Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML18271A13228 September 2018APR1400 Final Safety Evaluation Report, Appendix B - ReferencesFitness for Duty
High Radiation Area
Ultimate heat sink
Tornado Missile
Internal Flooding
Probabilistic Risk Assessment
Coatings
FLEX
Fukushima Dai-Ichi
Significance Determination Process
Spent Fuel Pool Instrumentation
Earthquake
Power-Operated Valves
Turbine Missile
Power Uprate
ML18274A40328 September 2018Korea Hydro & Nuclear Power Co., Ltd - Review Results to Final Safety Evaluation Report for Six Chapters
ML18043A88728 September 2018APR1400 Chapter 9, Auxiliary Systems, Final Safety Evaluation ReportHot Short
Safe Shutdown
Boric Acid
High winds
Shutdown Margin
High Radiation Area
Ultimate heat sink
Non-Destructive Examination
Grab sample
Fire Barrier
Anticipated operational occurrence
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Coatings
Operating Basis Earthquake
Operator Manual Action
Emergency Lighting
Incorporated by reference
Finite Element Analysis
Design basis earthquake
License Renewal
Earthquake
Control of Heavy Loads
Turbine Missile
Fuel cladding
Fire Protection Program
Siren
Exit Sign
ML18044A18528 September 2018APR1400 Chapter 10, Steam and Power Conversion System, Final Safety Evaluation ReportSafe Shutdown
Boric Acid
Ultimate heat sink
Non-Destructive Examination
Grab sample
Fire Barrier
Anticipated operational occurrence
Safe Shutdown Earthquake
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Incorporated by reference
Earthquake
Turbine Missile
Liquid penetrant
Dissimilar Metal Weld
Power Uprate
Stretch Power Uprate
ML18067A29228 September 2018APR1400 Chapter 4, Reactor, Final Safety Evaluation ReportSafe Shutdown
Shutdown Margin
Reactor Vessel Water Level
Anticipated operational occurrence
Safe Shutdown Earthquake
Hydrostatic
Nondestructive Examination
Incorporated by reference
Fuel cladding
Power change
ML18078A01628 September 2018APR1400 Chapter 11, Radioactive Waste Management, Final Safety Evaluation ReportSafe Shutdown
Boric Acid
Offsite Dose Calculation Manual
Anticipated operational occurrence
Post Accident Monitoring
Coatings
Annual Radiological Environmental Operating Report
Process Control Program
Annual Radiological Effluent Release Report
Earthquake
Accidental discharge
ML18081A50528 September 2018APR1400 Chapter 12, Radiation Protection, Final Safety Evaluation ReportSafe Shutdown
Boric Acid
Packing leak
High Radiation Area
Mission time
Fire Barrier
Anticipated operational occurrence
Locked High Radiation Area
Fuel cladding
Overexposure
ML18082A29828 September 2018APR1400 Chapter 2, Site Characteristics, Final Safety Evaluation ReportSafe Shutdown
Ultimate heat sink
Anticipated operational occurrence
Tornado Missile
Tornado-Generated Missile
Earthquake
ML18176A05128 September 2018APR1400 Chapter 15, Accident and Transient Analyses, Final Safety Evaluation ReportSafe Shutdown
Boric Acid
Shutdown Margin
Loop seal
Anticipated operational occurrence
Hydrostatic
Probabilistic Risk Assessment
Coatings
Incorporated by reference
Atmospheric Relative Concentration Values
Fuel cladding
Coast down
GOTHIC
Power Uprate
Failure to Scram
ML18197A21928 September 2018APR1400 Chapter 8, Electric Power, Final Safety Evaluation ReportSafe Shutdown
Ultimate heat sink
Anticipated operational occurrence
Tornado Missile
Safe Shutdown Earthquake
Operating Basis Earthquake
Open Phase Condition
Battery sizing
Earthquake
Maintenance Rule Program
Offsite Circuit
ML18211A56928 September 2018APR1400 Chapter 5, Reactor Coolant System and Connecting Systems, Final Safety Evaluation ReportSafe Shutdown
Boric Acid
Reactor Vessel Water Level
Non-Destructive Examination
Anticipated operational occurrence
Safe Shutdown Earthquake
Hydrostatic
Coatings
Nondestructive Examination
Incorporated by reference
Pressure and Temperature Limits Report
Foreign Material Exclusion
License Renewal
Earthquake
Fuel cladding
Liquid penetrant
Pressure Boundary Leakage
Dissimilar Metal Weld
Unidentified leakage
ML18212A09228 September 2018APR1400 Chapter 6, Engineered Safety Systems, Final Safety Evaluation ReportSafe Shutdown
Boric Acid
High winds
Shutdown Margin
Ultimate heat sink
Non-Destructive Examination
Mission time
Anticipated operational occurrence
Internal Flooding
Hydrostatic
Coatings
Nondestructive Examination
Incorporated by reference
Aging Management
Foreign Material Exclusion
Exemption Request
Earthquake
Maintenance Rule Program
Fuel cladding
Liquid penetrant
GOTHIC
ML18215A24028 September 2018APR1400 Chapter 17, Quality Assurance and Reliability Assurance, Final Safety Evaluation ReportProbabilistic Risk Assessment
Maintenance Rule Program
ML18215A24128 September 2018APR1400 Chapter 7, Instrumentation and Controls, Final Safety Evaluation ReportSafe Shutdown
Boric Acid
Shutdown Margin
Ultimate heat sink
Anticipated operational occurrence
Commercial Grade Dedication
Safe Shutdown Earthquake
Post Accident Monitoring
Probabilistic Risk Assessment
Incorporated by reference
Process Control Program
Earthquake
Fuel cladding
Fire Protection Program
ML18215A24228 September 2018APR1400 Chapter 3, Design of Structures, Systems, Components, and Equipment, Final Safety Evaluation ReportSafe Shutdown
Unanalyzed Condition
Boric Acid
Ultimate heat sink
Stroke time
Anticipated operational occurrence
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Operating Basis Earthquake
Nondestructive Examination
Squib
Incorporated by reference
Finite Element Analysis
Tornado-Generated Missile
Tornado Generated Missile
Earthquake
Power-Operated Valves
Power Operated Valves
Turbine Missile
Fuel cladding
Liquid penetrant
Pressure Boundary Leakage
Through-Wall Leakage
Fire Protection Program
Dissimilar Metal Weld
Loctite
Flow Induced Vibration
ML18227A06128 September 2018APR1400 Chapter 16, Technical Specifications, Final Safety Evaluation ReportSafe Shutdown
Boric Acid
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Grab sample
Offsite Dose Calculation Manual
Anticipated operational occurrence
Post Accident Monitoring
Probabilistic Risk Assessment
Qualified Offsite Circuit
Pressure and Temperature Limits Report
Annual Radiological Environmental Operating Report
Fuel cladding
Recently irradiated fuel
Offsite Circuit
Unidentified leakage
ML18261A16128 September 2018APR1400 Chapter 13, Conduct of Operations, Final Safety Evaluation ReportFitness for Duty
Ultimate heat sink
Grab sample
Probabilistic Risk Assessment
Cyber Security
Emergency Lighting
Incorporated by reference
Safeguards Contingency Plan
Earthquake
ML18264A14128 September 2018APR1400 Chapter 1, Introduction and General Discussion, Final Safety Evaluation ReportSafe Shutdown
Boric Acid
Shutdown Margin
Ultimate heat sink
Fire Barrier
Anticipated operational occurrence
Probabilistic Risk Assessment
Emergency Lighting
Incorporated by reference
FLEX
Fukushima Dai-Ichi
Exemption Request
Earthquake
Fuel cladding
Fire Protection Program
Power change
ML18269A17428 September 2018APR1400 Chapter 18, Human Factors Engineering, Final Safety Evaluation ReportSafe Shutdown
Fitness for Duty
Reactor Vessel Water Level
Ultimate heat sink
Probabilistic Risk Assessment
Incorporated by reference
Exemption Request
ML18269A24228 September 2018APR1400 Final Safety Evaluation Report, Appendix C - AcronymsSafe Shutdown
Boric Acid
Shutdown Margin
High Radiation Area
Ultimate heat sink
Offsite Dose Calculation Manual
Anticipated operational occurrence
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Nondestructive Examination
Incorporated by reference
Finite Element Analysis
FLEX
Aging Management
Pressure and Temperature Limits Report
Open Phase Condition
Foreign Material Exclusion
Process Control Program
Earthquake
Fire Protection Program
ML18270A07228 September 2018APR1400 Final Safety Evaluation Report, Table of ContentsSafe Shutdown
Fitness for Duty
Ultimate heat sink
Probabilistic Risk Assessment
Coatings
Spent Fuel Pool Instrumentation
Fire Protection Program
ML18270A39428 September 2018APR1400 Final Safety Evaluation Report, Appendix D - Principal ContributorsProbabilistic Risk Assessment
ML18270A45228 September 2018APR1400 Final Safety Evaluation Report, Appendix E - Index of Nrc'S RAIsSafe Shutdown
Ultimate heat sink
Probabilistic Risk Assessment
Turbine Missile
Pressure Boundary Leakage
Fire Protection Program
ML18271A12128 September 2018APR1400 Final Safety Evaluation Report, Appendix a - ChronologyLoop seal
Ultimate heat sink
Internal Flooding
Probabilistic Risk Assessment
Fukushima Dai-Ichi
Turbine Missile
Pressure Boundary Leakage
Fire Protection Program
ML18215A23928 September 2018APR1400 Chapter 19, Probabilistic Risk Assessment and Severe Accident Evaluation, Final Safety Evaluation ReportSafe Shutdown
Boric Acid
High winds
Shutdown Margin
Reactor Vessel Water Level
Loop seal
Ultimate heat sink
Mission time
Fire Barrier
Anticipated operational occurrence
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Emergency Lighting
Incorporated by reference
Finite Element Analysis
FLEX
B.5.b
Fukushima Dai-Ichi
Significance Determination Process
Seismically rugged
Spent Fuel Pool Instrumentation
Severe Accident Management Guideline
Battery sizing
Earthquake
Maintenance Rule Program
Turbine Missile
Fuel cladding
Fire Watch
Scaffolding
Backfit
Coast down
ML18264A13021 September 2018Enclosure 3 - Markup of the APR1400 Chapter 6 - FSER
ML18264A12921 September 2018Enclosure 2 - Markup of the APR1400 Chapter 5 - FSERHydrostatic
Dissimilar Metal Weld
ML18264A12821 September 2018Enclosure 1 - Markup of the APR1400 Chapter 4 - FSERReactor Vessel Water Level