ML18066A46731 March 1999Rev 0 to SIR-99-032, Flaw Tolerance & Leakage Evaluation Spent Fuel Pool Heat Exchanger E-53B Nozzle Palisades Nuclear Plant.Safe Shutdown Earthquake
Finite Element Analysis
ML20249C49517 June 1998Rev 1 to EA-GEJ-98-01, Palisades Cycle 14 Disposition of Events ReviewShutdown Margin
Fire Protection Program
Weak link
ML18066A34122 April 1998Rev 0 to EMF-98-013, Palisades Cycle 14:Disposition & Analysis of SRP Chapter 15 Events.Shutdown Margin
Anticipated operational occurrence
Rod Drop Event
Coast down
ML20217C27431 March 1998Independent Review - Is Consumers Energy Method (W Method) of Determining Palisades Nuclear Plant Best Estimate Fluence by Combining Transport Calculation & Dosimetry Measurements Technically Sound & Does It Meet Intent of Pts
ML18065B1645 February 1998Rev 0 to Regression Analysis for Containment Prestressing Sys at 25th Year Surveillance.
ML20197J38918 December 199725th Year Physical Surveillance of Palisades Npp
ML20217C25716 December 1997Review of Neutron Fluence Data for Palisades Reactor Pressure Vessel
ML18067A6359 July 1997Excerpt from Ampacity Evaluation for Open Air Cable Trays W/Percent Fill Greater than 30% of Useable Cross Sectional Area.
ML18067A6389 July 1997Excerpt from Ampacity Evaluation for Continuously Energized Power Cables Routed Through Fire Stops, Revision 1
ML18067A6378 July 1997Excerpt from Ampacity Evaluation for Duct Runs Containing Continuously Energized Power Cables, Revision 1
ML18067A63626 June 1997Excerpt from Ampacity Evaluation for Continuously Energized Power Cables in Open Air Conduits, Revision 1FLEX
ML18066A85831 January 1997Rev 2 to C-PAL-96-1063-01, Operability Assessment for Transient Conditions at Palisades Nuclear Plant in Response to GL 96-06.Loop seal
Coast down
ML18065B04712 July 1996TR on Use of Mcbend Code for Calculation of Neutron Fluences in PVs of Lwrs.
ML18065A75722 May 1996Rev 1 to IPEEE Rept, Per GL 88-20Hot Short
Safe Shutdown
Boric Acid
High winds
Shutdown Margin
Ultimate heat sink
Fire Barrier
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Emergency Lighting
Tornado Generated Missile
Design basis earthquake
Earthquake
Fire Protection Program
Backfit
Weak link
ML20108C1671 April 1996Nonproprietary Version of Fluence Calculations for Palisades Plant
ML18065A59723 March 1996Evaluation of Effects of Fire on West Wall of Turbine Lube Oil Room Adjacent to Pipe Tunnel Between TB & FW Purity Bldg.
ML18065A60122 March 1996Evaluation of Effects of Fire on West Wall of CCW Pump Room (Fire Area 16).Safe Shutdown
Fire Barrier
Fire Protection Program
ML20100D74918 January 1996Rev 0 to Evaluation of Effects of Fire on West Wall of TB Lube Oil Room Adjacent to Pipe Tunnel Between TB & FW Purity BldgSafe Shutdown
Fire Barrier
Fire Protection Program
ML18065A44814 December 1995Radiological Consequences for Palisades Max Hypothetical Accident & Loss of Coolant Accident.
ML18064A83230 June 1995IPE of External Events (Ipeee).Hot Short
Safe Shutdown
Boric Acid
High winds
Shutdown Margin
Ultimate heat sink
Fire Barrier
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Emergency Lighting
Tornado Generated Missile
Design basis earthquake
Earthquake
Fire Protection Program
Backfit
Weak link
ML20085H28023 May 1995Security Investigation Rept
ML18064A78019 May 1995Rept of SQUG Assessment at Palisades Nuclear Plant for Resolution of USI A-46.
ML20078P70227 January 1995Investigative ReptFitness for Duty
ML18064A41222 August 1994Pressure-Temp Curves & LTOP Setpoint Curve for Max Reactor Vessel Fluence of 2.192 X 10^19 Neutrons/cm^2.Stroke time
Hydrostatic
Reverse polarity
ML20070J80015 July 1994Final Rept Containment Sump Check Valves Weld Overlay Repair Implementation Evaluation Palisades Nuclear PlantWeld Overlay
Nondestructive Examination
Liquid penetrant
ML18059B0045 April 1994Rev 1 to EDG Fuel Supply Sys Storage Tank Tornado Protection Overview of EDG Fuel Supply Sys, Incorporating CARB Comments of 940318 & 24Safe Shutdown
Internal Flooding
Tornado Generated Missile
Earthquake
Fire Protection Program
ML20064E5306 March 1994Evaluation of Effectiveness of Code Case N-504-1 Repair for Proposed Root Causes for Containment Sump Suction Check ValvesWeld Overlay
Liquid penetrant
ML20064E4455 March 1994Check Valve Leak Root Cause,Engineering Analysis & Repair/Replacement OptionsSafe Shutdown
Boric Acid
Weld Overlay
Liquid penetrant
ML18059A51631 October 1993Nonproprietary Exam...Sections of Pressurizer PORV Line Safe-End Failure from Palisades Nuclear Generating Station.
ML20058P13631 October 1993Crack Propagation Analysis for Circumferential Cracks in Alloy 600 Nozzle Safe-EndsFinite Element Analysis
ML18059A48225 October 1993Evaluation of Potential Interference Between TE-0102 Nozzle & Thermowell.
ML18059A48325 October 1993Structural Evaluation for Machined Thermawell for TE-0101.
ML20059D88123 October 1993Justification of Weld Mods to Pressurizer Temperature Nozzles for TE-0101 & TE-0102Boric Acid
Hydrostatic
Nondestructive Examination
VT-2
Foreign Material Exclusion
Code Reconciliation
Liquid penetrant
Pressure boundary leak
Scaffolding
ML18059A48122 October 1993Acceptability of Partial Severing of TE-0101 Nozzle.
ML18059A48019 October 1993Structural Analysis of Temperature Nozzle Weld Mods for Consumers Power Palisades Pressurizer.
ML18059A47915 October 1993Half Bead Welding for Mods to TE-0101 & TE-0102.Dissimilar Metal Weld
ML18059A4227 October 1993Pressurizer Safe End Crack Engineering Analysis & Root Cause Evaluation.Nondestructive Examination
Liquid penetrant
ML18059A37531 August 1993Rev 1 to Palisades Cycle 11:Disposition & Analysis of SRP Chapter 15 Events.Shutdown Margin
Anticipated operational occurrence
Rod Drop Event
Fuel cladding
Coast down
ML18059B01931 July 1993Detailed Site Study,Berrien County,Mi, Final Rept
ML18064A42730 June 1993Wind Tunnel Predictions of Control Room Intake Concentrations from Three Sources of Radioactive Materials at Palisades Nuclear Power Plant, (CPP-Project 93-0907)
ML18058B86613 May 1993Resolution of Anchor Bolt Design Issues.Fire Protection Program
ML18058B39121 December 1992Cycle 11:Disposition & Analysis of Standard Review Plan Chapter 15 Events.Shutdown Margin
Anticipated operational occurrence
Rod Drop Event
Fuel cladding
Coast down
ML18058B42830 November 1992Vols 1,2 & 3 of Palisades Nuclear Plant Ipe.Boric Acid
Internal Flooding
ML18058A53916 June 1992Twentieth Yr Physical Surveillance of Palisades Nuclear Plant.
ML20086P8559 December 1991Criticality Safety Analysis for Palisades Spent Fuel Storage Pool NUS Racks
ML20086P8579 December 1991Criticality Safety Analysis for Palisades New Fuel Storage Array
ML18057B35231 October 1991Large Break Loca/Eccs Analysis W/Increased Radial Peaking & Reduced ECCS Flow.Boric Acid
Earthquake
ML18057A85931 March 1991Benchmarking & Validation of In-House DOT Calculation Methodology.
ML20081K77414 August 1990Incore Detector Algorithm (Pidal) Analysis of Quadrant Power Tilt UncertaintiesTemporary Modification
ML18057A26111 June 1990Simulator Certification Submittal.Boric Acid