ML20237J978

From kanterella
Jump to navigation Jump to search
Performance Indicators for Davis-Besse Nuclear Power Station,Salp 6,Weekly Rept 3 for Period Ending 870824
ML20237J978
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/24/1987
From: Myers T
TOLEDO EDISON CO.
To:
References
NUDOCS 8709040148
Download: ML20237J978 (6)


Text

-

- _ _ - _ _ _ _ _ - _. _ _ _ - _ _ _ _ = -..

l' T\\ 6 4

F10RITYTCUTEG

,\\ T ~R~ } 9fn:L A _ Q..-

d

./A;JM. t. _&-

EDISON TOLEDO-M mw+ (

_ _.1 C1 {

z PERFORMANCE INDICATORS Qs D ON AVENUE LAN ~ '

TOLEDO, OHtO 43052 0001 i

l I

d DAVIS-BESSE NUCLEAR POWER STATION SALP 6 Weekly Report p For Weekly Period Ending August 24, 1987 This Executive Summary is pnvided to help in maintaining up-to-date cognizance of those indicators of regulatory interest and events being tracked by Toledo Edison for trending of performance during the current i

SALP period. These indicators and events were developed using some of the

'I NRC recommended performance indicators. The previous-SALP (SALP 5)-

covered the period November 1, 1986 through July 31, 1987 and the current period began on August 1, 1987.

The Executive Summary provides a brief description of the event (s)/ action (s) which occurred during the week and a cumulative total for each regulatory performance indicator category on a weekly basis. Additionally, commitment status data for NRC open items related to Licensee Event Reports and Inspection Reports is included. A cumulative listing of individual events / actions with the most recent being listed first will be provided monthly under a separate report.

i Should you have any questions regarding the enclosure, please contact George Honma, Compliance Supervisor, Nuclear Licensing Division, at (419) 249-2309.

l 44

/ir

.4ett-5/ MyQs

// ~

Nuclear Licensing Director cc:

P. Smart D. Shelton A. Davis A. DeAgazio P. Byron J. Williams, Jr.

'XUB31887 g

"O[

8709040148 870824 PDR ADOCK 05000346 G

PDR

--______a

o 1

EXECUTIVE

SUMMARY

Events / Actions During Period of 08/18/87 to 08/24/87 The Unit operated at approximately 100 percent power until Friday, August 21, j

1987 at 10:48 p..,

when an electrical disturbance (lightning strike) on the grid resulted in a turbine generator trip and subsequent reactor trip. Reactor Protection System initiaticn was from the Anticipatory Reactor Trip System (ARTS). The turbine tripped on high vibration caused by an out-of-phase condition.

Reactor startup commenced at approximately 2:00 a.m. on August 23, 1987.

The turbine generator was synchronized online at 11:18 a.m.

On Monday, August' 24, 1987, the Unit was back to 100 percent power at approximately 6:00 p.m.

Three Technical Specification Limiting Condition for Operation Action Statements were unintentionally entered during the week (Page 3, j

Occurrence Nos. 3, 4 and 5).

l i

1 1

Davis-Besse Report No. 3

d3 o/

i7 r0 e

P o 3

6 0

8 5

5 2

0 0

t 8

1 5

6 P8 L/

A1 S0

/

1 1

l a7 t8 3

5 1

3 5

2 8

0 o9 7

T1 do i g rn7 ei8 P n/

n1 1

1 0

5 0

1 0

0 0

)

6i0 d

g/

e P e8 u

LB0 n

A i

S t

n o

C

(

)

7 Y

8 R

/

A 4

M 2

M

/

U 8

S d0 o

E i o V

rt 1

1 0

3 0

1 0

0 0

I e

T P7 U

8 C

/

E 8

X 1

E

/

8 0

(

l an ro n

oi o

f t i

n s

t ne n

a ot o

u i n i

t t i t

c i n a

A dU l

n o

s ot i

e C n V

t r

e n

u gm n

e t

s ne o

v a

e i t i

E e

r t a t

/

F u

it a

r l

mS s

c s

o y

i i

t i

e t

t a

L n r

f s

a e

F

- o o

i s

a c

f fi s

p c

t e

i s

a m

ot e

e e

n l

d p

S e

c g

R p

e e

n i

t sA a

S v

R I

r d

s e

t 2

E T

e y

c n u

7 l

d r

S no O

a y

e r

e ei 0

c t

n o

e y

rt d

3 d

i n

t n

t ray e

i r

a r

c i

e urr c

i h

u l

a g

f cet r

C c

c p

e n

a c pn o

0 e

e n

R E

S OOE F

1 T

S U

1 2

3 4

5 6

7 8

9

u EXECUTIVE

SUMMARY

(continued)

Indicator / Event Description Event Date Occurrence No.(s) 1.

Reactor Trips A turbine generator 08/21/87 1

{

trip and subsequent reactor trip occurred at approximately 2300 hours0.0266 days <br />0.639 hours <br />0.0038 weeks <br />8.7515e-4 months <br /> due to an elect-rical disturbance on the grid.

2.

Engineered Safety Features Actuations Reactor Protection 08/21/87 1

System initiation from the Anticipatory i

Reactor Trip System.

{

3.

Safety System None Failures j

4.

LCO Action Statement

a. Meteorological 08/22/87 5

tower instruments failed during lightning storm.

Meteorological instruments were returned to service approximately two hours later.

b. Liquid effluent 08/21/87 4

total flow computer point was declared inoperable due to service water to collection box computer flow point indicating no flow cond1 tion. Flow i

is being estimated every four hours dur-ing releases until computer noint can be i

repaired 3

Davis-Besse Report No. 3

1 EXECUTIVE

SUMMARY

(continued)

Indicator / Event Description Event Date Occurrence No.(s)

LCO Action Statement

c. The diesel fire 08/20/87 3

(continued) pump was declared j

inoperable after l

review of surveil-j l

lance due to high 1

cooling water temp-erature. The cooling water regulator was repaired and the diesel

<1

[

"~

fire pump was returned to operable status.

l 7

5.

Forced Outages None i.

6.

10CFR50.72 Reports See Reactor Trip (1) 08/21/87 1

(

and ESF Actuation l'

(1) occurrences, j

7.

Tech 9fealSpecifi-cation Violation None 8.

Security Events None 4

Davis-Besse Report No. 3

1 1

1 I

i 1

i 1

l l

I o

f, T

1 eues 1

encm <

1O M

.M i

~

ND

-2 l

O O

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _