Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20211H51131 August 1999Non-proprietary Rev 1 to MPR-1820(NP), TMI Nuclear Generating Station OTSG Kinetic Expansion Insp Criteria Analysis
ML20210R47913 August 1999Update 3 to Post-Defueling Monitored Storage SAR, for TMI-2Decommissioning Funding Plan
Fire Protection Program
ML20210K7659 July 1999Rev 2 to 86-5002073-02, Summary Rept for Bwog 20% Tp Loca
ML20212H54918 June 1999Non-proprietary Rev 4 to HI-981983, Licensing Rept for Storage Capacity Expansion of Oyster Creek Spent Fuel PoolSafe Shutdown
High Radiation Area
Safe Shutdown Earthquake
Hydrostatic
Nondestructive Examination
Earthquake
Control of Heavy Loads
Fuel cladding
Liquid penetrant
Overexposure
Depleted uranium
ML20209G00731 March 1999Submittal-Only Screening Review of Three Mile Island,Unit 1 Individual Plant Exam for External Events (Seismic Portion)Ultimate heat sink
Safe Shutdown Earthquake
Internal Flooding
Seismically rugged
Earthquake
Weak link
ML20237D56931 August 1998Rev 0 to MPR-1957, Design Submittal for Oyster Creek Core Plate Wedge Modification
ML20237D57118 August 1998Rev 0 to SE-000222-002, Core Plate Wedge InstallationInternal Flooding
Foreign Material Exclusion
Liquid penetrant
Flow Induced Vibration
ML20236W9969 June 19981998 Quadrennial Simulator Certification Rept
ML20247F1895 May 1998Risk Evaluation of Post-LOCA Containment Overpressure RequestProbabilistic Risk Assessment
Containment Hardened Vent
Hardened vent
ML20151Y46531 March 1998Non-proprietary Version of Rev 1 to GENE-E21-00143, ECCS Suction Strainer Hydraulic Sizing Rept
ML20210P44631 August 1997Update 2 to TMI-2 Post-Defueling Monitored Storage Sar
ML20210T34131 August 1997Rev 0 to TMI Nuclear Generating Station OTSG Kinetic Expansion Insp Criteria Analysis
ML20199E58418 August 1997Limited Liability Company Agreement of Amergen Energy Co, LLC Among PECO Energy Co,British Energy PLC & British Energy,Inc
ML20217G0482 January 1997Rev 0 to Risk Assessment of Deferred Oyster Creek ProjectsHot Short
Safe Shutdown
Fire Barrier
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Large early release frequency
Operability Determination
Severe Accident Management Guideline
Fire Protection Program
ML20133D87723 December 1996Rev 2 to TMI-1 Evaluation of Thermo-Lag Fire BarriersSafe Shutdown
Fire Barrier
Exemption Request
Fire Protection Program
ML20133A79020 December 1996Volumes 1 & 2 to Plant Referenced Simulator CertificationShutdown Margin
Half scram
Stroke time
Met Tower
Temporary Modification
Squib
Main transformer failure
Scram Discharge Volume
Overtravel
Hardened vent
Fuel cladding
Coast down
ML20134C8854 October 1996Core Spray Sys Insp Program -16REVT-1
ML20137F13027 August 1996Rev 0 to Auxiliary Bldg Sump Sludge Prevention (Regulatory Required)Fire Barrier
Coatings
ML20248D11231 July 1996Development of Equipment Seismic Fragilities for OCNGS Ipeee
ML20117E73331 July 1996Pressure-Temp Curves Per RG 1.99,Rev 2 for OncppHydrostatic
ML20117H66220 July 1996Rev 1 to TR 094 TMI-1 Evaluation of Thermo-Lag Fire BarriersSafe Shutdown
Fire Barrier
Exemption Request
Fire Protection Program
ML20129G92917 June 1996TMI-1 Reload Design & Setpoint MethodologyShutdown Margin
Anticipated operational occurrence
Fuel cladding
ML20117J0498 May 1996At&T Round Cell Nuclear Util User'S Council Charter
ML20117F10411 April 1996Response to NRC GL 95-07 Pressure Locking & Thermal Binding of Safety Related Power Operated Gate ValvesSafe Shutdown
Stroke time
Power-Operated Valves
ML20148F0612 April 1996Rev 0 to SQ-TI-EG-T-0001B-1, EDG 1B Air Start 1 Reservior
ML20148F0832 April 1996Rev 0 to EDG 1B Air Start 2 Reservoir Tank
ML20101L8041 March 1996USI A-46 Seismic Evaluation ReptSafe Shutdown
Shutdown Margin
Ultimate heat sink
Fire Barrier
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Coatings
Finite Element Analysis
FLEX
Scram Discharge Volume
Excess Flow Check Valve
Earthquake
Power Operated Valves
Backfit
Failure to Scram
ML20098B12919 September 1995Rev 1 to Pages 3 & 30 of TMI-1 USI A-46 Seismic Evaluation ReptSafe Shutdown
ML20140B30416 August 1995Rev 2 to Removal of Ice Condenser Vent Rod & Containment Spray/E5 Water Heat Exchanger Monitoring Sys
ML20100L65825 May 1995Div 1/2 Mod Design Description for New TMI-1 Radwaste Demineralizer Sys Three Mile Island Unit 1,Nuclear Generating Station, Rev 2High Radiation Area
Earthquake
ML20087J52811 May 1995Nonproprietary Page 2 of TMI Unit 1 USI A-46 Seismic Evaluation Rept
ML20082G41922 March 1995Rev 0 to Topical Rept 093, TMI-1 Reactor Bldg Twenty Yr Tendon Surveillance (Insp Period 6)
ML20082Q80510 March 1995TMI-1 Core Thermal-Hydraulic Methodology Using VIPRE-01 Computer CodeShutdown Margin
Coast down
ML20082G44422 February 1995Vols I & II 20th Yr Physical Surveillance of TMI-1 Containment Bldg
ML20248D04931 December 1994Assessment of Potential for Liquefaction & Permanent Ground Displacements at Designated Facilities,Oyster Creek Nuclear Generating Station
ML20078E5789 November 1994Rev 0 to Safety Evaluation SE-403037-001, Reactor Vessel Shroud RepairSafe Shutdown
Anticipated operational occurrence
Safe Shutdown Earthquake
Internal Flooding
Design basis earthquake
Flow Induced Vibration
ML20248D09031 October 1994Seismic Fragilities of Civil Structures at Oyster Creek Nuclear Generating StationHydrostatic
Probabilistic Risk Assessment
Earthquake
Weak link
ML20100L6323 August 1994Shipment of Miscellaneous Waste Evaporator ConcentratesInternal Flooding
Process Control Program
ML20069M8312 June 1994Considerations Associated W/Changing Electromatic Relief Valve (EMRV) SetpointsSafe Shutdown
Weld Overlay
Coatings
Feedwater Controller Failure
Operability Determination
Exemption Request
Fuel cladding
ML20059M21830 November 1993Amend 19 to Pdms Sar
ML20148F10128 October 1993Rev 0 to Air Accumulator for FW-V-16B
ML20148F09328 October 1993Rev 0 to Air Accumulator for FW-V-16A
ML20058E26020 September 1993Addl Stress Info for Drywell Shield Wall from Structural Evaluation of Spent Fuel Pool
ML20059F04731 August 1993Amend 18 to Post-Defueling Monitored Storage (Pdms) Sar. W/Rev 2 to List of Pdms Requirements & Commitments
ML20056E59231 July 1993Conservative Design In-Structure Response Spectra for Resolution of USI A-46 for Tmi,Unit 1Safe Shutdown Earthquake
Operating Basis Earthquake
ML20059H95830 June 1993Design Criteria for Soil-Structure Interaction Analysis of Reactor/Containment Bldg at Gpun Oyster Creek Nuclear Generating StationSafe Shutdown Earthquake
Earthquake
ML20012G60526 February 1993Referenced Simulator Certification Suppl Rept.
ML20059D7357 February 1993Review of Offsite Response to Site Area Emergency Incident at Three Mile Island Nuclear StationSafe Shutdown
Minimum staff
ML20126D28318 December 1992Criticality SAR for TMI-2 Reactor Vessel
ML20125A99730 November 1992Rev 2 to Drf 00664 Index 9-4, ASME Section Viii Evaluation of Oyster Creek Drywell for W/O Sand Case,Part 2,Stability Analysis