PLA-6817, Temporary Change to Allow Implementation of Multiple Spurious Operations Modifications on SSES Unit 1 4160 V Buses Unit 2 Technical Specifications 3.8.7 and 3.7.1 PLA-6817

From kanterella
(Redirected from PLA-6817)
Jump to navigation Jump to search

Temporary Change to Allow Implementation of Multiple Spurious Operations Modifications on SSES Unit 1 4160 V Buses Unit 2 Technical Specifications 3.8.7 and 3.7.1 PLA-6817
ML12069A176
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 03/08/2012
From: Kearney F
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PLA-6817
Download: ML12069A176 (45)


Text

Faber A. Kearney VPL Susquehanna, LLC Sfte Wie President 769 Sakni Boulevard Berwick, PA 18603 Tel. 570,542.2904 Fax~ 570.54215304 Pr~

fakcameylgpplueb.coni MAR 0 8 2012 U. S.Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop OPI-17 Washington, DC 20555 SUSQUEHANNA STEAM ELECTRIC STATION PROPOSED AMENDMENT NUMBER 281 TO UNIT 2 OPERATING LICENSE NO. NPF-22 TEMPORARY CHANGE TO ALLOW IMPLEMENTATION OF MULTIPLE SPURIOUS OPERATIONS MODIFICATIONS ON SSES UNIT 14160 V BUSES UNIT 2 TECHNICAL SPECIFICATIONS 3.8.7 and 3.7.1 PLA-6817 Docket No. 50-388 Pursuant to 10 CFR 50.90, PPL Susquehanna, LLC (PPL), hereby requests approval of the following proposed amendment to the Susquehanna Steam Electric Station (SSES)

Unit 2 Technical Specification (TS). The proposal would change Technical Specification 3.8.7 "Electrical Power Systems - Distribution Systems - Operating" and Technical Specification 3.7.1 "Plant Systems - RHRSW System and UHS."

This proposed change reflects a temporary extension of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to the Completion Time for Condition C In the SSES Unit 2 TS 3.8.7 "Distribution Systems - Operating" to allow a Unit 1 4160 V subsystem to be de-energized and removed from service for 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> to perform modifications on the bus. It also proposes a temporary extension of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to the Completion Time for Condition A in SSES Unit 2 TS 3.7,1 "Plant Systems -

RIHRSW System and UHS" to allow the Ultimate Heat Sink (UJ-IS) spray array and spray array bypass valves associated with applicable division Residual Heat Removal Service Water (RHRSW) and in Condition B the applicable division Unit 2 RHRSW subsystem to'be inoperable for 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> during the Unit 1 4160 V bus breaker control logic modifications.

As demonstrated in the enclosed evaluation, the proposed amendment does not involve a significant hazard consideration.

These temporary Technical Specification changes are necessary to support modifications to the breaker control logic on Unit 1 4160 V ESS buses that were identified during our implementation of the Multiple Spurious Operations Resolution Process addressed in EGM 09-002 and Regulatory Guide 1,189 Revision 2.

A ?_j -Do e L t.

Document Control Desk PLA-6817 In accordance with the provisions of 10 CFR 50.91, "Notice for public comment; State consultation," paragraph (a)(6), PPL requests that this amendment be processed on an exigent basis to support timely installation of modifications to address 4 kV control circuit changes in response to the guidance provided in NRC Regulatory Guide 1.189 Revision 2 and Industry Guidance Document NEI 00-01 to resolve a longstanding issue on Multiple Fire-Induced Spurious Operations. The basis for the exigency is discussed in the Enclosure. In order to support the planned Unit 14160 V bus breaker control logic modifications during the spring of 2012 Unit 1 refueling outage, PPL requests that this change be approved by April 5, 2012. PPL further requests that the approved amendment be issued to be effective immediately upon approval with the implementation to be completed within 30 days.

The Enclosure to this letter also provides the Evaluation of this Proposed Changes to Unit 2 Technical Specification 3.8.7 and Technical Specification 3.7.1. Attachment 1 is the Technical Specification mark-up. Attachment 2 is a mark-up of the associated Technical Specification Bases changes provided for information.

There are no regulatory commitments associated with the proposed changes.

The need for this change has been discussed with the SSES NRC Project Manager, and it has also been reviewed by the SSES Plant Operations Review Committee and by the Susquehanna Review Committee.

In accordance with 10 CFR 50.9 1(b), PPL Susquehanna, LLC is providing the Commonwealth of Pennsylvania with a copy of this proposed License Amendment request.

If you have any questions or require additional information, please contact r.. Cornelius T. Coddington at (610) 774-4019.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on: _ _ _z Sincerely,

ýA. K eaey]

Document Control Desk PLA-6817

Enclosure:

PPL Susquehanna, LLC Evaluation of Proposed Changes to Unit 2 Technical Specification 3.8.7, "Electrical Power Systems - Distribution Systems - Operating" and Unit 2 Technical Specification 3.7.1, "Plant Systems - RHRSW System and UHS" Attachments: Proposed Changes to Unit 2 Technical Specification 3.8.7, "Electrical Power Systems - Distribution Systems - Operating" and Unit,2 Technical Specification 3.7.1, "Plant Systems - RHRSW System and UHS" (Mark-ups) Proposed Change to Unit 2 Technical Specifications Bases 3.8.7, "Electrical Power Systems - Distribution Systems - Operating" and Unit 2 Technical Specification Bases 3.7.1, "Plant Systems - RHRSW System and UHS" (Mark-ups provided for Information Only) Generic Outage Schedule for 4.16 kV ESS Bus Modifications Copy: NRC Region I Mr. J. W. Andersen, NRR/EEEB/BC Mr. R. B. Elliot, NRR/STSB/BV Mr. P. W. Finney, NRC Sr. Resident Inspector Mr. D. M. Frumkin, NRR/AFPB Mr. D. G. Harrison, NRR/APLA/BC Mr. R. R. Janati, DEP/BRP Mr. A. R. Klein, NRR/AFPB/BC Mr. G. S. Matharu, NRR/EEEB Mr. K. V. Scales, NRR/EEEB Mr. B. K. Vaidya, NRC Project Manager Mr. G. M. Waig, NRR/STSB (Tech Specification Branch)

Mr. G. A. Wilson, NRR/DORL/LPLI-l/BC

Document Control Desk PLA-6817 bc: P. W. Brady GENPL5 C. T. Coddington GENPL4 T. A. Gorman GENPL5 J. M. Helsel NUCSB3 P. A. Horn (SRC) NUCSB2 A. T. Iliadis NUCSB3 J. E. Krais NUCSB2 M. R. Mjaatvedt GENPL5 J. J. Petrilla, III NUCSA4 J. L. Tripoli NUCSA4 T. G. Wales (DBD) GENPL5 L. M. Yupco NUCSB3 NRA File GENPILA DCS GENPL4

Enclosure to PLA-6817 PPL Susquehanna, LLC Evaluation of Proposed Changes to Unit 2 Technical Specification 3.8.7 "Electrical Power Systems -

Distribution Systems - Operating" and Unit 2 Technical Specification 3.7.1, "Plant Systems -

RHRSW System and UHS"

1. DESCRIPTION
2. PROPOSED CHANGE
3. BACKGROUND
4. TECHNICAL ANALYSIS
5. REGULATORY SAFETY ANALYSIS 5.1 No Significant Hazards Consideration 5.2 Applicable Regulatory Requirements/Criteria
6. ENVIRONMENTAL CONSIDERATIONS
7. REFERENCES

Enclosure to PLA-6817 Page 1 of 30 PPL EVALUATION

Subject:

PPL Susquehanna Evaluation of Proposed Changes to Unit 2 Technical Specification 3.8.7 Electrical Power Systems - Distribution Systems -

Operating and Unit 2 Technical Specification 3.7.1, "Plant Systems - RHRSW System and UHS"

1. DESCRIPTION The proposed change to the PPL Susquehanna (PPL) Unit 2 Technical Specification 3.8.7 reflects a temporary change to the Completion Time for Condition C to the SSES Unit 2 Technical Specification 3.8.7 to allow a Unit 1 4160 V subsystem to be de-energized and removed from service to perform modifications to the bus breaker control logic. These modifications are necessary to resolve issues identified during the resolution of the Multiple Fire-Induced Spurious Operations issue.

The proposed change to the SSES Unit 2 Technical Specification 3.7.1 reflects a temporary change to the Completion Time for Conditions A and B due to the extension of the completion time for a Unit 1 4160 V subsystem to be de-energized and removed from service.

2. PROPOSED CHANGE A mark-up of the proposed change to the Unit 2 Technical Specifications (TS) 3.8.7 is included in Attachment 1 of this submittal. The Unit 2 TS 3.8.7, Condition C, Completion Time is revised to extend the Completion Time for a Unit 1 4160 V subsystem that is de-energized and removed from service. Condition C is revised as follows:

C. One Unit 1 AC electrical power C.1 Restore Unit 1 AC electrical power 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> distribution subsystem distribution subsystem to inoperable. OPERABLE status. OR 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> during the installation of the multiple fire-induced spurious operations modifications in Unit 1 (1)

W Upon completion of the MSO modifications on all four Unit 1 4.16 WV buses, this temporary extension is no longer applicable and will expire on May 31, 2012.

Enclosure to PLA-6817 Page 2 of 30 A mark-tip of the proposed change to The Unit 2 TS 3.7.1 is also included in Attachment 1. The SSES Unit 2 TS 3.7.1 Condition A Completion Time is being revised to extend the Completion Time for the Ultimate Heat Sink (UHS) spray array and spray array bypass valves associated with Residual Heat Removal Service Water (RHRSW) System to be inoperable for 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> (an extension of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />) during the Unit 1 4160 V bus breaker control logic modifications to the Unit 1 1A201 and 1A202 4.16 kV buses. Condition A is revised as follows:

One valve in Table 3.7.1-2 A.3 Restore the inoperable valve(s) to 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> from the inoperable. OPERABLE status. discovery of an inoperable RHRSW OR subsystem in the opposite loop from the One valve in Table 3.7.1-3 inoperable valve(s) inoperable.

AND OR 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Any combination of valves in Table 3.7.1-1, Table 3.7.1-2, or OR Table 3.7.1-3 in the same return loop inoperable. 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> during the Installation of the multiple fire-induced spurious operations modifications in Unit 1 1')

(continued)

"I Upon completion of the MSO modifications on all four Unit 1 4.16 kV buses, this temporary extension is no longer applicable and will expire on May 31, 2012.

The SSES Unit 2 TS 3.7.1 Condition B Completion Time is being revised to extend the Completion Time for the Unit 2 RHRSW subsystem to be inoperable for 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> (an extension of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />) during the Unit 1 4160 V bus breaker control logic modifications to the Unit 1 1A201 and 1A202 4.16 kV buses, Condition B is revised as follows:

B. One Unit 2 RHRSW subsystem B.1 Restore the Unit 2 RHRSW 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from inoperable, subsystem to OPERABLE status. discovery of the associated Unit 1 RHRSW subsystem inoperable OR 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> during the installation of the multiple fire-induced spurious operations modifications in Unit 1 (1)

AND 7 days "I Upon completion of the MSO modifications on all four Unit 1 4.16 kV buses, this temporary extension is no longer applicable and will expire on May 31, 2012.

Enclosure to PLA-6817 Page 3 of 30 This change will allow sufficient time to complete the required modifications.

The Unit 2 TS Bases Section B 3.8.1 and Section B 3.7.1 have also been revised based on this change.

3. BACKGROUND Reason for Modifications In response to the guidance provided in NRC Regulatory Guide 1.189 Revision 2 and Industry Guidance Document NEI 00-01, PPL is implementing changes to the 4 kV Control Circuits. The guidance in these documents is to resolve a longstanding Multiple Fire-Induced Spurious Operations (MSO) issue. The NRC granted enforcement discretion to the Industry under Enforcement Guidance Memorandum (EGM) 09-002. EGM 09-002 was issued on May 14, 2009. The EGM stated that the start of the enforcement discretion period was tied to the issuance of Regulatory Guide 1.189 Revision 2. Regulatory Guide 1.189 Revision 2 was published in the Federal Register on November 2, 2009. The Federal Register notice for Regulatory Guide 1.189 Revision 2 started the enforcement discretion clock. Implementation of the EGM required a three phased approach:

" MSO Identification in CAP [Phase 11: The EGM provided enforcement discretion for all MSO Issues included in a licensee's corrective action program (CAP) with compensatory measures and risk significance of less then red provided these issues were included in CAP within 6 months (May 2, 2010).

" MSO Analysis [Phase 21: Perform the analysis to determine which MSOs require a plant change.

" MSO Corrective Actions [Phase 31: The EGM provided enforcement discretion for all MSOs meeting the Phase I requirement above until November 2, 2012 to complete the required plant changes.

Phase 1 Response:

The initial PPL Susquehanna, LLC effort upon issuance of Regulatory Guide 1.189 Revision 2 was to implement the requirements of NEI 00-01 Revision 2 by reviewing the BWR Generic List of MSOs in Appendix G to NEI 00-01 using an Expert Panel Process. The Expert Panel was completed in December of 2009. The Expert Panel Process resulted in the identification of 69 Plant Specific MSOs for PPL Susquehanna, LLC. Between December of 2009 and May of 2010, each of these Plant Specific MSOs was entered into CAP and evaluated for either generic compensatory measures or the need for MSO specific compensatory measures. All

Enclosure to PLA-6817 Page 4 of 30 Plant Specific MSOs were entered into CAP by May 2, 2010. This met the first phase requirement of the EGM.

Phase 2 & 3 Responses:

The EGM also required that any corrective actions required for any Plant Specific MSOs be completed within three years of the issuance of Regulatory Guide 1.189 Revision 2, i.e., November 2, 2012. Phase 2 and 3 were performed concurrently. To meet the EGM end date, each MSO had to be reviewed to determine if a plant change was required and, if a plant change was required, to determine if the plant change would require an outage to implement. The available Unit 1 outage windows within the EGM Enforcement Discretion Window were as follows:

" Unit 1 - 1 6 th RIO - March of 2010: This outage occurred during the time period when Phase 1, Plant Specific MSOs, was being completed. As such, this outage was not available for completing any MSO plant changes.

" Unit 1 - 17"' RIO - March of 2012: The milestone for the issuance of plant changes for this outage was around June of 2011. Given the need for analyzing each of the 69 Plant Specific MSOs to determine which required plant changes and the need to engineer the changes identified, this Unit 1 RIO became the outage available for completing the MSO plant changes.

Since the modifications affect common equipment powered from Unit 1 4160 V buses that support Unit 2 operation, changes to the Unit 2 Technical Specifications are required.

Justification and Basis for the Exigent Circumstances As described above the timing of the enforcement discretion period under the EGM relative to the PPL Susquehanna, LLC Outage schedules require that the changes to the Unit I - 4.16 kV Breakers be accomplished in the upcoming Unit 1 - 17 th RIO which starts March 31, 2012. Due to the late identification in the Appendix R Multiple Spurious Operations (MSOs) Project of the need for work on the Unit I -

4.16 kV Breakers, the planning effort that identified the need for each 4.16 kV Bus to be out of service to accomplish the work for a period of time that could challenge the LCO times associated with Technical Specifications 3.8.7 Condition C and 3.7.1 Conditions A and B was not completed until February of 2012. With the planned start of the Unit 1 - 17 th RIO on March 31, 2012, insufficient time is available for PPL to submit a Technical Specification Change Request that would allow time for the 30-day prior public notice period. Since this change request does not involve a significant hazard and since time is not available for the 30-day prior public notice period, it is being submitted as an exigent Technical Specification Change.

Enclosure to PLA-6817 Page 5 of 30 The planning phase for this engineering change identified that the work would require approximately 60 hours6.944444e-4 days <br />0.0167 hours <br />9.920635e-5 weeks <br />2.283e-5 months <br /> to complete. Although this time appears to be within the 72-hour completion time allowed by TS 3.8.7 Condition C, and TS 3.7.1 Conditions A and B, it is only an estimate that is based upon currently available information and does not include any allowances for unforeseen circumstances. Since the modification scope is complex, and the modification involves special post maintenance testing, it is critical that maintenance is performed in a deliberate manner without perceived time pressure. The pre-job briefings for this work will clearly identify the expectations to stop work in the event that unanticipated circumstances arise or additional time is required to complete the specific tasks. The 24-hour extension will allow ample time to avoid undue time pressure to complete this first time evolution and will provide a reasonable period of time to resolve any unanticipated circumstances that may arise. This proposed extension also reduces the potential for the unnecessary burden of shutting down Unit 2.

Performing the MSO modifications while both Unit 1 and Unit 2 were online was discussed. In order to perform the modifications safely, the 4.16 kV buses need to be taken out of service. With Unit 1 online, the LCO completion time for one bus out of service is 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />. Since the scope of work requires - 60 hours6.944444e-4 days <br />0.0167 hours <br />9.920635e-5 weeks <br />2.283e-5 months <br /> per bus, this LCO time is not sufficient to perform the modifications. Therefore, an exigent Technical Specification change was requested.

Overview of SSES AC Distribution System The SSES AC Distribution System transmits the output of the Unit 1 and Unit 2 Main Generators to offsite switchyards, and distributes power from the unit auxiliary and offsite power supplies to onsite AC loads. These loads are required for startup, normal unit operation, shutdown, and emergency plant operations. Voltage levels of 500 kV, 230 kV, 24 kV, 13.8 kV, 4.16 kV, 480 V and 208/120 V are provided for a variety of reasons.

The electric power distribution system (See Figure 1 for simplified AC Distribution System) includes Class 1E and non-Class lE AC Power Systems. The non-Class IE portion of the onsite power systems provides AC power for non-nuclear safety related loads, A limited number of non safety-related loads are important to the power generating equipment integrity and are fed from the Class 1E Distribution System.

The non-Class lE AC Power System distributes power at 13.8 kV, 4.16 kV, 480 V and 208/120 V grouped into two symmetrical distribution systems arising from the 13.8 kV buses.

The Class 1E AC Power System distributes power at 4.16 kV, 480 V, and 208/120 V to the safety-related loads. The Class lE AC System is divided into four load group channels per unit (load Group Channels A, B, C, and D) such that any combination of three out of four load groups has the capability of supplying the minimum required safety loads. The 4.16 kV Bus of each Class 113 Load Group Channel is provided

Enclosure to PLA-6817 Page 6 of 30 with connections to two offsite power sources designated as preferred and alternate power supplies (Preferred and alternate power supplies up to the 4.16 kV Buses of the Class lE Power System are considered as non-Class 1E). Diesel generators are provided as a standby power supply in the event of total loss of the preferred and alternate supplies.

Four independent diesel generators, shared between the two Units, provide emergency power for one of the four Class 1E AC load groups in each Unit when normal sources are lost. In addition, two divisionalized load groups are established from the~four load groups (Division I is comprised of Channels A and C; Division I is comprised of Channels B and D) for those engineered safety feature loads which require one out of two load groups to meet the design basis requirements. A spare diesel generator (E-Diesel) is provided, which can be manually aligned as a replacement for any one of the other four diesel generators.

The ESS buses designated load group channel is as follow for Unit 1 and Unit 2 respectively:

ESS BUS LOAD GROUP 480 VAC LOAD CENTER 1A201 A 1B210 1A203 C 1B230 1A202 B 1B220 1A204 D 1B240 2A201 A 213210 2A203 C 2B230 2A202 B 213220 2A204 D 213240 Each ESS Bus (powered from the startup bus) powers a 4.16 kVI480 V ESS Load Center (LC) transformer used to supply an essential 480 V single-ended LC. The associated 4.16 kV ESS bus is the only source of power to the respective LC.

The ESS LC supplies power to the individual 480 V loads and to Motor Control Centers (MCCs) that power instrument AC Distribution panels 125 and 250 V DC Battery Chargers and Essential plant lighting.

The 250 V DC Battery Chargers on each unit are supplied by that unit's 4.16 kV ESS Bus. The 125 V DC Battery Chargers can be supplied from either unit's 4.16 kV ESS Bus.

Alignment Pertinent to this Technical Specification Change Request During the Unit 1 - 17'h Refueling and Inspection Outage (RIO), the following alignment of the SSES AC Distribution will apply.

Enclosure to PLA-6817 Page 7 of 30 Unit 1 will be in a shutdown condition for the Unit 1 - 17"' RIO. During the course of the Unit I - 17 th RIO, each of the four (4) Unit 1 4.16 kV ESS Buses will be taken out of service on a one-at-a-time basis to perform the work discussed in this submittal.

Due to the Common Loads supplied by the Unit 1 - 4.16 kV ESS Buses, depending on which Unit 1 - 4.16 kV Bus is out of service, equipment required for the operation of common systems also supporting the operation of Unit 2 will be affected.

The following impacts will occur depending on which Unit 1 - 4.16 kV Bus is out of service:.

4.116 IN Common Affected Unit 2 Unit 2 Tech Spec LCO ESS Bus Equipment Tech Spec for Duration for the Affected Imp~acted this:Equipmient Equipment. ..

1A201 ESW A Pump 3.7,2 7 Days RHRSW A LOOP 3.7.1 72 Hours Return Valves 1A202 ESW B Pump 3.7.2 7 Days RHRSW B LOOP 3.7.1 72 Hours Return Valves 1A203 ESW C Pump 3.7.2 7 Days SGTS Division 1 3.6.4.3 7 Days CREOASS 3.7.3 7 Days Division 1 Control Room 3.7.4 30 Days Floor Cooling Division 1 1A204 ESW D Pump 3.7.2 7 Days SGTS Division 2 3.6.4.3 7 Days CREOASS 3.7.3 7 Days Division 2

Enclosure to PLA-6817 Page 8 of 30

.4.16 kV Commnljon .Af ,fected Unit 2. Unit.2 Tech Spec LCO

,FSBs Equipmnent Tech Spec for Duration for the Affected Impacted...this.Equipment Equipment Control Room 3.7.4 30 Days Floor Cooling Division 2 _I .....

Whenever a Unit 1 - 4.16 kV ESS Bus is taken out of service, Technical Specification 3.8.7 Condition C requires a Limiting Condition for Operation (LCO) to be entered for Unit 2 due to the Common Load Impacts. The duration of this Unit 2 LCO is 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. As can be seen from the table above, the only 4.16 kV ESS Bus outages that would present a condition where the Technical Specification LCO duration for the specific system impacted is less than 7 days are 4.16 kV ESS Buses 1A201 and 1A202, This is due to the impact on the RHRSW System, which has an LCO duration of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> for this condition. For all other 4.16 kV ESS Buses and impacted common systems, the LCO duration would be a minimum of 7 days which is three days longer than the current extension being requested in this Technical Specification Change Request. The significance of the increase in LCO duration for the RHRSW System is addressed in the next section of this submittal, entitled Overview of the RHRSW System.

With respect to the condition of the SSES AC Distribution System on Unit 2 throughout this evolution and regardless of which Unit 1 - 4.16 kV ESS bus is out of service is as follows:

" All four (4) Common Emergency Diesel Generators are operable.

" All 125 V DC and 250 V DC Battery Chargers, Batteries and Distribution Systems for Unit 2 are operable.

The only equipment impacts to Unit 2 from the work being performed on Unit 1 are those specifically cited in the table above due to the common loads supplied from the Unit 1 - 4.16 kV ESS Buses.

Overview of Residual Heat Removal Service Water (RHRSW) System The RHRSW System is designed to provide cooling water for the Residual Heat Removal (RHR) System heat exchangers, required for a safe reactor shutdown following a Design Basis Accident (DBA) or transient. The RHRSW System is operated whenever the RHR heat exchangers are required to operate in the shutdown cooling mode or in the suppression pool cooling or spray mode of the RHR System.

Enclosure to PLA-6817 Page 9 of 30 The RHRSW System consists of two independent and redundant subsystems. Each subsystem is made up of a header, one pump, a suction source, valves, piping, heat exchanger, and associated instrumentation. Either of the two subsystems is capable of providing the required cooling capacity to maintain safe shutdown conditions. The two subsystems are separated so that failure of one subsystem will not affect the operability of the other subsystem. One Unit 1 RHRSW subsystem and the associated (same division) Unit 2 RHRSW subsystem constitute a single RHRSW loop. The two RHRSW pumps in a loop can each be independently aligned to either Unit's heat exchanger. The RHRSW System is designed with sufficient redundancy so that no single active component failure can prevent it from achieving its design function. One such redundant feature is the use of a redundant manual isolation valve in each loop's bypass return line, which can be closed manually using a "reach-rod" through the top of the RHRSW Valve Vault missile shield without having to access the Valve Vault itself.

The RHRSW System is described in the FSAR, Section 9.2.6.

Cooling water is pumped by the RHRSW pumps from the ultimate heat sink (UHS) through the tube side of the RHR heat exchangers. After removing heat from the RHRSW heat exchanger, the water is discharged to the spray pond (UHS) by way of the UHS return loops. The UHS return loops direct the return flow to a network of sprays that dissipate the heat to the atmosphere or directly to the UHS via a bypass header. The divisionalized UHS return loops are common to both units, The system is initiated manually from the control room except for the back-up spray array bypass manual valves that can be operated locally in the event of a failure of the primary spray array bypass valves. The system can be started any time the LOCA signal is manually overridden or clears.

The ultimate heat sink system is composed of an approximately 3,300,000 cubic foot spray pond and associated piping and spray risers. Each UHS return loop contains a bypass line, a large spray array and a small spray array. The purpose of the UHS is to provide both a suction source of water and a return path for the RHRSW and Emergency Service Water (ESW) systems. The function of the UHS is to provide water to the RHRSW and ESW systems at a temperature less than the 97°F design temperature of the RHRSW and ESW systems. UHS temperature is maintained less than the design temperature by introducing the hot return fluid from the RHRSW and ESW systems into the spray loops and relying on spray cooling to maintain temperature. The UHS is designed to supply the RHRSW and ESW systems with all the cooling capacity required during a combination LOCA/LOOP for thirty days without fluid addition. The UHS is described in the FSAR, Section 9.2.7.

Alignment Pertinent to this Technical Specification Chanize Reauest While work is being performed on the Unit 1 - 4.16 kV ESS Bus 1A201 and 1A202, RHRSW Loop A and B, respectively, will be affected. When 1A201 and 1A202 are out of service, 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> LCOs are required for Unit 2 under Unit 2 Technical

Enclosure to PLA-6817 Page 10 of 30 Specification Sections 3.8.7 Condition C, 3.7.1 Condition A and 3.7.1 Condition B.

While work is being performed on the Unit 1 - 1A201 and 1A202 4.16 kV ESS buses, however, the following action will be taken to align the RHRSW System to optimally support Unit 2.

The RHRSW Spray, Pond Return Bypass Valve, HV01222A or B, on the out of service loop will be electrically de-powered in the open position.

With the out of service RHRSW Loop configured as described above, a return flow path will be established. Since the RHRSW Pumps on Unit 2 are not impacted by the Unit I - 4.16 kV ESS Bus outages, with this return flow path established, the affected RHRSW Loop on Unit 2 will be functional. With the RHRSW Spray Pond Return Bypass Valve, HV01222A or B, electrically de-powered, fire-induced circuit failures will not be able to affect the position of the valve.' Note that this alignment provides for a functional RHRSW loop for Unit 2 while still maintaining the other Unit 2 RHRSW loop operable.

With the RHRSW Spray Pond Return Bypass Valve, HV01222A or B, electrically disabled, all flow through the affected loop will go directly to the Spray Pond. This flow path does not provide spray cooling to the returning process fluid and, under design basis conditions, will result in Spray Pond temperatures exceeding the temperature at which safe shutdown of both units is assured, Under design basis conditions, the manual return line bypass valve is closed within 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> and all cooling is accomplished using the unaffected loop. The conditions driving the elevated Spray Pond temperatures in the design basis analysis are as follows:

" The use of conservative reactor decay heat values.

" The use of conservative meteorology.

" The use of conservative initial Spray Pond temperatures, i.e., Technical Specification Maximum Temperature.

The use of conservative values for these parameters is required in the design and licensing basis for SSES. Calculations performed using still conservative, but more "best estimate" values for each of these parameters have determined that, with the bypass valve open for 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and the large spray array valve open on the opposite loop, the peak Spray Pond temperatures are still approximately 4 degrees F below the peak Spray Pond temperature when safely shutting down both units.

The initial Spray Pond temperature, in the "best estimate" case discussed above, was around 800 F. The Spray Pond temperatures for the duration of this temporary change would not be expected to be anywhere near this level since the work is being performed in April when the daytime temperatures are less than 80 degrees F.

Additionally, for the plant alignment pertinent to this change request, one of the operating units will already be in a safe shutdown condition.

Enclosure to PLA-6817 Page 11 of 30 Given this set of facts, it is expected that shutting down Unit 2 and continuing to cool Unit 1 through the open Spray Pond bypass valve, in the event that the operable loop of RHRSW were to fail in a configuration similar to that described above would be acceptable for a period approaching 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> with no additional actions on the part of the operators. In this 20 hour2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> period, however, actions could be taken by the operators to access the RHRSW Spray Pond Valve Vault and to manually close the bypass valve and to manually open the spray array valves. Re-aligning the bypass and spray array valves would return the UHS to its design condition with spray cooling. These actions could be accomplished well within the available 20 hour2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> time frame available. The valves requiring local manual manipulation are the valves within the system that are remotely cycled for system operation under design basis conditions. Therefore, it is expected that these valves which are periodically cycled would be capable of local manual manipulation should local manual manipulation be required.

Therefore, the safety consequences of this condition are not considered to be high.

Unit 14 kV Bus Outage Sequence Only one Unit 1 bus will be removed from service at a time All Unit 2 buses will remain energized and operable Typical Outage Logic for a Unit 1 4.16 kV Bus:

  • Deenergize bus

" Wiring changes

  • Cold scheme checks of wiring changes
  • Functional testing of offsite power breakers

" Functional testing of diesel generator (D/G) breaker

" Energize bus

" Modification closure

" Restore bus to operable status The order of the planned bus outages is 'A', 'C', 'D', 'B'. The detailed generic outage schedule to be used for each of the Unit 1 4 kV buses is included in .

Unit 2 Work During Unit 1 4 kV Bus Outages Planned Work on Unit 2 is as follows:

Routine surveillances to maintain systems operable o This would include surveillances for battery checks, Residual Heat Removal (RHR) and Core Spray (CS) system flow tests, D/G monthly tests,

Enclosure to PLA-6817 Page 12 of 30 Standby Gas Treatment (SBGT), Control Room Emergency Outside Air (CREOAS), etc.

  • Planned maintenance on the 'B' loop of RHRSW o Entire loop drained impacting both units. This work will not be performed in parallel with Unit 1 4 kV bus work which impacts the other division of RHRSW.
  • SBGT damper inspections o Each inspection requires about 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> of a 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> Unit 2 LCO.

Emergent work on Unit 2 will be performed as required to keep the unit on line.

During the Unit 1 4.16 kV ESS bus outages, PPL's normal Maintenance Rule (a)4 Program on both the online and outage units will be used to identify and manage risk, Scope of work The scope of work driving the need for an exigent Technical Specification change to Section 3.8.7 is associated with changes to the 125 vdc control circuits for the Diesel Generator (04 Breaker), Primary Offsite Feeder (01 Breaker) and Secondary Offsite (09 Breaker) Feeder breakers on each of the Unit 1 4.16 kV Buses. The specific scope of work for each breaker is explained below:

" The 01 and 09, Primary and Secondary Feeder Breakers, will be modified to assure that a fire induced cable failure followed by a loss of offsite power will not prevent either of these breakers from tripping on bus under voltage. The changes to accomplish this involve the addition of a new fuse and a new diode in the breaker control circuitry for the 01 and 09 breakers on each of the 4.16 kV Buses.

  • The 04, Diesel Generator Breaker, will be modified to assure that a fire-induced spurious closure of the breaker during a Control Room fire can be re-aligned using local operator actions. The changes to accomplish this involve moving a portion of the auto-start logic to a location under a contact from the Control Switch Lateral on each of the 04 Breakers on each of the 4.16 kV Buses.

Although the physical work associated with these changes is not extensive, when it is combined with the time to remove the bus from service, to perform the physical work, to perform the testing required to assure the acceptability of the change and to restore the bus to service, the evolution is considered to be significant. Additionally, installation uncertainties that cannot be verified until the bus is removed from service, pose an additional threat to the ability to complete this work in the 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> allotted prior to invoking a Unit 2 shutdown.

Enclosure to PLA-6817 Page 13 of 30 Fire Protection System Status Requirements The common systems or functions impacted by the removal of a Unit 1 4.16 kV Bus from service for maintenance with the potential to impact Unit 2 are listed in the table below:

Table F1 Common Applicable LCO Completion Potential Impact System - Unit Time to Post-Fire Safe Impacted (one sub-system) Shutdown ESW - Unit 2 3.7.2 7 days Yes RHRSW - Unit 2 337.1 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Yes SBGT - Unit 2 3.6.4.3 7 days No CREOAS - Unit 2 3.7.3 7 days No Control Room 3.7.4 30 days No Floor Cooling -

Unit 2 As can be seen from Table F1 above, the potential impact to Post-Fire Safe Shutdown on Unit 2 from the removal of a single 4.16 kV Bus on Unit I is the loss of ESW and RHRSW depending on which bus is out of service. The loss of the ESW functions applies when the 4.16 kV Buses on Unit 1 are out of service. It is important to note that, with all four 4.16 kV Buses on Unit 1 operable, should an impact to any of the ESW functions described below, e.g., an ESW Pump, occur due to a loss of that specific function, Unit 2 would be in a 7 day LCO. The loss of a Unit 1 - 4.16 kV Buses could affect the ESW functions listed in Table F2 below:

Enclosure to PLA-6817 Page 14 of 30 Table F2 ESW Function Function Level Mitigation Available Potentially Impacted ESW Pumps During the duration of the Unit 1- 4.16 kV Bus work, the Diesel Driven Fire Pump will be treated as protected equipment to assure the availability of fire suppression. Additionally, Plant Procedures for the control of combustibles and for hot work will limit the potential for plant fires with the potential to damage any remaining ESW pumps.

ESSW Loss of ESW HVAC will be mitigated by implementing the Pumphouse ESSW Pumphouse temporary cooling measures outlined in an HVAC operating.

ESW Diesel These valves are normally open and required open. These valves Generator Supply are powered from 0B516, 0B526, 0B536, and 0B546 that are Valves (A-D) powered from Unit 2 4.16 kV buses when Unit 1 4.16 kV buses are out of service. Therefore, there is no impact to these valves during the work evolution discussed in this evaluation.

ESW Diesel These valves are normally open and required open. These valves Generator Return are powered from 0B516, 0B526, 0B536, and 0B546 that are Valves (A-D) powered from Unit 2 4.16 kV buses when Unit 1 4.16 kV buses are is out of service, Therefore, there is no impact to these valves during the work evolution discussed in this evaluation.

Enclosure to PLA-6817 Page 15 of 30 The loss of RHRSW could affect the functions listed in Table F3 below:

Table F3 RHRSW Function Level Mitigation Available Function Potentially Impacted ESSW Loss of ESW HVAC will be mitigated by implementing the Pumphouse Fans ESSW Pumphouse temporary cooling measures outlined in an 1/2 V 506A/B operating procedure.

RHRSW Loop A These valves in the common ESW-RHRSW return line to the Return to Spray Spray Pond are powered from OB517, which is powered from Pond Valves Unit 1 Bus 1A201. During the duration of the Unit 1- 4.16 kV Bus work, the Diesel Driven Fire Pump will be treated as protected equipment to assure the availability of fire suppression. Additionally, Plant Procedures for the control of combustibles and for hot work will limit the potential for plant fires with the potential to damage plant equipment. Based on the discussion under the section of this submittal on the Overview of the Residual Heat Removal Service Water (RHRSW) System, it is expected that this Loop would be functional even with the power to the RHRSW Return to the Spray Pond Valves not available.

RHRSW Loop B These valves in the common ESW-RHRSW return line to the Return to Spray Spray Pond are powered from GB527, which is powered from Pond Valves Unit 1 Bus 1A202. During the duration of the Unit 1- 4.16 kV Bus work, the Diesel Driven Fire Pump will be treated as protected equipment to assure the availability of fire suppression. Additionally, Plant Procedures for the control of combustibles and for hot work will limit the potential for plant fires with the potential to damage plant equipment. Based on the discussion under the section of this submittal on the Overview of the Residual Heat Removal Service Water (RHRSW) System, it is expected that this Loop would be functional even with the power to the RHRSW Return to the Spray Pond Valves not available.

Enclosure to PLA-6817 Page 16 of 30

Conclusion:

The 4.16 kV Bus Outages on Unit 1 will have an impact on the ESW and RHRSW Systems used for Post-Fire Safe Shutdown on Unit 2. The potential impacts to post-fire safe shutdown beyond those associated with the actual bus outage can be mitigated by existing plant procedures to: (1) provide temporary cooling to the ESSW Pumphouse should loss of HVAC Systems occur; (2) control combustibles and hot work to limit the potential for plant fires capable of damaging plant equipment, and; (3) protect the Diesel Driven Fire Pump to assure a source of fire water is available for fire suppression, Additionally, based on the discussion under the section of this submittal on the Overview of the Residual Heat Removal Service Water (RHRSW)

System, it is expected that two Loops of RHRSW would be available. One would be operable and protected from the effects of fires. The other would be functional even with the power to the RHRSW Return to the Spray Pond Valves not available. With the RHRSW Return to the Spray Pond Bypass Valve open and de-energized, fire-induced spurious closure of the valve is not possible.

Protected Equipment The equipment to be protected during the Unit 1 ESS bus outages was determined by licensed operators using the principles of our protected equipment program and considerations of Technical Specifications based on which bus was de-energized. The creation of the protected equipment list also considered risk insights from PPL's Maintenance Rule (a)4 model. The lists of protected equipment are shown in attached Table 1.

4. TECHNICAL ANALYSIS During the upcoming Unit 1 refueling outage, Unit 1 171h RIO, 4 kV MSO modifications implementation are expected to occur which requires each Unit 1 4.16 kV ESS bus to be taken out of service. Unit 2 Technical Specifications (TS) 3.8.7 requires Unit 1 distribution system to be operable to support Unit 2 operation. The common loads required for Unit 2 continued operation need to remain powered by Unit 1 4.16 kV ESS buses. The scheduled modification activities on Unit 1 will be performed on one bus at the time. As such, the remaining three 4.16 kV ESS buses on Unit I remain capable of supplying the required loads for Unit 2.

The proposed change to Unit 2 TS 3.8.7 Condition C completion time from 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> (an additional 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />) for each Unit 1 4.16 kV ESS bus outage is needed to provide sufficient time to implement scheduled MSO modifications and perform required post modification testing.

Enclosure to PLA-6817 Page 17 of 30 The table below lists the common supported systems and the TS conditions and completion times for one inoperable Unit 1 4.16 kV ESS bus.

4.16 kV j common I01 Affected 1Unit 2 Unlit 2 Tech Spec LCO kSS Bujqii mn ehS e for Duration for the Afetd Impacted this Equipment Equipment 1A201 ESW A Pump 3.7.2 7 Days RHRSW A LOOP 3.7.1 72 Hours Return Valves 1A202 ESW B Pump 3.7.2 7 Days RHRSW B LOOP 3.7.1 72 Hours Return Valves 1A203 ESW C Pump 3.7.2 7 Days SGTS Division 1 3.6.4.3 7 Days CREOASS 3.7.3 7 Days Division 1 Control Room 3.7.4 30 Days Floor Cooling Division 1 1A204 ESW D Pump 3.7.2 7 Days SGTS Division 2 3.6.4.3 7 Days CREOASS 3.7.3 7 Days Division 2 Control Room 3.7.4 30 Days Floor Cooling Division 2

.. I I I I Whenever a Unit 1 - 4.16 kV ESS Bus is taken out of service, Technical Specification 3.8.7 Condition C requires a Limiting Condition for Operation (LCO) to be entered for Unit 2 due to the Common Load Impacts. The duration of this Unit 2 LCO is 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. As can be seen from the table above, the only 4.16 kV ESS Bus outages that would present a condition where the Technical Specification LCO duration for the specific system impacted is less than 7 days are 4.16 kV ESS Buses 1A201 and

Enclosure to PLA-6817 Page 18 of 30 1A202. This is due to the impact on the RHRSW System, which has an LCO duration of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> for this condition. For all other 4.16 kV ESS Buses and for all other impacted common systems, the LCO duration would be a minimum of 7 days which is three days longer than the current extension being requested in this Technical Specification Change Request. The significance of the increase in LCO duration for the RHRSW System is addressed later in this section.

With respect to the condition of the SSES AC Distribution System on Unit 2 throughout this evolution and regardless of which Unit 1 - 4.16 kV ESS bus is out of service is as follows:

" All 125 V DC and 250 V DC Battery Chargers, Batteries and Distribution Systems for Unit 2 are operable.

The only equipment impacts to Unit 2 from the work being performed on Unit 1 are those specifically cited in the table above due to the common loads supplied from the Unit 1 - 4.16 kV ESS Buses.

As seen in the table above, the UHS spray array and spray array bypass valves are powered from the Unit 1 1A201 and 1A202 4.16 kV ESS buses; therefore, an extension to their completion time in Condition A of TS 3.7.1 is needed to support work on the two Unit 1 4.16 kV buses.

While work is being performed on the Unit 1 - 4.16 kV ESS Bus 1A201 or 1A202, RHRSW Loop A or B, respectively, will be affected. When 1A201 or 1A202 are out of service, 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> LCOs are required for Unit 2 under Unit 2 Technical Specification Sections 3.8.7 Condition C, 3.7.1 Condition A and 3.7.1 Condition B. While work is being performed on the Unit I - 1A201 or 1A202 4.16 kV ESS buses, however, the following action will be taken to align the RHRSW System to optimally support Unit 2.

  • The RHRSW Spray Pond Return Bypass Valve, HV01222A or B, on the out of service loop will be electrically de-powered in the open position.

With the out of service RHRSW Loop configured as described above, a return flow path will be established. Since the RHRSW Pumps on Unit 2 are not impacted by the Unit 1 - 4.16 kV ESS Bus outages, with this return flow path established, the affected RHRSW Loop on Unit 2 will be functional. With the RHRSW Spray Pond Return Bypass Valve, HV01222A or B, electrically de-powered, fire-induced circuit failures will not be able to affect the position of the valve.

With the RHRSW Spray Pond Return Bypass Valve, HV01222A or B, electrically disabled, all flow through the affected loop will go directly to the Spray Pond. This

Enclosure to PLA-6817 Page 19 of 30 flow path does not provide spray cooling to thereturning process fluid and, under design basis conditions, will result in Spray Pond temperatures exceeding the temperature at which safe shutdown of both units is assured. Under design basis conditions, the manual return line bypass valve is closed within 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> and all cooling is accomplished using the unaffected loop. The conditions driving the elevated Spray Pond temperatures in the design basis analysis are as follows:

" The use of conservative reactor decay heat values.

" The use of conservative meteorology.

" The use of conservative initial Spray Pond temperatures, i.e., Technical Specification Maximum Temperature.

The use of conservative values for these parameters is required in the design and licensing basis for SSES. Calculations performed using still conservative, but more "best estimate" values for each of these parameters have determined that, with the bypass valve open for 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and the large spray array valve open on the opposite loop, the peak Spray Pond temperatures are still approximately 4 degrees F below the peak Spray Pond temperature when safely shutting down both units.

The initial Spray Pond temperature, in the "best estimate" case discussed above, was around 800 F. The Spray Pond temperatures for the duration of this temporary change would not be expected to be anywhere near this level since the work is being performed in April when the daytime temperatures are less than 80 degrees F.

Additionally, for the plant alignment pertinent to this change request, one of the operating units will already be in a safe shutdown condition.

Given this set of facts, it is expected that shutting down Unit 2 and continuing to cool Unit 1 through the open Spray Pond bypass valve, in the event that the operable loop of RHRSW were to fail in a configuration similar to that described above, would be acceptable for a period approaching 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> with no additional actions on the part of the operators. In this 20 hour2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> period, however, actions could be taken by the operators to access the RHRSW Spray Pond Valve Vault and to manually close the bypass valve and to manually open the spray array valves. Re-aligning the bypass and spray array valves would return the UHS to its design condition with spray cooling. These actions could be accomplished well within the available 20 hour2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> time frame available. The valves requiring local manual manipulation are the valves within the system that are remotely cycled for system operation under design basis conditions. Therefore, it is expected that these valves which are periodically cycled would be capable of local manual manipulation should local manual manipulation be required.

Therefore, the safety consequences of this condition are not considered to be high.

The Completion Time associated with Condition B of TS 3.7.1 is extended to 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> to allow the Unit 2 RHRSW subsystem to be restored to operable status. The declaration

Enclosure to PLA-6817 Page 20 of 30 that the Unit 2 RHRSW subsystem is inoperable is administrative. The Actions in Condition A require that the Unit 2 subsystem be declared inoperable due to the inoperability of the UHS spray array and spray array bypass valves. When the flow path is established as required by the actions in Condition A, the Unit 2 subsystem will be functional because of the following:

a. The subsystem's pump is operable ( the Unit 1 4.16 kV ESS bus outage does not affect the power to the Unit 2 RHRSW pump.); and
b. The subsystem has an operable flow path (established as part of the Actions in Condition A) which is capable of taking suction from the UHS and transferring the water to the RHR heat exchanger and returning it to the UHS at the assumed flow rate, and
e. The UHS is operable.

NOTE: With an operable pump, operable flow path and an operable UHS, the Unit 2 RHRSW subsystem meets the operability definition. However, since Condition A requires the subsystem to be declared inoperable and Condition A can not be cleared until the UHS valves are operable, the Unit 2 subsystem is administratively declared inoperable even though it will perform its design function.

Operation of the Unit 2 ECCS equipment supplied by the Unit 2 AC Distribution Subsystem is not affected by the scheduled Unit 1 4.16 kV modification activities.

5. REGULATORY SAFETY ANALYSIS 5.1 No Significant Hazards Consideration This "No Significant Hazards Consideration" evaluates the following changes to the Technical Specifications:
a. The Unit 2 TS 3.8.7, Condition C, Completion Time is revised to extend the Completion Time from 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> for a Unit 1 4160 V subsystem that is de-energized and removed from service,
b. The Unit 2 TS 3.7.1, Condition A, Completion Time is revised to extend the Completion Time from 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> for a loop of UHS spray array and spray array bypass valves being inoperable due to the Unit I 4160V subsystem completion time being extended.
c. The Unit 2 TS 3.7.1, Condition B, Completion Time is revised to extend the Completion Time from 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> for one Unit 2 RHRSW subsystem being inoperable due to the Unit 1 4160V subsystem completion time being extended.

Enclosure to PLA-6817 Page 21 of 30

1. Do the proposed changes involve a significant increase in the probability or consequences of an accident previously evaluated?

Response: No The temporary changes to the completion times for TS 3.8.7, Condition C and TS 3.7.1, Conditions A and B are necessary to implement plant changes which modify the 4 kV Control Circuits on the 4.16 kV ESS Buses in order to mitigate the consequences of multiple fire-induced spurious operations. These modifications decrease the probability that a fire-induced hot short will cause equipment malfunctions. The current assumptions in the safety analysis regarding accident initiators and mitigation of accidents are unaffected by these changes. No SSC failure modes or mechanisms are being introduced, and the likelihood of previously analyzed failures remains unchanged.

The Completion Time to restore the Unit 2 RHRSW subsystem has been extended to 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> in order to complete the modifications associated with the Multiple Fire-Induced Spurious Operations issue. This is a temporary extension of the Completion Time. The extended Completion Times for TS 3.7.1 Conditions A and' B are only applicable when either the 1A 201 4.16 kV ESS Bus or the 1A 202 4.16 kV ESS Bus is out of service in order to implement modifications associated with the Multiple Fire-Induced Spurious Operations issue. The affected Unit 2 RHRSW subsystem remains functional, while the other subsystem of Unit 2 RHRSW will remain operable.

There are no changes to any accident initiators or to the mitigating capability of safety-related equipment supported by the Class lE Electrical AC system. The protection provided by these safety-related systems will continue to be provided as assumed by the safety analysis.

Therefore, this proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.

2. Do the proposed changes create the possibility of a new or different kind of accident from any accident previously evaluated?

Response: No The proposed changes to Technical Specification 3.8.7 Condition C, and to Technical Specification 3.7.1 Condition A and Condition B involve the extension of completion time for a Unit 1 4.16 kV Bus to be out of service in order to modify the control circuits to mitigate the consequences of multiple fire-induced spurious operations, the completion time for the UHS spray array and spray array bypass valves to be inoperable and one Unit 2 RHRSW subsystem being

Enclosure to PLA-6817 Page 22 of 30 inoperable. No new equipment is being introduced, and installed equipment is not being operated in a new or different manner. There are no setpoints, at which protective or mitigative actions are initiated, affected by this change. These changes do not alter the manner in which equipment operation is initiated, nor will the function demands on credited equipment be changed. No alterations in the procedures that ensure the plant remains within analyzed limits are being proposed, and no major changes are being made to the procedures relied upon to respond to an off-normal event as described in the FSAR. As such, no new failure modes are being introduced. The proposed change does not alter assumptions made in the safety analysis and licensing basis.

Therefore, the proposed change does not create the possibility of a new or different kind of accident from any previously evaluated.

3. Do the proposed changes involve a significant reduction in a margin of safety?

Response: No The margin of safety is established through equipment design, operating parameters, and the setpoints at which automatic actions are initiated. The proposed changes are acceptable because the completion time extensions allow modifications to the 4.16 kV control circuits to mitigate the consequences of a fire-induced short damaging equipment. Therefore, the plant response to analyzed events is affected by this modification in that the plant will better cope with the fire-induced shorts and will continue to provide the margin of safety assumed by the safety analysis.

With the RHRSW Spray Pond Return Bypass Valves on the out of service loop electrically de-powered in the open position, a return flow path will be established.

Since the RHRSW Pumps on Unit 2 are not impacted by the Unit 1 - 4.16 kV ESS Bus outages, with this return flow path established, the affected RHRSW Loop on Unit 2 will be functional. Also in this configuration a fire-induced circuit failures will not be able to affect the position of the valves. This configuration will continue to provide the margin of safety assumed by the safety analysis, Therefore, the proposed change does not involve a significant reduction in a margin of safety.

Based on the above, PPL concludes that the proposed changes do not involve a significant hazards consideration under the standards set forth in 10 CFR 50.92(c),

and accordingly, a finding of no significant hazards consideration is justified.

Enclosure to PLA-6817 Page 23 of 30 5.2 Applicable Regulatory Requirements/Criteria SSES FSAR Sections 3.1 and 3.13 provide detailed discussion of SSES compliance with the applicable regulatory requirements and guidance.

The proposed TS amendment:

(a) Does not result in any change in the qualifications of any component; and (b) Does not result in the reclassification of any component's status in the areas of shared, safety-related, independent, redundant, and physically or electrically separated.

Susquehanna conformance with the applicable General Design Criteria (GDC) related to the proposed Unit 2 TS 3.8.7 change is provided as follows:

GDC 5 - Sharing of Structures, Systems and Components Offsite Power Supplies - The two preferred offsite power supplies are shared by both units 1 and 2. The capacity of each offsite power supply is sufficient to operate the Engineered Safety Features (ESF) of one unit and safe shutdown of the other unit. Additional details are provided in FSAR Section 8.2.

Diesel Generators - The Diesel Generators are shared systems important to safety. Loss of one of the four aligned diesel generators will not impair the capability to safely shutdown both units, since this can be done with three diesel generators. Additional details are provided in FSAR Section 8.3.1.4.

Unit 1 AC Distribution System - The Unit 1 AC Distribution system is a shared system between both units 1 and 2 since the common equipment (Emergency Service Water, RHR Service Water, Standby Gas Treatment System including the Reactor Recirculation Fans, Control Structure HVAC, and Control Room Floor Cooling) is energized only from the Unit 1 AC Distribution System. The capacity of the Unit 1 AC Distribution System is sufficient to operate the engineered safety features on one unit and the safe shutdown loads of the other unit.

GDC 17 - Electric Power Systems Two offsite power transmission systems and four onsite standby diesel generators (A, B, C and D) with their associated battery systems are provided. Either of the two offsite transmission power systems or any three of the four onsite standby diesel generator systems have sufficient capability to operate safety related equipment for cooling the reactor core

Enclosure to PLA-6817 Page 24 of 30 and maintaining primary containment integrity and other vital functions in the event of a postulated accident in one unit with a safe shutdown of the other unit.

Additionally, a fifth diesel generator 'E' with its associated battery system is provided as a replacement, and has the capability of supplying the emergency loading for any one of the other four diesel generators (A, B, C or D). Diesel generator 'E' must be manually aligned to replace any one of the other four diesel generators in the event of a failure.

The two independent offsite power systems supply electric power to the onsite power distribution system via the 230 kV transmission grid. Each of the offsite power sources is supplied from a transmission line which terminates in switchyards (or Substations) not common to the other transmission line, The two transmission lines are on separate rights-of-way. These two transmission circuits are physically independent and are designed to minimize the possibility of their simultaneous failure under operating and postulated accident and environment conditions.

Each offsite power source can supply all Engineered Safety Feature (ESF) buses through the associated transformers. Power is available to the ESF buses from their preferred offsite power source during normal operation and from the alternate offsite power source if the preferred power is unavailable. Each diesel generator (A, B, C, or D) supplies standby power to one of the four ESF buses in each unit. Loss of both offsite power sources to an ESF bus results in automatic starting and connection of the associated diesel generator (A, B, C, or D) within 10 seconds. Loads are progressively and sequentially added to avoid generator instabilities.

There are four independent AC load groups provided to assure independence and redundancy of equipment function. These meet the safety requirements assuming a single failure since any three of the four load groups have sufficient capacity to supply the minimum loads required to safely shut down the unit. Independent routing of the preferred and alternate offsite power source circuits to the ESF buses are provided to meet the single failure safety requirements.

Additional discussion and details are provided in FSAR Sections 8.2 and 8.3.

Based on compliance with the General Design Criteria 5 and 17 above, (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance

Enclosure to PLA-6817 Page 25 of 30 of the amendment will not be inimical to the common defense and security or to the health and safety of the public.

6. ENVIRONMENTAL CONSIDERATION 10 CFR 51.22(c)(9) identifies certain licensing and'regulatory actions, which are eligible for categorical exclusion from the requirement to perform an environmental assessment. A proposed amendment to an operating license for a facility does not require an environmental assessment if operation of the facility in accordance with the proposed amendment would not: (1) involve a significant hazards consideration; (2) result in a significant change in the types or significant increase in the amounts of any effluents that may be released offsite; or (3) result in a significant increase in individual or cumulative occupational radiation exposure. PPL Susquehanna, LLC has evaluated the proposed change and has determined that the proposed change meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9).

Accordingly, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment needs to be prepared in connection with issuance of the amendment. The basis for this determination, using the above criteria, follows:

Basis As demonstrated in the "No Significant Hazards Consideration" evaluation, the proposed amendment does not involve a significant hazards consideration.

There is no significant change in the types or significant increase in the amounts of any effluents that may be released offsite. The proposed change does not involve any physical alteration of the plant (no new or different type of equipment will be installed) or change in methods governing normal plant operation.

There is no significant increase in individual or cumulative occupational radiation exposure. The proposed change does not involve any physical alteration of the plant (no new or different type of equipment will be installed) or change in methods governing normal plant operation.

7. REFERENCES FSAR Sections 3.1, 3.13, 8.1, 8.2, 8.3, 9.2.6 and 9.2.7.

Unit 1 P&ID RHR Service Water System (M- 112, sheets 1 and 2)

Unit 2 P&ID RHR Service Water System (M-2112, sheet 1)

Enclosure to PLA-6817 Page 26 of 30 TABLE 1 PROTECTED EQUIPMENT 1B and 1D 4 kV Buses and Load Centers If in service, Shutdown Cooling (SDC)

If in service, Supplemental Decay Heat Removal (SDHR) 1C004 and ICO05 Racks (Entire Outage) 1B Loop Core Spray (When only one injection source available when cavity flooded.)

Offsite Transformer T10 Offsite Transformer T20 230 kV and 500 kV Switchyards 1B and 1D 125 V DC Batteries 1B and ID 250 V DC Batteries 2B and 2D 125 V DC Batteries 2B and 2D 250 V DC Batteries 151 F067 RHR Shutdown Cooling Valve (When closed for work.)

U2 HPCI U2 RCIC 2B and 2D 4 kV Buses and Load Centers U2 B Loop RHR U2 B Loop RHRSW Diesel Driven Fire Pump B Division ESW Pumphouse B Diesel Generator C Diesel Generator D Diesel Generator

Enclosure to PLA-6817 Page 27 of 30 TABLE 1 (Continued) lBO4 Y SS Bus Outage 1A and IC 4 kV Buses and Load Centers If in service, Shutdown Cooling (SDC)

If in service, Supplemental Decay Heat Removal (SDHR) 1C004 and 1C005 Racks (Entire Outage)

IA Loop Core Spray (When only one injection source available when cavity flooded.)

Offsite Transformer T 10 Offsite Transformer T20 230 kV and 500 kV Switchyards 1A and IC 125 V DC Batteries IA and IC 250 V DC Batteries 2A and 2C 125 V DC Batteries 2A and 2C 250 V DC Batteries 151F067 RHR Shutdown Cooling valve (When closed for work.)

U2 HPCI U2 RCIC 2A and 2C 4 kV Buses and Load Centers U2 A Loop RHR U2 A RHRSW Diesel Driven Fire Pump A Division ESW Pumphouse A Diesel Generator C Diesel Generator D Diesel Generator

Enclosure to PLA-6817 Page 28 of 30 TABLE 1 (Continued)

I C4k FSýSBumsu.0age:

1B and ID 4 kV Buses and Load Centers If in service, Shutdown Cooling (SDC)

If in service, Supplemental Decay Heat Removal (SDHR) 1C004 and iC005 Racks (Entire Outage) 1B Loop Core Spray (When only one injection source available when cavity flooded.)

Offsite Transformer T1O Offsite Transformer T20 230 kV and 500 kV Switchyards 1B and ID 125 V DC Batteries IB and ID 250 V DC Batteries 2B and 2D 125 V DC Batteries 2B and 2D 250 V DC Batteries 151F067 RHR Shutdown Cooling valve (When closed for work.)

U2 HPCI U2 RCIC 2B and 2D 4 kV Buses and Load Centers U2 B Loop RHR U2 B RHRSW Diesel Driven Fire Pump B Division ESW Pumphouse A Diesel Generator B Diesel Generator D Diesel Generator

Enclosure to PLA-6817 Page 29 of 30 TABLE 1 (Continued) iD 4 k E'SS Bus6Outae IA and IC 4 kV Buses and Load Centers If in service, Shutdown Cooling (SDC)

If in service, Supplemental Decay Heat Removal (SDHR) 1C004 and 1CO05 Racks (Entire Outage)

IA Loop Core Spray (When only one injection source available when cavity flooded.)

Offsite Transformer TIO Offsite Transformer 120 230 kV and 500 kV Switchyards IA and IC 125 V DC Batteries IA and IC 250 V DC Batteries 2A and 2C 125 V DC Batteries 2A and 2C 250 V DC Batteries 151F067 RHR Shutdown Cooling valve (When closed for work.)

U2 HPCI U2 RCIC 2A and 2C 4 kV Buses and Load Centers U2 A Loop RHR U2 A RHRSW Diesel Driven Fire Pump A Division ESW Pumphouse A Diesel Generator B Diesel Generator C Diesel Generator

Enclosure to PLA-6817 Page 30 of 30 TON10 UR i:236K 23 MOVT a.,

CA50a T-211 0X207

£83211 OX213 qlbm Figure 1 SIMPLIFIED SSES AC DISTRIBUTION SYSTEM

Attachment I to PLA-6817 PPL Susquehanna, LLC Proposed Changes to Unit 2 Technical Specification 3.8.7 "Electrical Power Systems -

Distribution Systems - Operating" and Unit 2 Technical Specification 3.7.1, "Plant Systems -

RHRSW System and UHS" (Markups)

PPL Rev. 2 Distribution Systems-Operating 3.8.7 3.8 ELECTRICAL POWER SYSTEMS 3.8.7 Distribution Systems-Operating LCO 3.8.7 The electrical power distribution subsystems in Table 3.8.7-1 shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A, -.------------ NOTE ...................... Note ----------------

Not applicable to DG E DC Bus Enter applicable Conditions and 0D597 Required Actions of LCO 3.8.4,


.----------..-.--...----- "DC Sources - Operating," for DC source(s) made inoperable One or more Unit 2 AC by inoperable power distribution electrical power distribution subsystem(s).

subsystems inoperable.

A.1 Restore Unit 2 AC electrical power 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> distribution subsystem(s) to OPERABLE status. AND 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> from discovery of failure to meet LCO 3.8.7 except for Condition F or G B -.-------------- NOTE -------------- B.1 Restore Unit 2 DC electrical power 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> Not applicable to DG E DC Bus distribution subsystem(s) to 0D597 OPERABLE status. AND One or more Unit 2 DO 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> from electrical power distribution discovery of failure to subsystems inoperable, meet LCO 3.8.7 except for Condition F or G C, One Unit 1 AC electrical power C.1 Restore Unit 1 AC electrical power 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> distribution subsystem distribution subsystem to inoperable. OPERABLE status. OR 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> during the installation of the multiple fire-induced spurious operations modifications in Unit 1 (1)

(continued) eUpon completion of the MSO modifications on all four Unit 1 4.16 kV buses, this temporary extension is no longer applicable and will expire on May 31, 2012.

SUSQUEHANNA - UNIT 2 TS / 3.8-44 Amendment 464-, 49-6, 2408

PPL Rev. 4 RHRSW System and UHS 3.7.1 3.7 PLANT SYSTEMS 3.7.1 Residual Heat Removal Service Water (RHRSW) System and the Ultimate Heat Sink (UHS)

LCO 3.7.1 Two RHRSW subsystems and the UHS shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS


.--..-.-.............-------------------------- NOTE ----------------------------------------------------------

Enter applicable Conditions and Required Actions of LCO 3.4.8, "Residual Heat Removal (RHR) Shutdown Cooling System-Hot Shutdown," for RHR shutdown cooling made inoperable by RHRSW System.

CONDITION REQUIRED ACTION COMPLETION TIME A. - -------------- NOTE ----------- A.1 Declare the associated RHRSW Immediately Separate Condition entry is subsystems inoperable.

allowed for each valve.

AND One valve in Table 3.7.1-1 A.2 Establish an open flow path to the 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> inoperable. UHS.

OR AND One valve In Table 3.7.1-2 A.3 Restore the inoperable valve(s) to 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> from the inoperable. OPERABLE status. discovery of an inoperable RHRSW OR subsystem in the opposite loop from the One valve in Table 3.7.1-3 inoperable valve(s) inoperable.

AND OR 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Any combination of valves in Table 3.7.1-1, Table 3.7.1-2, or OR Table 3.7.1-3 in the same return loop inoperable. 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> during the installation of the multiple fire-induced spurious operations modifications in Unit 1(1)

(continued)

(1)Upon completion of the MSO modifications on all four Unit 1 4.16 kV buses, this temporary extension is I no longer applicable and will expire on May 31, 2012. I SUSQUEHANNA - UNIT 2 TS / 3.7-1 Amendment 464,480, 2-24

PPL Rev. 4 RHRSW System and UHS 3.7.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B. One Unit 2 RHRSW subsystem B.1 Restore the Unit 2 RHRSW 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from inoperable, subsystem to OPERABLE status. discovery of the associated Unit 1 RHRSW subsystem inoperable OR 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> during the installation of the multiple fire-induced spurious operations modifications in Unit 1 (I)

AND 7 days C. Both Unit 2 RHRSW C.1 Restore one Unit 2 RHRSW 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> from discovery subsystems Inoperable. subsystem to OPERABLE status. of one Unit 1 RHRSW subsystem not capable of supporting associated Unit 2 RHRSW subsystem AND 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> D. Required Action and associated D.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Completion Time not met.

AND OR D.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> UHS inoperable.

(1) Upon completion of the MSO modifications on all four Unit 1 4.16 kV buses, this temporary extension is no longer applicable and will expire on May 31, 2012.

SUSQUEHANNA - UNIT 2 TS / 3.7-2 Amendment -,4 6 480

Attachment 2 to PLA-6817 PPL Susquehanna, LLC Proposed Change to Unit 2 Technical Specification Bases 3.8.7 "Electrical Power Systems -

Distribution Systems - Operating" and Unit 2 Technical Specification Bases 3.7.1, "Plant Systems - RHRSW System and UHS" (Markups provided for Information Only)

PPL Rev--3 Distribution Systems-Operating B 3.8.7 BASES ACTIONS C.1 (continued)

Time of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> is consistent with the Completion Times associated with LCOs for the Unit 2 and common equipment potentially affected by loss of a Unit 1 AC electrical power subsystem.

The Completion Time has been extended to 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> in order to complete the modifications In Unit 1 associated with the Multiple Fire-Induced Spurious Operations issue. This is a temporary extension of the Completion Time.

Upon completion of the MSO modifications on all four Unit 1 4.16 kV buses, this temporary extension is no longer applicable and will expire on May 31, 2012.

D.1 With two required Unit 1 AC buses, load centers, motor control centers, or distribution panels inoperable for the performance of Unit 1 SR 3.8.1.19 but not resulting in a loss of safety function, the remaining AC electrical power distribution subsystems are capable of supporting the minimum safety functions necessary to shut down the reactor and maintain it in a safe shutdown condition, assuming no single failure. The overall reliability Is reduced, however, because a single failure Inthe remaining power distribution subsystems could result in the minimum required ESF functions not being supported. Therefore, the required AC buses, load centers, motor control centers, and distribution panels must be restored to OPERABLE status within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

E.land E.2 If the inoperable distribution subsystem cannot be restored to OPERABLE status within the associated Completion Time, the unit must be brought to a MODE in which the LCO does not apply. To achieve this status, the plant must be brought to at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and to MODE 4 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required plant conditions from full power conditions In an orderly manner and without challenging plant systems.

F.1 If Diesel Generator E Is not aligned to the Class 1E distribution system, the only supported safety function Is for the ESW system. Therefore, under this condition, If Diesel Generator E DC power distribution subsystem is not OPERABLE, to ensure the OPERABILITY of the ESW system, actions are taken to either restore the power distribution subsystem to OPERABLE status or shutdown Diesel Generator E and (continued)

SUSQUEHANNA - UNIT 2 TS / B 3.8-90 Revision -1

PPL Rev. 4 RHRSW System and UHS B 3.7.1 BASES ACTIONS A.1. A.2 and A.3 (continued)

With any UHS return path valve listed In Tables 3.7.1-1, 3.7.1-2, or 3.7.1-3 Inoperable, the UHS return path Is no longer single failure proof.

For combinations of Inoperable valves in the same loop, the UHS spray capacity needed to support the OPERABILITY of the associated Unit 1 and Unit 2 RHRSW subsystems is affected. As a result, the associated RHRSW subsystems must be declared Inoperable.

The 8-hour completion time to establish the flow path provides sufficient time to open a path and de-energize the appropriate valve In the open position.

The 72-hour completion time Is based on the fact that, although adequate UHS spray loop capability exists during this time period, both units are affected and an additional single failure results In a system configuration that will not meet design basis accident requirements.

The Completion Time has been extended to 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> in order to complete the modifications in Unit I associated with the Multiple Fire-Induced Spurious Operations Issue. This is a temporary extension of the Completion Time and is applicable during the 1A201 and 1A202 bus modifications. In order to cope with the consequences of a LOOP, a LOCA In Unit 2 and the shutdown of Unit 1 during the extended Completion Time, the following compensatory actions are required: 1) the affected loop's spray array bypass valves are in the open position and 2) the affected loop's spray array valves are closed. Upon completion of the MSO modifications on all four Unit 1 4.16 kV buses, this temporary extension Is no longer applicable and will expire on May 31, 2012.

If an additional RHRSW subsystem on either Unit Is inoperable, cooling capacity less than the minimum required for response to a design basis event would exist. Therefore, an 8-hour Completion Time is appropriate. The 8-hour Completion Time provides sufficient time to restore inoperable equipment and there is a low probability that a design basis event would occur during this period.

B.1 Required Action B.1 Is Intended to ensure that appropriate actions are taken If one Unit 2 RHRSW subsystem Is inoperable. Although designated and operated as a unitized system, the associated Unit 1 subsystem is directly connected to a common header which can supply the associated RHR heat exchanger in either unit. The associated Unit 1 subsystem is considered capable of supporting the associated Unit 2 RHRSW subsystem when the Unit 1 subsystem is OPERABLE and can provide the assumed flow to the Unit 2 heat exchanger. A Completion Time of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, when the associated Unit 1 RHRSW subsystem is not capable of supporting the associated Unit 2 RHRSW subsystem, is allowed to restore the Unit 2 RHRSW subsystem to OPERABLE status. In this configuration, the remaining OPERABLE Unit 2 RHRSW subsystem is adequate to perform the RHRSW heat removal function. However, the overall reliability is reduced because a single failure in the OPERABLE RHRSW subsystem The Completion Time to restore the Unit 2 RHRSW subsystem as been extended to 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> In order to complete the modifications in Unit 1 associated with the Multiple Fire-Induced Spurious Operations issue. This Is a temporary extension of the Completion Time and is applicable during the 1A201 and 1A202 bus modifications. The Unit 2 RHRSW subsystem remains functional since the subsystem has an operable pump, operable flow path and an operable UHS. Upon completion of the MSO modifications on all four Unit 1 4.16 kV buses, this temporary extension is no longer applicable and will expire on May 31, 2012.

(continued)

SUSQUEHANNA - UNIT 2 TS / B 3.7-5a Revision 4-1

Attachment 3 to PLA-6817 PPL Susquehanna, LLC Generic Outage Schedule for 4.16 kV ESS Bus Modifications

Attachment 3 to PLA-6817 Page 1 of 2 Ur.fI10I thflAOtf.KbO. SUM0.R - Appendix R MSO Sandbox 29-Feb.12 114:45

..- -- I.V w I I o I l

7. O~kAap Wc020,&14KV Oj0v0230A ý29. '1.4 1amm 24,01 2

IR40IA U*N400/US WORKM 05A,#(. = I 00.Oh 4 12 IRPE004 CO-P6OST PROTECTEO 00'JT FOR 02 4, 02.0pt.l2 2.0, 0 ON I 410LOADCENTERWO 2M.0 23*00 10-128142343 OP$4'1EPAREPLANT1 FOR1.A201 DUS 04$-200-0-220 OUTAGE 11 IM12 15041 C1ONl4ECE W4KV WORK 050,W12 010h 1102 iR-12010200 OPSVE-ENEORiA4Y000IJPOI *0"p.10 00ft'*2 GO, IP-100000 ito 211M 2 EX006.1POO,2 SF0,201.80 IR.I3t0740.O0 ELEC-WPPTO MOI.00 1020 LOAD$ 0.0&4v-12 05-AX.12 60.0 1010lp.10000 110 3300 0R04023200 Ce-AP CO A20101W41$10121MW OSAPI-12 0.A0, 12 M0 Wrll oct"" 00. 40 01.1w tR.140311404 P&SO0-WA12J10 N4e1$MONCall0 06O4p-IS 00-Op-t M0 FORIN45001SUSO 01A0 0M0 IR-146533".0 P110040001.02010W A'V VA06AM2 O&M-Il 07-AW-12 260h WlWaO .OooG6 0M0 0000q IR-140022-02 PUO0101 0C8108.FSEOOOKS S,0 0Oyp.I) 1OW-li 3.00 WRINGCKM0482WR400-IA20101 0420 01w2 (00>0/75101 (OQGOI)TOBUS UO.I0KV SUPPI.

t-1514S1220 RELY.P0.0P10401TEST MAOO102.T OlAp-12 07200112 2-Oh 0 C0W4NGE IN1020101W 401 6422 07A02 000 1l01001512.01 OPS-RAMOIB1Gt120101 TOTE$TA'4V07P' - 07-Ap1.12 120h SW P051020500000 0? 0,w 18-161451M-0 IELY.FLW4TTEST ISO0IA2OI01 WIM 074O-12 07Op4-IS M20 SM0TlIJTO O WY.1OS" I0M 1JM T-UFT0001.1008 IRt-14M329-00 010-APLOO.MA2100A'411V BUS 30/S =~12 03-~ .12 M0 '3 W100000W1005L 01T IR-146"W0.i P104005'F tAX02010'#410NS 1430 =00012 :04pl12 9&s, Vat" CKARGE0 035 :003 IR1434140200 POO20COLD 0CK000.PW~ BOCK A10.5 4074-12 074Op12 20'h W50400CW5000W41P 10LAN100 0420 rT75 fR-151451wO RELY-PERF PuOICT TESTAlsoCAOLC0 9~I "7O-l S 0-AF cwooleo12 1.. 20hC0AKOU IR-1514510.01 OP-RCS4OIOSM CA20109 O ESTW4K1071*6-A12 1.1 IANplO BWSFORlJSORETEST Ito0 1240 ..

..................I ................-......

IR-1514510-0 RELY-fUNOCTYESIMSOOtA20iC9WrrH 0-p12 074lS 1.061 BO~lNTC$TAX4K0W 12.t6 1&00 D-.-0000 lN-14Ma-0)0 098-A001.O0F0R0150 MOD1020104. 05,-0112 06,-12-I 2Oh 00A4.10lT/SPFY 22.0 Qm0 1R-100440&I P~E20 R000M200 M424W 12004, O0-AP-12 07-Op-li2 2$.C 00041OWSMP~Y 022 04JD0 IRa-1402450-02PAJOO4OLVSW 01111.3 J USOWIMIO O 7Ap-12 07-Opli1 30-v 04tW020G00At10K0 0420 07=0 15.10540000 OPS-RACKGKRIAS2I04 ToTESTW4KV 074,V-12 07440,-IS ¶1 0423705MOO19124-02 0720 O005 a IR,5000-UN OPS0.XOI 0.201 BREA056 FPURUN 07W-12-I OT4-Op- 2.0h 20*0 .0000 TI-02IESTACTrVITYSTART0 & lIMO 1 1R-1514512-0 OPM-RJI(W0 1.2010170 OPERATE 07400P.12070,W-12lO1 .. ...........-.........-....................... .....

w401 sue0FORAM00 RETEST 1250 io000 IR-14512-04 07WY-TOOC OW N 001.$ CK 20101Wrll- 07,*-IS 014-00,12 120 OJ100IST~tkE0A4KV6U3 110d 100 IrD IR-161010-0 090-500610M514"2100TOOPERATE 7Op-IS2 VZ,.2 1.0h 0 WA0V$120P0204150000037 .105 14.82108015500 IR.1514510-03 SELY.IOCSWC0IEC201.02100WIfl 07-00.12 Op-IS lb2 BXRRS.TO+/-1.00W4MV6US 1640 17C

.IR-1420M-02 OPS4WV(070RlJSOMOO 05004, C7 11004.IOICVOP9Y II

~-1207-Op-IlZ 170 2-01 IR-14&533&-0 OP~ OA~O"I020101 4K01/BUS O .07,-01. 07-00,12 Z~60 0 tit-14022002 OP"9),WC "109OOAAVBUOIOO 07; -1? 07;,-12 Wolin2 01020002 I AR-13020$040 FPFIO-PARTCLO 5224ICY REAJOOR O.1tv 12 IAM0200 17=0 1050 AA2

'IR.120002441 NSEP905T0.09224 IG'OE&%TR 07A-Op-l '07-Op-I ta"2101 I=2 20v0 15.120202442 09141551OLE0120024100SPEAKE5 0?Op.2 974V4'-2 tkh4 1.00101 2M1) 21M0 15-1400"420191 F -9051C1.TS104KVKY tA .2*104 07-Ap-i12-?.Op-w12: M0 0 1O0O40IA6JK '020 IT=0 IRFt. 0OSM4-S ;NSOIART1.18510400010IA.20104 02t4-l :07-O12 IAN IR-1202014-0 OPS-PART O(A05110KY 40S 20100 .07-4O12-lor S7A12 1.02 FO0041 ALK 1020 I55 1020

  • L4..10.0o54 lllrn A"U. 0140 I (,) PIO-a S),100, AV

Attachment 3 to PLA-6817 Page 2 of 2 T

AMl* W*Lk h VWS Oup 61 .. IF' J US.R10-AppendckR MSO 8andbox 29-Fsb.12 14:45 H'UG-PARI CLS0234 KV WAXCER *T~1 07-Ap,*122 z0h 14.00 1903 19.1w 0SC-PARr CLSr234 KV GP2ERT 07A-o12 0T. .I2 11h LAMM10 20.0 20.x Oi'&14ESYO~tIA 4KVBUSFIR 071.42.12 60h l1.120.03 21 M =

2EW03$I PCcI,2 N00.2 E 10-1310740-W M-C.8UPP TO 10070AE IA201ILOADS 0?X.l2 08-Apr.12 IL0$

IAWIP-100-02 11M 03.0 19-125197M0 N4e04.i04-l01E8VSWIA1RAJ4 R 06tr12 M03.21 M0 a a 04,00 I EAID,1 I CO.I NPO0.2V iR-12003-0 EE".CLW1poRT0-104.101Bus0 wAol 00-Aomlo.I0-A.03 2A3 BUSX10FRIE01 020) 0403 2 VIEC I00u -A41wwOllxCO~ttET8.OB 00, R lqL4Ef MMAt*WLc4. Page 2 d 2 ~a0~S*1 4ok

  • w.~A" ED- AcWO' o~wa0k0s.40