Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML23241A00225 August 2023Paragon Final Part 21 Report on Defect with Eaton/Cutler Hammer Size 4 and 5 Freedom Series Contactors Modified by Paragon with Special Coils And/Or with RTV to Improve the Securing of Shading Coils
ML23221A3703 August 2023Paragon Energy Solutions, 10CFR Part 21 Initial Notification: P21-08032023-IN, Rev. 0
ML21181A22029 June 2021Part 21 Written Notification - P21-03302021 Rev. 2 - Failures of Size 1 and 2 Freedom Series Full Voltage Reversing Starters
ML21126A17229 April 2021Paragon Energy Solutions Failures of Size 1 and 2 Freedom Series Full Voltage Reversing Starters
ML20366A04718 November 2020Curtiss-Wright 10 CFR Part 21 Notification for SF-1154 Hydraulic Fluid Batch 17BLVS293
ML20255A20021 July 2020Paragon Energy Solutions, Failures of Size 1 and 2 Freedom Series Auxiliary Contacts
ML19253A05329 August 2019Azz Nuclear - Report of Potential 1O CFR Part 21, Eaton Size 1 and 2 A200 Series Starters/Contactors
ML19190A0447 June 201910 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 - Cw SAS Initial Report No. 10CFR21-48Overspeed trip
Overspeed
ML19168A01231 May 2019Paragon Energy Solution LLC-10 CFR Part 21 Report of Defect GS2 Terry Turbine Introl Positioners
ML19120A10617 April 2019Interim Report of Potential 10 CFR Part 21, Eaton Size 1 and 2 A200 Series Starters/Contactors
ML19121A15515 April 2019Curtiss-Wright Nuclear Division, Enertech - 10 CFR Part 21 Notification for SF-1154 Hydraulic Fluid
ML19080A0598 March 2019Interim Report of Potential 10CFR Part 21, Eaton A200 Series Starters/Contactors
ML17179A3787 June 2017TE Connectivity - Part 21 Transfer of Information TE-023
ML17090A39827 March 2017Engine Systems, Inc. - Part 21 Report Regarding Identification of Failed Diode Surge Suppressor with Internal Manufacturing Defect
ML17081A45320 March 2017Part 21 - Plastic Jar Dedication Sampling
ML16188A37430 June 2016Part 21 - Inadequate Swaging and Adherence of Silicone O-Ring and Silicone PAD Soft Seat Main Disc and Pilot Disc Assemblies
ML16188A37621 June 2016Part 21 Interim Evaluation of Deviation - Contractor FailureCommercial Grade
ML16154A20520 May 2016Part 21 Interim Evaluation of a Deviation - Contactor Failure
ML15303A00726 October 2015Part 21 Report Regarding Speed Switch Capacitor Failure, Per Shearon Harris Plant
ML15314A03123 October 2015Engine Systems, Inc. - 10CFR21 Reporting of Defects and Non-Compliance, Report No. 10CFR21-0113, Rev. 0, Per Shearon Harris Nuclear Plant
ML15099A0432 April 2015Amendment to Event Number 50299, 10 CFR Part 21 Notification, Potentially Defective Pressure & Temperature Switches
ML15099A0422 April 2015Notification of Part 21 Report - Potentially Defective Pressure & Temperature Switches
ML14274A05222 September 2014Final Report 10CFR Part 21 Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries, Revision 1 - Original Letter Did Not Include the List of Affected Utilities
ML14213A09924 July 2014Notification of Part 21 Report - Potentially Defective Pressure & Temperature Switches
ML14169A03015 June 2014Update to Interim Report - 10CFR 21 Evaluation Regarding Potential Deficiencies in Seismic Qualifications for PV-62
ML13165A34212 June 201360-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers
ML13099A23827 March 2013Notification of Potential Part 21 Report Re Series 24 Csr Relays with Oversized Cam Drive Components
ML12352A12313 December 201260-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers
ML12348A13613 December 2012Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers
ML12123A08927 April 2012Abb, Inc., Notification of Potential Part 21 Report - Hk Circuit Breaker Studs Failed to Meet Specification
ML12094A3712 April 2012Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations
ML12075A10614 March 2012Notification of Potential Part 21 Re Defect on Arvan Electrical Terminal Blocks
ML12058A14123 February 2012Part 21 Report - Rosemount Nuclear Instruments, Inc., Pressure Transmitter with Nonzero Based Calibrations
ML11186A8911 July 2011Notification of Potential Part 21 Seal Failure and Leakage Associated with Model B5497-301 Valves
ML09268024623 September 2009Notification of Potential Part 21 on Reportable Occurrence Under 10 CFR Part 21: Firmware Anomaly in the Model RM-80 Radiation Monitoring SystemOverexposure
ML08319001712 November 2008Notification of Potential Part 21 on All Dimensionally Verified Commercial Grade Items Processed Per Fisher Manufacture Procedure Fmp 2K28Commercial Grade
ML08239010625 August 2008Notification of Potential Part 21 on Failure of F and G SwitchesTest box
ML0809906344 April 2008Part 21 Notification Regarding Failure to Comply with the Requirements for Dedication of Commercial Grade ItemsCommercial Grade
ML0734402117 December 2007Deficiency Report Part 21 Potential Insufficient Thread Engagement for Certain Pressure Transmitters
ML0732000869 November 2007Notification of Potential Part 21 Report Conval Valves Weld QualificationsCommercial Grade
ML0713703097 March 2007Velan, Inc., Piston Check Cv Information
ML06186038130 June 2006Operations Center Event Report, Defective Paperless Data Acquisition Recorders.
ML0609504013 April 2006Director Office of Inspection & Enforcement Reference: 10 CFR 21 Notification of 3/30/06 Rev1