Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML24255A864 | 6 September 2024 | Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification | |
ML24057A338 | 25 February 2024 | EN 56993 - Fairbanks Morse | |
ML24088A114 | 25 February 2024 | Fairbanks Morse (Fm) Part 21 Report 23-02 Re Synchro-Start Mini-Gen Signal Generator | |
ML24088A110 | 25 February 2024 | Fairbanks Morse (Fm) Part 21 Notification Report Number 23-01 Re Asco Stainless Steel Solenoid Valves | |
ML24057A337 | 25 February 2024 | 56992-EN 56992 - Fairbanks Morse Defense | |
ML23279A061 | 5 October 2023 | Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) | Commercial Grade Dedication |
ML23254A024 | 6 September 2023 | Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) | |
ML22307A060 | 3 November 2022 | EN 56200 - Fairbanks Morse Re Basic Component Which Fails to Comply or Contains a Defect | Overspeed |
ML22301A174 | 28 October 2022 | Global Nuclear Fuel Americas, LLC (GNF) - Part 21 60-Day Interim Report Notification: GNF3 Raised Water Rod (SC-22-04 Rt) | Affidavit GNF3 Water rod |
ML21322A051 | 27 October 2021 | Paragon Energy Solutions, LLC, P21-09282021, Rev. 0, Final Notification of a Deviation with Inverter Assembly (Model NLI-072034-CSI-K-5-A) | |
ML20049A075 | 11 February 2020 | C&D Technologies, Inc. -10 CFR Part 21 Evaluation Regarding Container Failure in KCR-07 Batteries | |
ML19253A053 | 29 August 2019 | Azz Nuclear - Report of Potential 1O CFR Part 21, Eaton Size 1 and 2 A200 Series Starters/Contactors | |
ML19120A106 | 17 April 2019 | Interim Report of Potential 10 CFR Part 21, Eaton Size 1 and 2 A200 Series Starters/Contactors | |
ML19080A059 | 8 March 2019 | Interim Report of Potential 10CFR Part 21, Eaton A200 Series Starters/Contactors | |
ML19053A500 | 1 February 2019 | Sor, Inc. Part 21 Notification of Deviation Sor R-Series Housing with Terminal Block | |
ML17194A825 | 11 July 2017 | Part 21 Report Re Wedge Pin Failure in Anchor Darling Motor Operated Double Disc Gate Valves with Threaded Stem to Upper Wedge Connections | Anchor Darling |
ML17179A378 | 7 June 2017 | TE Connectivity - Part 21 Transfer of Information TE-023 | |
ML17081A453 | 20 March 2017 | Part 21 - Plastic Jar Dedication Sampling | |
ML17026A414 | 20 January 2017 | C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling | |
ML17006A011 | 13 December 2016 | Part 21 Notification - Defective Safety-Related Relays Supplied by TE Connectivity | |
ML16313A062 | 18 October 2016 | C&D Technologies, Inc. - 10 CFR Part 21 Evaluation Regarding Terminal Welding Failure in 3DCU-9 Batteries | Commercial Grade |
ML16209A050 | 13 July 2016 | Part 21 - Furmanite Nuclear Grade Leak Seal Material FSC-N-1B | |
ML16188A374 | 30 June 2016 | Part 21 - Inadequate Swaging and Adherence of Silicone O-Ring and Silicone PAD Soft Seat Main Disc and Pilot Disc Assemblies | |
ML15288A199 | 9 October 2015 | Part 21 Interim Report - Potential Defect on P/N 535-601 Moore Industries Milliamp Modules | |
ML15223B264 | 6 August 2015 | Part 21 Report - Notification of Deviation Regarding Hk Circuit Breaker Pivot Pin | |
ML15211A496 | 24 July 2015 | Part 21 - Actuator Shaft Did Not Meet Dimensional Requirements | |
ML15103A244 | 6 April 2015 | Part 21 Report - Deviation of Hk Circuit Breaker Close Latch Spring | Commercial Grade Dedication |
ML15022A650 | 20 January 2015 | Letter from Steven R. Eisenberg USNRC 10CFR Part 21 Notification | |
ML14259A389 | 8 September 2014 | Part 21 - Failure to Meet Specified Irradiation During Testing of Coated Test Panels | |
ML14204A707 | 23 July 2014 | Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Unseating of Valve Spring on SSPV | Affidavit |
ML14210A010 | 23 July 2014 | Part 21 - Unseating of Valve Spring on Scram Solenoid Pilot Valve | Safe Shutdown Shutdown Margin Scram Discharge Volume Failure to Scram Affidavit |
ML14204A708 | 23 July 2014 | Enclosure 2, Description of Closure Evaluation, Non-Proprietary Information - Class I (Public) | Safe Shutdown Shutdown Margin Scram Discharge Volume Failure to Scram |
ML14134A079 | 8 May 2014 | Part 21 - Potential Defect in NUS-710DU Trip Unit to Produce a Valid Trip Output Signal | |
ML14139A259 | 8 May 2014 | 10 CFR Part 21 Report Notification, NUS710DU Trip Units | |
ML14303A526 | 28 March 2014 | Interim Part 21 Report - Misaligned Separators in LCR-25 Standby Batteries | |
ML13340A382 | 5 December 2013 | Part 21 Reportable Condition Notification: Failure of Relay Logic Card Modules in 2 Out of 4 Voters | Affidavit |
ML13165A342 | 12 June 2013 | 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers | |
ML13127A012 | 3 May 2013 | Notification of Potential Interim Part 21 Report of Defect in a Relief Valve Bellows | |
ML13106A062 | 15 April 2013 | Part 21 Notification Due to Pump Defect | Time of Discovery |
ML13077A334 | 15 March 2013 | Part 21 Report - Initial Notification for Flowserve Model 28KXL Pump Impeller Defect | Unanalyzed Condition Fitness for Duty |
ML13064A012 | 25 February 2013 | Notification of Potential Part 21 Report Re Wedge Pin Failure of an Anchor/Darling Double-Disc Gate Valve | Anchor Darling |
ML13044A075 | 8 February 2013 | Part 21 - Completed Evaluation for Potential Error in Main Steam Line High Flow Calculational Methodology | Power Uprate |
ML13042A096 | 8 February 2013 | Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Error in Main Steam Line High Flow Calculational Methodology | Power Uprate |
ML12348A136 | 13 December 2012 | Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers | |
ML12352A123 | 13 December 2012 | 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers | |
ML12347A308 | 12 December 2012 | Part 21 60-Day Interim Report Notification: Error in Main Steam Line High Flow Calculational Methodology | |
ML12283A246 | 28 September 2012 | Part 21 - Fairbanks Morse Opposed Piston EDG Oil Pump Leak | Hydrostatic Commercial Grade |
ML12319A012 | 27 September 2012 | Error in Main Steam Line High Flow Calculational Methodology | |
ML12258A399 | 10 September 2012 | Potential Part 21 Issue Related to Tyco Timing Relay | Commercial Grade |
ML12163A130 | 6 June 2012 | Part 21 Report - Failure of CRD Collet Retainer Tube/Outer Tube Weld |