Rev 6 to Safety-Related Piping Sys Support & Hanger Discrepancies, Summary ReptML20134Q016 |
Person / Time |
---|
Site: |
Davis Besse |
---|
Issue date: |
08/27/1985 |
---|
From: |
TOLEDO EDISON CO. |
---|
To: |
|
---|
Shared Package |
---|
ML20134Q013 |
List: |
---|
References |
---|
NUDOCS 8509090132 |
Download: ML20134Q016 (15) |
|
|
---|
Category:GENERAL EXTERNAL TECHNICAL REPORTS
MONTHYEARML20207E8011999-05-19019 May 1999 Non-proprietary Rev 2 to HI-981933, Design & Licensing Rept DBNPS Unit 1 Cask Pit Rack Installation Project ML20205K5781998-12-31031 December 1998 Waterhammer Phenomena in Containment Air Cooler Swss ML20217P8041998-04-0707 April 1998 11RFO OTSG ECT Insp Scope ML20196B8771996-12-16016 December 1996 First Amended & Restated Master Decommissioning Trust Agreement Dtd as of 961231 Between Toledo Edison Co & Mellon Bank ML20196B8951996-12-16016 December 1996 First Amended & Restated Master Decommissioning Trust Agreement Dtd as of 961216 Between Cleveland Electric Illuminating Co & Mellon Bank ML20134D7821996-05-0808 May 1996 Rev 1 to Instrument Drift Data Analysis Methodology & Assumptions ML20091S4311995-08-31031 August 1995 USI A-46 Seismic Evaluation Rept. W/61 Oversize Drawings ML20138J1411994-02-28028 February 1994 Rev 0 to IPEEE,A-46 & Design In-Structure Response Spectra for Selected Bldgs at Dbnps ML20067D3311993-08-31031 August 1993 Technical Evaluation Rept,Evaluation of B&Wog Pressurizer Surge Line Thermal Stratification Program to Address NRC Bulletin 88-11 ML20091P5721991-10-31031 October 1991 Reactor Containment Bldg Integrated Leak Rate Test Including,Type A,B & C Periodic Test Results ML20070Q1911991-03-25025 March 1991 NRC Form 474 Simulation Facility Certification ML20058L1891990-08-0101 August 1990 Dcrdr Human Engineering Discrepancy Repts 1988 Summary Addendum 1,Vol 1 ML20006E3671990-01-11011 January 1990 Toledo Edison Co Mark-BZ Fuel Assembly Seismic & LOCA Analysis. ML20094J0841989-12-0808 December 1989 Investigation of Acoustic Leak Monitoring for NRC Region Iii. Info Partially Deleted ML19324C1761989-10-30030 October 1989 Hpi/Makeup Nozzle Weld Overlay Repair Contingency Plan. ML19327B0161989-10-11011 October 1989 Cycle 7 LOCA Limits. ML20245K6751989-08-0202 August 1989 Rev 2 to Review 18 Month PM Items for Diesel Generator & Evaluate Extension to 30 Months ML20151Z1941988-08-11011 August 1988 Rept on Reactor Vessel Continuous Vent Line Performance, ML20234F2501988-01-0606 January 1988 Rev 3 to App R Compliance Assessmemt Rept ML20147C0851987-12-0101 December 1987 Fifth Refueling Outage Executive Summary. Related Documents Encl ML20237J9781987-08-24024 August 1987 Performance Indicators for Davis-Besse Nuclear Power Station,Salp 6,Weekly Rept 3 for Period Ending 870824 ML20214J1891987-05-0505 May 1987 Rev 2 to App R Compliance Assessment Rept ML20206J5001987-03-31031 March 1987 Dcrdr Special Study Plans for Davis-Besse ML20212G7461987-01-0707 January 1987 Rept of Emergency Evacuation Review Team on Emergency Response Plans for Perry & Davis-Besse Nuclear Power Plants ML20214E0761986-11-17017 November 1986 Auxiliary Feedwater Calculation Summary ML20211E0651986-09-26026 September 1986 Transient Assessment Program Rept,Davis-Besse Unit 1 Reactor Trip on High Flux,840302 ML20214T7501986-09-11011 September 1986 DB Small-Break LOCA Analysis Assumptions Evaluation ML20154Q6531986-02-28028 February 1986 Westinghouse Owners Group Position on Davis-Besse Event ML20141E6691985-11-30030 November 1985 B&W Owners Group Action Plan for Review of 850609 Davis-Besse Transient ML20138H4891985-11-25025 November 1985 Rev 17 to Seismic Category I Piping Sys Support & Hanger Discrepancies ML20136H0951985-11-15015 November 1985 Revised Davis-Besse Reactor Protection Sys Single Failure Analysis ML20137H3971985-11-12012 November 1985 Rev 16 to Seismic Category I Piping Sys Support & Hanger Discrepancies Summary Rept ML20137S9031985-10-29029 October 1985 Toledo Edison Davis-Besse Nuclear Power Station Unit 1 Seismic Category I Piping Sys Support & Hanger Discrepancies,Summary Rept ML20209H5861985-10-28028 October 1985 Rev 3 to Course of Action ML20137S8241985-10-22022 October 1985 Rev 14 to Seismic Category I Piping Sys & Hanger Discrepancies,Summary Rept ML20209H6481985-10-15015 October 1985 Rev 3 to Auxiliary Feedwater Pump Turbine Overspeed Trip Throttle Valve Problem ML20138J4811985-10-15015 October 1985 Seismic Category I Piping Sys Support & Hanger Discrepancies ML20133M9911985-10-0808 October 1985 Rev 12 to Seismic Category I Piping Sys Support & Hanger Discrepancies,Summary Rept ML20133K9881985-10-0404 October 1985 Independent Mgt Assessment of Toledo Edison Davis-Besse QA Program ML20138A9411985-09-24024 September 1985 Rev 10 to Safety-Related Piping Sys Support & Hanger Discrepancies, Summary Rept ML20132E4471985-09-17017 September 1985 Rev 9 to Safety-Related Piping Sys Support & Hanger Discrepancies, Summary Rept ML20137C3021985-09-0909 September 1985 Toledo Edison Co Davis-Besse Nuclear Power Station Course of Action Rept ML20137M5431985-09-0909 September 1985 Vols 1 & 2 of Davis-Besse Course of Action ML20135D7421985-09-0303 September 1985 Rev 7 to Safety-Related Piping Sys Support & Hanger Discrepancies, Summary Rept ML20133K9941985-08-30030 August 1985 Rept of Assessment of Actions at Davis-Besse Resulting from 850609 Loss of Feedwater Event ML20134Q0161985-08-27027 August 1985 Rev 6 to Safety-Related Piping Sys Support & Hanger Discrepancies, Summary Rept ML20137U3061985-08-16016 August 1985 Rev 5 to Safety-Related Piping Sys Support & Hanger Discrepancies, Summary Rept ML20134B8371985-08-0909 August 1985 Rev 4 to Safety-Related Piping Sys Support & Hangar Discrepancies, Summary Rept ML20133M3261985-07-26026 July 1985 Rev 3 to Safety-Related Piping Sys Support & Hanger Discrepancies,Summary Rept ML20126L9021985-07-0505 July 1985 Rev 1 to Action Plans 5,6 & 7, Steam & Feedwater Rupture Control Sys Trip/Msiv Closure 1999-05-19
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217K1231999-10-14014 October 1999 Revised Positions for DBNPS & Pnpp QA Program ML20217D5441999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Davis-Besse Nuclear Power Station.With ML20211R0811999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Davis-Besse Nuclear Power Station,Unit 1.With ML20211B0271999-08-13013 August 1999 SER Accepting Second 10-year Interval Inservice Insp Requests for Relief RR-A16,RR-A17 & RR-B9 for Plant, Unit 1 ML20210Q8541999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Davis-Besse Nuclear Power Station,Unit 1.With ML20209E6231999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Davis-Besse Nuclear Power Station,Unit 1.With ML20195K2871999-06-16016 June 1999 Safety Evaluation Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20195F4871999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Davis-Besse Nuclear Power Station,Unit 1.With ML20207E8011999-05-19019 May 1999 Non-proprietary Rev 2 to HI-981933, Design & Licensing Rept DBNPS Unit 1 Cask Pit Rack Installation Project ML20207F4351999-05-0404 May 1999 Rev 1 to DBNPS Emergency Preparedness Evaluated Exercise Manual 990504 ML20206M6341999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Davis-Besse Nuclear Station,Unit 1.With ML20205M2931999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Davis-Besse Nuclear Power Station.With ML20207J1461999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Davis-Besse Nuclear Power Station,Unit 1.With ML20199H5931999-01-20020 January 1999 Safety Evaluation Accepting Thermo-Lag Re Ampacity Derating Issues for Plant ML20204J6751998-12-31031 December 1998 1998 Annual Rept for Dbnps,Unit 1,PNPP,Unit 1 & BVPS Units 1 & 2 ML20199E2501998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Davis-Besse Nuclear Power Station,Unit 1.With ML20206B0101998-12-31031 December 1998 1998 Annual Rept for Firstenergy Corp, for Perry Nuclear Power Plant & Davis-Besse Nuclear Power Station.Form 10-K Annual Rept to Us Securities & Exchange Commission for Fiscal Yr Ending 981231,encl ML20205K5781998-12-31031 December 1998 Waterhammer Phenomena in Containment Air Cooler Swss ML20197J3441998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Davis-Besse Nuclear Power Station,Unit 1.With ML20195D0001998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Davis-Besse Nuclear Power Station,Unit 1.With ML20155B6781998-10-28028 October 1998 Safety Evaluation Accepting Proposed Reduction in Commitment Changes in QA Program Matl Receipt Insp Process ML20154H5801998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Davis-Besse Nuclear Power Station,Unit 1.With ML20151W1611998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Dbnps.With ML20237E3171998-08-21021 August 1998 ISI Summary Rept of Eleventh Refueling Outage Activities for Davis-Besse Nuclear Power Station ML20237B1681998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Davis-Besse Nuclear Power Station,Unit 1 ML20236U5011998-07-23023 July 1998 Special Rept:On 980624,Unit 1 Site Damaged by Tornado & High Winds.Alert Declared by DBNPS Staff,Dbnps Emergency Response Facilities Activiated & Special Insp Team Deployed to Site by Nrc,As Result of Event ML20236R1441998-07-15015 July 1998 SER Related to Quality Assurance Program Description Changes for Davis-Besse Nuclear Power Station,Unit 1 ML20236N7451998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Davis-Besse Nuclear Power Station,Unit 1 ML20236K3981998-06-30030 June 1998 SER Accepting in Part & Denying in Part Relief Requests from Some of ASME Section XI Requirements as Endorsed by 10CFR50.55a for Containment Insp for Davis-Besse Nuclear Power Station,Unit 1 ML20236K5131998-06-29029 June 1998 Safety Evaluation Accepting Proposed Alternate Emergency Operations Facility Location for Davis-Besse Nuclear Power Station,Unit 1 ML20248F7441998-05-31031 May 1998 Reactor Vessel Working Group,Response to RAI Regarding Reactor Pressure Vessel Integrity ML20249A4121998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Davis-Besse Nuclear Power Station,Unit 1 ML20196B5221998-05-23023 May 1998 10CFR50.59 Summary Rept of Facility Changes,Tests & Experiments Dbnps,Unit 1 for 960602-980523 ML20236E7581998-05-19019 May 1998 Rev 0 to Davis-Besse Unit 1 Cycle 12 Colr ML20236N7501998-04-30030 April 1998 Rev 2 to Monthly Operating Rept for Apr 1998 for Davis-Besse Nuclear Power Station,Unit ML20247F6721998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Davis-Bess Nuclear Power Station,Unit 1 ML20249A4141998-04-30030 April 1998 Revised Monthly Operating Rept for Apr 1998 for Davis-Besse Nuclear Power Station,Unit 1 ML20217P8041998-04-0707 April 1998 11RFO OTSG ECT Insp Scope ML20216B4041998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Davis-Besse Nuclear Power Station,Unit 1 ML20216C5131998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Davis-Besse Nuclear Power Station,Unit 1 ML20202D3721998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Davis-Besse Nuclear Power Station,Unit 1 ML20199G6321998-01-26026 January 1998 Rev 1 to Davis-Besse Unit 1,Cycle 11,COLR ML20198R4771998-01-13013 January 1998 SER Approving Second 10-year Interval Inservice Inspection Program Plan Requests for Relief for Davis-Besse Nuclear Power Station,Unit 1 ML20198K7931997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Davis-Besse Nuclear Power Station,Unit 1 ML20217K6401997-12-31031 December 1997 1997 Annual Rept First Energy ML20203A3931997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Davis-Besse Nuclear Power Plant,Unit 1 ML20198S5371997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Davis-Besse Nuclear Power Station ML20217H7701997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Davis-Besse Nuclear Power Station,Unit 1 ML20216H3261997-08-31031 August 1997 Monthly Operating Rept for August 1997 for DBNPS ML20217K0241997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Davis Besse Nuclear Power Station,Unit 1 1999-09-30
[Table view] |
Text
1 TOLEDO EDISON DAVIS-BESSE NUCLEAR POWER STATION UNIT NO. 1 SAFETY-RELATED PIPING SYSTEM SUPPORT AND HANGER DISCREPANCIES
SUMMARY
REPORT --
REVISION 6 AUGUST 27, 1985 8509090132 850830 .
PDR ADOCK 05000346 P PDR 1
SECTION 1.0 AUXILIARY FEEDWATER PUMP TURBINE STEAM SUPPLY PIPING SYSTEM I
\
I
Pagt No. 1 AFPTSS SYSTEM ENGINEERING FINDINGS 08/37/85 d
1 REV. 6 SUPPORT N3. DESCRIPT!0M DATE NCR NO. DISP'O RESP l
i WRITTEN [ND l
E!D-19-H147 SWAY STRUT PULLED FROM NALL 03/01/85 85-0016 Y SJO A3 LD3SE ANCHOR EOLTS NUTS 03/13/85 85-0018 Y 6MF E3D-19-n!4 DEFORMED STANCH 10N 03/13/05 85-0019 Y GNF 1
i ESD-19-H32 NON-CCDE tELD CN WAPPER FLATE TO P!Fl%6 bELD 03/27/85 85-0026 Y SJO 1
C4/11/85 85-0032 Y SJO ED-19-455 CEFECTIVE MECHANICAL SNUBBER E!D-19-H55 EICESSIVE LATERAL S EMENT 0F SUFFORT 04/11/95 SR85-79 Y SJO ESD-19-H144 HiCRAdLIC SNUBBER FISTON F0D ER0 KEN 04/18/85 85-0038 Y SJO ESC-19-5136 TWELVE (12) ANCHOR BOLTS IN LIEU OF SEVEN (71 SPECIFIED 04/30/85 85-0042 Y 6NF EiD-19 k54 eELD DETAIL INACCURATE 04/30/85 85-0043 Y 6NF
' 05/01/85 85-0045 Y 6NF E50-19-M142 LOOSE ANCn0R BOLT NUT ESD-19+31 sALL INTERFERENCE WITH SUPPORT MEMBER 05/08/85 85-0052A Y RAA EiD-19-h!!2 LOCSE A4CHOR 50LTS, BASEPLATE 6AP 05/16185 85-0019A Y SNF l
i EBD-19+32 LOOSE ANCHOR BOLTS, ENUBBER P!PE CLAMP MIS-All6MED, 05/16/85 85-0019A Y SJO i
WASHERS MISSING EBD-19-KE P!PE SADDLES CEFORMED 05/16/85 85-0019A Y SJO E3D-19-H25 SHEARED BOLT 05/16/85 85-0019A Y SJO ED-19-H26 NALL CRACK 05/16/85 85-0019A Y SJO j EID-19-h18 SNUBBER FIPE CLAMP MIS-Al!6MED 05/16/85 85-0019A Y SJO 1
EBD-19-H135 LCDSE ANCHOR E0LTS, ONE BOLT DID NOT TOR 8UE 05/16185 85-0019A Y 6NF EBD-19-H66 LOCSE ANCHOR 80LTS 05/16/95 85-0019A Y GNF l EBD-19-h50 RESTRAINT PLtLED FROM WALL 05/16185 85-00194 Y 6MF i E)D-19-H49 S W Y STRUT PULLED FROM WALL 05/16/85 85-0019A Y 6NF E80-19-H142 RESTRAINT PULLED FROM WALL 05/16/85 85-0019A Y GNF EBD-19-H67 LOOSE ANCHOR BOLTS 05/16/85 85-0019A Y 6MF EBD-19-H145 SWAY STRUT JAM NUT LOOSE, LOOSE ANCHOR 80LT 05/17/85 85-0067 Y SJO 4
- (
Page No. 2 AFPTSS SYSTEM ENGINEERING FINDIN6S -
- . 08/37/65 REV. 6 SUPPORT NO. DESCRIPTION DATE NCR NO. P!SP'D RESP
- NRITTEN IND 4
, - EBD-19-Hs2 SN4Y STRUT JAR NUT LOOSE 05/17/85 85-0068 Y SJO EBB-2-h20 SUPPORT NOT SHOW ON HANGER LOCATION DRAnth6 05/17/85 95-0069 V SJO f E!3-19-H14- SNUBBER PIFE CLAMP MIS-ALIGNED, LOOSE ANCHOR BOLTS 05/17/85 95-0070 V SJO 1
I I
J i;
5 'f i-f 4
t
(
i 4
i ,4 1
4 i
c'
yr .
Page No. 1 AFFiSS SYSTEM CC INSPECTION FINDINGS 48/27/83 REV. 6 SUFPCRT hD. CESCRIPi!ON DATE NCR NO. DISP'D RESP l WRITTEN IND EED-19-H51 ANCHOR BOLT INSTALLED AT AN ANGLE, BASEPLATE GAP 04/30/85 85-0044 Y 6W ESD-19-h59 BOLTS LONSER THAN SPECIFIED, 6 ROUT 2' THICX [N LIEU OF 05/02/85 85-0046 Y 6NF l'
20-19+57 REMOTE RESERVOIR NOT SH0hN ON ORAWING 05/08/85 85-0048 Y RAA E3D-19-H51 INCORRECT SFRING SETTING 05/08/85 85-0052 Y FAA
- E3D-19-H50 CHIPPED CONCRETE AROUND BASEPLATE 05/08/85 85-0053 Y ENF i ESD-If-H143 FIREPROCFING BROKEN AWAY 05/09/85 65-0054 Y TWH I!D-19 +147 ANCHOR EOLT INSTALLED AT AN AN6LE 05/09/85 85-0055 Y GNF ED-19-H1!i SHIM SIZE N3T FER DRAWING 05/09/85 85-0054 Y RAA ED-19-k62 FIREPROOFING B50 KEN AWAY 05/09/85 85-0057 Y TWH E!D-19-F60 mRCNG SIZE SPRING FANGER 05/09/85 85-0058 Y PAA 13D-19-H141 E001 SEAL TORN 05/10/85 85-0059 Y TWH E3D-19-H58 EICESSIVE LATERAL MOVEMENT OF SUPPORT 05/10/85 SR85-79 Y SJO E90-19-H55 BASEPLATE ANCHOR BOLT NASHERS S!!E GUESTIONABLE 05/10/85 SR85-79 Y GNF EBD-20-H1 LDOSE ANCHOR BOLTS NUTS, BASEPLATE GAP 05/16/85 05-0064 Y 6W 4
A; BASE PLATE 6AP 05/16/85 85-M65 Y SW EID-19-H142 BASE PLATE 6AP 05/16/85 85-0066 Y 6W EBD-19-H144 BASE PLATE 6AP 05/16/85 85-M66 Y SW I EBD-19-H145 BASE PLATE 6AP 05/16/85 85-0066 Y GW EBD-19-H147 BASE PLATE 6AP 05/16185 85-0066 Y 6W EBD-19-H70 SWAY STRUT JAM NUT LOOSE 05/21/95 85-M92 Y SJO Ell-19-H14 ALL THPEAD R00 USED IN LIEU OF BOLTS 05/21/85 05-M92 Y GNF EID-19-H20 ALL THREAD R00 USED IN LIEU OF 90LTS 05/21/85 85-0092 Y GW E90-19-H38 HAN6ER LOCATION ORANING INCORRECT 05/21/05 05-M92 Y SJO EID-19-H39 . HANGER LOCAi!ON DRANING INCORRECT 05/21/85 85-0092 Y SJO 4
Pye No. 2 AFPTSS SYSTEM GC INSPECTION FICINGS 08/27/35 REV. 6
$UPPORT NJ. DESCRIFil0N DATE NCR NO. DISP'O RESP NRITTEN IND EID-19-H132 BOLTS USED NOT PEFLECTED ON DRAWING 05/21/95 85-092 Y BNF EID-19-H26 CRACKG FlfEFR00 FIN 6 05/21/95 NA Y TuH UD-19+:i CRACKEDFIREPR00 FINS 05/21/B5 NA Y TWH E!D-19-H:4 MIS $lh6 FIREFRC0FING 0$!21/85 NA Y TWH O D-19-h 5 CRACKE3 FIREPROOFING 05/21/95 NA Y TWH E5D-19-H;8 CRACKG FIREPROCFING 05/21/85 NA Y TWH EiD-19+39 CRACKU FIREIR00FING 05/21/85 NA Y TWH J.221 CRACKED FIFEPR00 FIN 6 05/21/65 NA Y TWH UD-20-H1 STAY STRUT P!PE CLAMP MIS-ALISMED 05/21/85 SR85-79 Y SJO ED-19-H21 Tb3 (2) BOLTS NOT PP.KED FOR T3RQUE TEST 05/21/E5 SRB 5-79 Y ENF EID-19425 UPFER 6UIDE Ah6LE BENT 05/22/65 85-0071 Y RAA G D-19-H132 FIREPROOFING BROKEN 05/22/85 85-0072 Y TWH OD-19-H133 FIREPROOFING BROKEN 05/22/65 65-0072 Y TWH EBD-19-H13 SWAV STRUT JAM N'JT LODSE 05/24/85 85-0074 Y SJD EiD-19-H13A SuAY STRUT JAM IrJT LODSE 05/24/85 85-0074 Y SJO EED-19-H15 SWAY STRUT JAM NUT LODSE 05/24/ES 85-0074 Y SJD EID-19-H16 SWAY STRUT JAM NUT LODSE 05/24/85 85-0074 Y SJO EED-19-H74 FLASHING MISSING ON INSULATION ,05/24/85 85 N 74 Y SJO HD-19-H19 TIREE (3) 0F FOUR (4) PINS HAVE NAILS IN LIEU OF COTTER 05/24/85 85-0074 Y SJG KEYS UD-19-H20 NASlER MISSIN6,110 FREE ROTAil0N ON BUSHIN6 05/24/85 85-0074 Y SJO DD-19-H26 INSUL BNil, STRAPS LOOSE & MISSING 05/24/85 85-0074 Y SJO DD-19-H32 SNUBBER PIPE CLAMP MIS-All6MED, SNUBBER JAM NUT LO%E 05/24185 85-0074 Y SJO DD-19-H33 SNAY STRUT ROTATES ON EITENSION THREADS Il0T BUSHIN6 05/24/85 85-0074 Y SJO DD-19-H36 STRAPS LODSE, INSULATION DONN,(ALSO H37) 05/24/85 85-0074 Y SJO
Page No. 3 AFPTSS SYSTEM GC INSPECTION FINDINGS OB12?IB5 FEV. 6 SUPPORT h3. DESCRIPT!DN DATE NCR NO. DISP'D RESP WalTTEN IND EID-19-H37 CORRESPONDS TO ESD-19-H36 CN 85-0074 05/24/85 85-M74 Y SJO EiD-19-H133 SWAY STRUT PIPE CLAMP MIS-ALI6NED 05/24185 A5-0074 Y SJO E3D-19+65 SWAY STRUT MIS-ALI6NED 05/29/85 85-0082 Y SJO E50-19+10 IASEPLATE GAP 06/06/65 65-0090 Y 6NF EBD-19-h5 IA3EPLATE GAP 06/06/85 65-0090 Y GMF EBD-19-H6 BASEPLATE GAP 06/06/85 B5-0090 Y SW E3D-11-Ne6 BASEPLATE 6AP 06/06/85 85-0090 Y 6W EBD-19-H65 BASEPLATE 6AP 06/06/65 65-0090 Y 6W EiD-19-H150 BA3EPLATE 6AP %/06/85 85-0090 Y 6MF EiC-19-H67 BASEPLATE 6AP 06/06/85 65-0090 Y 6NF E3D-19-H135 BASEPLATE 6AP 06/06/65 85-0090 Y GNF ESD-19-H74 BASEPLATE GAP 06/06/05 85-0090 Y 6NF EDB-19-H21 BASEPLATE 6AP 06/06/65 85-0090 Y 6W EBD 19-H22 SASEPLATE 6AP 06/MIB5 65-0090 Y SNF EBD-19-H23 IASEPLATE 6AP M/06/85 85-0090 Y 6NF EBD-19-H24 BASEPLATE 6AP M/M185 85-0090 Y SNF E3D-19-H133 BASEPLATE 6AP MIM/85 85-M90 Y 6MF EBD-19-H132 BASEPLATE SAP M/H/85 85-M90 Y GNF EBD-19-H131 BASEP:. ATE 6AP 06/06/85 85-M90 Y GNF E6D-19-H12 BASEPLATE SAP 06/H/85 85-0090 Y 6NF EBD-19-H26 BASEPLATE 6AP M/H/85 85-0090 Y 6MF EBD-19-H72 BASEPLATE 64P M/M/85 85-M90 Y BNF A362 BASEPLATE GAF M/M/85 85-M90 Y 6W E3D-19-H49 BASEPLATEGAP 06/%/85 85-091 Y SNF EID-19-H50 SASEPLATE GAP HIN/85 85-091 Y 6MF
, Page No. 4 AFPTSS SYSTER SC thSPEtflDN FIN 0th65 08/27/85
- REV. 6 SUPPDRT ha. DESCRIPil0N BATE NCR NO. DISP'l RESP
bRITTEN IN8 EID-19-H52 BASEPLAft 6AP 06/06/85 85-091 Y GNF EBD-19-H53 BASEPLATE BAP 06/06/85 85-091 Y SNF EID-19-h:4 iASEPLATE GAP 06/06/85 85-091 Y GNF EBD-19-b!! EASEPLATE SAP 06/06/85 85-091 Y 6MF E!D-19-h56 BASEPLATE GAP 06/04/85 85-091 Y SNF E5D-19-b51 BASEPLATE 6AP 06/06/05 85-091 Y GNF Eik-19-H141 CONCRETE CRACKS 06/C&l85 SR85-74 Y SNF EiD-19-H47 CONCRETE CRACKS 06/06/85 SR85-74 Y 6MF E3D-19-H48 C3NCRETE CRACKS 06/06/85 SR85-74 Y 6NF A3 CCNCRETE CRACKS 06/06/85 SR85-74 Y 6NF E3D-19-H133 AN6LE NOT NELDED PER DRAN!N6 07/10/85 85-0092A Y SJO EBD 19-H132 b4SHERS t1 62 CISHED (CONCAVE) 07/11/85 85-0092A SNF l
l l
l
. Page No. 1 AFPTSS SYSTEM FINDINGS AFTER BASEllNE C9/27/65 REV. 6 SUPPORT h3. CESCRIPTION DATE NCR NO. DISP *D RESP WRITTEN IND f
EBD-19-H49 ANCHOR BOLTS PULLED OUT 05/14/85 85-0060 Y GNF E!D-19-H136 CNE INACTIVE BOLT 05/15/B5 85-0042A Y 6MF E3D-19-H49 SW Y STRUT P!FE CLAMP MIS-ALISNED 05/16/E5 85-0 % Y SJO EED-19-b47 EASEFLATE ANCHOR BOLT WASHERS NOT SHONN CN CRAWING 05/16/85 SR85-79 Y 64F EiD-19-M52 SNUBBER REAR BUSHIN6 NOT FREE TO MOVE 05/16/65 SR85-79 Y SJO E5D-19-bl!0 PIPE CLAMP 10LTS LODSE 05/21/B5 05-0092 Y SJO E3D-19-F67 CLEARANCE 6AP ON RESTRAINT NOT PER DRAWING 05/21/85 85-0092 Y SJO EiD-19-H36 SHIM WELDED TO SUPPORT NOT FER DRAWING 05/21/B5 SR85-79 Y SJO E5D-19-h39 SHIM WELDED TO SUPPORT NOT PER DRAWINS 05/21/95 SR85-79 Y SJO EED-19-b!7 SWAY STRUT END K ARIN6 DOES NOT MOVE FREELY 05/23/65 B5-0092 Y SJD EBD-19-nl4 CDNCRETE AROUNJ BASEPLATE IS CHlPPED 05/23/B5 SR85-73 Y GNF E!D-19-H132 CONCRETE CRACKS IN HALL 05/23/85 SR85-73 Y 64F EBD-19-H67 CDNCRETE CRACKS IN WALL 05/23/85 SR85-73 Y GE EBD-19-H68 CONCRETE CRACKS IN WALL 05/23!B5 SR85-73 Y GNF EBD-19-H12 CONCRETE CRACK IN HALL 05/23/85 SR85-73 Y 64F EBD-19-H14B CONCRETE CRACK IN BALL 05/23/B5 SR85-73 Y 6NF EBD-19-H65 CONCRETE CRACK IN WALL 05/23/05 SR85-73 Y 6MF EBD-19-H26 CONCRETE CRACK IN WALL 05/23/85 SR85-73 Y 6NF EBD-19-H22 CONCRETE CRACK IN WALL 05/23/85 SR85-73 Y 6NF EBD-19-H20 CONCRETE CRACK IN WALL 05/23/B5 SR85-73 Y SMF CBD-20-H1 LOOSE SWAY STRUT JAM NUT 06/05/85 85-0008 Y SJO EBD-20-H1 OR0 KEN FIREPROOFING M/05/85 85-0089 Y TW EID-19-H154 BROKEN FIREPROOFING 06/05/85 85-0089 Y TW EBD-19-HIB SWAY STRUT ROTATES ON THREADS M/06/85 85-0092 Y SJO EBD-20-H1 LOOSE SWAY STRUT JAM NUT M/%/85 85-0092 Y SJO
.,p , : 3: :3 : 3- 4 : . :.33 .::E: i;3E:, .i i :' !!
REV. 6 SUFFC9T h3. IESCRIPT10N DATE NCR NO. DISP'D FESP WRITTEM IND E30-li-n!6 SWAY STRUT JAM NUT LOOSE, PIPE CLA"P LOCSE 06/11/25 65-M98 f SJ:
E!L-19-H1: Swat STRUT EYELET CONTACTS PIFE CLAMP 06/11/65 65-0094 Y S23 6
i
- l Fate ha. 1 StiTER: AFFT STEAM SMPLY AO EinAUST SYSTEM 08/28/85 DAVIS - BESSE PIPING / SUPPORTS INSPECTON FINDIN65 REV. 6 I
$UPPORT DESCRIPTION DATE NCR/SR SISP'D RESP 4 IND l kURSER NUNIER l
A004 L0tER RIGHT NUT LOOSE 08/02/85 85-124 6NF ED-19-H131 LEVEllNG WUTS INSTALLED inPROPERLY 08/21/85 85-138 6aF
& n -
- - ~ a - + a ~ - ~ a s O
4 O '
1 J
i I
i t
?
SECTION 2.0 I AUXILIARY FEEDWATER SYSTEM i
l l
4 1
I i
4 4
L . - ,- - - - , ., n.,
i Page No. I SYSTEM: AUIlLIARY FEEDNATER 08/22/95 DAVIS - 6 ESSE PIPING / SUPPORTS INSPECT 0N FINDINGS REV. 6
, SUPPORT DESCRIPTION DATE NCR/SR DISP'D RESP NUMEER NUMBER IND EBD-14-H76 CONCRETE CHIPPED 05/C8/05 95-0049 Y SMF E3D-14-6B0 BAsiPLATE 6AP/ CONCRETE CHIFPED 05/08/85 95-0050 Y SNF 7
EiD-14-bi0 BASEFLATE 6AP 05/09185 85-0051 Y 6MF EiD-14+54 EDLT !!IE INCORRECT 05/23165 85-0073 Y 6MF E5D-14-eti LOGSE E0Li 05/24/85 85-0075 Y 6NF E5D-14-hsi CNE EOLT NILL NOT TOR 00E 05/29/85 65-0076 Y 6MF E3D-14+67 50LT TYPE INCORRECT 05/29/85 25-0077 Y 6NF E5D-14H77 BOLT SIZE 6 GUANTITY INCORRECT 06/25/B5 65-0102 Y 6MF ESD-14-Hit BOLT SIZE INCORRECT 07/10/85 85-OlM Y GMF E5D-14-690 INALEQUATE HELD REFAIR OF BASEPLATE 08/22/B5 65-140 6MF G l.
't
I l
l SECTION 3.0 LOW PRESSURE INJECTION SYSTEM
Fa;e ha. I SiSTEK: L0d FEESSUEE INJECi!CN 08128/85
.! . DAVIS - EESSE PIPIN6 / SUPPORTS INSPECTON FINDill65 REV. 6 4
SUPPORT DESCRIPTION DATE IICR/SR DISP *D RESP NUMBER NUMBER INO GCB-1-H15 ROI END ATTACHMENT LDAS PIN 15 LOOSE 08/21/95 85-139 SJO 1
., -- , . , . , -