ML18264A129

From kanterella
Jump to navigation Jump to search
Enclosure 2 - Markup of the APR1400 Chapter 5 - FSER
ML18264A129
Person / Time
Site: 05200046
Issue date: 09/21/2018
From:
Korea Hydro & Nuclear Power Co, Ltd
To:
Office of New Reactors
Shared Package
ML18264A126 List:
References
MKD/NW-18-0128L
Download: ML18264A129 (5)


Text

5.2.3.3.6 7KUHDGHG)DVWHQHUV

DCD Tier 2 Section 5.2.3.6, expands on the discussion in DCD Tier 2 Section 3.13 regarding threaded fasteners in the context of RCPB applications. The staff confirmed that the information provided in DCD Tier 2 Section 5.2.3.6 is consistent with DCD Tier 2 Section 3.13. The staff evaluation of this information is found in Section 3.13 of this SER.

5.2.3.3.7 5HDFWRU&RRODQW&KHPLVWU\

It is essential that coolant purity be maintained carefully, since many dissolved species can enhance material corrosion or otherwise damage internal components. One way of meeting this is by having RCS chemical parameters that are consistent with the limiting values presented in the EPRI PWR Primary Water Chemistry Guidelines (here after EPRI Guidelines). Although the staff does not formally review or issue a safety evaluation for the various EPRI water chemistry guidelines, these guidelines are recognized as representing the industries best practices in water chemistry control. Extensive experience in operating reactors has demonstrated that following the EPRI Guidelines minimizes the occurrence of corrosion-related failures. Further, the EPRI Guidelines are periodically revised to reflect evolving knowledge with respect to best practices in chemistry control. Therefore the staff accepts the use of the latest version of the EPRI guidelines as an acceptable basis for reactor coolant chemistry considerations (for example as stated in SRP Section 9.4.3).

The applicant addressed the EPRI guidelines through two COL items. These COL items ensure that the COL applicant references the latest edition of the EPRI guidelines (COL 5.2(5)) and provides threshold values and operator actions for primary water chemistry that are in compliance with the latest version of the EPRI Guidelines (COL 9.3(7)). These COL Items ensure the APR1400 primary water chemistry will conform to the latest EPRI Guidelines and thus will follow industry best practices, and the staff therefore determined that the APR1400 RCS water chemistry values, are acceptable. fluoride EPRI Guidelines also specify certain water chemistry concentrations as control parameters, which require strict adherence to limits in order to achieve material protection. In APR1400 DCD Tier 2 Section 5.2.3.2.1, Reactor Coolant Chemistry, the applicant provided a detailed discussion of the control parameters for dissolved oxygen, ammonia, lithium, dissolved hydrogen, fluoride and sulfate. For each of these chemical species, except Li, the applicant provided limiting values equal to, or more stringent than, the Action Level 2 values from the EPRI Guidelines. (For chloride and fluoride ion concentrations, these values are also mentioned in RG 1.44 as strict limits.) For Li concentration, no exact limits are provided in the EPRI Guidelines, as this component is determined by the pH control. The EPRI Guidelines only state Action Level 1 limits for H2 and O2, and DCD Tier 2 Table 5.2-55, Reactor Coolant Design Specification, standard values are consistent with, or more stringent than, these limits. The EPRI Guidelines stipulate sampling three times/week for all but sulfate (once/week) and dissolved O (as stipulated in plant TS). However, they note that sampling frequencies may vary and that they will be determined in the plant TS. The staff concluded that the applicant has provided appropriate limits for the RCS water chemistry control parameters since the limits are the same, or more stringent that the limits recommended by the EPRI Guidelines.

EPRI Guidelines specify certain water chemistry parameters as diagnostic, which do not have mandated limits, but which should nevertheless be monitored as they provide an additional level of protection from corrosion, radiation protection and other failures. These are listed as DCD Tier 2 Table 5.2-8, "Reactor Coolant Detailed Power Operation Specifications," 5-38

b. The pump and valve IST program.
c. The hydrostatic testing program.

The following sections of the SER document the staffs review of the ISI and testing program.

As stated in the introduction, the staffs review of the pump and valve IST program is documented in Section 3.9, Mechanical Systems and Components, of this SER.

System Boundary Subject to Inspection. The definition of the system boundary subject to inspection is acceptable if it is in agreement with the definition of the RCPB provided in 10 CFR 50.2. Per 10 CFR 50.2, the RCPB includes all pressure-retaining components of boiling and PWRs, such as pressure vessels, piping, pumps, and valves, which are part of the RCS, or connected to the RCS, up to and including any and all of the following: (a) the outermost containment isolation valve in system piping that penetrates the primary reactor containment; (b) the second of two valves normally closed during normal reactor operation in system piping that does not penetrate primary reactor containment; (c) the RCS safety and relief valves. The examination requirements of ASME Section XI, Subsection IWB, apply to all Class 1 pressure retaining components and their welded attachments.

DCD Tier 2 Section 5.2.4.1.1 states that the RPV, pressurizer, primary side of the SG, and associated piping, pumps, valves, bolting, and component supports are subject to inspection.

The applicant further stated that all ASME Code Class 1 pressure-retaining components are subject to inspection. The staff confirmed that the applicant appropriately enumerated all components subject to inspection compliant with 10 CFR 50.55a and ASME Section XI.

Accessibility Arrangement of Systems and Components to Provide Accessibility. The design and arrangement of system components are acceptable if an adequate clearance is provided in accordance with ASME Section XI, Subarticle IWA-1500, ccessibility. 10 CFR 50.55a(g)(3)(i) requires Class 1 components, including supports, to be designed and be provided with access to enable the performance of inservice examination of these components, in addition to meeting the preservice examination requirements set forth in the editions and addenda of Section III or XI of the ASME Code of record.

DCD Section 5.2.4.1.2 states that the layout and arrangement of the APR1400 plant provides adequate working space and access for inspection, maintenance, and repair of the Class 1 components of the RCPB in accordance with ASME Section XI, Subarticle IWA-1500. The applicant also stated that all Class 1 components shall be designed for and provided with access to enable the performance of ASME Section XI inspections in the installed condition.

The applicant also described the provisions provided in the APR1400 design to allow access for to perform the required examinations of the RPV, reactor coolant piping, RCPs, the pressurizer, the SGs, and other RCPB components. In addition, the application states that provisions are made for removable insulation, removable shielding, the installation of handling machinery, adequate personnel and equipment access space, and laydown space for all temporarily removed or serviced components. Storage space for the removable insulation panels is also provided as well as working room adjacent to each piping system weld to allow for manual examination. Relevant to this, DCD Tier 2 Section 5.2.4.1, states that dissimilar metal welds and austenitic welds in piping will be examined from both sides. It is further stated that when ultrasonic examination from both sides is not possible, then single-sided ultrasonic examination will be performed in accordance with ASME Section XI, Appendix VIII. The staff determined that the applicants approach is acceptable because it is in accordance with ASME Section XI.

5-43

approximately 350 °F (176.7 °C) and 450 psia (31.6 kg/cm2A). Also, the SCS is operated while the plant is shutdown during reduced inventory, such as mid-loop operation. Additionally, the SCS is used to cooldown the RCS following a small break LOCA (SBLOCA) (refer to Section 6.3). The SCS is designed with two independent trains that can operate in both single and two loop operation. Each train has its own suction and discharge connections to the RCS.

This section of the DCD describes the design basis, system operation, instrumentation and testing requirements of the SCS. DCD Tier 2 Section 6.3, Emergency Core Cooling System, provides additional information of the SCS as it relates to the interface with the SIT.

SIS 5.4.7.2 6XPPDU\RI$SSOLFDWLRQ

After the reactor coolant temperature and pressure have been reduced to below their designed values for SCS operation, as shown in the table below, the SCS is placed into shutdown cooling service to maintain or reduce the RCS temperature to the temperature defined by the SCS mode of operation: (1) Normal Shutdown, (2) Safety Shutdown, and (3) Refueling Shutdown.

In the safety shutdown mode, the SCS will be used for accidents such as SBLOCA, steam and feedwater line breaks, and SG tube ruptures. In addition, the SCS is used for plant heatup operations that bring the RCS from cold shutdown to hot standby. The SCS operational modes are summarized in the table below with approximate initial and final reactor conditions.

Mode Initial Conditions Final Conditions Of Operation Pressure Temperature Flow Rate Time After Temperature Trains (kg/cm2A) / (oC) / (oF) (L/min) & Shutdown (oC) / (oF) In (psia) (gpm) (Hours)

Service Normal S/D 31.6 / 450 ~176.7 / ~350 18,927 / 24 60 / 140 2 (5,000) 40 54.4 / 130 2 Safety S/D 28.1 / 400 ~193.3 / ~380 18,927 / 24 93.3 / 200 1 (5,000)

Refueling 18,927 / 96 ~48.9 / ~120 2 (5,000)

Startup Variable Variable 18,927 / Pressure: 176.7 / 350 2 (5,000) 31.6 kg/cm2A

/ 450 psia Prior to fuel loading, the SCS configuration and component operational performance is verified through a series of inspections, tests, and analyses whereupon the results are compared against the acceptance criteria as identified in DCD Tier 1 Section 2.4.4, Shutdown Cooling System, Table 2.4.4-4, Shutdown Cooling System ITAAC. During the initial startup following 5-112

2)),&,$/86(21/<+/-35235,(7$5<,1)250$7,21

EDVLVGHPRQVWUDWLQJZK\WKHXVHRIVXFKDFULWHULDZLOOSURYLGHIRUDQDFFHSWDEOHOHYHORIVDIHW\

DJDLQVWIO\ZKHHOIDLOXUH7KHVWDIILVVXHGIROORZXS5$,4XHVWLRQ

0/$ UHTXHVWLQJWKHDSSOLFDQWWRUHYLVHWKH$35'&WRDSSO\D5&3IO\ZKHHO

VWUHVVOLPLWRIRQHWKLUGRIWKH\LHOGVWUHQJWKRIWKHPDWHULDORUSURYLGHDWHFKQLFDOMXVWLILFDWLRQ

UHJDUGLQJZK\WKHXVHRIRQHWKLUGRIWKHXOWLPDWHVWUHQJWKDVWKHGHVLJQVWUHVVOLPLWZLOOSURYLGH

DQDFFHSWDEOHOHYHORIVDIHW\DJDLQVWSRWHQWLDOIDLOXUHRIWKHIO\ZKHHOV([DPSOHVRIDQ

DFFHSWDEOHDSSURDFKGLVFXVVHGLQWKH-XQHSXEOLFPHHWLQJLQFOXGHGVSHFLI\LQJD\LHOG

VWUHQJWKRI1PP NVL WKDWZDVLQRULJLQDOIO\ZKHHODQDO\VLV GDWHG$XJXVW LQ

OLHXRIWKHFXUUHQWVSHFLILHG\LHOGVWUHQJWKRI1PP NVL RUSURYLGLQJVXIILFLHQW

DQDO\WLFDOEDVLVWRGHPRQVWUDWHWKDWWKHFKDQJHLQWKHSUREDELOLW\RIFUHDWLQJDPLVVLOHE\XVLQJ

XOWLPDWHVWUHQJWKDVWKHGHVLJQVWUHVVOLPLWLQOLHXRIWKH\LHOGVWUHQJWKLVVPDOO7KHVWDII

LVVXHGIROORZXS5$,4XHVWLRQ 0/$ UHTXHVWLQJWKH

DSSOLFDQWWRDGGUHVVWKLVLVVXH,IWKHXVHRIWKHRQHWKLUGXOWLPDWHVWUHQJWKFULWHULDLVWREH

MXVWLILHGDVQRWHGDERYHWKHDFFHSWDQFHFULWHULDLQWKH$35$015³.+13

$35)O\ZKHHO,QWHJULW\5HSRUW'5HYLVLRQGDWHG1RYHPEHUQHHGVWREH

UHYLVHG7KHUHIRUH5$,4XHVWLRQZDVEHLQJWUDFNHGDVDQRSHQLWHP

,QLWVUHVSRQVHVWR5$,4XHVWLRQ 0/$DQG0/$ 

WKHDSSOLFDQWVWDWHGWKDW$35$015ZDVUHYLVHGWRDSSO\DIO\ZKHHOVWUHVVOLPLWRI

RQHWKLUGRIWKHPDWHULDO¶V\LHOGVWUHQJWKZKLFKLV1PP NVL ZKLFKVXSHUVHGHV

WKHSUHYLRXV5$,UHVSRQVH 0/$ ,QDGGLWLRQLQLWVUHYLVHGUHVSRQVHWR5$,

4XHVWLRQ 0/$ WKHDSSOLFDQWUHYLVHG$35'&'

6HFWLRQWRLQFOXGH5HYLVLRQRI$35$015LVVXHG-XO\ZKLFK

VXSHUVHGHV5HYLVLRQRI$35$015GDWHG1RYHPEHU8SRQ

UHYLHZLQJ5HYLVLRQRI$35$015LVVXHG-XO\WKHVWDIIQRWHVWKDWWKH

GHVLJQVSHFLILFDWLRQIRUWKHIO\ZKHHOZDVPRGLILHGE\RSWLPL]LQJWKHVKULQNILWVWUHVVHVWRPHHW

WKHQRUPDORSHUDWLQJVWUHVVOLPLWRIRQHWKLUGRI\LHOGVWUHQJWK%DVHGRQWKLVUHGHVLJQ

$35$015ZDVPRGLILHGH[WHQVLYHO\WRGHPRQVWUDWHWKDWWKHGHVLJQVWUHVVRIWKH

IO\ZKHHODWGHVLJQVSHHGGRHVQRWH[FHHGRQHWKLUGRIWKH\LHOGVWUHQJWKRIWKHPDWHULDO

FRQVLVWHQWZLWK6HFWLRQRI185(*7KHVWDIIIRXQG$35$015

5HYLVLRQLVVXHG-XO\ZKLFKZDVVXEPLWWHGE\WKHDSSOLFDQWLQLWVOHWWHUGDWHG

$XJXVWDFFHSWDEOHDQGLVGLVFXVVHGEHORZ7KHUHIRUH5$,

4XHVWLRQLVUHVROYHGDQGFORVHG

8641 5HYLVLRQRI$35$015LVVXHG-XO\VSHFLILHGWKDWWKHGHVLJQVSHFLILFDWLRQ

ZDVUHYLVHGWRRSWLPL]HWKHVKULQNILWVWUHVVHVGHOHWHGWKHUHTXLUHPHQWRIWRWDOVWUHVVHVDWMRLQW

UHOHDVHVLQFHLWLVQRWDSSOLFDEOHDQGXVHG\LHOGVWUHQJWKRIWKHPDWHULDODVWKHGHVLJQVWUHVV

OLPLWLQOLHXRIWKHXOWLPDWHVWUHQJWKRIWKHIO\ZKHHOPDWHULDO7KHVWDIIYHULILHGWKDWWKHFDOFXODWHG

VWUHVVHVRIWKHIO\ZKHHOGXULQJQRUPDORSHUDWLQJFRQGLWLRQVDUHEHORZRQHWKLUGRIWKH\LHOG

VWUHQJWKDQGWKDWWKHVWUHVVHVGXULQJGHVLJQRYHUVSHHGFRQGLWLRQVDUHOHVVWKDQWKHWZRWKLUGV

RIWKH\LHOGVWUHQJWKRIWKHIO\ZKHHOPDWHULDO

)RUWKHGXFWLOHIUDFWXUHDQDO\VLV$35$0155HYLVLRQXVHVWKHHODVWLFVWUHVV

DQDO\VLVPHWKRGRIWKH$60(&RGH6HFWLRQ,,,$UWLFOH)WRSUHGLFWWKHFULWLFDOVSHHG

EDVHGRQWKHGXFWLOHIUDFWXUHRIWKHIO\ZKHHO7KH$60(&RGHVWDWHVWKDWWKHVWUHVVOLPLWVIRU

WKHJHQHUDOSULPDU\PHPEUDQHVWUHVVLQWHQVLW\VKRXOGEHHTXDOWRRIWKHPLQLPXPVSHFLILHG

XOWLPDWHWHQVLOHVWUHQJWKRIWKHIO\ZKHHOPDWHULDO7KHVWDIIYHULILHGWKDWWKHPLQLPXPFDOFXODWHG

OLPLWLQJVSHHG USP DVVXPLQJDPP LQFK FUDFNLVDWOHDVWWZLFHWKHQRUPDO

RSHUDWLQJVSHHG USP 7KHVWDIIGHWHUPLQHGWKDWWKHFULWLFDOVSHHGIRUGXFWLOHIUDFWXUH

PHHWVWKHFULWHULRQLQ5*,QDGGLWLRQWKHVWDIIFRQILUPHGWKDWWKHFULWLFDOVSHHGIRUGXFWLOH

IUDFWXUH USP LVJUHDWHUWKDQWKH/2&$RYHUVSHHGRIUSP7KHUHIRUHWKHVWDII



pressurization downstream of the low pressure system. The staff concludes that the charging line pathway pressure detection and manual isolation terminates a potential ISLOCA transient. .

Therefore, the staff finds the design response to this pathway satisfies the ISLOCA acceptance criteria in Section 5.A(C) of this SER based on the following:

charging

  • System integrity is preserved since the portion of the letdown line pressurized by the ISLOCA is designed to full RCS design pressure.

charging line upstream of the charging pumps

  • The letdown line downstream of the letdown control valves and all other downstream interfacing systems are designed to be protected from an ISLOCA by manual action of the isolation valves. Therefore, the low pressure systems integrity is ensured.
  • The RCS pressurization pathway is isolated, which prevents primary coolant loss and no increase in offsite dose.

The staff reviewed the impact of the difference between the letdown line and the charging line.

In the letdown line, the pressurization pathway is in the direction of normal flow. Therefore, the letdown line has been designed to reduce and control the fluid pressure under normal and ISLOCA operating conditions. Besides isolation, a backup relief valve is provided which is sized to provide reasonable assurance that the design pressure, in the low pressure sections, is not exceeded. However, for the charging line, the pressurization pathway direction in the charging line is opposite to the flow. To remedy this condition, the charging line has three check valves in series to prevent overpressurization of the CVCS. This check valve configuration has a high probability of not failing when the charging pump and auxiliary charging pump (ACP) are not in operation. The applicant noted that a pressure indicator upstream of the charging pumps provides MCR indication upon sensing high pressure to initiate an operator manual isolation of the charging line by the containment isolation valves. To further improve over-pressurization protection, the applicant stated that there will be installed relief valves in the volume control tank [VCT] discharge line, charging pump mini-flow line, charging pump discharge line, and ACP discharge line. The staff determined that this pathway configuration is acceptable because it is consistent with the guidance in SECY-90-016, meets the ISLOCA acceptance criteria in Section 5.A(C) of this SER, and additional relief valves provide additional assurance that the design pressure, in the low pressure sections, is not exceeded.

5HDFWRU&RRODQW3XPS6HDO,QMHFWLRQ/LQH

The seal injection line is a primary pathway system connected directly to the RCS through which an ISLOCA event can start. Pressurization is composed of two separate pathways: (1) from the charging nozzle through the shell side of the regenerative HX to the seal injection line and (2) from the RCP seals through the tube side of the high pressure seal cooler to the discharge side of the charging pump. As noted in Table 5A-1 of this SER, the applicant identified the boron recovery system and atmospheric system as low-pressure interfacing systems with RCP seal injection line which presents a potential over-pressurization transient event.

The design pressure of the seal injection line is 212.7 kg/cm2G (3,025 psig), which is greater than normal RCS pressure. Therefore, the staff finds that the seal injection line meets the acceptance criteria in Section 5.A(C) of this SER 5-141