ML20056B458 | 21 August 1990 | Advises That Legal Notices Re Reissuances of NPDES Permit for Plant Have Been Published in Richmond-Times Dispatch & Central Virginian on 900804 & 11 & 0726 & 0802,respectively, as Requested.Confirmation from Newspapers Encl | |
ML20055H839 | 23 July 1990 | Requests Publication of Encl Public Notice of Reissuance of Vpdes Permit for Plant.Certification of Public Notice Issue Date Also Requested | |
ML20055H840 | 23 July 1990 | Requests Publication of Encl Public Notice of Reissuance of Vpdes Permit for Plant.Certification of Public Notice Issue Date Requested | |
ML20055D298 | 28 June 1990 | Informs of Change in Location of Discharge of Reject Water from Plant Reverse Osmosis Water Purification Sys.Effective 900626,discharge Directed to Discharge Tunnel at Intake Structure Per State Recommendation | |
ML18153B849 | 26 July 1989 | Informs of 890711 Discovery of die-off of Approx 200 Fish in Uppermost End of Discharge Canal.Possibly Caused by Fish Being Trapped in Discharge Canal & Dying from Temp Shock at Time of Startup of Plant | |
ML18153B578 | 13 January 1989 | Informs That on 890109,discovered Small Oil Sheen in Upper End of Station Discharge Canal Attributed to Parking Lot Runoff Involving Less than 1 Pint of Oil Flowing Into Storm Drain & Discharge Canal.James River Believed Unaffected | |
ML20153D508 | 29 August 1988 | Confirms Telcon Rept of 880827 Oil Spill During Operator Attempt to Dewater Oil/Water Separator,Resulting in Discharge to Outfall 004.Operators to Exercise More Caution During Dewatering Until Chiller Operation Curtailed | |
ML20151Q107 | 20 April 1988 | Comments on Comparison Review of 1986 Semiannual Effluent Release Repts,Per 880311 Request.Percent of Tech Spec Limit for Total Body Dose Rate for Fourth Quarter on Page 7 Changed from 7.63E3% to 7.63E-3% | |
ML20213A460 | 15 December 1986 | Discusses 861212 Visit to Plant Re 861209 Piping Failure. Addition of Snubber or Piping Changes May Be Necessary.Addl Info from Util Needed | |
ML20214R764 | 25 November 1986 | Confirms Recent Oil Spill.On 861118,oil Found in Upper End of Station Cooling Water Discharge Canal.Sorbent Matls Secured in Storm Drain.Related Info Encl | Time of Discovery |
ML20214P007 | 25 November 1986 | Forwards Completed Oil Spill Questionnaire VA 87-011 of Spill on 861022.Spill Determined to Be Discharge of Polystyrene Resin,Not Oil | Time of Discovery |
ML20214J133 | 21 November 1986 | Confirms Recent Oil Spill at Facilities,Previously Reported on 861118.Complete Info Being Assembled & Full Rept Will Be Provided by 861125 | |
ML20207B411 | 14 July 1986 | Forwards Completed Questionnaire Re 860604 Oil Spill | Time of Discovery |
ML20137B470 | 6 January 1986 | Forwards Oil Spill Questionnaire WV-86-002 Describing 851002 Discharge of Approx 1 Gallon Lubricating Oil from Oil/Water Separator Into Discharge Canal Leading to Lake Anna.Catch Basin Cleaned | Time of Discovery |
ML20128C863 | 19 June 1985 | Forwards Completed Questionnaire Re 850519 Oil Spill, Submitted on 850605 by T Voltaggio | Time of Discovery |
ML20106F999 | 15 October 1984 | Forwards Completed 841004 Questionnaire VA-273 Re 840927 Oil Spill | Time of Discovery High winds |
ML20097H705 | 5 September 1984 | Forwards Oil Spill Questionnaire VA-84-231 Addressing 840816 Spill | Time of Discovery |
ML20095J204 | 20 August 1984 | Informs of Oil Spill on 840816.Two Gallons of Oil Discovered Near First Storm Drain at Discharge Canal.Oil Contained in Area & Cleaned Up by Use of Absorbent Pads & Fiber Pearl. Caused by Separator Left Running | |
ML20092K557 | 20 June 1984 | Submits Addl Info Re 840616 Possible Oil Spill Previously Reported by Telephone.Util Unable to Confirm or Deny Original Rept of Spill.Level Control Sys for Unit 1 Turbine Sump Tested & Found Operating Satisfactorily | |
ML20092C869 | 13 June 1984 | Forwards Completed Oil Spill Questionnaire VA-84-156 Re 840518 Spill in Condenser Cooling Water Discharge Canal. Cause Unidentified.Oil Contained by Absorbent Boom | Time of Discovery |
ML20087G315 | 7 March 1984 | Forwards Completed Oil Spill Questionnaire VA-84-093 for 840215 Occurrence | Time of Discovery |
ML20081C210 | 1 March 1984 | Advises That 11.6% Permit Responsibility Transferred to Old Dominion Electric Cooperative on 831221,per . Requests NPDES Permit & 401 Certificate Be Modified to Reflect Transfer.W/O Stated Encl | |
ML18141A495 | 2 February 1984 | Ack Receipt of Tl Wedgewood 831230 Ltr.Forwards Payment of Assessed Penalty for Discharge of Oil Into Cooling Water Discharge Canal | |
ML20086G585 | 29 December 1983 | Informs of 831228 Oil Sheen Discovered on Lake Anna.Caused by Rain Washing Oil Off Waste Oil Drums.Oil Boom & Absorbent Pads Used to Contain & Clean Up Spill.Oil Drum Storage Facility Const in Progress | |
ML20087M061 | 22 September 1983 | Forwards Preliminary Results of Natural Circulation Analyses for 811111 Transient at McGuire & 800605 Natural Circulation Low Power Test at North Anna | |
ML20009H262 | 8 July 1981 | Informs of 810703 Facility Oil Spill.On 810703,station Transformer Ruptured & Caught Fire.Unknown Quantity of Oil Washed to Lake Anna Via Discharge Storm Sewer.Cleanup Continued Until 810705.No Environ Impact Cited | |
ML18139A975 | 31 December 1980 | Advises That Response Plan Not Acceptable in Present Form. Supplies,Personnel & Technical Assistance to Be Provided by State Health Dept in Most Cases Nonexistent | |
ML19259C825 | 3 July 1979 | Confirms 790628 Telcon Re New Info About Util Motion for Summary Disposition & Prefiled Written Testimony Re Tornado Missiles.Large Missiles Could Not Strike Fuel Elements | Tornado Generated Missile |
ML19248D291 | 27 April 1979 | FOIA Request for Documents Relating to Alleged Withholding of Info Re Nuclear Plants Operated by VEPCO | |
ML19282B887 | 19 February 1979 | Expresses Concern Re Replacement of Radioactive Steam Generators & Possible Radiation Exposure Dangers.Requests Public Hearings | |
ML19241B525 | 1 November 1978 | Requests Assistance in Obtaining Responses to 780902 Ltr to JW Moorman & 781101 Ltr to NRC Re False Statements Dealing W/Abnormal Settlement of Plant | |
ML20214U296 | 14 October 1977 | Requests Attention to Possibility That Util Failed to Disclose Existence of Hosgri Fault Near Diablo Canyon in San Luis Obispo,Ca to NRC for 2 Yrs.Investigation Similar to That Being Conducted Re North Anna Suggested | Safe Shutdown Safe Shutdown Earthquake Earthquake Backfit |
ML19331A678 | 25 March 1977 | Discusses Nuclear Power Plant Const Delays Caused by NRC Inefficiency & Indifference.Requests President Carter to Take Positive & Constructive Action Re Voter Supported Nuclear Energy.Certificate of Svc Encl |