Response to NRC Regulatory Issue Summary 2006-15 Preparation and Scheduling of Operator License Examinations.
ML062640092
Person / Time
Site: Dresden, Peach Bottom, Oyster Creek, Byron, Three Mile Island, Braidwood, Limerick, Clinton, Quad Cities, LaSalle
Issue date: 09/20/2006
From: Nicely K
Exelon Generation Co, Exelon Nuclear
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
2130-06-20399, 5928-06-20558, RS-06-134
Download: ML062640092 (13)


Text

RS-06-134 5928-0640558 21300600399 September 20, 2006 U . S . Nuclear Regulatory Commission ATTN : Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos . STN 50-456 and STN 50-457 Byron Station, Units 1 and 2 Facility Operating -License Nos. NPF-37 and NPF-66 NRC Docket Nos . STN 50-454 and STN 50-455 Clinton Power Station, Unit 1 Facility Operating License No . NPF-62 NRC Docket No. 50-461 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos . DPR-19 and DPR-25 NRC Docket Nos . 50-237 and 50-249 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-1 1 and NPF-1 8 NRC Docket Nos. 50-373 and 50-374 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 Oyster Creek Generating Station Facility Operating License No. DPR-1 6 NRC Docket No . 50-219 Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos . DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278

September 20, 2006 U. S . Nuclear Regulatory Commission Page 2 Cities Wad Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 Three Mile Island Nuclear Station, Unit 1 Facility Operating License No. DPR-50 NRC Docket No. 50-289

Subject:

Response to NRC Regulatory Issue Summary 2006-15 "Preparation and Scheduling of Operator Licensing Examinations"

Reference:

NRC Regulatory Issue Summary 2006-15, "Preparation and Scheduling of Operator Licensing Examinations," dated August 14, 2006 The referenced Regulatory Issue Summary (RIS) requested that facility licensees provide a proposed schedule of these examinations and an estimate of the number of candidates to be tested in site examinations and the Generic Fundamentals Examinations (GFEs) for calendar years 2007 through 2009 including an estimate for calendar year 2010.

In calendar years 2007 and 2009, 6 candidates are expected to take the dual site Limited Senior Reactor Operator (LSRO) initial license examination as indicated on Attachment 8. The schedule for the indicated exam is as follows: the written exam and part of the operating exam will be given at Limerick Generating Station (LGS); the remainder of the operating exam will be completed at Peach Bottom Atomic Power Station (PBAPS) . Since the LSRO exam is a dual site exam that involves both LGS and PBAPS, rather than repeating the same information on both attachments, the exam scheduling information is provided on Attachment 8 for PBAPS and Attachment 6 for LGS references Attachment 8 where necessary.

Attachments 1 through 10 provide the responses to RIS 2006-15 for the Exelon Generation Company, LLC (EGC) and AmerGen Energy Company, LLC (AmerGen) plants identified above .

The operator licensing examination information for each facility is provided on a separate NRC Form 536. If you have any questions about this letter, please contact David. J . Chrzanowski at (630) 657-2816 .

Respectfully, Kenneth M. Nicely Manager - Licensing

September 20, 2006 U . S. Nuclear Regulatory Commission Page 3 - Completed NRC Form 536 for Braidwood Station - Completed NRC Form 536 for Byron Station - Completed NRC Form 536 for Clinton Power Station - Completed NRC Form 536 for Dresden Nuclear Power Station - Completed NRC Form 536 for LaSalle County Station - Completed NRC Form 536 for Limerick Generating Station - Completed NRC Form 536 for Oyster Creek Generating Station - Completed NRC Form 536 for Peach Bottom Atomic Power Station - Completed NRC Form 536 for Quad Cities Nuclear Power Station 0 - Completed NRC Form 536 for Three Mile Island Nuclear Station - Unit 1

Response to RIS 2006-15 Attachment 1 Page 1 of 1 NBC FORM 536 U .S NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO, 3150-0131 EXPIRES: 08/31/2008 (8 2005)

Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> . This information collection is used to plan budgets and resources for operator examinations . Send comments burden OPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch (T-5 F5'3), U .S .

Nuclear Regulatory Commission, Washington, DC 200&OW1, or by Internet EXAMINATION DATA e-mail to in ocollects@nrc.&v, I and to the Desk Officer, office of Information and RepW"AffaimYE ITKIN WNWITILOffice ofManagement md Budget, Washington, DC 2003 . If a means used to impose an information collection not conductdoes not display a currently valid OMB control number, the NBC may or sponsor, and a person I net required to respond A the information collection .

FACILITY NRC REGION Braidwood Station, Units 1 and 2 III Facility Operating License Nos . NPF-72 and NPF-77 NRC Docket Nos . STN 50-456 and STN 50-457 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2007 ~ CY 2008 CY 2009 CY 2010 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 EXAMINATIONS 3F B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2007 CY 2008 CY 2009 CY 2010 NUMBER OF REACTOR OPERATORS 1 0 6 0 f

NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 11 0 8 0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 0 0 0 NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 12/03/2007 10/05/2009 ALTERNATE DATE 101/19/2009 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2007 CY 2008 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 14 0 0 CANDIDATES

Response to RIS 2006-15 Attachment 2 Page 1 of 1 NRC FORM 536 U .S NUCLEAR REGULATORY COMMISSION APPROVED BY OMB : NO . 3150-0131 EXPIRES : OW31/2008 Estimated burden per response to comply with this voluntary information collection request : I hour . This information collection is used to plan budgets and resources for operator examinations . Send comments re(y _a,rdn estimate to the Records and FOA/Privacy services Branch S

F ),burden U.S .

OPERATOR LICENSING Nuclear Regulatory I c Commission, Washington, DC 20555-0601, or by internet e-mail to in ocoIIects@nrc .&v, and to the Desk officer, Office of Information EXAMINATION DATA and Replat"Nu NE &low= (TI50-0131), Office of Management and Budget, Washington, DC 20503 . If a means used control to impose an mformation collection does not display not a currently valid OMB number, Me NRC may conduct or sponsor, and a person is not required to respond Q Me information collection .

FACILITY NRG REGION Byron Station, Units 1 and 2 III Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2007 CY 2008 CY 2009 CY 2010 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 0 1 EXAMINATIONS I

ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2007 CY 2008 CY 2009 CY 2010 NUMBER OF REACTOR OPERATORS 0 8 0 8 NUMBER OF SENIOR REACTOR ~

OPERATORS-INSTANT 0 8 8 0

NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 NUMBER OF SENIOR REACTOR OPERATORS-LIMITED 0 0 ~ 0 0 PROPOSED DATES PRIMARY DATE 05/24/2010 ALTERNATE DATE 05/26/2008 05/31/2010 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE 0`2007 Y 2008 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 16 0 0 0 0 0 0 0 CANDIDATES

Response to RIS 2006-15 Attachment 3 Page 1 of 1 NRC FORM 536 U.S NUCLEAR REGULATORY COMMISSION APPROVED BY OMB : NO . 3150-0131 EXPIRES : 08/31/2008 (8-2005)

Estimated burden per response to comply with this voluntary information collection request : 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> . This information collection is used to plan budgets and resources for operator examinations . Send comment burden an OPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch (T-5 Nuclear Regulatory I c Commission, Washington, DC NSWOWt or by Internet U .S .

EXAMINATION DATA e-mail M M ocollects , 0m,11, and to the Desk Officer, Office of Information and ApW"AMSMINE B-10202, Office atMariagememarid Budget, Washington, DC 20503, If a means used to impose an information collection does not display acurreny valid OW control number, Me NFIC may not and not conduct or sponsor, a person I required M respond " Me information collection.

FACILITY NRC REGION Clinton Power Station, Unit 1 rtl Facility Operating License No. NPF-62 NRC Docket No. 50-461 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2007 CY 2008 CY 2009 CY 2010 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS I

ESTIMATED NUMBER OF NFIC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2007 CY 2008 CY 2009 CY 2010 NUMBER OF REACTOR OPERATORS 6 0 4 0 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 6 0 5 0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 2 0 0 0 NUMBER OF SENIOR REACTOR OPERATORS-LIMITED 0 0 ~- 0 ~ 0 PROPOSED DATES PRIMARY DATE 08/13/2007 08/24/2009 ALTERNATE DATE T2009

)9 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2007 CY 2008 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 9 0 0 CANDIDATES

Response to RIS 2006-15 Attachment 4 Page 1 of 1 NRC FORM 536 U .S NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO . 3150-0131 EXPIRES : 08/31/2008 (8-2005)

Estimated burden per response to comply with this voluntary information collection n= I ham This information collection is used to plan budgets and resources 0 operator examinations . AM comments re( _,rain S F5 ),burden U.S .

OPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch Nuclear Repulatory in Commission, Washington, DC 20555-0001, or by Internet e-mail M and to the D k officer, Office of Information EXAMINATION DATA and Regulatory Affairs, NEOB-1 0202, (3150-0131), Office of Management and Budget, Washington,, DC 20503. If a means used to impose an information collection does net dsplay a currently valid OMB control number, the WC may net conduct or sponsor, and a person is net required M respond I Me information collection .

FACILITY NRC REACIN Dresden Nuclear Power Station, Units 2 and 3 111 Renewed Facility Operating License Nos . DPR-19 and DPR-25 NRC Docket Nos . 50-237 and 50-249 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2007 CY 2008 CY 2009 CY 2010 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NFIC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2007 CY 2008 CY 2009 CY 2010 NUMBER OF REACTOR OPERATORS 5 4 4 5 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 7 8 8 ~ 5 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR OPERATORS-LIMITED ,

PROPOSED DATES PRIMARY DATE 04/23/2007 02/11/2008 02/09/2009 02/08/2010 ALTERNATE DATE 04/30/2007 02/25/2008 02/23/2009 02/22/2010 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2007 CY 2008 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 12 0 0 0 12 0 CANDIDATES

Response to RIS 2006-15 Attachment 5 Page 1 of 1 NFIC FORM 536 U .S NUCLEAR REGULATORY COMMISSION APPROVED BY OMB : NO . 3150-0131 EXPIRES : OW31AW8 (8-2005)

Estimated burden per response to comply with this voluntary information collection request : I hour. His information collection is used to plan budgets and resources for operator examinations . Send comments rimiWinalaur en OPERATOR LICENSING estimate to the Records and FOA/Privacy Services Branch 75 F5 ), U .S .

Nuclear Regulatory Commission, Washington, DC 205&OM1 or by Internet EXAMINATION DATA e-mail to in ocollects@nm aA&pWWMW WKS00 Z(W5W01WLOff0eofIvl d Budget, Washington, DC 20503 . If a meansvalid used to impose an 719=1"m collection not does not display a currently not OMB control number, the NRC may conduct or sponsor, am a person is required M respond M Me information collection .

FACILITY NRC REGION LaSalle County Station, Units 1 and 2 III Facility Operating License Nos . NPF-1 1 and NPF-1 8 NRC Docket Nos . 50-373 and 50-374 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2007 CY 2008 CY 2009 CY 2010 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 EXAMINATIONS I

ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2007 CY 2008 CY 2009 CY 2010 NUMBER OF REACTOR OPERATORS 0 3 0 3 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 0 6 0 6 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 0 0 0 NUMBER OF SENIOR REACTOR ~

0 0 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 08/1812008 001711010 ALTERNATE DATE 08/251008 05110/2010 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2007 CY 2008 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 9 0 0 0 0 0 0 CANDIDATES f

Response to RIS 2006-15 Attachment 6 Page 1 of 1 NFIC FORM 536 U.S NUCLEAR REGULATORY COMMISSION APPROVED BY DIVE : NO, 3150-0131 EXPIRES: 08/31/2008 (8-2005)

Estimated burden per response M compl"M this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> . His information collection is used to plan budgets and resources 0 operator examinations. Send comments burden en OPERATOR LICENSING estimate to the Records and F01,4/Privacy Services Branch (T-5 Nuclear Regulatory Commission, Washington, DO20555-0001, o rbyInternet U .S .

e-mail to in occiNctsillnug, and to the Desk Officer, Office of Information EXAMINATION DATA and Regulatory Affairs, NE B-10202,(3150-0131), Office ofanManagement and Budget, Washington, DO 20503. U means used to impose net display information collection not conductdoes a currently valid OMB control number, thetheNRC may or sponsor, and a person I not required W respond M information collection .

FACILITY NRC REGION Limerick Generating Station, Units 1 and 2 1 Facility Operating license Nos. NPF-39 and NPF-85 NRC Docket Nos . 50-352 and 50-353 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2007 CY 2008 CY 2009 CY 2010 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 1 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2007 CY 2008 CY 2009 CY 2010 NUMBER OF REACTOR OPERATORS 0 2 0 6 NUMBER OF SENIOR REACTOR 0 14 0 4 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 0 0 2 NUMBER OF SENIOR REACTOR OPERATORS-LIMITED 0 PROPOSED DATES PRIMARY DATE 09/22/2008 ALTERNATE DATE 10/06/2008 10/18/2010 C. PROPOSED (GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2007 CY 2008 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 16 0 0 0 0 0 0 CANDIDATES

  • See Attachment 8 (Peach Bottom Atomic Power Station) for LSRO numbers and exam dates

Response to RIS 2006-15 Attachment 7 Page 1 of 1 NFIC FORM 536 U.S NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO . 3150-0131 EXPIRES : 0&31QW8 (8-2005) Estimated burden per response to comply with this voluntary information collection request : operator l hour. This information collection is used to plan budgets and resources & examinations . Send comments burden an OPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch (T-5 1`63), U .S .

Nuclear Regulatory 1( Commission, Washington, DO 20555-0001, or by Internet EXAMINATION DATA e-mail M M ocollects@nrc .n, E and to the Desk Officer, Office of Information Budget, Washington, DO 20503. 0 a mews used control to impose an information collection does W display net anda currently WWI OMB number, the NBC may conduct or sponsor, a person I no required to respond K Me information collection .

FACILITY NFIC REGION Oyster Creek Generating Station I Facility Operating License No. DPR-1 6 NRC Docket No. 50-219 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2007 CY 2008 CY 2009 CY 2010 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 2 0 1 EXAMINATIONS ESTIMATED NUMBER OF NFIC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2007 CY 2008 CY 2009 CY 2010 6

NUMBER OF REACTOR OPERATORS 0 0 6 4

8 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 0 0 4 8

1 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 0 2 0

NUMBER OF SENIOR REACTOR OPERATORS-LIMITED 0 ~ 0 ~ 0 0 PROPOSED DATES 04/07/2008 PRIMARY DATE 04/12/2010 10 6 008 04/21/2008 ALTERNATE DATE &Q010 10/20/2008 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE M

CY 2007 (TY 2008 PROPOSED NUMBER MARCH ~ SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 15 0 0 0 0 12 0 CANDIDATES

Response to RIS 2006-15 Attachment 8 Page 1 of 1 NFIC FORM 536 U .S NUCLEAR REGULATORY COMMISSION APPROVED BY OMB : NO . 3150-0131 EXPIRES : 08/31/2008 (8-2005)

Estimated burden per response to comply with this voluntary information collection request : 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations . Send comments burdenen OPERATOR LICENSING estimate to the Records and FOIA/Privacy services Branch (T-5 Nuclear Regulatory Commission, Washington, DO 200&OW1, or by U .S.

Internet EXAMINATION DATA "a W in oc Q@nrctv, I and to the Desk Officer . Office of Information and Regulatory Affairs, NE B-10MZPMTMMIOffice afManNementarid Budget, Washington, DO 20503 . If a means used to impose an information net collection does net display anda currently valid OMB control number, the NRO may conduct or sponsor, a person is net required to respond W Me information collection.

FACILITY NRC REGION Peach Bottom Atomic Power Station, Units 2 and 3 1 Renewed Facility Operating License Nos . DPR-44 and DPR-56 NRC Docket Nos . 50-277 and 50-278 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2007 CY 2008 CY 2009 CY 2010 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 and 1 LSRO 1 1 and 1 LSRO 1 EXAMINATIONS I

ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2007 CY 2008 CY 2009 CY 2010 NUMBER OF REACTOR OPERATORS 4 4 0 4 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 9 ~ - 10 0 10 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR OPERATORS-LIMITED PROPOSED DATES 02/05/2007 PRIMARY DATE 11/03/2008 07/27/2009 - LSRO 08/09/2010 06/04/2007 - LSRO ALTERNATE DATE 06/11/2007 12/08/2008 09/06/2010 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2007 CY 2008 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 14 0 0 0 0 0 CANDIDATES

Response to RIS 2006-15 Attachment 9 Page 1 of 1 NRC FORM 536 U .S NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO, 3150-0131 EXPIRES : 08/31/2008 (8-2005)

Estimated burden per response to comply with this voluntary information collection request : 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. His information collection is used to plan budgets and resources W operator examinations . Send comment burden OPERATOR LICENSING estimate to the Records and FOIA/Privacy services Branch Nuclear Regulatory I Commission, s (T-5 F5r3), UI .Slen.

DO MWOM, or by internet EXAMINATION DATA e-mM W moc&W= @nraWand to the Desk Officer, Office of Information aARegulatory N=k%NEO&MPBTMMYOffice dManagement wd Budget, Washington, DO 205133. If a mews used to impose an information collection does = display a currently valid OUR control number, Me NBC may not conduct or sponsor, and a person is no required to respond W Me information collection .

FACILITY NFIC REGION Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos . DPR-29 and DPR-30 NRC Docket Nos . 50-254 and 50-265 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2007 CY 2008 CY 2009 CY 2010 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NFICTREPARED 1 0 0 0 EXAMINATIONS B . INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2007 CY 2008 CY 2009 CY 2010 NUMBER OF REACTOR OPERATORS 2 0 6 0 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 9 0 6 0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 0 0 I I NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE ~i 06/04/2007 01/19/2009 ALTERNATE DATE 06/18/2007 1 02/02/2009 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2007 CY 2008 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 14 0 0 0 0 CANDIDATES

Response to RIS 2006-15 Attachment 10 Page 1 of 1 NBC FORM 536 U .S NUCLEAR REGULATORY COMMISSION APPROVED BY OMB : NO . 3150-0131 EXPIRES: 08/31/2008 (8-2005)

Estimated burden per response to comply with this voluntary information collection request : 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> . This information collection is used to plan budgets and resources for operator examinations . Send comments re ardmg burden OPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch ( -5 P53), U .S.

Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to mf9ocoliects@nrc .gov, and to the Desk Officer, Office of Information EXAMINATION DATA and Regulatory Affairs. NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503 . If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Three Mile Island Nuclear Station, Unit 1 1 Facility Operating License No. DPR-50 NRC Docket No. 50-289 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2007 CY 2008 CY 2009 CY 2010 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2007 CY 2008 CY 2009 CY 2010 NUMBER OF REACTOR OPERATORS 3 0 8 0 NUMBER OF SENIOR REACTOR 8 I

OPERATORS-INSTANT 0 3 0 NUMBER OF SENIOR REACTOR O OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR OPERATORS-LIMITED 0 O O O PROPOSED DATES PRIMARY DATE 04/23/2007 04/13/2009 ALTERNATE DATE 04/30/2007 1 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2007 CY 2008 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 10 0 0 0 0 0 CANDIDATES