Revised Monthly Operating Rept for Jan 1996 for Qcs Unit 2
ML20101D196
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 01/31/1996
From: Moore K
COMMONWEALTH EDISON CO.
To:
Shared Package
ML20101D175 List:
References
NUDOCS 9603200109
Download: ML20101D196 (1)


Text

.

s APPENDIX C REVISED OPERATINO DATA REPORT DOCKET NO. 50-265 UNTT Two DATE March 8,1996 COMPLETED BY Kristal Moore TELEPHONE (309) 654-2241 OPERATING STATUS 0000 010196

1. REPORTING PERIOD: 2400 0131% GROSS HOURS IN REPORTING PERIOD: 744
2. CURRENTLY AUTHOP! ZED POWER LEVEL (MWt): 2511 MAX > DEPEND > CAPACITY: 769 DESIGN ELECTRICAL RATING (MWe-NET): 789
3. POWER LEVELTO WHICH RESTRICTED GF ANY)(MWo-Net): N/A
4. REASONS FOR RESTRICTION GF ANY):

THl3 MONTH YR TO DATE CUMULATRE_

5. NUMBER OF HOURS REACTOR WAS CRTTICAL 744.00 744.00 54814.45 h
6. REACTOR RESERVE SHUTDOVN HO' IRS 0.00 0.00 2985.80
7. HOURS GENERATOR ON LIN1 744.00 744.00 150643.55
8. UNrr RESERVE SHUTITgWN HOURS 0.00 0.00 702.90
9. GROSS THERMAL ENERGY GENERATED (MWH) 1807028.30 1807028.30 326148249.22
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 580413.00 580413.00 104725948.00
11. NET ELECTRICAL ENERGY GENERATED (MWH) 556367.00 556367.00 99209253.00
12. REACTOR SERVICE FACTOR 100.00 100.00 75 5
13. REACTOR AVAILABILrrY FACTOR 100.00 100.00 h19 I
14. UNrr SERVICE FACTOR 100.00 100.00 72.73
15. UNrr AVAILABILITY FACTOR 100.00 100.00 73.07
16. UNIT CAPACTTY FACTOR (Using MDC) 97.24 97.24 62.29
17. UNrr CAPACirY FACTOR (Using Design MWe) 94.78 94.78 60.71 18 UNrr FORCED OLTTAGE RATE 0.00 0.00 10.26
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH): N/A
20. IF SHUTDOWN AT END OF REPORT PERIOD < ESTIMATED DATE OF STARTUP: N/A
21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): N/A FORECAST ACHIEVED INTTIAL CRTTICALITY INrrlAL ELECTRICTTY COMMERCIAL OPERATION 9603200109 960308 PDR ADOCK 05000254 R PDR TliCHOP3\NRC\ MON 7HLY.RPT