Issue date | Title | Topic | |
---|---|---|---|
ML20217M021 | 20 September 1999 | Part 21 Rept Re Possible Deviation of NLI Dc Power Supply Over Voltage Protection Circuit Actuation.Caused by Electrical Circuit Conditions Unique to Remote Engine Panel. Travelled to Hope Creek to Witness Startup Sequence of DG | |
ML18107A344 | 1 June 1999 | Interim Part 21 Rept Re Premature Over Voltage Protection Actuation in Circuit Specific Application in Dc Power Supply.Testing & Evaluation Activities Will Be Completed on 990716 | |
ML18106B093 | 25 February 1999 | Part 21 Rept Re Possible Defect in Swagelok Pipe Fitting Tee,Part Number SS-6-T.Caused by Crack Due to Improper Location of Heated Bar.Only One Part Out of 7396 Pieces in Forging Lot Was Found to Be Cracked.Affected Util,Notified | |
ML18106B055 | 1 February 1999 | Part 21 Rept Re Possible Matl Defect in Swagelok Pipe Fitting Tee,Part Number SS-6-T.Defect Is Crack in Center of Forging.Analysis of Part Is Continuing & Further Details Will Be Provided IAW Ncr Timetables.Drawing of Part,Encl | |
ML18106B044 | 29 January 1999 | Part 21 Rept Re Possible Defect in Swagelok Pipe Fitting Tee Part Number SS-6-T.Caused by Crack in Center of Forging. Continuing Analysis of Part & Will Provide Details in Acoordance with NRC Timetables | |
ML20202F686 | 26 January 1999 | Engine Sys,Inc Part 21 (10CFR21-0078) Rept Re Degradation of Synchrostat Model ESSB-4AT Speed Switches Resulting in Heat Related Damage to Power Supply Card Components.Caused by Incorrect Sized Resistor.Notification Sent to Customers | Reverse polarity |
ML20206N321 | 7 December 1998 | Final Part 21 Rept Re Piston Failure of MSIV Actuator at Daec.Rept Indicates That No Reportable Defect Exists,Per 10CFR21 | Finite Element Analysis |
ML17354B097 | 9 September 1998 | Part 21 Rept Re Possible Machining Defect in Certain One Inch Stainless Steel Swagelok Front Ferrules,Part Number SS-1613-1.Caused by Tubing Slipping Out of Fitting at Three Times Working Pressure of Tubing.Notified Affected Utils | |
ML20236N675 | 9 July 1998 | Part 21 & Deficiency Rept Re Notification of Potential Safety Hazard from Breakage of Cast Iron Suction Heads in Apkd Type Pumps.Caused by Migration of Suction Head Journal Sleeve Along Lower End of Pump Shaft.Will Inspect Pumps | |
ML20247P565 | 18 May 1998 | Part 21 Rept Re Model SA-A101 MSIV A' Actuator Showing Evidence of Internal Leakage,In Both Directions Past Pneumatic Piston.Situation Being Reviewed to Determine If Failure Could Pose Substantial Safety Hazard | |
ML20217D570 | 20 March 1998 | Part 21 Rept 40 Re Governor Valve Stems Made of Inconel 718 Matl Which Caused Loss of Governor Control.Control Problems Have Been Traced to Valve Stems Mfg by Bw/Ip.Id of Carbon Spacer Should Be Increased to at Least .5005/.5010 | |
ML20211M649 | 8 October 1997 | Addenda 1 to Part 21 Rept Re Weldments on Opposed Piston & Coltec-Pielstick Emergency stand-by Diesel gen-set lube-oil & Jacket Water Piping Sys.Revised List of Potentially Affected Utils to Include Asterisked Utils,Submitted | |
ML20211H791 | 30 September 1997 | Part 21 Rept Re Failure of Weldment Associated w/lube-oil Piping Sys on 970804 at Millstone,Unit 2.Root Cause Is Not Yet Known.Quality of Weldment Is Being Considered.Listed Util Sites Affected | |
ML17264A938 | 10 July 1997 | Deficiency Rept Re Potential Safety Hazard Associated w/FM-Alco 251 Engin,High Pressure Fuel tube-catalog: 4401031-2 in Which Dual Failure Mode Exists.Caused by Incorrect Forming Process | |
ML20210E359 | 27 March 1997 | Part 21 Rept Re Sorrento Electronics Inc Has Determined Operation & Maint Manual May Not Adequately Define Requirements for Performing Periodic Surveillance of SR Applications.Caused by Hardware Failures.Revised RM-23A | |
ML18102A370 | 6 September 1996 | Part 21 Rept Re Installation of NUS Model OCA 801 Signal Isolator Modules & Model Mth 801 Signal Summator Modules. Replacement Modules Including Spares for Plant,Unit 2 Have Been Inspected by Vendor & Repaired | Design basis earthquake |
ML18102A338 | 21 August 1996 | Part 21 Rept Re Chipping of Latching Mechanism Props Installed in GE 4 Kv magne-blast Circuit Breakers,Type AM-4.16-350-2H.Two Affected Breakers Have Been Returned to Vendor | |
ML18102A559 | 8 August 1996 | Part 21 Rept Re Defect in NUS Model OCA801 Signal Isolator Modules.Replacement Modules Installed in Reactor Control & Protection Sys | Design basis earthquake |
ML20115F247 | 3 July 1996 | Part 21 Rept Re Piping (Small Portion of Unmelted Matl Drawn Lengthwise Into Bar During Drawing Process) Defect That Existed in Bar as Received from Mill.Addl Insp Procedure for Raw Matl Instituted | |
ML17353A614 | 28 February 1996 | Part 21 Rept 10CFR21-0073 Re Defect W/Voltage Adjust Potentiometer Mfg by Chicago Telephone Supply Used on NEI Peebles (Portec) Voltage Regulators at Plant.Util Updating Voltage Regulators W/Maury Instrument Corp Potentiometer | |
ML20096A402 | 28 December 1995 | Interim Part 21 Rept Failure of Scram Discharge Vol Drain Valve 1BFHV-F011.Possible Causes of Failure,Includes Spring mis-adjustment,change in Spring Adjuster Setting & Spring Relaxation.Further Investigation Ongoing | Scram Discharge Volume |
ML18101A877 | 4 August 1995 | Interim Part 21 Rept Re Potentially Reportable Deficiency in Edward Valve Model 838YT Check Valves Due to Disk Exhibiting Excessive Leakage.Disk from Original Valve Cleaned, Inspected & Installed in Replacement Valve | |
ML18101A861 | 1 August 1995 | Interim Part 21 Rept Re Velan Valve Corp Check Valve Failure to Close.Insp of Internals Showed Moderate Wear in Gap Between Valve Disc & Hanger Arm.New Disc Installed & Valve Tested Satisfactorily | |
ML17352B139 | 28 April 1995 | Part 21 Rept Re Mechanical Defect in Shaft Length of Some HEA63 Lockout Relays Mfg Between 1990-94.Defect Identified Could Possibly Result in Binding of Front Shaft.Suspect Relays Checked for Date Codes & Replacements Ordered | |
ML20082S740 | 26 April 1995 | Part 21 Rept Re Hinge Arms Associated W/Sixteen Swing Check Valves Mfg by Anchor-Darling Valve Co | Anchor Darling |
ML20081L770 | 29 March 1995 | Initial Part 21 Rept Re Anchor-Darling Check Valve Hinge Arms.Cs Pump B Discharge Check Valve Failed to Close in Nov 1994 Because Butt Stop on Hinge Arm Not of Sufficient Length.New Butt Stop Hinge Arm,Hinge Pin & Disc Installed | |
ML17352A895 | 15 November 1994 | Part 21 Rept Re Unit 3A Sequencers at Turkey Point Plant. Unless Contacted by FP&L to Perform Programming Changes & Subsequent V&V to Sequencer Software,United Controls Plans No Other Evaluation of Defect for Listed Reason | |
ML18038A897 | 7 September 1994 | Part 21 Rept Re Defect in Latching Mechanism of Potter & Brumfield Relay on C&D High Voltage Shut Down Alarm Assembly Printed Circuit Boards.Pull Test on Relay Reset Button Incorporated Into Receiving Insp Procedures | |
ML18100B239 | 27 July 1994 | Part 21 Rept Re Signal Summators PM-505B & 506B Found to Saturate High When Summators Lose Power & Reenergized. Summators Powered from Independent Vital Instrument Buses & Inverters.Design Changes Implemented | |
ML18100B227 | 25 July 1994 | Part 21 Rept Re Cracking in Valve Stem & Plug Connection Pinning Collar Area on PORVs 1PR1 & 1PR2.Caused Attributed to Either IGSCC or Hydrogen Assisted Cracking.Porv Internals Replaced W/Internals Mfg from SS 316 Matl W/Plug Stellited | |
ML18100B210 | 14 July 1994 | Deficiency Rept Re PORV Plug & Stem Material Defects. Initially Reported 940714.PORV Internals Were Replaced W/Plug Stellited | |
ML18100B191 | 30 June 1994 | Initial Part 21 Rept Re Deficiency in Signal Summators PM-505B & PM-506B Supplied by Westinghouse.Design Changes Implemented & Operators Made Aware of Affects of Power Supply Transient on Summator Operability | |
NG-94-1150, Part 21 Rept Re Defect Identified W/ C RHR Pump Motor from Daec.Pump Performance Degraded.Installed New Shaft Rotating Element,Wear Ring & Hydrostatic Bearing & Replaced Pump Mechanical Seal & Motor Thrust | 28 March 1994 | Part 21 Rept Re Defect Identified W/ C RHR Pump Motor from Daec.Pump Performance Degraded.Installed New Shaft Rotating Element,Wear Ring & Hydrostatic Bearing & Replaced Pump Mechanical Seal & Motor Thrust | Hydrostatic |
ML20063M170 | 2 March 1994 | Part 21 Rept Clarifying & Supplementing Info Provided by Licensee Re Deficiency in Qualified Life Calculation for Microswitches Mfg by Comsip,Inc. Subj PTW-5300 Dc Indicators Supplied by Comsip,Inc,Mfg by Microswitch Corp | |
ML20059H772 | 17 January 1994 | Part 21 Rept Re Virginia Power Notifying Fairbands Morse Via Failure Analysis Rept NESML-Q-058 of Defective Air Start Distributor cam,16104412 | |
ML20059F263 | 7 January 1994 | Part 21 Rept Re Air Start Distributor Cam Mfg by Fairbanks Morse.Mfg Suggests That Site Referenced in Encl App I Inspect Air Start Distributor Cam as Soon as Practical | |
ML18100A768 | 13 December 1993 | Interim Part 21 Rept Re Discovery That Ge/Alco EDGs High Pressure Injection Tube Studs Did Not Meet Correct Matl non- Std & Not Correct Geometry.All Nonconforming Studs Identified & Replaced | |
ML20057G151 | 7 October 1993 | Part 21 Rept Re Westronics Model 2100C Series Recorders. Informs That Over Several Tests,Observed That Recorder Would Reset During Peak Acceleration & Door Being Forced Off Recorder.Small Retaining Clips Added to Bottom of Door | |
ML20046C659 | 5 August 1993 | Part 21 Rept:On 930429,deficiency Identified Re Heat Damage to Comsip Series PTW-5300 Dc Powered Microswitches.Initially Reported on 930709.Safety-related Dc Microswitches Will Be Replaced Prior to 931230 | |
ML20056D707 | 15 July 1993 | Part 21 Rept Re Reportable defect-75 PSIG Relief Check Valve 1 Npt,Emd 9521844,Kepner 416C-1-75 | |
ML20044G531 | 26 May 1993 | Suppl to 921207 Part 21 Rept Re Declutch Sys Anomaly in Certain Types of Valve Actuators Supplied by Limitorque Corp.Limitorque Designed New Declutch Lever Which Will Be Available in First Quarter 1993 | Stroke time |
ML20128H993 | 9 February 1993 | Interim Deficiency Rept Re Defect in Replacement EDG Fuel Oil Pumps Supplied by Colt Industries (Fairbanks Morse Engine Div).Initially Reported on 930111.Plugs & O-rings Repositioned.Vendor Requested to Perform Evaluation | Safe Shutdown |
ML18096B242 | 1 February 1993 | Part 21 Rept Re Possible Matl Defect in Stainless Steel Swagelock Tube Fittings.Initially Reported on 921218.List of Part Numbers,Heat Codes & Addl Affected Customers Encl | |
ML20127H382 | 8 January 1993 | Part 21 Rept Re Possible Defect in Forging Shipped to Facility.Fitting of Body May Have Nonmettalic Matl Which Could Cause Body to Crack Upon pull-up.Computer Note Received from Crawford Fitting Co Encl | |
ML20127K881 | 6 January 1993 | Part 21 Rept Re Engine Driven Fuel Oil Pump Being Returned for Proper Configuration Due to Portion of O Ring Missing from Plug | |
ML20126J596 | 31 December 1992 | Part 21 Rept Re Potential Loss of RHR Cooling During Nozzle Dam Removal.Nozzle Dams May Create Trapped Air Column Behind Cold Leg Nozzle Dam.Mod to Nozzle Dams Currently Underway. Ltrs to Affected Utils Encl | Hydrostatic |
ML20125C716 | 7 December 1992 | Part 21 Rept Re Possibility for Malfunction of Declutching Mechanisms in SMB/SB-000 & SMB/SB/SBD-00 Actuators. Malfunction Only Occurs During Seismic Event.Balanced Levers May Be Purchased from Vendor.List of Affected Utils Encl | Stroke time Anchor Darling |
ML20127P586 | 23 November 1992 | Followup to 921005 Part 21 Rept Re Potential Defect in SB/SBD-1 Housing Cover Screws.Procedure Re Replacement of SBD-1 Spring Cover Bolts Encl.All Fasteners Should Be Loosened & Removed.List of Affected Utils Encl | |
ML20115G800 | 22 October 1992 | Part 21 Rept Re Possible Defect in Raw Matl in Body of Male Elbow Part SS-600-2-6,heat Code Eby.Remaining Stock Should Be Checked to Verify That Subj Heat Code Not on Hand. Vendor Will Replace Unused SS-400-3 Ebys on Hand | |
ML20116L431 | 20 October 1992 | Followup to Part 21 Rept from Consolidating Power Supply, Inc Re Purchase & Procurement of 24-inch Flange at Facility Which Failed to Meet ASME Code Class III Requirements.Flange Purchased by Conex Pipe Sys,Inc.Investigation Underway |