Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
LR-N23-0024, Submittal of Hope Creek Generating Station Technical Specification Bases Changes29 March 2023Submittal of Hope Creek Generating Station Technical Specification Bases ChangesSafe Shutdown
Shutdown Margin
Reactor Vessel Water Level
Safety Limit Minimum Critical Power Ratio
High Radiation Area
Fire Barrier
Anticipated operational occurrence
Tornado Missile
Water Inventory Control
Internal Flooding
Hydrostatic
Missed surveillance
Abnormal operational transient
Surveillance Frequency Control Program
Scram Discharge Volume
Feedwater Controller Failure
Excess Flow Check Valve
Fast acting solenoid valve
Spiral reload
Overtravel
Control of Heavy Loads
Power Operated Valves
Turbine Missile
Fuel cladding
Pressure Boundary Leakage
Recently irradiated fuel
Offsite Circuit
Scaffolding
Power change
Unidentified leakage
Failure to Scram
LR-N21-0078, Hope and Creek Generating Station, Supplement to License Amendment Request to Revise Technical Specifications (TS) to Delete Definitions Found in 10 CFR Part 20 and Delete Figures of the Site and Surrounding Areas from TS18 November 2021Hope and Creek Generating Station, Supplement to License Amendment Request to Revise Technical Specifications (TS) to Delete Definitions Found in 10 CFR Part 20 and Delete Figures of the Site and Surrounding Areas from TSOffsite Dose Calculation Manual
LR-N21-0079, Submittal of Hope Creek Generating Station Technical Specification Bases Changes3 November 2021Submittal of Hope Creek Generating Station Technical Specification Bases ChangesSafe Shutdown
Shutdown Margin
Reactor Vessel Water Level
Safety Limit Minimum Critical Power Ratio
High Radiation Area
Fire Barrier
Anticipated operational occurrence
Tornado Missile
Water Inventory Control
Internal Flooding
Hydrostatic
Missed surveillance
Abnormal operational transient
Surveillance Frequency Control Program
Scram Discharge Volume
Feedwater Controller Failure
Excess Flow Check Valve
Fast acting solenoid valve
Spiral reload
Overtravel
Control of Heavy Loads
Power Operated Valves
Turbine Missile
Fuel cladding
Pressure Boundary Leakage
Recently irradiated fuel
Offsite Circuit
Scaffolding
Power change
Unidentified leakage
Failure to Scram
LR-N20-0060, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements29 September 2020Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) EnhancementsReactor Vessel Water Level
Stroke time
Water Inventory Control
Operating Basis Earthquake
Surveillance Frequency Control Program
Control of Heavy Loads
Fuel cladding
Recently irradiated fuel
Offsite Circuit
Scaffolding
ML20142A54121 May 20204 to Updated Final Safety Analysis Report, Section 16, Technical Specifications
LR-N20-0033, Submittal of Hope Creek Generating Station Technical Specification Bases Changes15 May 2020Submittal of Hope Creek Generating Station Technical Specification Bases ChangesSafe Shutdown
Shutdown Margin
Reactor Vessel Water Level
Safety Limit Minimum Critical Power Ratio
High Radiation Area
Stroke time
Anticipated operational occurrence
Water Inventory Control
Hydrostatic
Operating Basis Earthquake
Missed surveillance
Abnormal operational transient
Surveillance Frequency Control Program
Scram Discharge Volume
Feedwater Controller Failure
Excess Flow Check Valve
Fast acting solenoid valve
Spiral reload
Overtravel
Power Operated Valves
Fuel cladding
Pressure Boundary Leakage
Recently irradiated fuel
Scaffolding
Power change
Unidentified leakage
Failure to Scram
ML19058A22127 February 2019Application to Revise Technical Specifications to Adopt TSTF-546, Revise APRM Channel Adjustment Surveillance Requirement.Surveillance Frequency Control Program
Scram Discharge Volume
LR-N18-0127, Application to Revise Technical Specifications to Adopt TSTF-546, Revise APRM Channel Adjustment Surveillance Requirement.27 February 2019Application to Revise Technical Specifications to Adopt TSTF-546, Revise APRM Channel Adjustment Surveillance Requirement.Surveillance Frequency Control Program
Scram Discharge Volume
LR-N18-0013, License Amendment Request (LAR) to Amend the Hope Creek Technical Specifications (TS) to Revise Action for Inoperable Emergency Diesel Generator (EDG) a or B28 March 2018License Amendment Request (LAR) to Amend the Hope Creek Technical Specifications (TS) to Revise Action for Inoperable Emergency Diesel Generator (EDG) a or BSafe Shutdown
FLEX
Offsite Circuit
LR-N18-0011, Supplement to License Amendment Request- Safety Limit Minimum Critical Power Ratio Change. Includes GNF-004N5379-R1-NP, Gnf Additional Information Regarding the Requested Changes to the Technical Specification SLMCPR22 January 2018Supplement to License Amendment Request- Safety Limit Minimum Critical Power Ratio Change. Includes GNF-004N5379-R1-NP, Gnf Additional Information Regarding the Requested Changes to the Technical Specification SLMCPRSafety Limit Minimum Critical Power Ratio
Anticipated operational occurrence
Fuel cladding
LR-N17-0163, License Amendment Request - Safety Limit Minimum Critical Power Ratio Change, Non-Proprietary9 November 2017License Amendment Request - Safety Limit Minimum Critical Power Ratio Change, Non-ProprietaryAnticipated operational occurrence
Minimum Critical Power Ratio
Fuel cladding
LR-N17-0088, Submittal of Hope Creek Generating Station Updated Final Safety Analysis Report, Revision 22, Hope Creek Technical Specification Bases Changes, 10CFR54.37(b) Review Results for Hope Creek and Pseg Nuclear LLC Quality Assurance Topical Re9 May 2017Submittal of Hope Creek Generating Station Updated Final Safety Analysis Report, Revision 22, Hope Creek Technical Specification Bases Changes, 10CFR54.37(b) Review Results for Hope Creek and Pseg Nuclear LLC Quality Assurance Topical ReporSafe Shutdown
FLEX
Aging Management
Fire Protection Program
GOTHIC
ML17157B2659 May 2017Submittal of Hope Creek Generating Station Updated Final Safety Analysis Report, Revision 22, Hope Creek Technical Specification Bases Changes, 10CFR54.37(b) Review Results for Hope Creek and PSEG Nuclear LLC Quality Assurance Topical ReporSafe Shutdown
FLEX
Aging Management
Fire Protection Program
GOTHIC
LR-N16-0066, License Amendment Request to Permit Operability of Low Pressure Coolant Injection While Aligned to Shutdown Cooling17 June 2016License Amendment Request to Permit Operability of Low Pressure Coolant Injection While Aligned to Shutdown CoolingReactor Vessel Water Level
Surveillance Frequency Control Program
ML15265A22421 September 2015License Amendment Request, Digital Power Range Neutron Monitoring (Prnm) System UpgradeAnticipated operational occurrence
Commercial Grade Dedication
Cyber Security
Surveillance Frequency Control Program
LR-N15-0178, Hope Creek - License Amendment Request, Digital Power Range Neutron Monitoring (Prnm) System Upgrade21 September 2015Hope Creek - License Amendment Request, Digital Power Range Neutron Monitoring (Prnm) System UpgradeAnticipated operational occurrence
Commercial Grade Dedication
Cyber Security
Surveillance Frequency Control Program
LR-N13-0155, License Amendment Request to Relocate the Flood Protection Technical Specification to the Technical Requirements Manual5 September 2013License Amendment Request to Relocate the Flood Protection Technical Specification to the Technical Requirements ManualHigh winds
Surveillance Frequency Control Program
Recently irradiated fuel
LR-N11-0068, Application for Technical Specification Change TSTF-477, Revision 3, Add Action for Two Inoperable Control Room AC Subsystems to the Technical Specifications Using Consolidated Line Item Improvement Process28 February 2011Application for Technical Specification Change TSTF-477, Revision 3, Add Action for Two Inoperable Control Room AC Subsystems to the Technical Specifications Using Consolidated Line Item Improvement ProcessSafe Shutdown
Reactor Vessel Water Level
Ultimate heat sink
Surveillance Frequency Control Program
Recently irradiated fuel
ML11005039914 October 2010Attachment 4 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Supporting Documents (Cd with Paper Index)Offsite Dose Calculation Manual
LR-N10-0355, Attachment 4 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Supporting Documents (Cd with Paper Index)14 October 2010Attachment 4 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Supporting Documents (Cd with Paper Index)Offsite Dose Calculation Manual
LR-N10-0355, Attachment 2 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Clean Version)14 October 2010Attachment 2 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Clean Version)Safe Shutdown
Unanalyzed Condition
Time of Discovery
High winds
Reactor Vessel Water Level
Packing leak
Ultimate heat sink
Offsite Dose Calculation Manual
Internal Flooding
Met Tower
Operating Basis Earthquake
Earthquake
Turbine Missile
Pressure Boundary Leakage
Recently irradiated fuel
Power change
Operability Assessment
Unidentified leakage
Failure to Scram
ML11005041514 October 2010Hope Creek, CY-AA-170-500, Revision 0, Meteorological Monitoring System Calibration and MaintenanceMet Tower
LR-N10-0355, Hope Creek, CY-AA-170-500, Revision 0, Meteorological Monitoring System Calibration and Maintenance14 October 2010Hope Creek, CY-AA-170-500, Revision 0, Meteorological Monitoring System Calibration and MaintenanceMet Tower
LR-N10-0355, Attachment 3 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Comparison Matrix14 October 2010Attachment 3 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Comparison MatrixSafe Shutdown
High winds
Reactor Vessel Water Level
Ultimate heat sink
Internal Flooding
Met Tower
Operating Basis Earthquake
Earthquake
ML11005039814 October 2010Attachment 3 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Comparison MatrixSafe Shutdown
High winds
Reactor Vessel Water Level
Ultimate heat sink
Internal Flooding
Met Tower
Operating Basis Earthquake
Earthquake
LR-N10-0355, Attachment 1 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Strike-out Version)14 October 2010Attachment 1 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Strike-out Version)Safe Shutdown
Unanalyzed Condition
Time of Discovery
High winds
Reactor Vessel Water Level
Packing leak
Ultimate heat sink
Offsite Dose Calculation Manual
Internal Flooding
Met Tower
Operating Basis Earthquake
Earthquake
Turbine Missile
Pressure Boundary Leakage
Recently irradiated fuel
Power change
Operability Assessment
Unidentified leakage
Failure to Scram
ML11005037514 October 2010Attachment 1 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Strike-out Version)Safe Shutdown
Unanalyzed Condition
Time of Discovery
High winds
Reactor Vessel Water Level
Packing leak
Ultimate heat sink
Offsite Dose Calculation Manual
Internal Flooding
Met Tower
Operating Basis Earthquake
Earthquake
Turbine Missile
Pressure Boundary Leakage
Recently irradiated fuel
Power change
Operability Assessment
Unidentified leakage
Failure to Scram
ML11005040214 October 2010Attachment 2 to LR-N10-0355, Hope Creek Generating Station, Emergency Action Level Technical Bases Document (Clean Version)Safe Shutdown
Unanalyzed Condition
Time of Discovery
High winds
Reactor Vessel Water Level
Packing leak
Ultimate heat sink
Offsite Dose Calculation Manual
Internal Flooding
Met Tower
Operating Basis Earthquake
Earthquake
Turbine Missile
Pressure Boundary Leakage
Recently irradiated fuel
Power change
Operability Assessment
Unidentified leakage
Failure to Scram
ML1025802428 September 2010License Amendment Request H10-01:, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program
LR-N10-0355, Hope Creek, HC.OP-AB.ZZ-0150(Q), Rev. 6, 125VDC System Malfunction24 August 2010Hope Creek, HC.OP-AB.ZZ-0150(Q), Rev. 6, 125VDC System Malfunction
ML11005051824 August 2010Hope Creek, HC.OP-AB.ZZ-0150(Q), Rev. 6, 125VDC System Malfunction
ML11005050013 July 2010Hope Creek, HC.OP-AB.HVAC-0002(Q), Rev. 7, Control Room EnvironmentEmergency Lighting
LR-N10-0355, Hope Creek, HC.OP-AB.HVAC-0002(Q), Rev. 7, Control Room Environment13 July 2010Hope Creek, HC.OP-AB.HVAC-0002(Q), Rev. 7, Control Room EnvironmentEmergency Lighting
LR-N10-0355, Hope Creek, HC.OP-AB.RPV-0009(Q), Rev. 7, Shutdown Cooling24 June 2010Hope Creek, HC.OP-AB.RPV-0009(Q), Rev. 7, Shutdown Cooling
ML11005051624 June 2010Hope Creek, HC.OP-AB.RPV-0009(Q), Rev. 7, Shutdown Cooling
ML1100504773 May 2010Hope Creek, HC.OP-AB.CONT-0002(Q), Rev. 9, ContainmentSquib
LR-N10-0355, Hope Creek, HC.OP-AB.CONT-0002(Q), Rev. 9, Containment3 May 2010Hope Creek, HC.OP-AB.CONT-0002(Q), Rev. 9, Containment
LR-N10-0355, Hope Creek, HC.OP-AB.RPV-0003(Q), Rev. 21, Recirculation System/Power Oscillations21 April 2010Hope Creek, HC.OP-AB.RPV-0003(Q), Rev. 21, Recirculation System/Power OscillationsMELLLA
Power change
ML11005050621 April 2010Hope Creek, HC.OP-AB.RPV-0003(Q), Rev. 21, Recirculation System/Power OscillationsMELLLA
Power change
ML11005050521 April 2010Hope Creek, HC.OP-AB.MISC-0002(Q), Rev. 10, Crids/Overhead Annunciators/Ppc Computer
LR-N10-0355, Hope Creek, HC.OP-AB.MISC-0002(Q), Rev. 10, Crids/Overhead Annunciators/Ppc Computer21 April 2010Hope Creek, HC.OP-AB.MISC-0002(Q), Rev. 10, Crids/Overhead Annunciators/Ppc Computer
LR-N10-0355, Hope Creek, Offsite Dose Calculation Manual, Revision 2516 April 2010Hope Creek, Offsite Dose Calculation Manual, Revision 25Offsite Dose Calculation Manual
ML11005041716 April 2010Hope Creek, Offsite Dose Calculation Manual, Revision 25Offsite Dose Calculation Manual
LR-N10-0355, Hope Creek, HC.IC-GP.BB-0003(Q) - Rev. 17, Nuclear Boiler - Nondivisional Channel L-11683/B21-N027 Rx Cavity Flood Up Level/Rx Shutdown Range Level Setup17 March 2010Hope Creek, HC.IC-GP.BB-0003(Q) - Rev. 17, Nuclear Boiler - Nondivisional Channel L-11683/B21-N027 Rx Cavity Flood Up Level/Rx Shutdown Range Level Setup
ML11005047417 March 2010Hope Creek, HC.IC-GP.BB-0003(Q) - Rev. 17, Nuclear Boiler - Nondivisional Channel L-11683/B21-N027 Rx Cavity Flood Up Level/Rx Shutdown Range Level Setup
LR-N10-0355, Hope Creek, HC.OP-AB.MISC-0001(Q), Rev. 15, Acts of Nature5 March 2010Hope Creek, HC.OP-AB.MISC-0001(Q), Rev. 15, Acts of NatureSafe Shutdown
High winds
Fire impairment
Operating Basis Earthquake
Earthquake
ML1100505025 March 2010Hope Creek, HC.OP-AB.MISC-0001(Q), Rev. 15, Acts of NatureSafe Shutdown
High winds
Fire impairment
Operating Basis Earthquake
Earthquake
ML1100504999 September 2009Hope Creek, HC.OP-AB.COOL-0004(Q), Rev. 4, Fuel Pool Cooling
LR-N10-0355, Hope Creek, HC.OP-AB.COOL-0004(Q), Rev. 4, Fuel Pool Cooling9 September 2009Hope Creek, HC.OP-AB.COOL-0004(Q), Rev. 4, Fuel Pool Cooling
LR-N10-0355, Hope Creek, HC.OP-AB.IC-0003(Q), Rev. 3, Reactor Protection System25 April 2009Hope Creek, HC.OP-AB.IC-0003(Q), Rev. 3, Reactor Protection System