Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML24255A8646 September 2024Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification
ML24057A33825 February 2024EN 56993 - Fairbanks Morse
ML24088A11425 February 2024Fairbanks Morse (Fm) Part 21 Report 23-02 Re Synchro-Start Mini-Gen Signal Generator
ML24088A11025 February 2024Fairbanks Morse (Fm) Part 21 Notification Report Number 23-01 Re Asco Stainless Steel Solenoid Valves
ML24057A33725 February 202456992-EN 56992 - Fairbanks Morse Defense
ML23279A0615 October 2023Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs)Commercial Grade Dedication
ML23254A0246 September 2023Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs)
ML22307A0603 November 2022EN 56200 - Fairbanks Morse Re Basic Component Which Fails to Comply or Contains a DefectOverspeed
ML22301A17428 October 2022Global Nuclear Fuel Americas, LLC (GNF) - Part 21 60-Day Interim Report Notification: GNF3 Raised Water Rod (SC-22-04 Rt)Affidavit
GNF3
Water rod
ML21322A05127 October 2021Paragon Energy Solutions, LLC, P21-09282021, Rev. 0, Final Notification of a Deviation with Inverter Assembly (Model NLI-072034-CSI-K-5-A)
ML20049A07511 February 2020C&D Technologies, Inc. -10 CFR Part 21 Evaluation Regarding Container Failure in KCR-07 Batteries
ML19253A05329 August 2019Azz Nuclear - Report of Potential 1O CFR Part 21, Eaton Size 1 and 2 A200 Series Starters/Contactors
ML19120A10617 April 2019Interim Report of Potential 10 CFR Part 21, Eaton Size 1 and 2 A200 Series Starters/Contactors
ML19080A0598 March 2019Interim Report of Potential 10CFR Part 21, Eaton A200 Series Starters/Contactors
ML19053A5001 February 2019Sor, Inc. Part 21 Notification of Deviation Sor R-Series Housing with Terminal Block
ML17194A82511 July 2017Part 21 Report Re Wedge Pin Failure in Anchor Darling Motor Operated Double Disc Gate Valves with Threaded Stem to Upper Wedge ConnectionsAnchor Darling
ML17179A3787 June 2017TE Connectivity - Part 21 Transfer of Information TE-023
ML17081A45320 March 2017Part 21 - Plastic Jar Dedication Sampling
ML17026A41420 January 2017C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling
ML17006A01113 December 2016Part 21 Notification - Defective Safety-Related Relays Supplied by TE Connectivity
ML16313A06218 October 2016C&D Technologies, Inc. - 10 CFR Part 21 Evaluation Regarding Terminal Welding Failure in 3DCU-9 BatteriesCommercial Grade
ML16209A05013 July 2016Part 21 - Furmanite Nuclear Grade Leak Seal Material FSC-N-1B
ML16188A37430 June 2016Part 21 - Inadequate Swaging and Adherence of Silicone O-Ring and Silicone PAD Soft Seat Main Disc and Pilot Disc Assemblies
ML15288A1999 October 2015Part 21 Interim Report - Potential Defect on P/N 535-601 Moore Industries Milliamp Modules
ML15223B2646 August 2015Part 21 Report - Notification of Deviation Regarding Hk Circuit Breaker Pivot Pin
ML15211A49624 July 2015Part 21 - Actuator Shaft Did Not Meet Dimensional Requirements
ML15103A2446 April 2015Part 21 Report - Deviation of Hk Circuit Breaker Close Latch SpringCommercial Grade Dedication
ML15022A65020 January 2015Letter from Steven R. Eisenberg USNRC 10CFR Part 21 Notification
ML14259A3898 September 2014Part 21 - Failure to Meet Specified Irradiation During Testing of Coated Test Panels
ML14204A70723 July 2014Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Unseating of Valve Spring on SSPVAffidavit
ML14210A01023 July 2014Part 21 - Unseating of Valve Spring on Scram Solenoid Pilot ValveSafe Shutdown
Shutdown Margin
Scram Discharge Volume
Failure to Scram
Affidavit
ML14204A70823 July 2014Enclosure 2, Description of Closure Evaluation, Non-Proprietary Information - Class I (Public)Safe Shutdown
Shutdown Margin
Scram Discharge Volume
Failure to Scram
ML14134A0798 May 2014Part 21 - Potential Defect in NUS-710DU Trip Unit to Produce a Valid Trip Output Signal
ML14139A2598 May 201410 CFR Part 21 Report Notification, NUS710DU Trip Units
ML14303A52628 March 2014Interim Part 21 Report - Misaligned Separators in LCR-25 Standby Batteries
ML13340A3825 December 2013Part 21 Reportable Condition Notification: Failure of Relay Logic Card Modules in 2 Out of 4 VotersAffidavit
ML13165A34212 June 201360-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers
ML13127A0123 May 2013Notification of Potential Interim Part 21 Report of Defect in a Relief Valve Bellows
ML13106A06215 April 2013Part 21 Notification Due to Pump DefectTime of Discovery
ML13077A33415 March 2013Part 21 Report - Initial Notification for Flowserve Model 28KXL Pump Impeller DefectUnanalyzed Condition
Fitness for Duty
ML13064A01225 February 2013Notification of Potential Part 21 Report Re Wedge Pin Failure of an Anchor/Darling Double-Disc Gate ValveAnchor Darling
ML13044A0758 February 2013Part 21 - Completed Evaluation for Potential Error in Main Steam Line High Flow Calculational MethodologyPower Uprate
ML13042A0968 February 2013Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Error in Main Steam Line High Flow Calculational MethodologyPower Uprate
ML12348A13613 December 2012Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers
ML12352A12313 December 201260-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers
ML12347A30812 December 2012Part 21 60-Day Interim Report Notification: Error in Main Steam Line High Flow Calculational Methodology
ML12283A24628 September 2012Part 21 - Fairbanks Morse Opposed Piston EDG Oil Pump LeakHydrostatic
Commercial Grade
ML12319A01227 September 2012Error in Main Steam Line High Flow Calculational Methodology
ML12258A39910 September 2012Potential Part 21 Issue Related to Tyco Timing RelayCommercial Grade
ML12163A1306 June 2012Part 21 Report - Failure of CRD Collet Retainer Tube/Outer Tube Weld