Letter Sequence Other |
---|
|
Results
Other: ML20129D308, ST-HL-AE-5261, Provides Addl Info Re Proposed Special Test Exception 3.10.8, ST-HL-AE-5271, Provides Addl Info Re Proposed Special Test Exception 3.10.8, ST-HL-AE-5272, Provides Addl Info Re Proposed Special Test Exception 3.10.8, ST-HL-AE-5280, Forwards Revised Table to ,Deleting Item for Hydrogen Analyzers & Revised Table to ,Revising Column Heading.Stp PSA Info Re Containment Isolation Also Encl, ST-HL-AE-5414, Provides Addl Info Re Proposed Single ESF Train Mitigation Capabilities
|
MONTHYEARML20087H8561995-05-0101 May 1995 Proposed Tech Specs Re Incorporation of TS 3.10.8 Into Licenses NPF-76 & NPF-80 Project stage: Request ML20091R4151995-08-28028 August 1995 Proposed Tech Specs,Reflecting Addition of TS 3.10.8 Allowing Extension of Sdg AOT for Cumulative 21 Days on Each Sdg Once Per Fuel Cycle & Extension of AOT on Each Essential Cw Loop for Cumulative 7 Days Once Per Fuel Cycle Project stage: Request ST-HL-AE-5208, Submits Response to Request for Addl Info Re Proposed Special Test Exception1995-11-22022 November 1995 Submits Response to Request for Addl Info Re Proposed Special Test Exception Project stage: Request ML20100B8281996-01-0404 January 1996 Nonproprietary STP Tube Repair Criteria for ODSCC at Tube Support Plate Project stage: Request ST-HL-AE-5261, Provides Addl Info Re Proposed Special Test Exception 3.10.81996-01-0404 January 1996 Provides Addl Info Re Proposed Special Test Exception 3.10.8 Project stage: Other ST-HL-AE-5272, Provides Addl Info Re Proposed Special Test Exception 3.10.81996-01-0808 January 1996 Provides Addl Info Re Proposed Special Test Exception 3.10.8 Project stage: Other ST-HL-AE-5271, Provides Addl Info Re Proposed Special Test Exception 3.10.81996-01-0808 January 1996 Provides Addl Info Re Proposed Special Test Exception 3.10.8 Project stage: Other ST-HL-AE-5280, Forwards Revised Table to ,Deleting Item for Hydrogen Analyzers & Revised Table to ,Revising Column Heading.Stp PSA Info Re Containment Isolation Also Encl1996-01-23023 January 1996 Forwards Revised Table to ,Deleting Item for Hydrogen Analyzers & Revised Table to ,Revising Column Heading.Stp PSA Info Re Containment Isolation Also Encl Project stage: Other ST-HL-AE-5414, Provides Addl Info Re Proposed Single ESF Train Mitigation Capabilities1996-07-0909 July 1996 Provides Addl Info Re Proposed Single ESF Train Mitigation Capabilities Project stage: Other ML20129D3081996-09-24024 September 1996 Submits Station Blackout Modeling in Probalistic Safety Analysis for Proposed Standby Diesel Generator License Amendments,South Texas Project,Units 1 & 2 Project stage: Other 1996-01-23
[Table View] |
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARNOC-AE-000675, Forwards Clarification on Items Included in 990531 Response to RAI Re Proposed License Amend Associated with Operator Action for Sbloca,As Requested1999-10-21021 October 1999 Forwards Clarification on Items Included in 990531 Response to RAI Re Proposed License Amend Associated with Operator Action for Sbloca,As Requested NOC-AE-000680, Forwards Rev 5 to 0PGP03-ZV-0001, Severe Weather Plan1999-10-20020 October 1999 Forwards Rev 5 to 0PGP03-ZV-0001, Severe Weather Plan NOC-AE-000683, Forwards 30-day Rept Concerning Significant Changes to Accepted Large Break Loss of Coolant Accident ECCS Evaluation Model for South Tx Project,Units 1 & 2,IAW 10CFR50.46(a)(3)(ii)1999-10-19019 October 1999 Forwards 30-day Rept Concerning Significant Changes to Accepted Large Break Loss of Coolant Accident ECCS Evaluation Model for South Tx Project,Units 1 & 2,IAW 10CFR50.46(a)(3)(ii) ML20217K9341999-10-15015 October 1999 Forwards SER Accepting Util 990609 Relief Request RR-ENG-2-4 for Relief from ASME Code,Section XI, Nondestructive Exam Requirements Applicable to Stp,Units 1 & 2,reactor Vessel Closure Head Nuts ML20217K9091999-10-15015 October 1999 Forwards SER Accepting Util 990609 Relief Request RR-ENG-2-3 from ASME Code,Section Xi,Nondestructive Exam Requirements Applicable to South Texas Project,Units 1 & 2, Pressurizer Support Attachment Welds 05000498/LER-1999-008, Forwards LER 99-008-00 Re Turbine Trip That Occurred While Performing Main Turbine Emergency Trip Test.Commitments Made by Licensee Are Listed in Corrective Actions Section of LER1999-10-12012 October 1999 Forwards LER 99-008-00 Re Turbine Trip That Occurred While Performing Main Turbine Emergency Trip Test.Commitments Made by Licensee Are Listed in Corrective Actions Section of LER NOC-AE-000674, Forwards Requested Estimates of Needs for Operator Licensing Exams,Per AL-99-03, Operator Licensing National Exam Schedule1999-10-12012 October 1999 Forwards Requested Estimates of Needs for Operator Licensing Exams,Per AL-99-03, Operator Licensing National Exam Schedule NOC-AE-000625, Requests Partial Relief from ASME Section XI Visual Exam Requirements of IWA-5242(a).Relief Request Is Based on Provisions of Draft ASME Section XI Code Case N-616,which Is Expected to Be Published in Near Future1999-10-0707 October 1999 Requests Partial Relief from ASME Section XI Visual Exam Requirements of IWA-5242(a).Relief Request Is Based on Provisions of Draft ASME Section XI Code Case N-616,which Is Expected to Be Published in Near Future NOC-AE-000610, Requests Relief from ASME Section XI Code Nondestructive Exam Requirements of IWA-5250(a)(2) for Second Inservice Insp Interval,Per Provisions of 10CFR50.55a(3)(i)1999-10-0707 October 1999 Requests Relief from ASME Section XI Code Nondestructive Exam Requirements of IWA-5250(a)(2) for Second Inservice Insp Interval,Per Provisions of 10CFR50.55a(3)(i) NOC-AE-000653, Requests Relief from ASME Section XI Code Requirements of Table IWE-2500-1 for VT-3 Visual Exam of Seals & Gaskets on Airlocks,Hatches & Other Devices Required to Assure Containment leak-tight Integrity,Per 10CFR50.55a(a)(3)(i)1999-10-0707 October 1999 Requests Relief from ASME Section XI Code Requirements of Table IWE-2500-1 for VT-3 Visual Exam of Seals & Gaskets on Airlocks,Hatches & Other Devices Required to Assure Containment leak-tight Integrity,Per 10CFR50.55a(a)(3)(i) ML20217C3221999-10-0707 October 1999 Forwards Insp Repts 50-498/99-16 & 50-499/99-16 on 990808-0918.No Violations Noted.Insp Generally Characterized by safety-conscious Operations,Sound Engineering & Maint Practices & Careful Radiological Work Controls 05000499/LER-1999-006, Forwards LER 99-006-00,re Entry Into TS 3.0.3.Licensee Commitments Listed in Corrective Actions Section of Attachment1999-09-30030 September 1999 Forwards LER 99-006-00,re Entry Into TS 3.0.3.Licensee Commitments Listed in Corrective Actions Section of Attachment ML20212L1651999-09-30030 September 1999 Responds to STP Nuclear Operating Co 981012 & s Which Provided Update to TS Bases Pages B 3/4 8-14 Through B 3/4 8-17.NRC Staff Found Change Consistent with TS 3/4.8.2 DC Sources. Staff Found & Deleted Typographical Error NOC-AE-000664, Forwards Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 COLR & Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr1999-09-30030 September 1999 Forwards Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 COLR & Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr ML20212J7141999-09-29029 September 1999 Forwards Insp Repts 50-498/99-15 & 50-499/99-15 on 990920-24 at South Texas Project Electric Generating Station.No Violations Noted.Insp Covered Requalification Training Program & Observation of Requalification Activities NOC-AE-000646, Informs NRC That STP Nuclear Operating Co Is Y2K Ready IAW Nei/Nusmg 97-07 Guidelines & Also Provides Response to NRC Ltr1999-09-28028 September 1999 Informs NRC That STP Nuclear Operating Co Is Y2K Ready IAW Nei/Nusmg 97-07 Guidelines & Also Provides Response to NRC Ltr ML20212J0651999-09-27027 September 1999 Discusses Licensee 980330 Response to GL 97-06, Degradation of SG Internals. Concludes That Response to GL Provides Reasonable Assurance That Condition of SG Internals in Compliance with Current Licensing Bases for Facility ML20212F1791999-09-24024 September 1999 Discusses 990923 Meeting Conducted in Region IV Ofc Re Status of Activities to Support Confirmatory Order, ,modifying OL & to Introduce New Director,Safety Quality Concerns Program.List of Attendees Encl ML20212E9091999-09-23023 September 1999 Discusses GL 98-01, Year 2000 Readiness of Computer Sys at Npps, Supplement 1 & STP Nuclear Operating Co Response for STP Dtd 990629.Understands That at Least One Sys or Component Listed May Have Potential to Cause Transient ML20212F2111999-09-22022 September 1999 Forwards Review of SG 90-day Rept, South Texas Unit-2 Cycle 7 Voltage-Based Repair Criteria Rept, Submitted by Util on 990119 NOC-AE-000633, Forwards Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment. Rept Satisfies Reporting Requirements of NEI 97-06,dtd Dec 19971999-09-21021 September 1999 Forwards Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment. Rept Satisfies Reporting Requirements of NEI 97-06,dtd Dec 1997 NOC-AE-000634, Forwards Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Povs. MOV design-basis Review Checklist,Encl1999-09-21021 September 1999 Forwards Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Povs. MOV design-basis Review Checklist,Encl NOC-AE-000649, Forwards Current Annual Financial Data for STP Electric Generating Station Per 10CFR50.71(b),acting on Behalf of Central Power & Light Co,City of Austin,Tx,City Public Svc Board of San Antonio & Hl&P1999-09-21021 September 1999 Forwards Current Annual Financial Data for STP Electric Generating Station Per 10CFR50.71(b),acting on Behalf of Central Power & Light Co,City of Austin,Tx,City Public Svc Board of San Antonio & Hl&P 05000499/LER-1999-005, Forwards LER 99-005-00,re Esfa Following Loss of Power to Standby Transformer 2 Due to Electrical Fault.Licensee Commitments Are Listed in Corrective Actions Section of LER1999-09-20020 September 1999 Forwards LER 99-005-00,re Esfa Following Loss of Power to Standby Transformer 2 Due to Electrical Fault.Licensee Commitments Are Listed in Corrective Actions Section of LER ML20212D9171999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of South Texas Project & Identified No Areas in Which Performance Warranted Insp Beyond Core Insp Program.Details of Insp Plan Through Mar 2000 & Historical Listing of Plant Issues,Encl ML20216F5471999-09-15015 September 1999 Discusses 990914 Meeting Conducted at Region Iv.Meeting Was Requested by Staff to Introduce New Management Organization to Region IV & to Discuss General Plant Performance & Mgt Challenges IR 05000498/19990121999-09-14014 September 1999 Forwards Insp Repts 50-498/99-12 & 50-499/99-12 on 990816-19.Three Violations Occurred & Being Treated as Ncvs. Areas Examined During Insp Included Portions of Access Authorization & Physical Security Programs 05000498/LER-1999-007, Forwards LER 99-007-00 Re Train 'B' CR Makeup & Cleanup Filtration Sys Being Inoperable for Greater than Aot.Util Intends to Append Addl Info Section of LER with Brief Description of Test Results,Rather than Submit Separate LER1999-09-13013 September 1999 Forwards LER 99-007-00 Re Train 'B' CR Makeup & Cleanup Filtration Sys Being Inoperable for Greater than Aot.Util Intends to Append Addl Info Section of LER with Brief Description of Test Results,Rather than Submit Separate LER ML20211P8201999-09-0909 September 1999 Forwards SE Authorizing 990224 Submittal of First 10-year Interval ISI Program Plan - Relief Request RR-ENG-24,from ASME Section XI Code,Table IWC-2500-1 NOC-AE-000638, Forwards License Renewal Applications & Certifications of Medical Exam for Seven Listed Licensed Operators at Stp,Per 10CFR55.57.Encl Withheld,Per 10CFR2.790(a)(6)1999-09-0909 September 1999 Forwards License Renewal Applications & Certifications of Medical Exam for Seven Listed Licensed Operators at Stp,Per 10CFR55.57.Encl Withheld,Per 10CFR2.790(a)(6) ML20211P7671999-09-0909 September 1999 Forwards SER Authorizing Licensee 990517 Alternative Proposed in Relief Request RR-ENG-2-8 to Code Case N-491-2 for Second 10-year Insp Interval of South Texas Project, Units 1 & 2,pursuant to 10CFR50.55a(a)(3)(i) ML20211P7871999-09-0909 September 1999 Forwards Safety Evaluation Re First 10-yr Interval Inservice Insp Program Plan Request for Relief RR-ENG-31 IR 05000498/19990141999-09-0303 September 1999 Forwards Insp Repts 50-498/99-14 & 50-499/99-14 on 990627-0807.Apparent Violations Identified & Being Treated as Noncited Violations Consistent with App C of Enforcement Policy NOC-AE-000562, Requests Relief from Contruction Code non-destructive Exam Requirements for Repair/Replacement Activities During Second Inservice Insp Interval of Units 1 & 2,IAW Provisions of 10CFR50.55a(a)(3)(i)1999-08-31031 August 1999 Requests Relief from Contruction Code non-destructive Exam Requirements for Repair/Replacement Activities During Second Inservice Insp Interval of Units 1 & 2,IAW Provisions of 10CFR50.55a(a)(3)(i) ML20212A4351999-08-27027 August 1999 Discusses Investigation Rept OI-4-1999-009 Re Activites at South Texas Project.Oi Investigation Initiated in Response to Alleged Employment Discrimination Complaint. Allegation Not Substantiated.No Further Action Planned NOC-AE-000617, Forwards semi-annual Fitness for Duty Program Performance Rept for 990101-990630,IAW 10CFR26.71(d)1999-08-26026 August 1999 Forwards semi-annual Fitness for Duty Program Performance Rept for 990101-990630,IAW 10CFR26.71(d) ML20211J2511999-08-26026 August 1999 Discusses Proposed TS Change on Replacement SG Water Level Trip Setpoint for Plant,Units 1 & 2 NOC-AE-000585, Provides Notification That South Texas Project Has Completed Integrity Evaluation of Units 1 & 2 Reactor Coolant Pump Casings Required by Paragraph (D) of Code Case N-4811999-08-25025 August 1999 Provides Notification That South Texas Project Has Completed Integrity Evaluation of Units 1 & 2 Reactor Coolant Pump Casings Required by Paragraph (D) of Code Case N-481 ML20211F4421999-08-24024 August 1999 Forwards SE Authorizing Licensee 990513 Request for Relief RR-ENG-2-13,seeking Relief from ASME B&PV Code Section Xi,Exam Vessel shell-to-flange Welds for Second ISI Intervals ML20211F5031999-08-23023 August 1999 Forwards SE Authorizing Licensee 990315 Request for Relief RR-ENG-30,seeking Relief from ASME B&PV Code,Section Xi,Nde Requirements Applicable to Stp,Unit 2 SG Welds ML20212A4391999-08-17017 August 1999 Discusses Investigation Rept OI-4-1999-023 Re Activities at South Texas Project.Oi Investigation Initiated in Response to Alleged Employment Discrimination for Initiating Condition Report to Document Unauthorized Work Practices ML20210U1271999-08-16016 August 1999 Forwards Insp Repts 50-498/99-08 & 50-499/99-08 on 990517-21 & 0607-10.No Violations Noted.Corrective Action Program Was Reviewed ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams NOC-AE-000603, Informs of Addition of Restriction to SRO License 42658, for KM Espinoza,Effective 990721,per 10CFR50.74.Encl Info Withheld,Per 10CFR2.790(a)(6)1999-07-29029 July 1999 Informs of Addition of Restriction to SRO License 42658, for KM Espinoza,Effective 990721,per 10CFR50.74.Encl Info Withheld,Per 10CFR2.790(a)(6) NOC-AE-000470, Forwards Amend 12 to STP Fire Hazards Analysis Rept. Summary of Changes Made Under Provision of 10CFR50.59 Also Encl1999-07-28028 July 1999 Forwards Amend 12 to STP Fire Hazards Analysis Rept. Summary of Changes Made Under Provision of 10CFR50.59 Also Encl NOC-AE-000599, Forwards STP Unit 1,Cycle 9 Startup Testing Summary Rept. No New Licensing Commitments Contained in Ltr1999-07-28028 July 1999 Forwards STP Unit 1,Cycle 9 Startup Testing Summary Rept. No New Licensing Commitments Contained in Ltr NOC-AE-000589, Forwards Rev to 1RE08 ISI Summary Repts for Repairs & Replacements & for Sys Pressure Tests,Corecting Date of End of Insp Interval Provided in Item 9 of from NIS-1 from 09/24/99 to 09/24/20001999-07-26026 July 1999 Forwards Rev to 1RE08 ISI Summary Repts for Repairs & Replacements & for Sys Pressure Tests,Corecting Date of End of Insp Interval Provided in Item 9 of from NIS-1 from 09/24/99 to 09/24/2000 ML20210F3851999-07-26026 July 1999 Forwards Exam Repts 50-498/99-301 & 50-499/99-301 on 990706- 15.Exam Included Evaluation of 9 Applicants for SO Licenses & 8 Applicants for RO Licenses 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARNOC-AE-000675, Forwards Clarification on Items Included in 990531 Response to RAI Re Proposed License Amend Associated with Operator Action for Sbloca,As Requested1999-10-21021 October 1999 Forwards Clarification on Items Included in 990531 Response to RAI Re Proposed License Amend Associated with Operator Action for Sbloca,As Requested NOC-AE-000680, Forwards Rev 5 to 0PGP03-ZV-0001, Severe Weather Plan1999-10-20020 October 1999 Forwards Rev 5 to 0PGP03-ZV-0001, Severe Weather Plan NOC-AE-000683, Forwards 30-day Rept Concerning Significant Changes to Accepted Large Break Loss of Coolant Accident ECCS Evaluation Model for South Tx Project,Units 1 & 2,IAW 10CFR50.46(a)(3)(ii)1999-10-19019 October 1999 Forwards 30-day Rept Concerning Significant Changes to Accepted Large Break Loss of Coolant Accident ECCS Evaluation Model for South Tx Project,Units 1 & 2,IAW 10CFR50.46(a)(3)(ii) NOC-AE-000674, Forwards Requested Estimates of Needs for Operator Licensing Exams,Per AL-99-03, Operator Licensing National Exam Schedule1999-10-12012 October 1999 Forwards Requested Estimates of Needs for Operator Licensing Exams,Per AL-99-03, Operator Licensing National Exam Schedule 05000498/LER-1999-008, Forwards LER 99-008-00 Re Turbine Trip That Occurred While Performing Main Turbine Emergency Trip Test.Commitments Made by Licensee Are Listed in Corrective Actions Section of LER1999-10-12012 October 1999 Forwards LER 99-008-00 Re Turbine Trip That Occurred While Performing Main Turbine Emergency Trip Test.Commitments Made by Licensee Are Listed in Corrective Actions Section of LER NOC-AE-000625, Requests Partial Relief from ASME Section XI Visual Exam Requirements of IWA-5242(a).Relief Request Is Based on Provisions of Draft ASME Section XI Code Case N-616,which Is Expected to Be Published in Near Future1999-10-0707 October 1999 Requests Partial Relief from ASME Section XI Visual Exam Requirements of IWA-5242(a).Relief Request Is Based on Provisions of Draft ASME Section XI Code Case N-616,which Is Expected to Be Published in Near Future NOC-AE-000610, Requests Relief from ASME Section XI Code Nondestructive Exam Requirements of IWA-5250(a)(2) for Second Inservice Insp Interval,Per Provisions of 10CFR50.55a(3)(i)1999-10-0707 October 1999 Requests Relief from ASME Section XI Code Nondestructive Exam Requirements of IWA-5250(a)(2) for Second Inservice Insp Interval,Per Provisions of 10CFR50.55a(3)(i) NOC-AE-000653, Requests Relief from ASME Section XI Code Requirements of Table IWE-2500-1 for VT-3 Visual Exam of Seals & Gaskets on Airlocks,Hatches & Other Devices Required to Assure Containment leak-tight Integrity,Per 10CFR50.55a(a)(3)(i)1999-10-0707 October 1999 Requests Relief from ASME Section XI Code Requirements of Table IWE-2500-1 for VT-3 Visual Exam of Seals & Gaskets on Airlocks,Hatches & Other Devices Required to Assure Containment leak-tight Integrity,Per 10CFR50.55a(a)(3)(i) 05000499/LER-1999-006, Forwards LER 99-006-00,re Entry Into TS 3.0.3.Licensee Commitments Listed in Corrective Actions Section of Attachment1999-09-30030 September 1999 Forwards LER 99-006-00,re Entry Into TS 3.0.3.Licensee Commitments Listed in Corrective Actions Section of Attachment NOC-AE-000664, Forwards Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 COLR & Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr1999-09-30030 September 1999 Forwards Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 COLR & Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr NOC-AE-000646, Informs NRC That STP Nuclear Operating Co Is Y2K Ready IAW Nei/Nusmg 97-07 Guidelines & Also Provides Response to NRC Ltr1999-09-28028 September 1999 Informs NRC That STP Nuclear Operating Co Is Y2K Ready IAW Nei/Nusmg 97-07 Guidelines & Also Provides Response to NRC Ltr NOC-AE-000633, Forwards Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment. Rept Satisfies Reporting Requirements of NEI 97-06,dtd Dec 19971999-09-21021 September 1999 Forwards Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment. Rept Satisfies Reporting Requirements of NEI 97-06,dtd Dec 1997 NOC-AE-000634, Forwards Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Povs. MOV design-basis Review Checklist,Encl1999-09-21021 September 1999 Forwards Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Povs. MOV design-basis Review Checklist,Encl NOC-AE-000649, Forwards Current Annual Financial Data for STP Electric Generating Station Per 10CFR50.71(b),acting on Behalf of Central Power & Light Co,City of Austin,Tx,City Public Svc Board of San Antonio & Hl&P1999-09-21021 September 1999 Forwards Current Annual Financial Data for STP Electric Generating Station Per 10CFR50.71(b),acting on Behalf of Central Power & Light Co,City of Austin,Tx,City Public Svc Board of San Antonio & Hl&P 05000499/LER-1999-005, Forwards LER 99-005-00,re Esfa Following Loss of Power to Standby Transformer 2 Due to Electrical Fault.Licensee Commitments Are Listed in Corrective Actions Section of LER1999-09-20020 September 1999 Forwards LER 99-005-00,re Esfa Following Loss of Power to Standby Transformer 2 Due to Electrical Fault.Licensee Commitments Are Listed in Corrective Actions Section of LER 05000498/LER-1999-007, Forwards LER 99-007-00 Re Train 'B' CR Makeup & Cleanup Filtration Sys Being Inoperable for Greater than Aot.Util Intends to Append Addl Info Section of LER with Brief Description of Test Results,Rather than Submit Separate LER1999-09-13013 September 1999 Forwards LER 99-007-00 Re Train 'B' CR Makeup & Cleanup Filtration Sys Being Inoperable for Greater than Aot.Util Intends to Append Addl Info Section of LER with Brief Description of Test Results,Rather than Submit Separate LER NOC-AE-000638, Forwards License Renewal Applications & Certifications of Medical Exam for Seven Listed Licensed Operators at Stp,Per 10CFR55.57.Encl Withheld,Per 10CFR2.790(a)(6)1999-09-0909 September 1999 Forwards License Renewal Applications & Certifications of Medical Exam for Seven Listed Licensed Operators at Stp,Per 10CFR55.57.Encl Withheld,Per 10CFR2.790(a)(6) NOC-AE-000562, Requests Relief from Contruction Code non-destructive Exam Requirements for Repair/Replacement Activities During Second Inservice Insp Interval of Units 1 & 2,IAW Provisions of 10CFR50.55a(a)(3)(i)1999-08-31031 August 1999 Requests Relief from Contruction Code non-destructive Exam Requirements for Repair/Replacement Activities During Second Inservice Insp Interval of Units 1 & 2,IAW Provisions of 10CFR50.55a(a)(3)(i) NOC-AE-000617, Forwards semi-annual Fitness for Duty Program Performance Rept for 990101-990630,IAW 10CFR26.71(d)1999-08-26026 August 1999 Forwards semi-annual Fitness for Duty Program Performance Rept for 990101-990630,IAW 10CFR26.71(d) NOC-AE-000585, Provides Notification That South Texas Project Has Completed Integrity Evaluation of Units 1 & 2 Reactor Coolant Pump Casings Required by Paragraph (D) of Code Case N-4811999-08-25025 August 1999 Provides Notification That South Texas Project Has Completed Integrity Evaluation of Units 1 & 2 Reactor Coolant Pump Casings Required by Paragraph (D) of Code Case N-481 NOC-AE-000603, Informs of Addition of Restriction to SRO License 42658, for KM Espinoza,Effective 990721,per 10CFR50.74.Encl Info Withheld,Per 10CFR2.790(a)(6)1999-07-29029 July 1999 Informs of Addition of Restriction to SRO License 42658, for KM Espinoza,Effective 990721,per 10CFR50.74.Encl Info Withheld,Per 10CFR2.790(a)(6) NOC-AE-000599, Forwards STP Unit 1,Cycle 9 Startup Testing Summary Rept. No New Licensing Commitments Contained in Ltr1999-07-28028 July 1999 Forwards STP Unit 1,Cycle 9 Startup Testing Summary Rept. No New Licensing Commitments Contained in Ltr NOC-AE-000470, Forwards Amend 12 to STP Fire Hazards Analysis Rept. Summary of Changes Made Under Provision of 10CFR50.59 Also Encl1999-07-28028 July 1999 Forwards Amend 12 to STP Fire Hazards Analysis Rept. Summary of Changes Made Under Provision of 10CFR50.59 Also Encl 05000498/LER-1999-006, Forwards LER 99-006-00 Re Automatic Reactor Trip Due to over-temp delta-temp Actuation.Licensee Commitments Are Listed in Corrective Actions Section of LER1999-07-26026 July 1999 Forwards LER 99-006-00 Re Automatic Reactor Trip Due to over-temp delta-temp Actuation.Licensee Commitments Are Listed in Corrective Actions Section of LER NOC-AE-000589, Forwards Rev to 1RE08 ISI Summary Repts for Repairs & Replacements & for Sys Pressure Tests,Corecting Date of End of Insp Interval Provided in Item 9 of from NIS-1 from 09/24/99 to 09/24/20001999-07-26026 July 1999 Forwards Rev to 1RE08 ISI Summary Repts for Repairs & Replacements & for Sys Pressure Tests,Corecting Date of End of Insp Interval Provided in Item 9 of from NIS-1 from 09/24/99 to 09/24/2000 NOC-AE-000582, Forwards 1RE08 ISI Summary Rept for Welds & Component Supports of STP Electric Generating Station,Unit 1. Summary Rept Satisfies Reporting Requirements of IWA-6000 of Section XI for Welds & Component Supports1999-07-26026 July 1999 Forwards 1RE08 ISI Summary Rept for Welds & Component Supports of STP Electric Generating Station,Unit 1. Summary Rept Satisfies Reporting Requirements of IWA-6000 of Section XI for Welds & Component Supports NOC-AE-000597, Forwards voltage-based Criteria 90-day Rept for SG Tube Exam Performed Under NRC GL 95-05 During Refueling Outage 1RE08. Rept Contains Info Required by Section 6.b of Attachment 2 to GL 95-051999-07-23023 July 1999 Forwards voltage-based Criteria 90-day Rept for SG Tube Exam Performed Under NRC GL 95-05 During Refueling Outage 1RE08. Rept Contains Info Required by Section 6.b of Attachment 2 to GL 95-05 NOC-AE-000598, Forwards Four Copies of 1RE08 Refueling Outage ISI Summary Rept for Steam Generator Tubing1999-07-23023 July 1999 Forwards Four Copies of 1RE08 Refueling Outage ISI Summary Rept for Steam Generator Tubing NOC-AE-00586, Forwards Results of Control Rod Testing,In Response to NRC Bulletin 96-01, Control Rod Insertion Problems, Dtd 960308.Core Map Provided to Assist in Understanding Test Data1999-07-21021 July 1999 Forwards Results of Control Rod Testing,In Response to NRC Bulletin 96-01, Control Rod Insertion Problems, Dtd 960308.Core Map Provided to Assist in Understanding Test Data NOC-AE-000595, Forwards Chapters 1.0 & 16.0 to Operations QA Plan for South Texas Project.Rev Is Strictly Administrative & All Content Was Previously Submitted to NRC on 990503 & 9906151999-07-21021 July 1999 Forwards Chapters 1.0 & 16.0 to Operations QA Plan for South Texas Project.Rev Is Strictly Administrative & All Content Was Previously Submitted to NRC on 990503 & 990615 NOC-AE-000518, Requests Exemption from Various Special Treatment Requirements of 10CFR50,as Described in Encls to Ltr.Stp Believes That Pilot Application Will Assist NRC in Development & Implementation of risk-informed 10CFR501999-07-13013 July 1999 Requests Exemption from Various Special Treatment Requirements of 10CFR50,as Described in Encls to Ltr.Stp Believes That Pilot Application Will Assist NRC in Development & Implementation of risk-informed 10CFR50 NOC-AE-000536, Submits Request for Exemption from Requirements of 10CFR50.34(b)(11),10CFR50,App A,Gdc 2 & 10CFR100,App a, Section VI(a)(3) Re Maint of Seismic Instrumentation.Revised Page to Procedure OERP01-ZV-IN01 Included1999-07-13013 July 1999 Submits Request for Exemption from Requirements of 10CFR50.34(b)(11),10CFR50,App A,Gdc 2 & 10CFR100,App a, Section VI(a)(3) Re Maint of Seismic Instrumentation.Revised Page to Procedure OERP01-ZV-IN01 Included NOC-AE-000580, Forwards Response to NRC 990415 RAI Re Implementation of Commitments Related to GL 89-10, Safety-Related MOV Testing & Surveillance & GL 96-05, Periodic Verification of Design Basis Capability of Safety-Related Movs1999-07-13013 July 1999 Forwards Response to NRC 990415 RAI Re Implementation of Commitments Related to GL 89-10, Safety-Related MOV Testing & Surveillance & GL 96-05, Periodic Verification of Design Basis Capability of Safety-Related Movs NOC-AE-000574, Forwards ISI Summary Repts for Repairs & Replacements & for Sys Pressure Tests Performed Between 971004 & Completion of Eighth RO on 9904281999-07-0606 July 1999 Forwards ISI Summary Repts for Repairs & Replacements & for Sys Pressure Tests Performed Between 971004 & Completion of Eighth RO on 990428 NOC-AE-000557, Requests Relief from ASME Section XI Code Nondestructive Exam Requirements of App III,III-3410 for Second ISI Interval.Proposed Alternatives for Ultrasonic Exam of Piping Sys Welds,Attached1999-07-0606 July 1999 Requests Relief from ASME Section XI Code Nondestructive Exam Requirements of App III,III-3410 for Second ISI Interval.Proposed Alternatives for Ultrasonic Exam of Piping Sys Welds,Attached NOC-AE-000498, Requests Relief from ASME Section XI Code Nondestructive Exam Requirements Applicable to SG Main Steam Nozzle inside- Radius Sections.Attachment Includes Discussion of Basis & Justification for Request & Implementation Schedule1999-07-0606 July 1999 Requests Relief from ASME Section XI Code Nondestructive Exam Requirements Applicable to SG Main Steam Nozzle inside- Radius Sections.Attachment Includes Discussion of Basis & Justification for Request & Implementation Schedule NOC-AE-000573, Requests Relief from Requirements of ASME Section XI Code Case N-498,exempting Isolated Class 1 Reactor Vessel Head Vent Atmospheric Vent Piping & Valve from Being Tested at Full RCS Pressure1999-07-0606 July 1999 Requests Relief from Requirements of ASME Section XI Code Case N-498,exempting Isolated Class 1 Reactor Vessel Head Vent Atmospheric Vent Piping & Valve from Being Tested at Full RCS Pressure NOC-AE-000541, Submits Response to GL 98-01,Suppl 1, Y2K Readiness of Computer Systems at Npps. Readiness Disclosure for STP, Encl1999-06-29029 June 1999 Submits Response to GL 98-01,Suppl 1, Y2K Readiness of Computer Systems at Npps. Readiness Disclosure for STP, Encl NOC-AE-000571, Forwards Final Operating Exam Matls for STP Exam Scheduled for 990705.Revised Operating Exam Outline & post-validation Change Summary Has Been Included.Without Encls1999-06-24024 June 1999 Forwards Final Operating Exam Matls for STP Exam Scheduled for 990705.Revised Operating Exam Outline & post-validation Change Summary Has Been Included.Without Encls NOC-AE-000512, Responds to NRC 981201 Telcon Re Jco 93-0004,per Revised MSLB Analysis1999-06-23023 June 1999 Responds to NRC 981201 Telcon Re Jco 93-0004,per Revised MSLB Analysis NOC-AE-000560, Forwards LER 99-S02-00,re Failure to Maintain Positive Control of Vital Area Security Key.Licensee Commitments Are Found in Corrective Action Section of LER1999-06-23023 June 1999 Forwards LER 99-S02-00,re Failure to Maintain Positive Control of Vital Area Security Key.Licensee Commitments Are Found in Corrective Action Section of LER 05000498/LER-1999-005, Forwards LER 99-005-00,re Failure to Meet Requirements of TS Surveillance 3.7.1.2 Action B for Auxiliary FW Sys.Only Commitments Contained in Ltr Are Located in Corrective Action Section of LER1999-06-17017 June 1999 Forwards LER 99-005-00,re Failure to Meet Requirements of TS Surveillance 3.7.1.2 Action B for Auxiliary FW Sys.Only Commitments Contained in Ltr Are Located in Corrective Action Section of LER NOC-AE-000565, Forwards Amended Pages for Insertion Into South Texas Project Nuclear Operating Co Previously Submitted Response to NRC Rai.New Pages Include Expanded Answer to Question 4.b1999-06-16016 June 1999 Forwards Amended Pages for Insertion Into South Texas Project Nuclear Operating Co Previously Submitted Response to NRC Rai.New Pages Include Expanded Answer to Question 4.b NOC-AE-000548, Forwards Response to RAI Re Proposed Amends on Replacement SG Water Level Trip Setpoint Differences for Stp,Units 1 & 2.Nothing Contained in Response Should Be Considered Commitment Unless So Specified in Separate Correspondence1999-06-16016 June 1999 Forwards Response to RAI Re Proposed Amends on Replacement SG Water Level Trip Setpoint Differences for Stp,Units 1 & 2.Nothing Contained in Response Should Be Considered Commitment Unless So Specified in Separate Correspondence NOC-AE-000561, Forwards Change QA-042 to Operations QAP, Rev 13, Reflecting Current Organizational Alignment for STP & Culminating Organizational Realigment That Has Been Taking Place During Past Several Months1999-06-15015 June 1999 Forwards Change QA-042 to Operations QAP, Rev 13, Reflecting Current Organizational Alignment for STP & Culminating Organizational Realigment That Has Been Taking Place During Past Several Months NOC-AE-0559, Forwards STP Commitment Change Summary Rept for Period 981209-990610.Rept Lists Each Commitment for Which Change Was Made During Reporting Period & Provides Basis for Each Change1999-06-15015 June 1999 Forwards STP Commitment Change Summary Rept for Period 981209-990610.Rept Lists Each Commitment for Which Change Was Made During Reporting Period & Provides Basis for Each Change NOC-AE-000499, Forwards Relief Request RR-ENG-2-3,proposing to Perform Alternative Ultrasonic Examination from Outside Surface of Skirt Attachment Weld as Described in Encl,In Lieu of Surface Examination from Inside Pressurizer Skirt1999-06-0909 June 1999 Forwards Relief Request RR-ENG-2-3,proposing to Perform Alternative Ultrasonic Examination from Outside Surface of Skirt Attachment Weld as Described in Encl,In Lieu of Surface Examination from Inside Pressurizer Skirt NOC-AE-000502, Forwards Relief Request RR-ENG-2-6,proposing That Boroscopic VT-1 Visual Examination Be Allowed as Alternative to Section XI Surface Examination of Pump Casing Welds,Or Portions of Welds within Pits1999-06-0909 June 1999 Forwards Relief Request RR-ENG-2-6,proposing That Boroscopic VT-1 Visual Examination Be Allowed as Alternative to Section XI Surface Examination of Pump Casing Welds,Or Portions of Welds within Pits NOC-AE-000500, Forwards Relief Request RR-ENG-2-4,proposing to Perform Alternative Ultrasonic Examination from Outside & End Surfaces of Reactor Vessel Closure Head Nuts,As Described in Encl in Lieu of Surface Examination of Threaded Region1999-06-0909 June 1999 Forwards Relief Request RR-ENG-2-4,proposing to Perform Alternative Ultrasonic Examination from Outside & End Surfaces of Reactor Vessel Closure Head Nuts,As Described in Encl in Lieu of Surface Examination of Threaded Region NOC-AE-000545, Forwards Response to NRC 990416 RAI Re Util Proposed Amend on Operator Action for Small Break Loca, .Draft EOP Re Small Break Loca,Encl to Aid Discussion of Proposed Amend1999-05-31031 May 1999 Forwards Response to NRC 990416 RAI Re Util Proposed Amend on Operator Action for Small Break Loca, .Draft EOP Re Small Break Loca,Encl to Aid Discussion of Proposed Amend 1999-09-09
[Table view] |
Text
.
t l
The Light company South Texas Project Hectric Generating Station P.o. Box 289 5 Worth, Texas 77483 i Houston Lighting & Power July 5', 1996 ST-HL-AE-5414 I File No.: G20.02.01 I 10CFR50.90,50.92 U. S. Nuclear Regulatory Commission !
Attention: Document Control Desk i Washington, D.C. 20555 South Texas Project Units I and 2 Docket Nos. STN 50-498; STN 50-499 Additional Information Regarding Proposed Single Engineered Safety Features 1 Train Mitigation Capabilities (TAC No. M92169/M92170)
Subsequent to the transmittal ofinfonnation to support the previously submitted Special Test j Exception of the Standby Diesel Generator, the Nuclear Regulatory Commission staff requested !
additional information relating to single train event mitigation. The requested information and j response is provided in Attachment I to this letter. .
- 1 Should you have any questions, please contact Mr. A. W. Harrison at (512) 972-7298 or me at (512)972-7795.
i l
I
). 0.
D. A. Leazar Director, 1C002S Nuclear Fuel and Analysis 1
TCK/
l
/1 OD l ' l Attachment 1 9607160053 960709 PDR ADOCK 05000498 P PDR
.- - - - . . - - . - -- - .. . - . . - - - . -. ~ - - . .
Houston Lighting & Power Company ST-HL-AE-5414 South Texas Project Electric Generating Station File No.: G20.02.01 Page 2 l
Leonard J. Callan Rufus S. Scott l Regional Administrator, Region IV Associate General Counsel l U. S. Nuclear Regulatory Commission Houston Lighting & Power Company 611 Ryan Plaza Drive, Suite 400 P. O. Box 61067 l Arlington, TX 76011-8064 Houston, TX 77208 Thomas W. Alexion Institute of Nuclear Power Project Manager, Mail Code 13H3 Operations - Records Center i U. S. Nuclear Regulatory Commission 700 Galleria Parkway ;
l Washington, DC 20555-0001 Atlanta, GA 30339-5957 David P. Loveless Dr. Joseph M. Hendrie ;
Sr. Resident Inspector 50 Bellport Lane l c/o U. S. Nuclear Regulatory Comm. Bellport, NY 11713 ,
P. O. Box 910 Bay City, TX 77404-0910 Richard A. Ratliff !
Bureau of Radiation Control J. R. Newman, Esquire Texas Department of Health !
Morgan, Lewis & Bockius 1100 West 49th Street ,
1800 M Street, N.W. Austin, TX 78756-3189 Washington, DC 20036-5869 .
U. S. Nuclear Regulatory Comm.
M. T. Hardt/W. C. Gunst Attn: Document Control Desk City Public Service Washington, DC 20555-0001 P. O. Box 1771 '
San Antonio, TX 78296 J. C. Lanier/M. B. Lee J. R. Egan, Esquire City of Austin Egan & Associates, P.C. !
Electric Utility Department 2300 N Street, N.W. l 721 Barton Springs Road Washington, D.C. 20037 Austin, TX 78704 l
Central Power and Light Company J. W. Beck ATTN: G. E. Vaughn/C. A. Johnson Little Harbor Consultants, Inc.
P. O. Box 289, Mail Code: N5012 44 Nichols Road Wadsworth, TX 77483 Cohassett, MA 02025-1166 J. L. Pellet U. S. Nuclear Regulatory Commission
- l. 611 Ryan Plaza Drive, Suite 400
[ Arlington, TX 76011-8064 l
{
l
Attachm:nt 1 ST-HL-AE-5414 i Page1of5 l A. Describe the operator actions and time frame to accomplish the following activities. Clarify l where the operator has to go to perform the action if outside the Control Room.
i l 1. Action to depressurize the Reactor Coolant System to a pressure for using the Low Head Safety Injection pump to mitigate the Small Break Loss of Coolant Accident:
{
Response
l In the eveat cf degraded or inadequate core cooling, the Emergency Operating Procedures at the l South Texas Project provide direction for manual post-accident depressurization and cooldown. l These actions are based on core exit thermocouple temperatures and are found in procedures )
OPOP05-EO-FRC1, Response to Inadequate Core Cooling", and OPOP05-EO-FRC2, " Response to Degraded Core Cooling". If Auxiliary Feedwater flow and Steam Generator level are adequate, the j operator is instructed to lower Reactor Coolant System pressure via a secondary side cooldown using l the Steam Generators. If this is not possible, the operator is instructed to manually open a Pressurizer PORV to depressurize the Reactor Coolant System to a pressure that will allow injection via the Low Head Safety Injection pump. Either of these actions can be taken from the Control Room quickly
(<l5 minutes to perform actions) if necessary to mitigate a Small Break Loss-of-Coolant Accident.
l
- 2. Action to isolate non essential flow to Component Cooling Water system:
Response: !
l As stated on page 3 of 12 in letter ST-HL-AE-5208 dated November 22,1995, an analysis of the Component Cooling Water system following a Safety Injection signal indicates the remaining Component Cooling Water train will operate satisfactorily following a loss of power to any two Component Cooling Water trains. The Component Cooling Water has five flow paths that are isolated by a safety injection signal. Total Component Cooling Water flow for these five flow paths is approximately 12,400 gpm. Approximately 95% of the flow or 11,800 gpm is carried by two of the flow paths, the spent fuel pool coolers and the non-safety header. The isolation design for these two flow paths has redundant valves powered from all three Standby Diesel Generator trains. The configuration of these redundant valves ensures that if there is only one operable Standby Diesel Generator, only one of these flow paths will remain unisolated. This condition is only applicable for i Trains A or B, since Train C powers an isolation valve in both of these flow paths. In the case where a flow path is unisolated and it is desired to isolate the remaining flow path, an operator can be dispatched to manually close the remaining open isolation valve. This action would be performed by a Plant Operator in the Component Cooling Water header room of the Mechanical Auxiliary Building, which is located within 5 minutes of the Control Room. The open isolation valve could be manually closed within approximately 5 minutes by the operator.
I
. . - ~ . .. -. . . - . .- .- -- --- - -.- _- .
Attachm:nt i ST-HL-AE-5414 1 Page 2 of 5
]
- 3. Action to load the Positive Displacement Pump on the Technical Support Center Diesel Generator and align to the Reactor Coolant Pump seals:
Resnnnse:
The Technical Support Center Diesel Generator will start automatically on the Loss of Offsite Power ;
event and power its associated bus. If required, the Control Room Operator will then start the Positive Displacement Pump from the Control Room and supply Reactor Coolant Pump seal injecticn 8 via the normal path. These actions which are described in OPOP04-AE-0001, " Loss of any 13.8 kV ,
or 4.16 kV bus", could be complete in approximately 15 minutes. Ilowever, as discussed in the t response to question D, single train operation will still provide the necessary Component Cooling Water flow to the Reactor Coolant Pump thermal barrier to prevent seal damage. !
i i
- 4. Action to align Auxiliary Feedwater to an intact Steam Generator:
Remnonne:
STP has four Auxiliary Feedwater (AFW) trains feeding four steam generators. Auxiliary Feedwater trains A , B, and C are powered from Safety Trains A, B and C respectively. Auxiliary Feedwater Train D is a Turbine Driven pump which feeds D steam generator. If only one Standby Diesel Generator is available, then the minimum of one motor driven Auxiliary Feedwater pump and the steam driven Auxiliary Feedwater will be available to feed the steam generators. If either of these Auxiliary Feedwater pumps feeds an intact steam generator, the acceptance limit for this accident, i
which is the pressurizer does not go water solid within 30 minutes with no operator action, will be met.
I Ifit becomes necessary for another steam generator to be supplied by either of the running Auxiliary Feedwater pumps, a Plant Operator can be dispatched from the control room to the Auxiliary Feedwater valve cubicle in the Isolation Valve Cubicle in approximately 5 minutes. The performance of the necessary valve manipulations will take approximately 10 minutes.
- 5. Action to isolate the containment isolation valves to the piping for the containment radiation monitors:
i Resnonse:
Emergency Operating Procedure OPOP05-EO-0000, " Reactor Trip or Safety Injection" will be revised to provide direction to manually isolate these lines if unable to do so from the control room.
A Plant Operator dispatched from the control room will be able to reach the Mechanical Auxiliary l Building 41' Piping Penetration in approximately 5 minutes and locally isolate the containment j radiation monitors in approximately 10 minutes. )
I
..u.r..J. .m_%um,_a._ l i#-- La a.A-4+. -4AL Ms.r.J4+'at JA A JL - 4.r * *;&.a 4 4-a..' n J a ,.w. 4 e.
Attachm:nt 1 ST-HL-AE-5414 l Page 3 of 5 )
l B. Discuss the mitigating actions for Train C of Fuel Handling Building HVAC:
l t
l Recnonce:
1 The Fuel Handling Building HVAC is designed to mitigate the consequences of a fuel handling l l accident as well as LOCA (leakage from ECCS components located in the Fuel Handling Building) l by limiting plant site boundary dose to within the guidelines of 10 CFR 100. This is accomplished by routing exhaust air from the spent fuel pool and the remainder of the Fuel Handling Building through ESF filter units containing HEPA filters and iodine removal carbon filter units if high levels of l l airbome radioactivity are detected in the exhaust air or Safety Injectica is actuated. i The Fuel Handling Building exhaust air filters consist of a two train arrangement powered from A and B ESF diesels. In the event that only C ESF diesel is available, action would be taken to cross-connect ESF 4.16 kV buses to provide power to either A or B Fuel Handling Building exhaust air filter trains.
The following describes the steps required to connect one South Texas Project Engineered Safety j Features train to another Engineered Safety Features train, via Emergency Bus IL, any two Auxiliary i Engineered Safety Features Transformers, and the associated motor operated switches. This cross-connect scheme would be utilized to provide Standby Diesel Generator-backed power to the Fuel Handling Building HVAC heaters (114 kW per train) should no other preferred offsite power source ;
or SDG-backed source be available. This description summarizes required actions following the
- postulated loss of AC power to Engineered Safety Features Buses A and B. The initial conditions for this scenario include
- (1) SDG A and B are out of service; (2) SDG C is in the standby mode; and (3)
Class lE buses an supplied from offsite power. A loss of offsite power then occurs, followed by a I fuel handling accident or LOCA, the successful start of SDG C, and the successful loading of SDG C.
The :pecific steps required to cross-connect two Engineered Safety Features buses are detailed in Addendum 12 of STP procedure OPOP04-AE-0001, " Loss of Any 13.8 kV or 4.16 kV Bus". This description summarizes the steps for cross-connecting Engineered Safety Features Bus C to Engineered Safety Features Bus B. The cross-connect sequence includes opening the Engineered Safety Features Transformer ElB and ElC Motor Operated Switches (MOS) [#1] from the preferred offsite power source; closing the ElB and ElC MOS units [#1] to the Emergency Bus IL source; closing the Emergency Bus IL feeder breakers [#2] to Engineered Safety Features Buses B and C; and closing the Engineered Safety Features Bus B and C normal supply breaker [#3] to each 4.16 kV Engineered Safety Features Bus. Engineered Safety Features Bus B is then energized from the output ,
of SDG C. The FHB HVAC loads may then be manually actuated and energized by SDG C. l This cross-connect scheme was utilized in the docketed South Texas Project position for Technical Specification Amendments 71 and 60, requested in letter ST-HL-AE-4924 dated November 7,1994 and approved by the NRC in letter ST-AE-HL-94117, dated February 14,1995, i
! i
Attachment 1 ST-HL-AE-5414 Page 4 of 5 C. Clarify Control Room HVAC single train capability:
Resnome:
While the South Texas Project design bases for Control Room Envelope HVAC is two of three trains, the capabilities of a single train of the Control Room Envelope HVAC system supported by a single train of Essential Chilled Water powered by the same ESF diesel generator are the following. A l single train of Control Room Envelope HVAC will maintain designed temperature and relative '
humidity conditions. However, a single train of the Control Room Envelope HVAC system is not sufficient to maintain the control room envelope at 1/8" positive pressure relative to the surrounding l areas. While single train operation testing has demonstrated most configurations will provide a positive pressure in the control room envelope, it was determined approximately 30 cfm inleakage ;
could occur under certain single train configurations. This unfiltered inleakage, plus the normally assumed 10 cfm from the use of other doors in the pressurized areas, would yield a total Control l Room inleakage of approximately 40 cfm. l l The results of a sensitivity study of the Control Room thyroid dose to variations of the in-leakage l between 10 cfm and 40 cfm are shown below. The doses represent the TID-14844 source term results
- for one train of Control Room Envelope HVAC and consequently include a substantial amount of ;
conservatism.
]
THYROID DOSE RESULTS l
I IN I FAKAGE (CFM) DOSE (REM) 10 36 17 49 25 63 40 90 i
[The results noted above assumed a "once-filtered" inleakage of 250cfm. Results from the
- tests indicated that this inleakage value could be as high as 300cfm for certain conditions.
l Use of the 300cfm value would slightly increase the above doses]
When considering the extremely low probability (< E-9)of this beyond design basis configuration, :
Control Room dosage is considered acceptable given the conservatism in the calculation and that the doses are within the 10 CFR 50, Appendix A General Design Criteria limits when using the more
- realistic Westinghouse gap activity source term.
l l Based on the above, South Texas Project considers that the Control Room Envelope HVAC system has sufficient capability in the single train configuration to justify the short allowed outage time
- requested in the proposed Technical Specification.
f t
I Attachmrnt 1 ST-IIL-AE-5414 Page 5 of 5 D. Clarify Reactor Coolant Pump seal cooling capability if B Train ESF diesel is the only l operating diesel generator: '
Response
If the B Train ESF diesel is the only operating diesel generator following a LOOP, no centrifugal charging pump is available to provide seal injection to the Reactor Coolant Pumps. In the event of a loss of offsite power, the B train component cooling water system will provide adequate cooling flow ,
to the Reactor Coolant Pump thermal barrier heat exchanger to maintain the integrity of the Reactor Coolant Pump seals without Operator action. For additional defense in depth, the Positive Displacement Pump may be powered by the Technical Support Center Diesel Generator to provide seal injection to the Reactor Coolant Pumps in the event of a loss offsite power with only B SDG available.