z PERFORMANCE INDICATORS Qs D ON AVENUE LAN ~ '
TOLEDO, OHtO 43052 0001 i
l I
d DAVIS-BESSE NUCLEAR POWER STATION SALP 6 Weekly Report p For Weekly Period Ending August 24, 1987 This Executive Summary is pnvided to help in maintaining up-to-date cognizance of those indicators of regulatory interest and events being tracked by Toledo Edison for trending of performance during the current i
SALP period. These indicators and events were developed using some of the
'I NRC recommended performance indicators. The previous-SALP (SALP 5)-
covered the period November 1, 1986 through July 31, 1987 and the current period began on August 1, 1987.
The Executive Summary provides a brief description of the event (s)/ action (s) which occurred during the week and a cumulative total for each regulatory performance indicator category on a weekly basis. Additionally, commitment status data for NRC open items related to Licensee Event Reports and Inspection Reports is included. A cumulative listing of individual events / actions with the most recent being listed first will be provided monthly under a separate report.
i Should you have any questions regarding the enclosure, please contact George Honma, Compliance Supervisor, Nuclear Licensing Division, at (419) 249-2309.
l 44
/ir
.4ett-5/ MyQs
// ~
Nuclear Licensing Director cc:
P. Smart D. Shelton A. Davis A. DeAgazio P. Byron J. Williams, Jr.
'XUB31887 g
"O[
8709040148 870824 PDR ADOCK 05000346 G
--______a
o 1
EXECUTIVE
SUMMARY
Events / Actions During Period of 08/18/87 to 08/24/87 The Unit operated at approximately 100 percent power until Friday, August 21, j
1987 at 10:48 p..,
when an electrical disturbance (lightning strike) on the grid resulted in a turbine generator trip and subsequent reactor trip. Reactor Protection System initiaticn was from the Anticipatory Reactor Trip System (ARTS). The turbine tripped on high vibration caused by an out-of-phase condition.
Reactor startup commenced at approximately 2:00 a.m. on August 23, 1987.
The turbine generator was synchronized online at 11:18 a.m.
On Monday, August' 24, 1987, the Unit was back to 100 percent power at approximately 6:00 p.m.
Three Technical Specification Limiting Condition for Operation Action Statements were unintentionally entered during the week (Page 3, j
Occurrence Nos. 3, 4 and 5).
l i
1 1
Davis-Besse Report No. 3
d3 o/
i7 r0 e
P o 3
6 0
8 5
5 2
0 0
t 8
1 5
6 P8 L/
A1 S0
/
1 1
l a7 t8 3
5 1
3 5
2 8
0 o9 7
T1 do i g rn7 ei8 P n/
n1 1
1 0
5 0
1 0
0 0
)
6i0 d
g/
e P e8 u
LB0 n
A i
S t
n o
C
(
)
7 Y
8 R
/
A 4
M 2
M
/
U 8
S d0 o
E i o V
rt 1
1 0
3 0
1 0
0 0
I e
T P7 U
8 C
/
E 8
X 1
E
/
8 0
(
l an ro n
oi o
f t i
n s
t ne n
a ot o
u i n i
t t i t
c i n a
A dU l
n o
s ot i
e C n V
t r
e n
u gm n
e t
s ne o
v a
e i t i
E e
r t a t
/
F u
it a
r l
mS s
c s
o y
i i
t i
e t
t a
L n r
f s
a e
F
- o o
i s
a c
f fi s
p c
t e
i s
a m
ot e
e e
n l
d p
S e
c g
R p
e e
n i
t sA a
S v
R I
r d
s e
t 2
E T
e y
c n u
7 l
d r
S no O
a y
e r
e ei 0
c t
n o
e y
rt d
3 d
i n
t n
t ray e
i r
a r
c i
e urr c
i h
u l
a g
f cet r
C c
c p
e n
a c pn o
0 e
e n
R E
S OOE F
1 T
S U
1 2
3 4
5 6
7 8
9
u EXECUTIVE
SUMMARY
(continued)
Indicator / Event Description Event Date Occurrence No.(s) 1.
Reactor Trips A turbine generator 08/21/87 1
{
trip and subsequent reactor trip occurred at approximately 2300 hours0.0266 days <br />0.639 hours <br />0.0038 weeks <br />8.7515e-4 months <br /> due to an elect-rical disturbance on the grid.
2.
Engineered Safety Features Actuations Reactor Protection 08/21/87 1
System initiation from the Anticipatory i
Reactor Trip System.
{
3.
Safety System None Failures j
4.
LCO Action Statement
- a. Meteorological 08/22/87 5
tower instruments failed during lightning storm.
Meteorological instruments were returned to service approximately two hours later.
- b. Liquid effluent 08/21/87 4
total flow computer point was declared inoperable due to service water to collection box computer flow point indicating no flow cond1 tion. Flow i
is being estimated every four hours dur-ing releases until computer noint can be i
repaired 3
Davis-Besse Report No. 3
1 EXECUTIVE
SUMMARY
(continued)
Indicator / Event Description Event Date Occurrence No.(s)
LCO Action Statement
- c. The diesel fire 08/20/87 3
(continued) pump was declared j
inoperable after l
review of surveil-j l
lance due to high 1
cooling water temp-erature. The cooling water regulator was repaired and the diesel
<1
[
"~
fire pump was returned to operable status.
l 7
5.
Forced Outages None i.
6.
10CFR50.72 Reports See Reactor Trip (1) 08/21/87 1
(
and ESF Actuation l'
(1) occurrences, j
7.
Tech 9fealSpecifi-cation Violation None 8.
Security Events None 4