Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20207E801 | 19 May 1999 | Non-proprietary Rev 2 to HI-981933, Design & Licensing Rept DBNPS Unit 1 Cask Pit Rack Installation Project | High Radiation Area Hydrostatic Nondestructive Examination Earthquake Control of Heavy Loads Fuel cladding Liquid penetrant Depleted uranium |
ML20205K578 | 31 December 1998 | Waterhammer Phenomena in Containment Air Cooler Swss | |
ML20217P804 | 7 April 1998 | 11RFO OTSG ECT Insp Scope | |
ML20196B877 | 16 December 1996 | First Amended & Restated Master Decommissioning Trust Agreement Dtd as of 961231 Between Toledo Edison Co & Mellon Bank | |
ML20196B895 | 16 December 1996 | First Amended & Restated Master Decommissioning Trust Agreement Dtd as of 961216 Between Cleveland Electric Illuminating Co & Mellon Bank | |
ML20134D782 | 8 May 1996 | Rev 1 to Instrument Drift Data Analysis Methodology & Assumptions | Safe Shutdown Post Accident Monitoring Condition Adverse to Quality |
ML20091S431 | 31 August 1995 | USI A-46 Seismic Evaluation Rept. W/61 Oversize Drawings | Safe Shutdown Boric Acid High Radiation Area Ultimate heat sink Mission time Safe Shutdown Earthquake Probabilistic Risk Assessment Coatings Finite Element Analysis Condition Adverse to Quality Earthquake Backfit |
ML20138J141 | 28 February 1994 | Rev 0 to IPEEE,A-46 & Design In-Structure Response Spectra for Selected Bldgs at Dbnps | |
ML20067D331 | 31 August 1993 | Technical Evaluation Rept,Evaluation of B&Wog Pressurizer Surge Line Thermal Stratification Program to Address NRC Bulletin 88-11 | Finite Element Analysis |
ML20091P572 | 31 October 1991 | Reactor Containment Bldg Integrated Leak Rate Test Including,Type A,B & C Periodic Test Results | |
ML20070Q191 | 25 March 1991 | NRC Form 474 Simulation Facility Certification | Shutdown Margin Stroke time Post Accident Monitoring Fuel cladding |
ML20058L189 | 1 August 1990 | Dcrdr Human Engineering Discrepancy Repts 1988 Summary Addendum 1,Vol 1 | |
ML20006E367 | 11 January 1990 | Toledo Edison Co Mark-BZ Fuel Assembly Seismic & LOCA Analysis. | Safe Shutdown Earthquake Earthquake |
ML20094J084 | 8 December 1989 | Investigation of Acoustic Leak Monitoring for NRC Region Iii. Info Partially Deleted | VT-2 Through-Wall Leak |
ML19324C176 | 30 October 1989 | Hpi/Makeup Nozzle Weld Overlay Repair Contingency Plan. | Weld Overlay |
ML19327B016 | 11 October 1989 | Cycle 7 LOCA Limits. | |
ML20245K675 | 2 August 1989 | Rev 2 to Review 18 Month PM Items for Diesel Generator & Evaluate Extension to 30 Months | Reverse polarity |
ML20151Z194 | 11 August 1988 | Rept on Reactor Vessel Continuous Vent Line Performance, | |
ML20234F250 | 6 January 1988 | Rev 3 to App R Compliance Assessmemt Rept | Safe Shutdown Fire Barrier |
ML20147C085 | 1 December 1987 | Fifth Refueling Outage Executive Summary. Related Documents Encl | |
ML20237J978 | 24 August 1987 | Performance Indicators for Davis-Besse Nuclear Power Station,Salp 6,Weekly Rept 3 for Period Ending 870824 | |
ML20214J189 | 5 May 1987 | Rev 2 to App R Compliance Assessment Rept | Hot Short Safe Shutdown Boric Acid Shutdown Margin Ultimate heat sink Fire Barrier Emergency Lighting FLEX Exemption Request Fire Protection Program |
ML20206J500 | 31 March 1987 | Dcrdr Special Study Plans for Davis-Besse | Post Accident Monitoring Emergency Lighting |
ML20212G746 | 7 January 1987 | Rept of Emergency Evacuation Review Team on Emergency Response Plans for Perry & Davis-Besse Nuclear Power Plants | Probabilistic Risk Assessment Earthquake Chernobyl |
ML20214E076 | 17 November 1986 | Auxiliary Feedwater Calculation Summary | |
ML20211E065 | 26 September 1986 | Transient Assessment Program Rept,Davis-Besse Unit 1 Reactor Trip on High Flux,840302 | |
ML20214T750 | 11 September 1986 | DB Small-Break LOCA Analysis Assumptions Evaluation | |
ML20154Q653 | 28 February 1986 | Westinghouse Owners Group Position on Davis-Besse Event | Probabilistic Risk Assessment Weak link |
ML20141E669 | 30 November 1985 | B&W Owners Group Action Plan for Review of 850609 Davis-Besse Transient | Unanalyzed Condition High Radiation Area |
ML20138H489 | 25 November 1985 | Rev 17 to Seismic Category I Piping Sys Support & Hanger Discrepancies | |
ML20136H095 | 15 November 1985 | Revised Davis-Besse Reactor Protection Sys Single Failure Analysis | Post Accident Monitoring |
ML20137H397 | 12 November 1985 | Rev 16 to Seismic Category I Piping Sys Support & Hanger Discrepancies Summary Rept | |
ML20137S903 | 29 October 1985 | Toledo Edison Davis-Besse Nuclear Power Station Unit 1 Seismic Category I Piping Sys Support & Hanger Discrepancies,Summary Rept | |
ML20209H586 | 28 October 1985 | Rev 3 to Course of Action | |
ML20137S824 | 22 October 1985 | Rev 14 to Seismic Category I Piping Sys & Hanger Discrepancies,Summary Rept | |
ML20209H648 | 15 October 1985 | Rev 3 to Auxiliary Feedwater Pump Turbine Overspeed Trip Throttle Valve Problem | Scaffolding |
ML20138J481 | 15 October 1985 | Seismic Category I Piping Sys Support & Hanger Discrepancies | |
ML20133M991 | 8 October 1985 | Rev 12 to Seismic Category I Piping Sys Support & Hanger Discrepancies,Summary Rept | |
ML20133K988 | 4 October 1985 | Independent Mgt Assessment of Toledo Edison Davis-Besse QA Program | Nondestructive Examination |
ML20138A941 | 24 September 1985 | Rev 10 to Safety-Related Piping Sys Support & Hanger Discrepancies, Summary Rept | |
ML20132E447 | 17 September 1985 | Rev 9 to Safety-Related Piping Sys Support & Hanger Discrepancies, Summary Rept | |
ML20137C302 | 9 September 1985 | Toledo Edison Co Davis-Besse Nuclear Power Station Course of Action Rept | |
ML20137M543 | 9 September 1985 | Vols 1 & 2 of Davis-Besse Course of Action | Probabilistic Risk Assessment Temporary Modification Systematic Assessment of Licensee Performance Scaffolding |
ML20135D742 | 3 September 1985 | Rev 7 to Safety-Related Piping Sys Support & Hanger Discrepancies, Summary Rept | |
ML20133K994 | 30 August 1985 | Rept of Assessment of Actions at Davis-Besse Resulting from 850609 Loss of Feedwater Event | Stroke time Earthquake |
ML20134Q016 | 27 August 1985 | Rev 6 to Safety-Related Piping Sys Support & Hanger Discrepancies, Summary Rept | |
ML20137U306 | 16 August 1985 | Rev 5 to Safety-Related Piping Sys Support & Hanger Discrepancies, Summary Rept | |
ML20134B837 | 9 August 1985 | Rev 4 to Safety-Related Piping Sys Support & Hangar Discrepancies, Summary Rept | |
ML20133M326 | 26 July 1985 | Rev 3 to Safety-Related Piping Sys Support & Hanger Discrepancies,Summary Rept | |
ML20126L902 | 5 July 1985 | Rev 1 to Action Plans 5,6 & 7, Steam & Feedwater Rupture Control Sys Trip/Msiv Closure |