Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML23241A002 | 25 August 2023 | Paragon Final Part 21 Report on Defect with Eaton/Cutler Hammer Size 4 and 5 Freedom Series Contactors Modified by Paragon with Special Coils And/Or with RTV to Improve the Securing of Shading Coils | |
ML23221A370 | 3 August 2023 | Paragon Energy Solutions, 10CFR Part 21 Initial Notification: P21-08032023-IN, Rev. 0 | |
ML21181A220 | 29 June 2021 | Part 21 Written Notification - P21-03302021 Rev. 2 - Failures of Size 1 and 2 Freedom Series Full Voltage Reversing Starters | |
ML21126A172 | 29 April 2021 | Paragon Energy Solutions Failures of Size 1 and 2 Freedom Series Full Voltage Reversing Starters | |
ML20366A047 | 18 November 2020 | Curtiss-Wright 10 CFR Part 21 Notification for SF-1154 Hydraulic Fluid Batch 17BLVS293 | |
ML20255A200 | 21 July 2020 | Paragon Energy Solutions, Failures of Size 1 and 2 Freedom Series Auxiliary Contacts | |
ML19253A053 | 29 August 2019 | Azz Nuclear - Report of Potential 1O CFR Part 21, Eaton Size 1 and 2 A200 Series Starters/Contactors | |
ML19190A044 | 7 June 2019 | 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 - Cw SAS Initial Report No. 10CFR21-48 | Overspeed trip Overspeed |
ML19168A012 | 31 May 2019 | Paragon Energy Solution LLC-10 CFR Part 21 Report of Defect GS2 Terry Turbine Introl Positioners | |
ML19120A106 | 17 April 2019 | Interim Report of Potential 10 CFR Part 21, Eaton Size 1 and 2 A200 Series Starters/Contactors | |
ML19121A155 | 15 April 2019 | Curtiss-Wright Nuclear Division, Enertech - 10 CFR Part 21 Notification for SF-1154 Hydraulic Fluid | |
ML19080A059 | 8 March 2019 | Interim Report of Potential 10CFR Part 21, Eaton A200 Series Starters/Contactors | |
ML17179A378 | 7 June 2017 | TE Connectivity - Part 21 Transfer of Information TE-023 | |
ML17090A398 | 27 March 2017 | Engine Systems, Inc. - Part 21 Report Regarding Identification of Failed Diode Surge Suppressor with Internal Manufacturing Defect | |
ML17081A453 | 20 March 2017 | Part 21 - Plastic Jar Dedication Sampling | |
ML16188A374 | 30 June 2016 | Part 21 - Inadequate Swaging and Adherence of Silicone O-Ring and Silicone PAD Soft Seat Main Disc and Pilot Disc Assemblies | |
ML16188A376 | 21 June 2016 | Part 21 Interim Evaluation of Deviation - Contractor Failure | Commercial Grade |
ML16154A205 | 20 May 2016 | Part 21 Interim Evaluation of a Deviation - Contactor Failure | |
ML15303A007 | 26 October 2015 | Part 21 Report Regarding Speed Switch Capacitor Failure, Per Shearon Harris Plant | |
ML15314A031 | 23 October 2015 | Engine Systems, Inc. - 10CFR21 Reporting of Defects and Non-Compliance, Report No. 10CFR21-0113, Rev. 0, Per Shearon Harris Nuclear Plant | |
ML15099A043 | 2 April 2015 | Amendment to Event Number 50299, 10 CFR Part 21 Notification, Potentially Defective Pressure & Temperature Switches | |
ML15099A042 | 2 April 2015 | Notification of Part 21 Report - Potentially Defective Pressure & Temperature Switches | |
ML14274A052 | 22 September 2014 | Final Report 10CFR Part 21 Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries, Revision 1 - Original Letter Did Not Include the List of Affected Utilities | |
ML14213A099 | 24 July 2014 | Notification of Part 21 Report - Potentially Defective Pressure & Temperature Switches | |
ML14169A030 | 15 June 2014 | Update to Interim Report - 10CFR 21 Evaluation Regarding Potential Deficiencies in Seismic Qualifications for PV-62 | |
ML13165A342 | 12 June 2013 | 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers | |
ML13099A238 | 27 March 2013 | Notification of Potential Part 21 Report Re Series 24 Csr Relays with Oversized Cam Drive Components | |
ML12352A123 | 13 December 2012 | 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers | |
ML12348A136 | 13 December 2012 | Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers | |
ML12123A089 | 27 April 2012 | Abb, Inc., Notification of Potential Part 21 Report - Hk Circuit Breaker Studs Failed to Meet Specification | |
ML12094A371 | 2 April 2012 | Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations | |
ML12075A106 | 14 March 2012 | Notification of Potential Part 21 Re Defect on Arvan Electrical Terminal Blocks | |
ML12058A141 | 23 February 2012 | Part 21 Report - Rosemount Nuclear Instruments, Inc., Pressure Transmitter with Nonzero Based Calibrations | |
ML11186A891 | 1 July 2011 | Notification of Potential Part 21 Seal Failure and Leakage Associated with Model B5497-301 Valves | |
ML092680246 | 23 September 2009 | Notification of Potential Part 21 on Reportable Occurrence Under 10 CFR Part 21: Firmware Anomaly in the Model RM-80 Radiation Monitoring System | Overexposure |
ML083190017 | 12 November 2008 | Notification of Potential Part 21 on All Dimensionally Verified Commercial Grade Items Processed Per Fisher Manufacture Procedure Fmp 2K28 | Commercial Grade |
ML082390106 | 25 August 2008 | Notification of Potential Part 21 on Failure of F and G Switches | Test box |
ML080990634 | 4 April 2008 | Part 21 Notification Regarding Failure to Comply with the Requirements for Dedication of Commercial Grade Items | Commercial Grade |
ML073440211 | 7 December 2007 | Deficiency Report Part 21 Potential Insufficient Thread Engagement for Certain Pressure Transmitters | |
ML073200086 | 9 November 2007 | Notification of Potential Part 21 Report Conval Valves Weld Qualifications | Commercial Grade |
ML071370309 | 7 March 2007 | Velan, Inc., Piston Check Cv Information | |
ML061860381 | 30 June 2006 | Operations Center Event Report, Defective Paperless Data Acquisition Recorders. | |
ML060950401 | 3 April 2006 | Director Office of Inspection & Enforcement Reference: 10 CFR 21 Notification of 3/30/06 Rev1 |