Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20212E903 | 30 September 1999 | FPC Crystal River Unit 3 Plant Reference Simulator Four Year Simulator Certification Rept Sept 1995-Sept 1999 | Emergency Lighting Loss of condenser vacuum |
ML20211L132 | 31 August 1999 | EAL Basis Document | Safe Shutdown Health Physics Network High winds Shutdown Margin Ultimate heat sink Internal Flooding Earthquake Pressure Boundary Leakage Unidentified leakage |
ML20212C150 | 31 August 1999 | Non-proprietary Version of Rev 0 to Crystal River Unit 3 Enhanced Spent Fuel Storage Engineering Input to LAR Number 239 | Boric Acid Ultimate heat sink Safe Shutdown Earthquake Operating Basis Earthquake Finite Element Analysis Earthquake Control of Heavy Loads Fuel cladding |
ML20209F560 | 31 July 1999 | EAL Basis Document, for Jul 1999 | Safe Shutdown Health Physics Network High winds Shutdown Margin Ultimate heat sink Time to boil Internal Flooding Operating Basis Earthquake Earthquake Pressure Boundary Leakage Unidentified leakage |
ML20155F407 | 31 October 1998 | Rev 2 to Pressure/Temp Limits Rept | Hydrostatic |
ML20155D480 | 27 October 1998 | Amend 3 to Rancho Seco DSAR, Representing Updated Licensing Basis for Operation of Permanently Shutdown & Defueled Rancho Seco Nuclear Facility During Permanently Defueled Mode | Boric Acid High Radiation Area Grab sample Hydrostatic Emergency Lighting Design basis earthquake Process Control Program Earthquake Control of Heavy Loads Chernobyl Fuel cladding Scaffolding |
ML20236W650 | 31 July 1998 | Emergency Action Level Basis Document | Safe Shutdown Health Physics Network High winds Shutdown Margin Ultimate heat sink Internal Flooding Earthquake Pressure Boundary Leakage Unidentified leakage |
ML20236V880 | 30 July 1998 | Control Room Habitability Rept | Loop seal Power Uprate |
ML20217B173 | 16 April 1998 | FPC Crystal River,Unit 3,Tendon Surveillance Program Engineering Evaluation of Sixth Tendon Surveillance | |
ML20203K152 | 28 February 1998 | Post-LOCA Boron Concentration Mgt for CR-3 | |
ML20203K499 | 16 February 1998 | Boron Dilution by RCS Hot Leg Injection | |
ML20202J429 | 13 February 1998 | Rev 2 to MPR-1887, Crystal River 3 Reactor Bldg Cooling Fan Logic Mod Failure Modes & Effects Analysis | Hot Short Ultimate heat sink |
ML20198J888 | 10 January 1998 | Training | |
ML20198J882 | 10 January 1998 | Licensing | Ultimate heat sink Mission time Post Accident Monitoring |
ML20198J862 | 10 January 1998 | Maintenance | Grace period |
ML20198J857 | 10 January 1998 | Operations | |
ML20198J837 | 10 January 1998 | Engineering | Mission time |
ML20198J818 | 10 January 1998 | Assessing Performance & Organizational Roles | |
ML20198J804 | 10 January 1998 | Integrated Verification Team Rept | Shutdown Margin Mission time Coast down |
ML20198J781 | 10 January 1998 | Design & Licensing Basis | Operability Determination Power Uprate Manual Operator Action |
ML20198J750 | 10 January 1998 | Corrective Action Program Overview | |
ML20198J729 | 10 January 1998 | Overall Restart Readiness | Temporary Modification Eddy Current Testing Maintenance Rule Program Operability Assessment |
ML20198H507 | 31 December 1997 | Rev 5 to Justification for Continued Operation for CR Emergency Ventilation Sys & Control Complex Habitability Envelope | Loop seal Power Uprate |
ML20197B291 | 11 December 1997 | Generic Operability Evaluation for Large Bore Safety Related Piping at Crystal River-3 | Safe Shutdown Past operability Design basis earthquake Earthquake |
ML20198K445 | 30 November 1997 | Reactor Bldg Cooling Fan Logic Mod Failure Modes & Effects Analysis, Rev 0 | Hot Short Ultimate heat sink |
ML20202D416 | 26 November 1997 | Mod Outage Integrated Verification Team Rept | Shutdown Margin Ultimate heat sink Mission time Coast down |
ML20199K473 | 24 November 1997 | Sys Readiness Review Summary Rept | Safe Shutdown |
ML20212F419 | 31 October 1997 | Revised Boron Dilution by RCS Hot Leg Injection | Boric Acid |
ML20199D575 | 30 October 1997 | Overview of Safety Related Large Bore Piping & Piping Support Design & Construction Currently Existing at Crystal River-3 Nuclear Power Plant, Rev 0 | Safe Shutdown Earthquake Seismically rugged Design basis earthquake Earthquake Power Operated Valves |
ML20198T105 | 25 October 1997 | Tracer Gas Air Inleakage Measurements within Crystal River Unit 3 Control Complex Habitability Envelope, Summary Rept | |
ML20211N177 | 11 October 1997 | Rev 1 to Pressure/Temp Limits Rept | Hydrostatic |
ML20210T942 | 29 August 1997 | B Dilution by Hot Leg Injection | Boric Acid Post Accident Monitoring |
ML20217D327 | 30 July 1997 | Update of 1995 Decommissioning Evaluation for Rancho Seco Nuclear Generating Station | Scaffolding |
ML20148K796 | 12 June 1997 | Safety Analysis Input to Startup Team Safety Assessment Rept | Unanalyzed Condition Loop seal Mission time Flow Induced Vibration Power Uprate Manual Operator Action |
ML20148J382 | 23 May 1997 | Rev 16 to PSA F Annunciator Response | |
ML20141D940 | 16 April 1997 | Summary Document for Pressurizer NDE Development for FPC Crystal River Unit 3 | Liquid penetrant |
ML20137W815 | 20 March 1997 | Amend 1 to Post Shutdown Decommissioning Activities Rept | Earthquake Fire Protection Program |
ML20132F486 | 3 December 1996 | Restart Panel | Hot Short Mission time |
ML20133B271 | 31 October 1996 | Monthly Trend Rept for Oct 1996 | Temporary Modification |
ML20199D543 | 28 October 1996 | Evaluation of Piping & Support Documentation for Crystal River 3 | |
ML20134K958 | 15 October 1996 | Independent Design Review Panel Rept on 961015 | Safe Shutdown Boric Acid Operability Determination Maintenance Rule Program Chernobyl |
ML20117C643 | 25 July 1996 | FPC Crngp Unit 3 Graded Approach Methodology for Instrument Uncertainty | Safe Shutdown |
ML20100G414 | 29 February 1996 | Input to Items a & C of NRC Questions on Relief Request for Insp of Transition Piece to Bottom Head Weld at Crystal River Unit 3 | Stress corrosion cracking Thermal fatigue |
ML20101F608 | 29 February 1996 | Iga & Wear Voltage Correlations & Uncertainty Analysis | |
ML20100G428 | 1 February 1996 | Flaw Acceptance Handbook for Crystal River Unit 3 RPV & Nozzle Weld Insps | |
ML20095L146 | 2 January 1996 | Seismic Evaluation Rept for USI A-46, Rev 0 | Safe Shutdown Boric Acid Shutdown Margin Safe Shutdown Earthquake Emergency Lighting Finite Element Analysis Earthquake Backfit |
ML20098A457 | 19 September 1995 | Plant Ref Simulator Four Yr Simulator Certification Rept | Loss of condenser vacuum |
ML20101F600 | 30 June 1995 | Alternate Disposition Strategy for Low Vol OTSG Eddy Current Indications | Non-Destructive Examination Stress corrosion cracking Operational leakage |
ML20092M206 | 27 June 1995 | Pyrolysis Gas Chromatography Analysis of 3 Thermo-Lag Fire Barrier Samples | Fire Barrier |
ML20084L693 | 31 May 1995 | Exam of Crystal River-3 Pulled SG Tubes Final Rept |