Issue date | Title | Topic | |
---|---|---|---|
RC-99-0201, Suppl 2 to 990819 Application for Amend to License NPF-12 (TSP 980009),revising Heatup & Cooldown Curves in TS 3/4.4.9 RCS Pressure/Temp Limits & TS B 3/4.4.9.Rev 2 to WCAP-15102 Encl | 8 October 1999 | Suppl 2 to 990819 Application for Amend to License NPF-12 (TSP 980009),revising Heatup & Cooldown Curves in TS 3/4.4.9 RCS Pressure/Temp Limits & TS B 3/4.4.9.Rev 2 to WCAP-15102 Encl | Exemption Request |
RC-99-0154, Application for Amend to License NPF-12,revising Heatup & Cooldown Curves Located in TS Section 3/4.4.9.Requests Supersedes 990218 Application for Amend in Entirety.Rev 1 to WCAP-15102 Encl | 19 August 1999 | Application for Amend to License NPF-12,revising Heatup & Cooldown Curves Located in TS Section 3/4.4.9.Requests Supersedes 990218 Application for Amend in Entirety.Rev 1 to WCAP-15102 Encl | Exemption Request |
RC-99-0100, Application for Amend to License NPF-12,revising Required Min Contained Volume of CST from 172,000 Gallons of Water to 179,850 Gallons of Water,Per TS Section 3.7.1.3, CST - Lco | 17 May 1999 | Application for Amend to License NPF-12,revising Required Min Contained Volume of CST from 172,000 Gallons of Water to 179,850 Gallons of Water,Per TS Section 3.7.1.3, CST - Lco | |
RC-98-0214, Application for Amend to License NPF-12,revising Testing Methodology Utilized by Vsns to Determine Operability of Charcoal Adsorbers in ESF Air Handling Units | 4 December 1998 | Application for Amend to License NPF-12,revising Testing Methodology Utilized by Vsns to Determine Operability of Charcoal Adsorbers in ESF Air Handling Units | |
ML20153C387 | 18 September 1998 | Application for Amend to License NPF-12,revising TS 3.1.3.1, 3.2.2,3.2.3 & 6.9.1.11 by Incorporating W Beacon TR WCAP-12472-P-A to Augment Functionality of Flux Mapping Sys at VC Summer When Thermal Power Is Greater than 25% RTP | |
RC-98-0126, Application for Amend to License NPF-12,revising TS 4.7.7.e to Remove Situational Surveillance Requirement of During Shutdown Following Specified Surveillance Interval of at Least Once Per Eighteen Months | 1 July 1998 | Application for Amend to License NPF-12,revising TS 4.7.7.e to Remove Situational Surveillance Requirement of During Shutdown Following Specified Surveillance Interval of at Least Once Per Eighteen Months | |
RC-98-0016, Application for Amend to License NPF-12,requesting Removal of Table 4.8-1, Diesel Generator Test Schedule | 9 February 1998 | Application for Amend to License NPF-12,requesting Removal of Table 4.8-1, Diesel Generator Test Schedule | |
RC-97-0108, Application for Amend to License NPF-12,revising Testing Methodology Utilized by VCSNS to Determine Operability of Charcoal Adsorbers in Engineering Safeguards Features Air Handling Units | 21 May 1997 | Application for Amend to License NPF-12,revising Testing Methodology Utilized by VCSNS to Determine Operability of Charcoal Adsorbers in Engineering Safeguards Features Air Handling Units | |
RC-97-0065, TS Change Request - TSP 97-04,to License NPF-12,adding Footnote to TS 3.8.1.1, AC Sources - Operating, to Allow One Time Extension of Allowed Outage Time from 72 H to 7 Days to Perform on-line Maint on EDG B During Cycle 11 | 26 March 1997 | TS Change Request - TSP 97-04,to License NPF-12,adding Footnote to TS 3.8.1.1, AC Sources - Operating, to Allow One Time Extension of Allowed Outage Time from 72 H to 7 Days to Perform on-line Maint on EDG B During Cycle 11 | |
RC-97-0063, TS Change Request - TSP 97-02 to License NPF-12,charging mini-flow Header Isolation Motor Operated Valves | 26 March 1997 | TS Change Request - TSP 97-02 to License NPF-12,charging mini-flow Header Isolation Motor Operated Valves | |
RC-97-0064, TS Change Request - TSP 97-03 to License NPF-12,deleting Conservative from Definition of Core Alterations | 26 March 1997 | TS Change Request - TSP 97-03 to License NPF-12,deleting Conservative from Definition of Core Alterations | |
ML20128G289 | 2 October 1996 | Amend 135 to License NPF-12,changing TS for Plant Unit 1,in Response to 960416 Application,As Suppl by | |
RC-96-0109, TS Change TSP 950011 to License NPF-12,revising TS 3/4.6, Containment Sys Bases 3/4.6 & TS 6.8, Administrative Controls - Programs & Procedures, to Adopt Implementation Requirements of 10CFR50,App J,Option B | 16 April 1996 | TS Change TSP 950011 to License NPF-12,revising TS 3/4.6, Containment Sys Bases 3/4.6 & TS 6.8, Administrative Controls - Programs & Procedures, to Adopt Implementation Requirements of 10CFR50,App J,Option B | |
RC-96-0076, Application for Amend to License NPF-12,consisting of Change Request 95-03,enhancing LCO & SRs & Revises Bases for QPTR | 19 March 1996 | Application for Amend to License NPF-12,consisting of Change Request 95-03,enhancing LCO & SRs & Revises Bases for QPTR | |
RC-96-0035, Application for Amend to License NPF-12,revising Testing Methodology Utilized by Facility to Determine Operability of Charcoal Filters in ESF Air Handling Units | 10 February 1996 | Application for Amend to License NPF-12,revising Testing Methodology Utilized by Facility to Determine Operability of Charcoal Filters in ESF Air Handling Units | |
RC-95-0212, Application for Amend to License NPF-12,consisting of Change Request 95-07 Re ECCS Pump Testing | 8 December 1995 | Application for Amend to License NPF-12,consisting of Change Request 95-07 Re ECCS Pump Testing | |
RC-95-0299, Application for Amend to License NPF-12,consisting of Change Request 94-02,incorporating Revs to 10CFR20 Corrections of Bases 3/4 11-1 | 4 December 1995 | Application for Amend to License NPF-12,consisting of Change Request 94-02,incorporating Revs to 10CFR20 Corrections of Bases 3/4 11-1 | |
RC-95-0283, Application for Amend to License NPF-12,consisting of TS Change TSP 950010,allowing One Time Extension of AOT Specified in TS 3/4.5.2 for Each RHR Train from 72 H to 7 Days | 21 November 1995 | Application for Amend to License NPF-12,consisting of TS Change TSP 950010,allowing One Time Extension of AOT Specified in TS 3/4.5.2 for Each RHR Train from 72 H to 7 Days | |
RC-95-0184, Application for Amend to License NPF-12,consisting of TS Change Request 940007,removing Spec for MOVs Thermal Overload Protection & Bypass Devices (3/4.8.4.2) to Follow Guidance of Improved Westinghouse Standardized TS | 14 November 1995 | Application for Amend to License NPF-12,consisting of TS Change Request 940007,removing Spec for MOVs Thermal Overload Protection & Bypass Devices (3/4.8.4.2) to Follow Guidance of Improved Westinghouse Standardized TS | |
RC-95-0258, Application for Amend to License NPF-12,consisting of Change Request 95-01,permitting VCSNS to Operate at Uprate Power Level of 2900 Mwt Core Power When Unit Restarted After Ninth Refueling Outage | 1 November 1995 | Application for Amend to License NPF-12,consisting of Change Request 95-01,permitting VCSNS to Operate at Uprate Power Level of 2900 Mwt Core Power When Unit Restarted After Ninth Refueling Outage | Ultimate heat sink Fuel cladding |
RC-95-0226, Application for Amend to License NPF-12,consisting of Change Request TSP 940002,incorporating Revs to 10CFR20 | 31 August 1995 | Application for Amend to License NPF-12,consisting of Change Request TSP 940002,incorporating Revs to 10CFR20 | |
RC-95-0221, Suppl to TS Change TSP 950006 Re Compatibility W/Plant Operating Experience & Consistent W/Gl 93-05 | 21 August 1995 | Suppl to TS Change TSP 950006 Re Compatibility W/Plant Operating Experience & Consistent W/Gl 93-05 | |
RC-95-0174, Application for Amend to License NPF-12,consisting of TS Change Request TSP 950001,permitting Plant to Operate at Uprate Power Level of 2,900 Mwt Core Power.Proprietary Best Estimate Analysis... Encl.Analysis Withheld | 18 August 1995 | Application for Amend to License NPF-12,consisting of TS Change Request TSP 950001,permitting Plant to Operate at Uprate Power Level of 2,900 Mwt Core Power.Proprietary Best Estimate Analysis... Encl.Analysis Withheld | Ultimate heat sink Fuel cladding |
RC-95-0167, Application for Amend to License NPF-12,consisting of TS Change TSP 950002,revising TS 3/4.4.4 for Pressurizer PORVs to Follow Guidance of GL 90-06,GI 70 & Improved Westinghouse Standardized TS | 30 June 1995 | Application for Amend to License NPF-12,consisting of TS Change TSP 950002,revising TS 3/4.4.4 for Pressurizer PORVs to Follow Guidance of GL 90-06,GI 70 & Improved Westinghouse Standardized TS | |
RC-95-0162, TS Change TSP 950006 to License NPF-12,requesting Amend to TS 3/4.6.2, Depressurization & Cooling Sys to Change Required Test Frequency for Reactor Bldg Spray Nozzle Flow Test from Once Per Five Yrs to Once Per Ten Yrs | 19 June 1995 | TS Change TSP 950006 to License NPF-12,requesting Amend to TS 3/4.6.2, Depressurization & Cooling Sys to Change Required Test Frequency for Reactor Bldg Spray Nozzle Flow Test from Once Per Five Yrs to Once Per Ten Yrs | |
RC-95-0145, Application for Amend to License NPF-12.Amend Would Revise SR 4.6.1.2 to Delete Schedular Requirements for Type a Testing | 19 June 1995 | Application for Amend to License NPF-12.Amend Would Revise SR 4.6.1.2 to Delete Schedular Requirements for Type a Testing | |
RC-95-0058, Application for Amend to License NPF-12,requesting Discontinuation of Seismic Monitoring Network | 6 March 1995 | Application for Amend to License NPF-12,requesting Discontinuation of Seismic Monitoring Network | Earthquake |
RC-95-0045, Application for Amend to License NPF-12,incorporating Revs to 10CFR20 | 21 February 1995 | Application for Amend to License NPF-12,incorporating Revs to 10CFR20 | |
RC-95-0028, Suppl to TS Change TSP 940004 to License NPF-12,relocating Seismic Monitoring Instrumentation | 30 January 1995 | Suppl to TS Change TSP 940004 to License NPF-12,relocating Seismic Monitoring Instrumentation | |
RC-94-0313, Application for Amend to License NPF-12 to TS Re Changes to Current SBLOCA Evaluation Model Applicable to Plant | 7 December 1994 | Application for Amend to License NPF-12 to TS Re Changes to Current SBLOCA Evaluation Model Applicable to Plant | |
RC-94-0271, Proposed TS Change Request TSP 940004 to License NPF-12, Relocating Seismic Monitoring Instrumentation Lco,Srs & Associated Tables & Bases in TS Section 3/4.3.3.3 to FSAR or Equivalent Controlled Document | 17 October 1994 | Proposed TS Change Request TSP 940004 to License NPF-12, Relocating Seismic Monitoring Instrumentation Lco,Srs & Associated Tables & Bases in TS Section 3/4.3.3.3 to FSAR or Equivalent Controlled Document | Pressure Boundary Leakage |
RC-94-0184, TS Change TSP 940003 to License NPF-12,permitting Alternative Equivalent Testing Methods to Be Performed on Diesel Fuel Purchased for EDGs & Changing Rev Level of WCAP-10216-P-A, Relaxation of Constant Axial Offset.. | 20 July 1994 | TS Change TSP 940003 to License NPF-12,permitting Alternative Equivalent Testing Methods to Be Performed on Diesel Fuel Purchased for EDGs & Changing Rev Level of WCAP-10216-P-A, Relaxation of Constant Axial Offset.. | |
RC-94-0075, Application for Amend to License NPF-12,consisting of TS Change TSP 930012,deleting TS SR 4.8.4.1.a.3 Which Mandates Periodic Retesting of Penetration Protection Fuses & Bases B 3/4.8.4 Will Also Delete Refs to Subj Fuses | 11 March 1994 | Application for Amend to License NPF-12,consisting of TS Change TSP 930012,deleting TS SR 4.8.4.1.a.3 Which Mandates Periodic Retesting of Penetration Protection Fuses & Bases B 3/4.8.4 Will Also Delete Refs to Subj Fuses | |
RC-94-0076, Application for Amend to License NPF-12,consisting of TS Change TSP 940001,revising AOT for RHR Suction Relief Valves as Specified in LCO for TS 3.4.9.3, Overpressure Protection Sys. Change Parallels Guidance of GL 90-06,GI-94 | 11 March 1994 | Application for Amend to License NPF-12,consisting of TS Change TSP 940001,revising AOT for RHR Suction Relief Valves as Specified in LCO for TS 3.4.9.3, Overpressure Protection Sys. Change Parallels Guidance of GL 90-06,GI-94 | |
RC-93-0069, Application for Amend to License NPF-12 Consisting of TS Change TSP 930019,replacing SGs Utilized Engineered Safeguards Design Rating of Core power.Non-proprietary Rev 1 to WCAP-13481 & Proprietary Rev 1 to WCAP-13480 Repts Encl | 11 March 1994 | Application for Amend to License NPF-12 Consisting of TS Change TSP 930019,replacing SGs Utilized Engineered Safeguards Design Rating of Core power.Non-proprietary Rev 1 to WCAP-13481 & Proprietary Rev 1 to WCAP-13480 Repts Encl | |
RC-94-0073, Application for Amend to License NPF-12,revising TSs Re Limiting Safety Sys Settings Reactor Trip Sys Instrumentation Trip Setpoints ESF Actuation Sys Instrumentation Setpoint | 11 March 1994 | Application for Amend to License NPF-12,revising TSs Re Limiting Safety Sys Settings Reactor Trip Sys Instrumentation Trip Setpoints ESF Actuation Sys Instrumentation Setpoint | |
RC-94-0049, Application for Amend to License NPF-12,incorporating Current Provisions of 10CFR50.36(a)2 Re Semiannual Radioactive Effluent Release Rept to Be Submitted Annually Rather than Semiannually | 25 February 1994 | Application for Amend to License NPF-12,incorporating Current Provisions of 10CFR50.36(a)2 Re Semiannual Radioactive Effluent Release Rept to Be Submitted Annually Rather than Semiannually | Offsite Dose Calculation Manual |
RC-93-0304, Application for Amend to License NPF-12,consisting of TS Change TSP 930017,revising Figures 3.9-1 & 3.9-2 to Permit Storage of Fuel Assemblies in Region 2 & 3,respectively,of Spent Fuel Storage Racks | 13 December 1993 | Application for Amend to License NPF-12,consisting of TS Change TSP 930017,revising Figures 3.9-1 & 3.9-2 to Permit Storage of Fuel Assemblies in Region 2 & 3,respectively,of Spent Fuel Storage Racks | |
ML20057E421 | 4 October 1993 | Corrected TS Bases 3/4.5.4 & 3/4.6.2.2 Re Emergency Core Cooling & Containment Sys | |
ML20057E399 | 4 October 1993 | Corrected Amend 109 to License NPF-12,consisting of Changes to TS Bases 3/4.7.1.2 | |
ML20045F775 | 30 June 1993 | Application for Amend to License NPF-12,revising EFW TS SR 4.7.1.2 to Reflect Actual Secondary Steam Pressure Conditions Consistent W/Analysis Performed in Support of Increased SG Tube Plugging Margin | Enforcement Discretion |
ML20044G749 | 25 May 1993 | Application for Amend to License NPF-12,changing TS 4.7.1.2.a.2 to Perform Turbine Driven Pump Surveillance Test at Secondary Steam Pressure Greater than or Equal to 865 Psi | Enforcement Discretion |
ML20045C340 | 25 May 1993 | Corrected Application for Amend to License NPF-12,changing Tech Spec 4.7.1.2.a.2 to Perform Turbine Driven Pump Surveillance Test at Secondary Steam Pressure Greater than or Equal to 865 Psig.Enforcement Discretion Also Requested | Enforcement Discretion |
RC-93-0039, Application for Amend to License NPF-12,modifying Insp Requirements in TS 3/4.4.5, SGs & LCO for 3/4.4.6.2, Operational Leakage to Avoid Unnecessary Plugging of SG Tubes W/O Compromising Safety | 12 February 1993 | Application for Amend to License NPF-12,modifying Insp Requirements in TS 3/4.4.5, SGs & LCO for 3/4.4.6.2, Operational Leakage to Avoid Unnecessary Plugging of SG Tubes W/O Compromising Safety | |
RC-93-0021, Application for Amend to License NPF-12,revising TS Bases 3/4.3.1 & 3/4.3.2 to Incorporate Issuance of Amend 108 Which Revised ESFs Response Times to Account for Sequential Stroking of Outlet Isolation Valves for RWST & VCT | 29 January 1993 | Application for Amend to License NPF-12,revising TS Bases 3/4.3.1 & 3/4.3.2 to Incorporate Issuance of Amend 108 Which Revised ESFs Response Times to Account for Sequential Stroking of Outlet Isolation Valves for RWST & VCT | |
ML20126E235 | 22 December 1992 | Application for Amend to License NPF-12,revising TS Bases 3/4.5.4 & 3/4.6.2.2 to Lower Value of Ph Range of Solution Circulated Through Sump Following Design Basis Loca,Based on More Rigorous Calculations to Update RB Spray Sys | |
ML20116M494 | 13 November 1992 | Suppl to 910204 & 920902 Applications for Amend to License NPF-12,changing Main Steam Safety Valve Setpoint Tolerance from Plus or Minus 1% to Plus or Minus 3% | |
ML20115A535 | 6 October 1992 | Application for Amend to License NPF-12,consisting of TSP 920002,revising TS Table 2.2-1, RTS Instrumentation Trip Setpoints to Allow Increase in Max Permissible Average Level of SG Tube Plugging from 15% to 18% | |
ML20115A365 | 6 October 1992 | Application for Amend to License NPF-12,consisting of TS Change TSP 910005,revising TS 3/4.4.9,Figures 3.4-2 & 3.4-3 Re PT Curves & Deleting Table 4.4-5 & Ref to SR 4.4.9.1.2, in Ref to GL 91-01 | |
ML20106B175 | 23 September 1992 | Application for Amend to License NPF-12,changing TS to Remove Table 3.6-1, Containment Isolation Valves Per Guidance Provided in GL 91-08 |