Issue date | Title | Topic | |
---|---|---|---|
ML17286B276 | 31 July 1991 | Rev 0 to Washington Nuclear Plant 3 Seismic Design Basis Model Validation,Soil Variation Studies. | |
ML17286B268 | 7 May 1991 | Justification for Revised Tornado Design Criteria. | High winds Tornado Missile Tornado-Generated Missile Tornado Generated Missile |
ML17347B462 | 31 December 1989 | App a to USI A-46 & Generic Ltr 87-02. | Safe Shutdown Safe Shutdown Earthquake Probabilistic Risk Assessment Operating Basis Earthquake Earthquake Backfit |
ML20246D687 | 14 August 1989 | Rev 1 to Criticality Analysis of Byron & Braidwood Station High Density Fuel Racks | |
ML18008A031 | 31 July 1989 | NTH-TR-01 Decrease in Heat Removal by Secondary Sys. | Safe Shutdown Rod Drop Event |
ML19327B401 | 31 July 1989 | Safety Evaluation for Byron/Braidwood Stations Units 1 & 2 Transition to Westinghouse 17 X 17 Vantage 5 Fuel. | |
ML20246D671 | 30 June 1989 | Criticality Analysis of Byron/Braidwood Fresh Fuel Racks | |
ML20247H071 | 30 June 1989 | Description & Verification Summary of Computer Program, Gappipe | Earthquake |
ML20247H079 | 22 June 1989 | App to Description & Verification Summary of Computer Program,Gappipe | |
ML20247N062 | 31 May 1989 | Production Training Dept,Braidwood,Malfunctions & Initial Conditions | |
ML20247L184 | 12 May 1989 | Leak-Before-Break Evaluation for Stainless Steel Piping, Byron & Braidwood Nuclear Power Stations Units 1 & 2 | Packing leak Safe Shutdown Earthquake Liquid penetrant Flow Induced Vibration |
ML20247K301 | 12 May 1989 | Leak-Before-Break Evaluation for Carbon Steel Piping | Safe Shutdown Earthquake Hydrostatic Finite Element Analysis Earthquake Flow Induced Vibration |
ML18094A355 | 30 April 1989 | Assessment of Impacts of Salem & Hope Creek Generating Stations on Kemps Ridley (Lepidochelys Kempi) & Loggerhead (Carretta Caretta) Sea Turtles. | Safe Shutdown Earthquake |
ML20247F132 | 23 March 1989 | Post-Tensioning Sys Evaluation,Callaway Unit 1 Containment & Wolf Creek Unit 1 Containment | |
ML17251A481 | 28 February 1989 | Ultrasonic Indication Sizing Technique Development. Related Info Encl | Hydrostatic |
ML20005G421 | 28 February 1989 | Reactor Vessel Heatup & Cooldown Limit Curves for Normal Operation. | Hydrostatic |
ML20206C745 | 30 November 1988 | ATWS Mitigation Sys Specific Design for Byron/Braidwood Stations, Rev 5 | |
ML20205T750 | 4 November 1988 | Detection & Skin Dose Evaluation for Characteristic X-Ray in Activation Product Contamination | |
ML20206K310 | 31 October 1988 | Rev 1 to Impact of Reg Guide 1.99,Rev 2 on Limerick Generating Station Unit 1 | |
ML20206K302 | 31 October 1988 | Rev 1 to Impact of Reg Guide 1.99,Rev 2 on Peach Bottom Atomic Power Station Unit 3 | |
ML20154N608 | 30 September 1988 | Rev 1 to Identification of Unisolable Piping & Determination of Insp Locations | Nondestructive Examination |
ML20154K209 | 9 September 1988 | Rev 0 to Response to NRC Bulletin 88-005,Nonconforming Matls Supplied by Piping Supplies,Inc at Folsom,Nj & West Jersey Mfg Co.... Proprietary Procedure 1404.1, Leeb Hardness Testing (Equotip).... Encl.Procedure Withheld | |
ML20245B418 | 17 August 1988 | Investigation Rept,Design & Operation of Sampling Sys for Analysis of High Purity Water | Grab sample |
ML17347A798 | 16 June 1988 | Radiological Data Prepared for Resolution of USI A-46. | Safe Shutdown Earthquake Earthquake Backfit |
ML17347A797 | 16 June 1988 | Seismic Hazard Data Prepared for Resolution of USI A-46. | Earthquake |
ML20150F294 | 31 May 1988 | Rev 4 to, ATWS Mitigation Sys Specific Design for Byron/ Braidwood Stations | |
ML20196L628 | 20 May 1988 | Rev 2 to ATWS Mitigation Sys Actuation Circuitry (Amsac) | Anticipated operational occurrence |
ML20196L642 | 6 May 1988 | ATWS Mitigation Sys Actuation Circuitry Response to Unit Transients | |
ML20151H958 | 30 April 1988 | CASMO-3G Validation | |
ML20147D392 | 29 February 1988 | Seismic Hazards Assessment for Washington Nuclear Plant-3, Satsop,Wa Contract C-20453, Final Rept | |
ML20151T468 | 31 January 1988 | Experimental & Finite Element Evaluation of Spent Fuel Rack Damping & Stiffness | |
ML20148G543 | 15 January 1988 | Nonproprietary Mods to Critical Flow Model in RELAP5YA | |
ML20155K139 | 30 December 1987 | Final Rept MSIV 3-Way Dual Solenoid Valve Failures | Half scram Grab sample Stroke time |
ML20235F088 | 17 December 1987 | Marked-up Draft Seismological Analysis of Bodega Head,Ca | |
ML20236Y094 | 21 October 1987 | Epri/Westinghouse Owners Group Analysis of DHR Risk at Point Beach, Final Rept | Safe Shutdown Boric Acid Mission time Probabilistic Risk Assessment Earthquake Backfit Failure to Scram |
ML20235G304 | 29 September 1987 | Partially Withheld, Preliminary Investigation of Enrico Fermi II Nuclear Power Plant | |
ML20235B312 | 31 August 1987 | Comparison of Monticello & Brunswick Recirculation Pump Trip | |
ML18151A135 | 28 August 1987 | Rev 1 to SPDS SAR for VEPCO NUREG-0696 Computer Project, North Anna & Surry Nuclear Power Stations. | Fuel cladding |
ML20237K820 | 26 August 1987 | TVA Employee Concerns Special Program Bellefonte Nuclear Plant Element Rept BLN-NSRS-2, Review of Nuclear Safety Review Staff Non-Startup Items at Bellefonte | Shutdown Margin Tornado Missile Earthquake |
ML20237K769 | 6 August 1987 | Rev 3 to TVA Employee Concern Special Program Browns Ferry Nuclear Plant Element Rept BFN-NSRS-1, Review of Nuclear Safety Review Staff Restart Items at Browns Ferry | |
ML20236N259 | 31 July 1987 | Final Summary Rept of Human Factors Engineering Review for Byron & Braidwood Stations Spds | Emergency Lighting |
ML20237K798 | 28 July 1987 | Rev 1 to TVA Employee Concerns Special Program Browns Ferry Nuclear Plant Element Rept BFN-NSRS-2, Review of Nuclear Safety Review Staff Non-Restart Items at Browns Ferry | Shutdown Margin Nondestructive Examination Earthquake |
ML20237K808 | 23 July 1987 | Rev 0 to TVA Employee Concern Special Program Bellefonte Nuclear Plant Element Rept BLN-NSRS-1, Review of Nuclear Safety Review Staff Startup Items at Bellefonte | Systematic Assessment of Licensee Performance |
ML18093A179 | 19 June 1987 | Installation of Trip-A-Unit Protection Scheme Suppl Info Salem & Hope Creek Generating Stations. | |
ML20214S308 | 28 May 1987 | Weekly Status Rept,Assessment of Embedment Plates Status as of 870528 | |
ML20214T294 | 27 May 1987 | Comm Ed Final Summary Rept on Human Factors Review for Byron/Braidwood Stations Emergency Response Facilities | |
ML20215K244 | 30 April 1987 | Assessment of Embedment Plates Status as of 870430, Weekly Status Rept | |
ML20214E058 | 16 April 1987 | Rev 2 to ATWS Mitigation Sys Specific Design for Byron/Braidwood Stations | |
ML17279A191 | 7 April 1987 | Comparision of Electrical Design of Wye Pattern Globe Valve Actuator W/Ball Valve,Hanford 2 & River Bend Design. Five Oversize Drawings Encl | |
ML18092B497 | 3 April 1987 | S-C-E500-NSE-0675-R-1, Justification for Operation of All Three Units at Artificial Island at Increased Power During Hope Creek-Keeney Line Outage. |