Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20056B45821 August 1990Advises That Legal Notices Re Reissuances of NPDES Permit for Plant Have Been Published in Richmond-Times Dispatch & Central Virginian on 900804 & 11 & 0726 & 0802,respectively, as Requested.Confirmation from Newspapers Encl
ML20055H83923 July 1990Requests Publication of Encl Public Notice of Reissuance of Vpdes Permit for Plant.Certification of Public Notice Issue Date Also Requested
ML20055H84023 July 1990Requests Publication of Encl Public Notice of Reissuance of Vpdes Permit for Plant.Certification of Public Notice Issue Date Requested
ML20055D29828 June 1990Informs of Change in Location of Discharge of Reject Water from Plant Reverse Osmosis Water Purification Sys.Effective 900626,discharge Directed to Discharge Tunnel at Intake Structure Per State Recommendation
ML18153B84926 July 1989Informs of 890711 Discovery of die-off of Approx 200 Fish in Uppermost End of Discharge Canal.Possibly Caused by Fish Being Trapped in Discharge Canal & Dying from Temp Shock at Time of Startup of Plant
ML18153B57813 January 1989Informs That on 890109,discovered Small Oil Sheen in Upper End of Station Discharge Canal Attributed to Parking Lot Runoff Involving Less than 1 Pint of Oil Flowing Into Storm Drain & Discharge Canal.James River Believed Unaffected
ML20153D50829 August 1988Confirms Telcon Rept of 880827 Oil Spill During Operator Attempt to Dewater Oil/Water Separator,Resulting in Discharge to Outfall 004.Operators to Exercise More Caution During Dewatering Until Chiller Operation Curtailed
ML20151Q10720 April 1988Comments on Comparison Review of 1986 Semiannual Effluent Release Repts,Per 880311 Request.Percent of Tech Spec Limit for Total Body Dose Rate for Fourth Quarter on Page 7 Changed from 7.63E3% to 7.63E-3%
ML20213A46015 December 1986Discusses 861212 Visit to Plant Re 861209 Piping Failure. Addition of Snubber or Piping Changes May Be Necessary.Addl Info from Util Needed
ML20214R76425 November 1986Confirms Recent Oil Spill.On 861118,oil Found in Upper End of Station Cooling Water Discharge Canal.Sorbent Matls Secured in Storm Drain.Related Info EnclTime of Discovery
ML20214P00725 November 1986Forwards Completed Oil Spill Questionnaire VA 87-011 of Spill on 861022.Spill Determined to Be Discharge of Polystyrene Resin,Not OilTime of Discovery
ML20214J13321 November 1986Confirms Recent Oil Spill at Facilities,Previously Reported on 861118.Complete Info Being Assembled & Full Rept Will Be Provided by 861125
ML20207B41114 July 1986Forwards Completed Questionnaire Re 860604 Oil SpillTime of Discovery
ML20137B4706 January 1986Forwards Oil Spill Questionnaire WV-86-002 Describing 851002 Discharge of Approx 1 Gallon Lubricating Oil from Oil/Water Separator Into Discharge Canal Leading to Lake Anna.Catch Basin CleanedTime of Discovery
ML20128C86319 June 1985Forwards Completed Questionnaire Re 850519 Oil Spill, Submitted on 850605 by T VoltaggioTime of Discovery
ML20106F99915 October 1984Forwards Completed 841004 Questionnaire VA-273 Re 840927 Oil SpillTime of Discovery
High winds
ML20097H7055 September 1984Forwards Oil Spill Questionnaire VA-84-231 Addressing 840816 SpillTime of Discovery
ML20095J20420 August 1984Informs of Oil Spill on 840816.Two Gallons of Oil Discovered Near First Storm Drain at Discharge Canal.Oil Contained in Area & Cleaned Up by Use of Absorbent Pads & Fiber Pearl. Caused by Separator Left Running
ML20092K55720 June 1984Submits Addl Info Re 840616 Possible Oil Spill Previously Reported by Telephone.Util Unable to Confirm or Deny Original Rept of Spill.Level Control Sys for Unit 1 Turbine Sump Tested & Found Operating Satisfactorily
ML20092C86913 June 1984Forwards Completed Oil Spill Questionnaire VA-84-156 Re 840518 Spill in Condenser Cooling Water Discharge Canal. Cause Unidentified.Oil Contained by Absorbent BoomTime of Discovery
ML20087G3157 March 1984Forwards Completed Oil Spill Questionnaire VA-84-093 for 840215 OccurrenceTime of Discovery
ML20081C2101 March 1984Advises That 11.6% Permit Responsibility Transferred to Old Dominion Electric Cooperative on 831221,per . Requests NPDES Permit & 401 Certificate Be Modified to Reflect Transfer.W/O Stated Encl
ML18141A4952 February 1984Ack Receipt of Tl Wedgewood 831230 Ltr.Forwards Payment of Assessed Penalty for Discharge of Oil Into Cooling Water Discharge Canal
ML20086G58529 December 1983Informs of 831228 Oil Sheen Discovered on Lake Anna.Caused by Rain Washing Oil Off Waste Oil Drums.Oil Boom & Absorbent Pads Used to Contain & Clean Up Spill.Oil Drum Storage Facility Const in Progress
ML20087M06122 September 1983Forwards Preliminary Results of Natural Circulation Analyses for 811111 Transient at McGuire & 800605 Natural Circulation Low Power Test at North Anna
ML20009H2628 July 1981Informs of 810703 Facility Oil Spill.On 810703,station Transformer Ruptured & Caught Fire.Unknown Quantity of Oil Washed to Lake Anna Via Discharge Storm Sewer.Cleanup Continued Until 810705.No Environ Impact Cited
ML18139A97531 December 1980Advises That Response Plan Not Acceptable in Present Form. Supplies,Personnel & Technical Assistance to Be Provided by State Health Dept in Most Cases Nonexistent
ML19259C8253 July 1979Confirms 790628 Telcon Re New Info About Util Motion for Summary Disposition & Prefiled Written Testimony Re Tornado Missiles.Large Missiles Could Not Strike Fuel ElementsTornado Generated Missile
ML19248D29127 April 1979FOIA Request for Documents Relating to Alleged Withholding of Info Re Nuclear Plants Operated by VEPCO
ML19282B88719 February 1979Expresses Concern Re Replacement of Radioactive Steam Generators & Possible Radiation Exposure Dangers.Requests Public Hearings
ML19241B5251 November 1978Requests Assistance in Obtaining Responses to 780902 Ltr to JW Moorman & 781101 Ltr to NRC Re False Statements Dealing W/Abnormal Settlement of Plant
ML20214U29614 October 1977Requests Attention to Possibility That Util Failed to Disclose Existence of Hosgri Fault Near Diablo Canyon in San Luis Obispo,Ca to NRC for 2 Yrs.Investigation Similar to That Being Conducted Re North Anna SuggestedSafe Shutdown
Safe Shutdown Earthquake
Earthquake
Backfit
ML19331A67825 March 1977Discusses Nuclear Power Plant Const Delays Caused by NRC Inefficiency & Indifference.Requests President Carter to Take Positive & Constructive Action Re Voter Supported Nuclear Energy.Certificate of Svc Encl