Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20195D199 | 28 May 1999 | Probabilistic Operational Assessment of ANO-2 SG Tubing for Cycle 14 | Boric Acid Nondestructive Examination |
ML20199F740 | 16 November 1998 | Rev 9 to ANO-1 Simulator Operability Test,Year 9 (First Cycle) | Safe Shutdown Main transformer failure Fuel cladding |
ML20155H716 | 15 July 1998 | Rev 1 to 96-R-2030-02, Revised Reactor Vessel Fluence Determination | |
ML20248J990 | 26 May 1998 | Rev 0 to SIR-98-055, Risk Evaluation & Element Selection in Support of ASME Code Case N-560 ANO-1 | |
ML20217N910 | 27 March 1998 | Rev 0 to SIR-98-026, Svc History & Susceptibility Review, Risk Evaluation & Element Selection for Svc Water Sys at ANO-2 | |
ML20217N877 | 27 March 1998 | Rev 0 to SIR-98-011, Evaluation of Damage Mechanisms for Svc Water Sys at ANO-2 | Anticipated operational occurrence |
ML20236J133 | 16 February 1998 | Rev 1 to 97-R-2015-01, PPS Response to Failure of DC Bus | |
ML20203D984 | 30 November 1997 | ANO Commitment Change Summary Rept for Sept 1995-Nov 1997 | |
ML20211N463 | 7 October 1997 | SG Tube Integrity Evaluation | Safe Shutdown Boric Acid |
ML20154B750 | 30 November 1996 | Rev 0, Review of Degradation Mechanisms in EPRI Risk- Informed Inservice Evaluation Procedure | Boric Acid Weld Overlay Finite Element Analysis |
ML20135E814 | 30 November 1996 | Pressure-Temp Limits for 32 Efpy | Hydrostatic |
ML20135D243 | 16 October 1996 | Rev 1 to ANO Unit 2 Leak Rate Model for Circumferential Cracks in SG Tubes | |
ML20135D259 | 16 October 1996 | Rev 0 to ANO Unit 2 Projected End of Cycle 12 Circumferential Crack Population | |
ML20135D248 | 16 October 1996 | Rev 1 to Probability of Burst Model for ANO-2 Tts Circumferential Cracks | |
ML20133M164 | 9 September 1996 | Revised OTSG Iga Sizing Technique App H Qualification | |
ML20116F302 | 31 July 1996 | Steam Generator Operational Assessment | Safe Shutdown Boric Acid Non-Destructive Examination |
ML20135D255 | 11 April 1996 | ANO Unit 2 SG Tubes Evaluation of Bursh Pressures W/Circumferential Flaws Present | |
ML20135D262 | 31 March 1996 | ANO Unit 2 SG Tubes:95/95 Mechanical Properties | |
ML20101R538 | 28 February 1996 | LTOP for 21 Efpy | |
ML20101H111 | 28 February 1996 | Input to Items 2A & 2C of NRC Question on Relief Request for Insp of Transition Piece to Bottom Head Weld of Reactor Vessel at Arkansas Nuclear One - Unit 1 | |
ML20101H126 | 22 February 1996 | Flaw Acceptance Stds for Arkansas Nuclear One Unit 1 Reactor Pressure Vessel Weld Insps | Hydrostatic |
ML20095C243 | 31 October 1995 | ANO Unit 2 Simulator Performance Testing Rept | |
ML20091R657 | 31 August 1995 | ANO Unit 2 SG Tube Circumferential Cracking Repair Limit Evaluation | Boric Acid Probabilistic Risk Assessment Nondestructive Examination Finite Element Analysis Flow Induced Vibration |
ML20082E754 | 24 March 1995 | Failure Analysis Rept 3707R MSSV Valve Serial Number BM-02978 Nonconforming Matl - Lower Adjusting Ring Pin at Wyle Lab | |
ML20080H663 | 28 February 1995 | ANO Unit 2 SG Circumferential Cracking Evaluation | Boric Acid |
ML20077S008 | 17 January 1995 | Simulator Performance Testing Rept | Safe Shutdown Stroke time Met Tower Temporary Modification Fuel cladding |
ML20063L755 | 1 February 1994 | Rev 0 to Twentieth Yr Physical Surveillance of ANO Unit 1 Containment Bldg | |
ML20057D074 | 21 September 1993 | ANO Unit 2 Cycle 10,Proposed Changes to Incore Detector Ts | |
ML20057D071 | 21 September 1993 | Cycle 10,COLSS & Cpcs Addressable Constants for Reduction of Operable Incore Detectors | |
ML20056E233 | 31 August 1993 | Evaluation of Thermal Stratification Effects on Shutdown Cooling Line for Ano,Unit 2 | Non-Destructive Examination |
ML20067D331 | 31 August 1993 | Technical Evaluation Rept,Evaluation of B&Wog Pressurizer Surge Line Thermal Stratification Program to Address NRC Bulletin 88-11 | Finite Element Analysis |
ML20056E229 | 17 August 1993 | SG Degraded Tube Analysis Per Reg Guide 1.121 | |
ML20056D311 | 29 January 1993 | Analysis Allowing Extended Operation W/One PPS Channel in Bypass for ANO Unit 2 | |
ML20101K986 | 23 June 1992 | Response to NRC Generic Ltr 92-01 for Arkansas Nuclear One - Unit 2 | |
ML20097G085 | 8 June 1992 | Rev 0 to ASME Code Case N-481 Evaluation of Arkansas Nuclear One Unit 1 Reactor Coolant Pumps | Hydrostatic VT-2 |
ML20092C985 | 31 December 1991 | Technical Rept, Monitoring Hydrogen Gas in Containment During Early Phases of Severe Accident | |
ML20087A473 | 20 December 1991 | Rev 0 to Summary of Entergy Position Re Deferral of Permanent Nozzle Repair for Arkansas Nuclear One,Unit 1 Pressurizer Level Tap Nozzle, Engineering Rept | Boric Acid |
ML20081K933 | 31 May 1991 | Final Rept on Low-Temperature Overpressure Protection Analysis for ANO 2 for 21 Effective Full Power Years | |
ML20073K845 | 31 March 1991 | Entergy Nuclear Performance Rept,Mar 1991 | Unanalyzed Condition Fire Barrier Nondestructive Examination Missed surveillance |
ML20028H644 | 17 January 1991 | ANO Unit 1 Simulator Certification. | Safe Shutdown Boric Acid Stroke time Coast down |
ML20076B350 | 31 December 1990 | Criticality Analysis of Arkansas Nuclear One,Unit 1 Fresh Fuel Rack | |
ML20235T212 | 14 February 1989 | Addendum to Amend 6 to SAR for Arkansas Nuclear One Unit 2 | |
ML20235N610 | 14 February 1989 | Summary of Engineering Evaluation of ANO-1 High Pressure Injection Sys Backflow Condition | Hydrostatic Finite Element Analysis Code Reconciliation |
ML20206F404 | 31 October 1988 | Request for Exemption from ATWS Rule 10CFR50.62 for Arkansas Nuclear One Unit 2 | Anticipated operational occurrence Exemption Request Backfit |
ML20207B290 | 1 July 1988 | Vols I & II of Rept, Fifteenth Yr Physical Surveillance of Arkansas Nuclear 1 - Unit 1 Primary Reactor Contatinment Bldg | |
ML20154F609 | 1 July 1988 | Ten-Yr Visual Tendon Surveillance of Arkansas Nuclear One, Unit 2 Primary Reactor Containment Bldg,Surveillance Rept | |
ML20151N300 | 30 April 1988 | Primary Reactor Containment Integrated Leakage Rate Test, Final Rept | |
ML20147C649 | 3 December 1987 | One,Unit-II,Simulator Operability Test | Feedwater Controller Failure |
ML20147C629 | 18 November 1987 | Revised Abstract:Performance Test Development,Conduct & Evaluation | |
ML20238C307 | 28 August 1987 | Justification for Continued Operation | Safe Shutdown Shutdown Margin Offsite Dose Calculation Manual Coatings Earthquake Fuel cladding |