ML20196A195 | 17 June 1999 | Instrument Drift Analysis | |
ML20196B877 | 16 December 1996 | First Amended & Restated Master Decommissioning Trust Agreement Dtd as of 961231 Between Toledo Edison Co & Mellon Bank | |
ML20196B895 | 16 December 1996 | First Amended & Restated Master Decommissioning Trust Agreement Dtd as of 961216 Between Cleveland Electric Illuminating Co & Mellon Bank | |
ML20134H219 | 18 October 1996 | Application of Acoustic Methodology for Evaluation of Submerged Structures on Mark III Large Passive ECCS Suction Strainer | Hydrostatic |
ML20115J983 | 30 June 1996 | Individual Plant Examination of External Events for Severe Accident Vulnerabilities for Pnpp | Safe Shutdown High winds Fire Barrier Safe Shutdown Earthquake Post Accident Monitoring Internal Flooding Hydrostatic Probabilistic Risk Assessment Operating Basis Earthquake Emergency Lighting Tornado Generated Missile Seismically rugged Exemption Request Earthquake Fire Protection Program Fire Watch Backfit Weak link |
PY-CEI-NRR-2076, Rev 2 to Nonproprietary Version of Controlled Copy of Dose Calculation Data Base for Application of Revised DBA Source Term to CEI Pnpp | 14 June 1996 | Rev 2 to Nonproprietary Version of Controlled Copy of Dose Calculation Data Base for Application of Revised DBA Source Term to CEI Pnpp | |
ML20128L561 | 10 April 1996 | Safety Evaluation Summary Per 10CFR50.59(B)(2) 1994-1996 | Safe Shutdown Packing leak Grab sample Offsite Dose Calculation Manual Fire Barrier Stroke time Tornado Missile Hydrostatic Past operability Fire impairment Nondestructive Examination Temporary Modification Emergency Lighting Feedwater Controller Failure Turbine Missile Fire Protection Program Weak link Unidentified leakage Failure to Scram |
ML20100G011 | 1 February 1996 | Rev 0 to Pnpp EALs Bases Document | Safe Shutdown Time of Discovery High winds Ultimate heat sink Offsite Dose Calculation Manual Earthquake Offsite Circuit Power change Unidentified leakage |
ML20101M985 | 8 August 1995 | Analytical Rept | |
ML20113D169 | 24 July 1995 | Pyrolysis Gas Chromatography Analysis of 5 Thermo-Lag Fire Barriers Samples | Safe Shutdown Fire Barrier |
ML20083C030 | 27 April 1995 | GE Numac Leak Detection Sys Seismic Analysis Summary, for DCP 87-0725 | |
ML20196B787 | 21 April 1995 | Pennsylvania Power Co Master Decommissioning Trust Agreement for Beaver Valley Power Station & Perry Nuclear Power Plant | |
ML20083C019 | 3 March 1995 | GE Numac Leak Detection Sys Emi/Rfi Analysis Rept, for DCP 87-0725 | |
ML20073E968 | 26 September 1994 | Course of Action Progress Rept | Reactor Vessel Water Level High Radiation Area Coatings Temporary Modification Maintenance Rule Program Scaffolding |
ML20210J873 | 7 April 1994 | Detoxification of Clam-Trol CT-4 & CT-1:Daphnia Magna Bioassays | |
ML20059M611 | 15 November 1993 | Rev 0 to Perry Nuclear Power Plant Course of Action | |
ML20196B850 | 1 July 1993 | Ohio Edison Co Master Decommissioning Trust Agreement for Perry Nuclear Power Plant Unit One,Perry Nuclear Power Plant Unit Two,Beaver Valley Power Station Unit One & Beaver Valley Power Station Unit Two | |
ML18010B084 | 5 May 1993 | NRC Licensing Submittal Review of Licensing Conditions Imposed by NUREG-1216. | Safe Shutdown Boric Acid Shutdown Margin Loop seal Stroke time Temporary Modification Stress corrosion cracking Liquid penetrant Overspeed trip |
ML18010A952 | 30 November 1992 | NRC Licensing Submittal Review of Licensing Conditions Imposed by NUREG-1216. | Nondestructive Examination Liquid penetrant |
ML20101J982 | 19 June 1992 | Five-Yr Plan | |
ML20096A892 | 8 May 1992 | Rev 0 to Evaluation of Flaw Indication(S) in Perry Feedwater Nozzle to Safe-End Welds, Summary Technical Rept | |
PY-CEI-NRR-1463, Rev 0 to Evaluation of Flaw Indications in Perry FW Nozzle to Safe-End Welds Extrapolated Beyond RF0-3 | 14 February 1992 | Rev 0 to Evaluation of Flaw Indications in Perry FW Nozzle to Safe-End Welds Extrapolated Beyond RF0-3 | |
ML20092A439 | 31 January 1992 | Rev 0 to N71 Pipe Rupture Evaluation | Finite Element Analysis Scram Discharge Volume |
ML20077G626 | 28 June 1991 | Simulation Facility Certification | |
ML20070Q512 | 7 March 1991 | Rev 1 to Evaluation of Indications in Perry Feedwater Nozzle-to-Safe-End Welds, Summary Technical Rept | |
ML17347B462 | 31 December 1989 | App a to USI A-46 & Generic Ltr 87-02. | Safe Shutdown Safe Shutdown Earthquake Probabilistic Risk Assessment Operating Basis Earthquake Earthquake Backfit |
ML20246D687 | 14 August 1989 | Rev 1 to Criticality Analysis of Byron & Braidwood Station High Density Fuel Racks | |
ML19327B401 | 31 July 1989 | Safety Evaluation for Byron/Braidwood Stations Units 1 & 2 Transition to Westinghouse 17 X 17 Vantage 5 Fuel. | |
ML18008A031 | 31 July 1989 | NTH-TR-01 Decrease in Heat Removal by Secondary Sys. | Safe Shutdown Rod Drop Event |
ML20246D671 | 30 June 1989 | Criticality Analysis of Byron/Braidwood Fresh Fuel Racks | |
ML20247H071 | 30 June 1989 | Description & Verification Summary of Computer Program, Gappipe | Earthquake |
ML20246B203 | 23 June 1989 | Safety Evaluation for Limitorque Motor Operators Motor W/O T-Drains | Boric Acid |
ML20247H079 | 22 June 1989 | App to Description & Verification Summary of Computer Program,Gappipe | |
ML20247N062 | 31 May 1989 | Production Training Dept,Braidwood,Malfunctions & Initial Conditions | |
ML20247K301 | 12 May 1989 | Leak-Before-Break Evaluation for Carbon Steel Piping | Safe Shutdown Earthquake Hydrostatic Finite Element Analysis Earthquake Flow Induced Vibration |
ML20247L184 | 12 May 1989 | Leak-Before-Break Evaluation for Stainless Steel Piping, Byron & Braidwood Nuclear Power Stations Units 1 & 2 | Packing leak Safe Shutdown Earthquake Liquid penetrant Flow Induced Vibration |
ML18094A355 | 30 April 1989 | Assessment of Impacts of Salem & Hope Creek Generating Stations on Kemps Ridley (Lepidochelys Kempi) & Loggerhead (Carretta Caretta) Sea Turtles. | Safe Shutdown Earthquake |
ML20247F132 | 23 March 1989 | Post-Tensioning Sys Evaluation,Callaway Unit 1 Containment & Wolf Creek Unit 1 Containment | |
ML20005G421 | 28 February 1989 | Reactor Vessel Heatup & Cooldown Limit Curves for Normal Operation. | Hydrostatic |
ML17251A481 | 28 February 1989 | Ultrasonic Indication Sizing Technique Development. Related Info Encl | Hydrostatic |
ML20206C745 | 30 November 1988 | ATWS Mitigation Sys Specific Design for Byron/Braidwood Stations, Rev 5 | |
ML20205T750 | 4 November 1988 | Detection & Skin Dose Evaluation for Characteristic X-Ray in Activation Product Contamination | |
ML20206K302 | 31 October 1988 | Rev 1 to Impact of Reg Guide 1.99,Rev 2 on Peach Bottom Atomic Power Station Unit 3 | |
ML20206K310 | 31 October 1988 | Rev 1 to Impact of Reg Guide 1.99,Rev 2 on Limerick Generating Station Unit 1 | |
ML20154N608 | 30 September 1988 | Rev 1 to Identification of Unisolable Piping & Determination of Insp Locations | Nondestructive Examination |
ML20154K209 | 9 September 1988 | Rev 0 to Response to NRC Bulletin 88-005,Nonconforming Matls Supplied by Piping Supplies,Inc at Folsom,Nj & West Jersey Mfg Co.... Proprietary Procedure 1404.1, Leeb Hardness Testing (Equotip).... Encl.Procedure Withheld | |
ML20245B418 | 17 August 1988 | Investigation Rept,Design & Operation of Sampling Sys for Analysis of High Purity Water | Grab sample |
ML17347A797 | 16 June 1988 | Seismic Hazard Data Prepared for Resolution of USI A-46. | Earthquake |
ML17347A798 | 16 June 1988 | Radiological Data Prepared for Resolution of USI A-46. | Safe Shutdown Earthquake Earthquake Backfit |
ML20150F294 | 31 May 1988 | Rev 4 to, ATWS Mitigation Sys Specific Design for Byron/ Braidwood Stations |