ML20211H511 | 31 August 1999 | Non-proprietary Rev 1 to MPR-1820(NP), TMI Nuclear Generating Station OTSG Kinetic Expansion Insp Criteria Analysis | |
ML20210R479 | 13 August 1999 | Update 3 to Post-Defueling Monitored Storage SAR, for TMI-2 | Decommissioning Funding Plan Fire Protection Program |
ML20210K765 | 9 July 1999 | Rev 2 to 86-5002073-02, Summary Rept for Bwog 20% Tp Loca | |
ML20212H549 | 18 June 1999 | Non-proprietary Rev 4 to HI-981983, Licensing Rept for Storage Capacity Expansion of Oyster Creek Spent Fuel Pool | Safe Shutdown High Radiation Area Safe Shutdown Earthquake Hydrostatic Nondestructive Examination Earthquake Control of Heavy Loads Fuel cladding Liquid penetrant Overexposure Depleted uranium |
ML20209G007 | 31 March 1999 | Submittal-Only Screening Review of Three Mile Island,Unit 1 Individual Plant Exam for External Events (Seismic Portion) | Ultimate heat sink Safe Shutdown Earthquake Internal Flooding Seismically rugged Earthquake Weak link |
ML20237D569 | 31 August 1998 | Rev 0 to MPR-1957, Design Submittal for Oyster Creek Core Plate Wedge Modification | |
ML20237D571 | 18 August 1998 | Rev 0 to SE-000222-002, Core Plate Wedge Installation | Internal Flooding Foreign Material Exclusion Liquid penetrant Flow Induced Vibration |
ML20236W996 | 9 June 1998 | 1998 Quadrennial Simulator Certification Rept | |
ML20247F189 | 5 May 1998 | Risk Evaluation of Post-LOCA Containment Overpressure Request | Probabilistic Risk Assessment Containment Hardened Vent Hardened vent |
ML20151Y465 | 31 March 1998 | Non-proprietary Version of Rev 1 to GENE-E21-00143, ECCS Suction Strainer Hydraulic Sizing Rept | |
ML20210P446 | 31 August 1997 | Update 2 to TMI-2 Post-Defueling Monitored Storage Sar | |
ML20210T341 | 31 August 1997 | Rev 0 to TMI Nuclear Generating Station OTSG Kinetic Expansion Insp Criteria Analysis | |
ML20199E584 | 18 August 1997 | Limited Liability Company Agreement of Amergen Energy Co, LLC Among PECO Energy Co,British Energy PLC & British Energy,Inc | |
ML20217G048 | 2 January 1997 | Rev 0 to Risk Assessment of Deferred Oyster Creek Projects | Hot Short Safe Shutdown Fire Barrier Safe Shutdown Earthquake Probabilistic Risk Assessment Large early release frequency Operability Determination Severe Accident Management Guideline Fire Protection Program |
ML20133D877 | 23 December 1996 | Rev 2 to TMI-1 Evaluation of Thermo-Lag Fire Barriers | Safe Shutdown Fire Barrier Exemption Request Fire Protection Program |
ML20133A790 | 20 December 1996 | Volumes 1 & 2 to Plant Referenced Simulator Certification | Shutdown Margin Half scram Stroke time Met Tower Temporary Modification Squib Main transformer failure Scram Discharge Volume Overtravel Hardened vent Fuel cladding Coast down |
ML20134C885 | 4 October 1996 | Core Spray Sys Insp Program -16R | EVT-1 |
ML20137F130 | 27 August 1996 | Rev 0 to Auxiliary Bldg Sump Sludge Prevention (Regulatory Required) | Fire Barrier Coatings |
ML20248D112 | 31 July 1996 | Development of Equipment Seismic Fragilities for OCNGS Ipeee | |
ML20117E733 | 31 July 1996 | Pressure-Temp Curves Per RG 1.99,Rev 2 for Oncpp | Hydrostatic |
ML20117H662 | 20 July 1996 | Rev 1 to TR 094 TMI-1 Evaluation of Thermo-Lag Fire Barriers | Safe Shutdown Fire Barrier Exemption Request Fire Protection Program |
ML20129G929 | 17 June 1996 | TMI-1 Reload Design & Setpoint Methodology | Shutdown Margin Anticipated operational occurrence Fuel cladding |
ML20117J049 | 8 May 1996 | At&T Round Cell Nuclear Util User'S Council Charter | |
ML20117F104 | 11 April 1996 | Response to NRC GL 95-07 Pressure Locking & Thermal Binding of Safety Related Power Operated Gate Valves | Safe Shutdown Stroke time Power-Operated Valves |
ML20148F061 | 2 April 1996 | Rev 0 to SQ-TI-EG-T-0001B-1, EDG 1B Air Start 1 Reservior | |
ML20148F083 | 2 April 1996 | Rev 0 to EDG 1B Air Start 2 Reservoir Tank | |
ML20101L804 | 1 March 1996 | USI A-46 Seismic Evaluation Rept | Safe Shutdown Shutdown Margin Ultimate heat sink Fire Barrier Safe Shutdown Earthquake Probabilistic Risk Assessment Coatings Finite Element Analysis FLEX Scram Discharge Volume Excess Flow Check Valve Earthquake Power Operated Valves Backfit Failure to Scram |
ML20098B129 | 19 September 1995 | Rev 1 to Pages 3 & 30 of TMI-1 USI A-46 Seismic Evaluation Rept | Safe Shutdown |
ML20140B304 | 16 August 1995 | Rev 2 to Removal of Ice Condenser Vent Rod & Containment Spray/E5 Water Heat Exchanger Monitoring Sys | |
ML20100L658 | 25 May 1995 | Div 1/2 Mod Design Description for New TMI-1 Radwaste Demineralizer Sys Three Mile Island Unit 1,Nuclear Generating Station, Rev 2 | High Radiation Area Earthquake |
ML20087J528 | 11 May 1995 | Nonproprietary Page 2 of TMI Unit 1 USI A-46 Seismic Evaluation Rept | |
ML20082G419 | 22 March 1995 | Rev 0 to Topical Rept 093, TMI-1 Reactor Bldg Twenty Yr Tendon Surveillance (Insp Period 6) | |
ML20082Q805 | 10 March 1995 | TMI-1 Core Thermal-Hydraulic Methodology Using VIPRE-01 Computer Code | Shutdown Margin Coast down |
ML20082G444 | 22 February 1995 | Vols I & II 20th Yr Physical Surveillance of TMI-1 Containment Bldg | |
ML20248D049 | 31 December 1994 | Assessment of Potential for Liquefaction & Permanent Ground Displacements at Designated Facilities,Oyster Creek Nuclear Generating Station | |
ML20078E578 | 9 November 1994 | Rev 0 to Safety Evaluation SE-403037-001, Reactor Vessel Shroud Repair | Safe Shutdown Anticipated operational occurrence Safe Shutdown Earthquake Internal Flooding Design basis earthquake Flow Induced Vibration |
ML20248D090 | 31 October 1994 | Seismic Fragilities of Civil Structures at Oyster Creek Nuclear Generating Station | Hydrostatic Probabilistic Risk Assessment Earthquake Weak link |
ML20100L632 | 3 August 1994 | Shipment of Miscellaneous Waste Evaporator Concentrates | Internal Flooding Process Control Program |
ML20069M831 | 2 June 1994 | Considerations Associated W/Changing Electromatic Relief Valve (EMRV) Setpoints | Safe Shutdown Weld Overlay Coatings Feedwater Controller Failure Operability Determination Exemption Request Fuel cladding |
ML20059M218 | 30 November 1993 | Amend 19 to Pdms Sar | |
ML20148F101 | 28 October 1993 | Rev 0 to Air Accumulator for FW-V-16B | |
ML20148F093 | 28 October 1993 | Rev 0 to Air Accumulator for FW-V-16A | |
ML20058E260 | 20 September 1993 | Addl Stress Info for Drywell Shield Wall from Structural Evaluation of Spent Fuel Pool | |
ML20059F047 | 31 August 1993 | Amend 18 to Post-Defueling Monitored Storage (Pdms) Sar. W/Rev 2 to List of Pdms Requirements & Commitments | |
ML20056E592 | 31 July 1993 | Conservative Design In-Structure Response Spectra for Resolution of USI A-46 for Tmi,Unit 1 | Safe Shutdown Earthquake Operating Basis Earthquake |
ML20059H958 | 30 June 1993 | Design Criteria for Soil-Structure Interaction Analysis of Reactor/Containment Bldg at Gpun Oyster Creek Nuclear Generating Station | Safe Shutdown Earthquake Earthquake |
ML20012G605 | 26 February 1993 | Referenced Simulator Certification Suppl Rept. | |
ML20059D735 | 7 February 1993 | Review of Offsite Response to Site Area Emergency Incident at Three Mile Island Nuclear Station | Safe Shutdown Minimum staff |
ML20126D283 | 18 December 1992 | Criticality SAR for TMI-2 Reactor Vessel | |
ML20125A997 | 30 November 1992 | Rev 2 to Drf 00664 Index 9-4, ASME Section Viii Evaluation of Oyster Creek Drywell for W/O Sand Case,Part 2,Stability Analysis |