Revised Monthly Operating Rept for Sept 1997 for Quad Cities,Unit 2
ML20199A672
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 09/30/1997
From: Sirles K
COMMONWEALTH EDISON CO.
To:
Shared Package
ML20199A658 List:
References
NUDOCS 9711180064
Download: ML20199A672 (6)


Text

_ . _ _ __. . .m_ . _ _ _ _ _ _ _ _ . _ _ _ _ . _ . . . _ _ _ . _ _ _ . . _ .. . .

I

. i

-4 l

APPENDIX D REV. 1 i

. UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET Ho.- 50-26$ >

l UNIT NAME Two COMPLETED BY Kristal Sirles [

~

DATE OCL &gr 9. 1922 REPORT MONTH Egotember 1997 TELEPHONE 309-654-2241  !

i i

N 4 i m o g

~

to to  ! '

5 3o O *

"A bx h Em* LICENSEE- '

DURATION EVENT CORRECTIVE ACTIONS / COMMENTS NO. DATE (HOURS) REPORT

- C710 - 92097 5. 0.0 B $ .... . .... ... Main Steam tmlatkin Valve Timing and Main -[

Tuttiine Surveillance.  :

07 11 - 9 27-97 P D2.1 A 2 ... -.. ... .e* Shutdown to Address safe Shuidown lauen. .l i

i E

b

?

^

r 6

h i

e

'..,a,....m.4 ,,+-.-m_. , , , . _ . . . _ , . . . _ , , . . . _ . ,.m., . _ , , , .._ --_, , . . . _ , , _ _. . . .

VI. UNIOUE REPORTING REOUIREMENTS The following items are included in this report based on prior commitments to the commission:

A. Main Steam Relief Valve Operations There were no Main Steam Relief Valve operations for the reporting period.

B. Control Rod Drive Scram Timinct Data for Units One and Two There was no Control Rod Drive scram timing data for Units One and Two for the reporting period.

f TifHor)WROMONTHLY RPT

. - . . . . _ . _ . . - . - . _ _ . . . - - .~. - .. - - -.... - - _ _ . ~ - . . ~ . - . - - . _ . _ . .

?

- i

?

. -t t I l

t VII. REFUELING INFORMATION The following information about future reloads at Quad-Cities  ;

Station was requested in a January 26, 1978, licensing memorandum  !

(78-24) from D. E. O'Brien to C. Reed, et al., titled "Dresden, i

Quad-Cities and Zion Station--NRC Request for Refueling Information", dated January 18, 1978. I i

i

a. i; 1

i, 1

i i

t 1

.h i

TI CHOPhN RC\ MONTHLY.RPT

.. . . _ - . . . . - _ . - . , . . . - . . . . ~ . - , . . - , . - - - . .. ..:_.- ~ . - . _ ----...-;.---

l QTP 0300-S32 R3vicion 3 l April 1997 I

. QUAD CITIES REFUELING INFORMATION REQUEST  ;

1. Unit: 01 Reload: 14 Cycles 15 l
2. Scheduled date for next refueling shutdown: 9/05/98
3. Scheduled date for restart following refueling: 11/14/98
4. Will refueling or resumption of operation thereafter require a Technical  !

Specification change or other license amendments l

Yes

5. Scheduled date(s) for submitting proposed licensing action and supporting information November, 1997
6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

Approx. 216 SPC 9X9IX Fuel Bundles Q1R15 will be loaded.

7. The number of fuel assemblies.
n. Number of assemblies in core: 724
b. Number of assemblies in spent fuel pool 1933
8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned in number of fuel assemblies:
a. Licensed storage capacity for spent fuel 3657
b. Planned increase in licensed storage: 0
9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity: 2002 (final) 1

f QTP 0300 S32 Ravicion 3 i April 1997

. QUAD CITIES REFUELING INFORMATION REQUEST

1. Unit 02 Reload: 14 Cycle: 15
2. Schedu?ed date for next refueling shutdown: 2/20/99 i
3. Scheduled date for restart following refueling: 3/27/99
4. Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment:

Yes P

5. Scheduled date(s) for submitting proposed licensing action and supporting informationt l August, 1998
6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

N/A

7. The number of fuel assemblies.
a. Number of assemblies in core: 724
b. Number of assemblies in spent fuel pool 2943
8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned in number of fuel assemblies:
a. Licensed storage capacity for spent fuel: 3897
b. Planned increase in licensed storage: 0
9. The. projected date of the last refueling that can be discharc A to the spent fuel pool assuming the present ticensed capacity: 200:

I (final)

]

2  ;

i I- - - - .

4

. j P

VIII. GLOSSARY The following abbreviations which may have been used in the 1 Monthly Report, are defined belows i i

ACAD/ CAM - Atmospheric Containment Atmospheric  ;

Dilution / Containment Atmospheric Monitoring ANSI - American National Standards Institute i APRM - Average Power Range Monitor ATWS- - Anticipated Transient Without Scram BWR- - Boiling Water Reactor 7 CRD- - Control Rod Drive  ;

EHC - Electro-Hydraulic Control System EOF - Emergency Operations Facility  ;

GSEP - Generating Stations Emergency Plan  ;

HEPA' - High-Efficiency Particulate Filter HPCI - High Pressure Coolant Injection System HRSS - High Radiation Sampling System IPCLRT - Integrated Primary Containment Leak Rate Test IRM - Intermediate Range Monitor ISI - Inservice Inspection LER -

Licensee Event Report i I

LLRT -

Local Leak Rate Test LPCI - Low Pressure Coolant Injection Mode of RHRs  !

LPRM - Local Power Range Monitor l MAPLHGR - Maximum Average Planar Linear Heat Generation Rate MCPR - Minimum Critical Power Ratio i

MFLCPR - Maximum Fraction Limiting Critical Power Ratio MPC - Maximum Permissible Concentration MSIV - Main Steam Isolation Valve.  !

NIOSH - National Institute for Occupational Safety and Health PCI - Primary Containment Isolation PCIOMR - Preconditioning Interim Operating Management

. Recommendations  !

RBCCW - Reactor Building Closed Cooling Water System RBM - Rod Block Monitor y RCIC - Reactor Core Isolation Cooling System RHRS - Residual Heat Removal System RPS - Reactor Protection System '

RWM -

Rod Worth Minimizer SBGTS - Standby Gas Treatment System ,

SBLC -

Standby Liquid Control SDC -_ Shutdown Cooling Mode of RHRS SDV -

Scram Discharge Volume SRM - Source Range Monitor TBCCW -. Turbine Building Closed Cooling Water System TIP z

Traversing Incore Probe i TGC , Technical. Support Center a

TLCitOPhNRC\MONTitLYMT

. . - , ,_