake
ML20003F73621 April 1981to Equipment Qualification Status Rept.
ML19347D90410 April 1981Amend 14 to Mark II Containment Design Assessment Rept.Safe Shutdown Earthquake
Hydrostatic
Operating Basis Earthquake
ML20126F96217 March 1981Ceramic Fiber Blanket Wrap for Fire Protection of Cable Trays & ConduitsSafe Shutdown
ML20002E37120 January 1981Equipment Qualification.Anchor Darling