Letter Sequence Other |
|---|
|
Results
Other: ML20129D308, ST-HL-AE-5261, Provides Addl Info Re Proposed Special Test Exception 3.10.8, ST-HL-AE-5271, Provides Addl Info Re Proposed Special Test Exception 3.10.8, ST-HL-AE-5272, Provides Addl Info Re Proposed Special Test Exception 3.10.8, ST-HL-AE-5280, Forwards Revised Table to ,Deleting Item for Hydrogen Analyzers & Revised Table to ,Revising Column Heading.Stp PSA Info Re Containment Isolation Also Encl, ST-HL-AE-5414, Provides Addl Info Re Proposed Single ESF Train Mitigation Capabilities
|
MONTHYEARML20087H8561995-05-0101 May 1995 Proposed Tech Specs Re Incorporation of TS 3.10.8 Into Licenses NPF-76 & NPF-80 Project stage: Request ML20091R4151995-08-28028 August 1995 Proposed Tech Specs,Reflecting Addition of TS 3.10.8 Allowing Extension of Sdg AOT for Cumulative 21 Days on Each Sdg Once Per Fuel Cycle & Extension of AOT on Each Essential CW Loop for Cumulative 7 Days Once Per Fuel Cycle Project stage: Request ST-HL-AE-5208, Submits Response to Request for Addl Info Re Proposed Special Test Exception1995-11-22022 November 1995 Submits Response to Request for Addl Info Re Proposed Special Test Exception Project stage: Request ML20100B8281996-01-0404 January 1996 Nonproprietary STP Tube Repair Criteria for ODSCC at Tube Support Plate Project stage: Request ST-HL-AE-5261, Provides Addl Info Re Proposed Special Test Exception 3.10.81996-01-0404 January 1996 Provides Addl Info Re Proposed Special Test Exception 3.10.8 Project stage: Other ST-HL-AE-5272, Provides Addl Info Re Proposed Special Test Exception 3.10.81996-01-0808 January 1996 Provides Addl Info Re Proposed Special Test Exception 3.10.8 Project stage: Other ST-HL-AE-5271, Provides Addl Info Re Proposed Special Test Exception 3.10.81996-01-0808 January 1996 Provides Addl Info Re Proposed Special Test Exception 3.10.8 Project stage: Other ST-HL-AE-5280, Forwards Revised Table to ,Deleting Item for Hydrogen Analyzers & Revised Table to ,Revising Column Heading.Stp PSA Info Re Containment Isolation Also Encl1996-01-23023 January 1996 Forwards Revised Table to ,Deleting Item for Hydrogen Analyzers & Revised Table to ,Revising Column Heading.Stp PSA Info Re Containment Isolation Also Encl Project stage: Other ST-HL-AE-5414, Provides Addl Info Re Proposed Single ESF Train Mitigation Capabilities1996-07-0909 July 1996 Provides Addl Info Re Proposed Single ESF Train Mitigation Capabilities Project stage: Other ML20129D3081996-09-24024 September 1996 Submits Station Blackout Modeling in Probalistic Safety Analysis for Proposed Standby Diesel Generator License Amendments,South Texas Project,Units 1 & 2 Project stage: Other 1996-01-23
[Table View] |
Submits Station Blackout Modeling in Probalistic Safety Analysis for Proposed Standby Diesel Generator License Amendments,South Texas Project,Units 1 & 2| ML20129D308 |
| Person / Time |
|---|
| Site: |
South Texas  |
|---|
| Issue date: |
09/24/1996 |
|---|
| From: |
Alexion T NRC |
|---|
| To: |
NRC |
|---|
| References |
|---|
| TAC-M92169, TAC-M92170, NUDOCS 9609300035 |
| Download: ML20129D308 (2) |
|
Text
.- _
4 September 24, 1996 j
l MEMORANDUM T0:
PDIV-I File FROM:
Tom Alexion
SUBJECT:
STATION BLACK 0UT MODELING IN THE PROBABILISTIC SAFETY ANALYSIS FOR PROPOSED STANDBY DIESEL GENERATOR LICENSE AMENDMENTS, SOUTH TEXAS PROJECT, UNITS 1 AND 2 (STP)
(TAC NOS. M92169 AND M92170)
I received tho attached fax from John Flack, who received it from the licensee.
l Docket No. 50-498 and 50-499 l
Attachment:
Fax from Licensee DISTRIBUTION:
Docket File PUBLIC (PDR)
TAlexion l
D0C. NAME: STP92169
)
l l
DE Di ' /
NRC ftE CENTER COPY 3aeeis 9609300035 960924 PDR ADOCK 05000498 P
PDR
00/10 '06 13:21 ID STP,HL&P NUCLEAR ENG FAX:072808' PACE 2
o ISBO_ INT 1.XLWJDG_SBO XLS l
.L
..... Station Blockout (880) Contibution 1
i l
initiatore used to calculate 880 j
i i
LOSP Loss of 345kV Offrite Power LOMT Loss of PoWor ffom Mein Iransformer LOSPX Loss of all Offs!ts Power TLOSP Loss of 34SkV Power 1
)
1 TLOSPX Loss of 345kV & 138kV, P.o._wer I
Fre.quency of Sequences for:
Base Case SBO 3.73E-06
,Bese Ceee PDS 2.07 E-05
!D21 AOT SBO I 5.28E-OS l
ID21AOT PDS
! 2.30E-05 4
i j
ID14RV1 iSBO l 4.40E 06
' ' " ~"
I
'fD14RV1 7PDS 2.18E 057 i
I I
! Percent increasifor SSO Freipiency from Base Ne~e
~
~
~
D21 AO.T i
'41.81} _ _..
_.q Percent increase for PDS Frequency from Bose Caos
'D21 AOT 10.09 4
i
'D14RV1
.. 5.28 j
I
.,880 Percent of Database l
4 IBase Case f
18.01 D21 AOT 23.03 i
D14RV1 1
20.18 cNes
//faclc l W ' $ e N t e n o*b 0 Q*J 'e
$1se C a a,,.
-y
()2 i (\\ en rt Nod <l < 9 tes m W o z.s Cay sam & /
d' b j'j @ \\/ l D Nfoht f ft ft+Lc M tv l'/ h y
.Std m;'k /
Sho
%L b h,A Pb 5
-9 C o. < e Dwee Fee
-c acm ISBO_ INT 1.XLW)DG_SBO.XLS 9/18/96 ATTACHMENT