Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML17188A269 | 16 March 2017 | Enclosure 14 O LR-N17-0044 and LAR H17-03 - Calculation SC-BB-0525, Hope Creek Heat Balance Uncertainty Calculation, Revision 5 | |
LR-N17-0044, Enclosure 14 O LR-N17-0044 and LAR H17-03 - Calculation SC-BB-0525, Hope Creek Heat Balance Uncertainty Calculation, Revision 5 | 16 March 2017 | Enclosure 14 O LR-N17-0044 and LAR H17-03 - Calculation SC-BB-0525, Hope Creek Heat Balance Uncertainty Calculation, Revision 5 | |
ML15030A242 | 22 September 2014 | Appendix a, Mass Flux Calculations | |
ML12284A427 | 4 October 2012 | PSEG Early Site Permit Application, Calculation of Multiplier Effects for Er Section 10.4 | |
ML102371019 | 12 August 2010 | Attachment 14.2 of Calculation H-1-ZZ-MDC-1880, Rev 4 | |
ML102371018 | 10 August 2010 | Calculation H-1-ZZ-MDC-1880, Rev. 4, Post-LOCA Eab, LPZ & CR Doses | |
ML103440451 | 23 April 2010 | Document: Ansys Input Files and Calculation Package Drafts | Safe Shutdown Tornado Missile Hydrostatic Coatings Finite Element Analysis |
LR-N10-0355, Offsite Dose Calculation Manual, Rev. 25 for Pseg Nuclear LLC Salem Generating Station | 16 April 2010 | Offsite Dose Calculation Manual, Rev. 25 for Pseg Nuclear LLC Salem Generating Station | Offsite Dose Calculation Manual |
ML110070170 | 16 April 2010 | Offsite Dose Calculation Manual, Rev. 25 for PSEG Nuclear LLC Salem Generating Station | Offsite Dose Calculation Manual |
LR-N10-0355, Hope Creek, Offsite Dose Calculation Manual, Revision 25 | 16 April 2010 | Hope Creek, Offsite Dose Calculation Manual, Revision 25 | Offsite Dose Calculation Manual |
ML110050417 | 16 April 2010 | Hope Creek, Offsite Dose Calculation Manual, Revision 25 | Offsite Dose Calculation Manual |
ML101300373 | 27 October 2009 | Attachment 1, Offsite Dose Calculation Manual Revision, 24 | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Power change |
LR-N10-0140, Salem - Attachment 1, Offsite Dose Calculation Manual Revision, 24 | 27 October 2009 | Salem - Attachment 1, Offsite Dose Calculation Manual Revision, 24 | Offsite Dose Calculation Manual |
ML101390316 | 2 September 2009 | Calculation H-1-ZZ-MDC-1880, Revision 3, Post-LOCA Eab, LPZ and CR Doses, Attachment 5 to LR-N10-0163 | Stroke time Safe Shutdown Earthquake Deep Dose Equivalent |
ML101300371 | 6 August 2009 | Attachment 1, Offsite Dose Calculation Manual, Revision 23 | Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Process Control Program Annual Radiological Effluent Release Report Power change |
LR-N10-0140, Hope Creek - Attachment 1, Offsite Dose Calculation Manual Revision, 23 | 6 August 2009 | Hope Creek - Attachment 1, Offsite Dose Calculation Manual Revision, 23 | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Annual Radiological Effluent Release Report Power change |
ML101300374 | 6 August 2009 | Attachment 1, Offsite Dose Calculation Manual Revision, 23 | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Annual Radiological Effluent Release Report Power change |
LR-N10-0140, Salem - Attachment 1, Offsite Dose Calculation Manual, Revision 23 | 6 August 2009 | Salem - Attachment 1, Offsite Dose Calculation Manual, Revision 23 | Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Process Control Program Annual Radiological Effluent Release Report Power change |
ML110050414 | 5 August 2009 | Hope Creek, CC-AA-309-1001, Rev. 3, Hc Class 1E 125 Vdc Station Battery & Charger Sizing | |
LR-N10-0355, Hope Creek, CC-AA-309-1001, Rev. 3, Hc Class 1E 125 Vdc Station Battery & Charger Sizing | 5 August 2009 | Hope Creek, CC-AA-309-1001, Rev. 3, Hc Class 1E 125 Vdc Station Battery & Charger Sizing | |
ML101300370 | 9 June 2009 | Attachment 1, Offsite Dose Calculation Manual, Revision 22 | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Power change |
LR-N10-0140, Salem - Attachment 1, Offsite Dose Calculation Manual, Revision 22 | 9 June 2009 | Salem - Attachment 1, Offsite Dose Calculation Manual, Revision 22 | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Power change |
LR-N09-0099, Annual Radioactive Effluent Release Report, Page 181 Through End | 31 May 2009 | Annual Radioactive Effluent Release Report, Page 181 Through End | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Power change |
LR-N09-0099, Hope Creek, and Salem, Units 1 and 2, 2008 Annual Radioactive Effluent Release Report, Cover Through Page 180 | 31 May 2009 | Hope Creek, and Salem, Units 1 and 2, 2008 Annual Radioactive Effluent Release Report, Cover Through Page 180 | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Process Control Program |
ML091280378 | 31 May 2009 | Hope Creek, and Salem, Units 1 and 2, 2008 Annual Radioactive Effluent Release Report, Cover Through Page 180 | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Process Control Program |
LR-N09-0074, Letter from Jeffrie Keenan of PSEG Nuclear L.L.C., NRC Decommissioning Funding Status Report for Salem, Hope Creek & Peach Bottom Generating Stations | 31 March 2009 | Letter from Jeffrie Keenan of PSEG Nuclear L.L.C., NRC Decommissioning Funding Status Report for Salem, Hope Creek & Peach Bottom Generating Stations | |
ML082110419 | 23 July 2008 | Calculation S-1-FHV-MDC-0705, Revision 5, Fhv System Heating and Cooling and Air Flow Determination. | |
ML070871112 | 19 February 2007 | Calculation 0108-0342-JFL-01, Rev 0, Analysis of CCW Supply Temperature During LOCA Recirculation. | Stroke time Coast down |
ML071290563 | 16 February 2007 | Calculation HC-31Q-301, Rev 0, RPV Steam Dome Dynamic Pressure Sensor Data Reduction, Including LCR H05-01, Rev 1, Updated Attachment 7, Steam Dryer Evaluation Provided in Attachment 5 | Power change Flow Induced Vibration |
ML070790652 | 14 February 2007 | Calculation S-C-SF-MDC-1810, Rev 7, Decay Heat-up Rates and Curves. | |
ML070960111 | 7 December 2006 | Calculation No. SC-SE-0002-2, Average Power Range Monitor (APRM) Channels A-F and Rod Block Monitors (RBM) Channels a and B, Attachment 3 | MELLLA |
ML063110181 | 8 August 2006 | Attachment 4 - Calculation No. H-1-BG-MDC-1859, Revision 1, Instrument Line Pipe Break Accident. | Tornado Missile |
ML063110194 | 8 August 2006 | Attachment 8 - Calculation No. H-1-AE-MDC-1868, Revision 1, Feedwater Line Break Accident Outside Primary Containment. | Tornado Generated Missile |
ML063110188 | 7 August 2006 | Attachment 6 - Calculation No. H-1-ZZ-MDC-1929, Revision 0, Fuel Handling Accident Radiological Consequences. | |
ML063110190 | 7 August 2006 | Attachment 7 - Calculation No. H-1-CG-MDC-1795, Revision 4, Control Rod Drop Accident Radiological Consequences. | |
ML062230324 | 18 May 2006 | Attachment 6, Calculation S-C-ZZ-MDC-1920, Rev. 41R0, 'Fuel Handling Accident Radiological Consequences Evaluation. ' | Stroke time Met Tower NJPDES Incorporated by reference |
ML062210236 | 2 April 2006 | Supplement to Request for License Amendment Ultimate Heat Sink, Calculation No. EG-0047, Rev. 4 | Safe Shutdown Ultimate heat sink Anticipated operational occurrence Safe Shutdown Earthquake Probabilistic Risk Assessment Operating Basis Earthquake Earthquake |
ML060540298 | 7 December 2005 | Calculation EG-0047, Rev. 3, Hope Creek Generating Station Ultimate Heat Sink Temperature Limits. | Ultimate heat sink Stroke time Safe Shutdown Earthquake Probabilistic Risk Assessment Met Tower NJPDES Operating Basis Earthquake Incorporated by reference |
ML052650219 | 13 September 2005 | Rev. 0 to Calculation 0108-0236-01 | |
LR-N05-0424, Attachment 1, Calculation S-1-SJ-MDC-1539, Revision 2, Accumulator Pressure Decay Time During Discharge Test. | 12 August 2005 | Attachment 1, Calculation S-1-SJ-MDC-1539, Revision 2, Accumulator Pressure Decay Time During Discharge Test. | Stroke time |
LR-N08-0308, Attachment 3 - Salem, Units 1 and 2 - Calculation S-2-SJ-MDC-1394, Rev. 5, Accumulator Pressure Decay Time During Discharge Test. | 20 July 2005 | Attachment 3 - Salem, Units 1 and 2 - Calculation S-2-SJ-MDC-1394, Rev. 5, Accumulator Pressure Decay Time During Discharge Test. | |
ML050980146 | 4 April 2005 | Decontamination Port, Reactor Recirc Vibration Acceleration Estimate | |
ML050980199 | 2 April 2005 | Decontamination Port, Reactor Recirc Vibration Data Analysis | |
ML050980195 | 2 April 2005 | Decontamination Port, Fatigue Crack Growth Evaluation | |
ML050980131 | 1 April 2005 | Decontamination Port, Natural Frequency of Loop B Port | |
ML050980112 | 1 April 2005 | Decontamination Port, Harmonic Stress Analysis of Loop B Port | |
ML050060022 | 30 December 2004 | 'B' Recirculation Pump Stuffing Box Measurements Summary | |
ML050060114 | 23 December 2004 | Design Change Package 80062466 Revision 3 Extended Power Uprate Piping Vibration Monitoring, Installation Package, 12/23/2004 | Safe Shutdown Fire Barrier Stroke time Hydrostatic Met Tower NJPDES Incorporated by reference Control of Heavy Loads Fuel cladding Fire Protection Program Scaffolding Loctite Flow Induced Vibration Power Uprate |
ML050060074 | 3 November 2004 | Structural Integrity Associates, Inc. HC-06-301 Hope Creek Recirculation System Vibration Testing (Vtd 326747) 11/03/2004 | |
ML050060054 | 19 October 2004 | Design Change Package 80062466 Revision 1 Extended Power Uprate Piping Vibration Monitoring Installation Package, 10/19/2004 | Safe Shutdown Fire Barrier Stroke time Hydrostatic Met Tower NJPDES Incorporated by reference Fuel cladding Fire Protection Program Scaffolding Loctite Flow Induced Vibration |