Category:Inservice/Preservice Inspection and Test Report
MONTHYEARML23129A2872022-09-14014 September 2022 Fifth Ten-Year Interval ISI Program and Third Ten-Year Interval Containment Inservice Inspection Program, Revision 4 ML21130A0842021-04-21021 April 2021 Fifth Ten-Year Interval Inservice Inspection Program and Third Ten-Year Interval Containment Inservice Inspection Program, Revision 3 ML21130A0852021-04-21021 April 2021 0 to Updated Final Safety Analysis Report, Appendix J, Inservice Inspection Program NLS2021009, Inservice Inspection OAR-1 Owner'S Activity Report2021-01-21021 January 2021 Inservice Inspection OAR-1 Owner'S Activity Report NLS2019005, Inservice Inspection OAR-1 Owner'S Activity Report2019-02-14014 February 2019 Inservice Inspection OAR-1 Owner'S Activity Report NLS2017071, Inservice Inspection Program Fifth Ten-Year Interval 10 CFR 50.55a Relief Requests2017-08-17017 August 2017 Inservice Inspection Program Fifth Ten-Year Interval 10 CFR 50.55a Relief Requests NLS2017006, Inservice Inspection OAR-1 Owner'S Activity Report2017-02-0202 February 2017 Inservice Inspection OAR-1 Owner'S Activity Report NLS2015003, Inservice Inspection OAR-I Owner'S Activity Report2015-01-28028 January 2015 Inservice Inspection OAR-I Owner'S Activity Report NLS2013031, Inservice Inspection OAR-I Owner'S Activity Report2013-02-27027 February 2013 Inservice Inspection OAR-I Owner'S Activity Report NLS2011082, Inservice Inspection Owner'S Activity Report (OAR-1) Owner'S Activity Report2011-08-0505 August 2011 Inservice Inspection Owner'S Activity Report (OAR-1) Owner'S Activity Report NLS2010016, Inservice Inspection OAR-I Owner'S Activity Report for the Fall 2009 Refueling Outage2010-02-0202 February 2010 Inservice Inspection OAR-I Owner'S Activity Report for the Fall 2009 Refueling Outage NLS2009006, 10 CFR 50.55a Request Number RI-21, Revision 0, and Request Number RI-22, Revision 02009-02-16016 February 2009 10 CFR 50.55a Request Number RI-21, Revision 0, and Request Number RI-22, Revision 0 NLS2008065, Inservice Inspection Summary Report for the Spring 2008 Refueling Outage2008-08-14014 August 2008 Inservice Inspection Summary Report for the Spring 2008 Refueling Outage NLS2008007, Correction to Inservice Inspection Summary Report2008-01-17017 January 2008 Correction to Inservice Inspection Summary Report NLS2007013, Inservice Inspection Summary Report2007-02-20020 February 2007 Inservice Inspection Summary Report NLS2006064, Response to NRC Request for Additional Information Regarding Relief Request RI-13 for the Fourth 10-Year Inservice Inspection Interval Cooper Nuclear Station2006-08-0101 August 2006 Response to NRC Request for Additional Information Regarding Relief Request RI-13 for the Fourth 10-Year Inservice Inspection Interval Cooper Nuclear Station NLS2006015, 10 CFR 50.55a Requests for Fourth Ten-Year Inservice Inspection Interval2006-02-23023 February 2006 10 CFR 50.55a Requests for Fourth Ten-Year Inservice Inspection Interval NLS2005074, Fourth Ten-Year Interval Pump and Valve Inservice Testing Program Relief Requests2005-10-19019 October 2005 Fourth Ten-Year Interval Pump and Valve Inservice Testing Program Relief Requests NLS2005086, Inservice Inspection Relief Requests RI-21, Revision 2, and RI-36 and Withdrawal of Relief Request RI-202005-09-28028 September 2005 Inservice Inspection Relief Requests RI-21, Revision 2, and RI-36 and Withdrawal of Relief Request RI-20 NLS2005049, Inservice Inspection Summary Report2005-05-16016 May 2005 Inservice Inspection Summary Report NLS2004125, Inservice Inspection Relief Request RI-35 Cooper Nuclear Station2004-10-25025 October 2004 Inservice Inspection Relief Request RI-35 Cooper Nuclear Station NLS2004009, Inservice Inspection Relief Requests PR-03, RC-06, RC-07, R1-17, R1-31, R1-32, and R1-332004-02-12012 February 2004 Inservice Inspection Relief Requests PR-03, RC-06, RC-07, R1-17, R1-31, R1-32, and R1-33 NLS2003059, Inservice Testing Program Relief Request RP-06, Revision 12003-09-19019 September 2003 Inservice Testing Program Relief Request RP-06, Revision 1 NLS2003080, Inservice Inspection (ISI) Summary Report for the Spring 2003 Refueling Outage at Cooper Nuclear Station2003-07-21021 July 2003 Inservice Inspection (ISI) Summary Report for the Spring 2003 Refueling Outage at Cooper Nuclear Station NLS2002111, Inservice Testing Program Relief Request RP-06, RP-072002-11-14014 November 2002 Inservice Testing Program Relief Request RP-06, RP-07 NLS2002040, Inservice Inspection Summary Report for Cooper Nuclear Station2002-03-28028 March 2002 Inservice Inspection Summary Report for Cooper Nuclear Station 2022-09-14
[Table view] Category:Letter type:NLS
MONTHYEARNLS2024053, Licensee Guarantees of Payment of Deferred Premiums2024-07-30030 July 2024 Licensee Guarantees of Payment of Deferred Premiums NLS2024055, Data from Metamic Coupon Sampling Program2024-07-29029 July 2024 Data from Metamic Coupon Sampling Program NLS2024052, Supplement to the Application to Modify the Allowable Value for Cooper Nuclear Station Technical Specifications High Pressure Coolant Injection Pump Discharge Low Flow2024-07-24024 July 2024 Supplement to the Application to Modify the Allowable Value for Cooper Nuclear Station Technical Specifications High Pressure Coolant Injection Pump Discharge Low Flow NLS2024051, Supplement to the Application to Revise Technical Specifications to Adopt TSTF-374, Revision to Diesel Fuel Oil Testing Program2024-07-0303 July 2024 Supplement to the Application to Revise Technical Specifications to Adopt TSTF-374, Revision to Diesel Fuel Oil Testing Program NLS2024044, Secondary Containment Differential Pressure Perturbation Exceeds Technical Specifications2024-06-0606 June 2024 Secondary Containment Differential Pressure Perturbation Exceeds Technical Specifications NLS2024038, High Pressure Coolant Injection Pressure Switch Installation Causes Condition That Could Have Prevented Fulfillment of a Safety Function and a Condition Prohibited B Technical.2024-05-13013 May 2024 High Pressure Coolant Injection Pressure Switch Installation Causes Condition That Could Have Prevented Fulfillment of a Safety Function and a Condition Prohibited B Technical. NLS2024035, Main Turbine Stop Valve Position Switches Do Not Meet Channel Independence Criteria Results in Two Channels Being Declared Inoperable and a Condition Prohibited by Technical Specifications2024-05-0909 May 2024 Main Turbine Stop Valve Position Switches Do Not Meet Channel Independence Criteria Results in Two Channels Being Declared Inoperable and a Condition Prohibited by Technical Specifications NLS2024025, License Amendment Request to Revise Technical Specifications Table 3.3.2.1-1, Control Rod Block Instrumentation2024-05-0909 May 2024 License Amendment Request to Revise Technical Specifications Table 3.3.2.1-1, Control Rod Block Instrumentation NLS2024037, 2023 Annual Radiological Environmental Report2024-05-0808 May 2024 2023 Annual Radiological Environmental Report NLS2024030, Annual Radioactive Effluent Release Report2024-04-25025 April 2024 Annual Radioactive Effluent Release Report NLS2024033, Preparation and Scheduling of Operator Licensing Examinations2024-04-25025 April 2024 Preparation and Scheduling of Operator Licensing Examinations NLS2024029, High Pressure Coolant Injection Steam Leak Causes Condition That Could Have Prevented Fulfillment of a Safety Function and a Condition Prohibited by Technical Specifications2024-04-22022 April 2024 High Pressure Coolant Injection Steam Leak Causes Condition That Could Have Prevented Fulfillment of a Safety Function and a Condition Prohibited by Technical Specifications NLS2024031, Notice of Intent to Apply for Subsequent Renewal of Operating License2024-04-22022 April 2024 Notice of Intent to Apply for Subsequent Renewal of Operating License NLS2024036, Nebraska Public Power District 2023 Financial Report2024-04-19019 April 2024 Nebraska Public Power District 2023 Financial Report NLS2024027, Response to NRC Request for Additional Information Regarding Application for the Emergency License Amendment Request to Revise Technical Specifications 3 .3 .1.1, Reactor Protection (RPS) Instrumentation2024-04-0303 April 2024 Response to NRC Request for Additional Information Regarding Application for the Emergency License Amendment Request to Revise Technical Specifications 3 .3 .1.1, Reactor Protection (RPS) Instrumentation NLS2024024, Emergency License Amendment Request to Revise Technical Specifications 3.3.1.1, Reactor Protection (RPS) Instrumentation2024-04-0101 April 2024 Emergency License Amendment Request to Revise Technical Specifications 3.3.1.1, Reactor Protection (RPS) Instrumentation NLS2024018, Property Insurance Coverage2024-03-20020 March 2024 Property Insurance Coverage NLS2024017, Response to an Apparent Violation in NRC Inspection Report 05000298/2023012; EA-24-0012024-03-0808 March 2024 Response to an Apparent Violation in NRC Inspection Report 05000298/2023012; EA-24-001 NLS2024009, Response to Nuclear Regulatory Commission Request for Additional Information Regarding Application to Revise Technical Specifications to Support Inspection of2024-03-0808 March 2024 Response to Nuclear Regulatory Commission Request for Additional Information Regarding Application to Revise Technical Specifications to Support Inspection of NLS2024013, Inoperable Turbine Stop Valve Limit Switch Causes Condition Prohibited by Technical Specifications2024-03-0404 March 2024 Inoperable Turbine Stop Valve Limit Switch Causes Condition Prohibited by Technical Specifications NLS2024014, Technical Specifications Prohibited Condition for Inoperable Service Water Booster Pump2024-03-0404 March 2024 Technical Specifications Prohibited Condition for Inoperable Service Water Booster Pump NLS2024001, Application to Modify the Allowable Value for Cooper Nuclear Station Technical Specifications High Pressure Coolant Injection Pump Discharge Low Flow2024-02-16016 February 2024 Application to Modify the Allowable Value for Cooper Nuclear Station Technical Specifications High Pressure Coolant Injection Pump Discharge Low Flow NLS2024006, Response to Nuclear Regulatory Commissions Request for Additional Information for Relief Request RC3-022024-01-25025 January 2024 Response to Nuclear Regulatory Commissions Request for Additional Information for Relief Request RC3-02 NLS2024006, Response to Nuclear Regulatory Commission'S Request for Additional Information for Relief Request RC3-022024-01-25025 January 2024 Response to Nuclear Regulatory Commission'S Request for Additional Information for Relief Request RC3-02 NLS2024007, Emergency Plan Implementing Procedure 5.7.1, Revision 732024-01-16016 January 2024 Emergency Plan Implementing Procedure 5.7.1, Revision 73 NLS2024003, 30 Day Report - Unauthorized Disassembly of Liquid Scintillation Detector2024-01-15015 January 2024 30 Day Report - Unauthorized Disassembly of Liquid Scintillation Detector NLS2024004, Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 20232024-01-10010 January 2024 Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 2023 NLS2023053, ISFSI, Supplement to Exemption Request from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-30030 November 2023 ISFSI, Supplement to Exemption Request from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation NLS2023050, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-22022 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation NLS2023045, Application to Revise Technical Specifications to Adopt TSTF-374, Revision to Diesel Fuel Oil Testing Program2023-11-15015 November 2023 Application to Revise Technical Specifications to Adopt TSTF-374, Revision to Diesel Fuel Oil Testing Program NLS2023051, Response to Nuclear Regulatory Commission Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2023-10-10010 October 2023 Response to Nuclear Regulatory Commission Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements NLS2023049, 10 CFR Part 21 Report Regarding HGA Relays2023-09-0606 September 2023 10 CFR Part 21 Report Regarding HGA Relays NLS2023029, License Amendment Request to Revise Technical Specifications to Support Inspection of Diesel Fuel Oil Storage Tanks2023-09-0606 September 2023 License Amendment Request to Revise Technical Specifications to Support Inspection of Diesel Fuel Oil Storage Tanks NLS2023047, Licensee Guarantees of Payment of Deferred Premiums2023-07-26026 July 2023 Licensee Guarantees of Payment of Deferred Premiums NLS2023033, 10 CFR 50.55a Relief Request RC3-022023-06-27027 June 2023 10 CFR 50.55a Relief Request RC3-02 NLS2023039, Preparation and Scheduling of Operator Licensing Examinations2023-06-0101 June 2023 Preparation and Scheduling of Operator Licensing Examinations NLS2023038, Nebraska Public Power District 2022 Financial Report2023-05-22022 May 2023 Nebraska Public Power District 2022 Financial Report NLS2023031, Annual Radiological Environmental Report2023-05-11011 May 2023 Annual Radiological Environmental Report NLS2023017, Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2023-05-0303 May 2023 Application to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements NLS2023018, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-0303 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling NLS2023030, Annual Radioactive Effluent Release Report2023-04-27027 April 2023 Annual Radioactive Effluent Release Report NLS2023007, Technical Specification Bases Changes2023-04-17017 April 2023 Technical Specification Bases Changes NLS2023027, Annual Report of Individual Exposure Monitoring2023-04-13013 April 2023 Annual Report of Individual Exposure Monitoring NLS2023021, Quality Assurance Program Changes2023-04-10010 April 2023 Quality Assurance Program Changes NLS2023020, Decommissioning Funding2023-03-29029 March 2023 Decommissioning Funding NLS2023019, Property Insurance Coverage2023-03-23023 March 2023 Property Insurance Coverage NLS2023010, Inservice Inspection OAR-1 Owner'S Activity Report for Cooper Nuclear Station2023-02-0909 February 2023 Inservice Inspection OAR-1 Owner'S Activity Report for Cooper Nuclear Station NLS2023005, Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 20222023-01-19019 January 2023 Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 2022 NLS2022054, Preparation and Scheduling of Operator Licensing Examinations2023-01-0505 January 2023 Preparation and Scheduling of Operator Licensing Examinations NLS2022055, Emergency Plan, Revision 812023-01-0404 January 2023 Emergency Plan, Revision 81 2024-07-30
[Table view] |
Text
N Nebraska Public Power District Always there when you need us NLS2011082 August 5, 2011 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001
Subject:
Inservice Inspection OAR- I Owner's Activity Report Cooper Nuclear Station, Docket No. 50-298, DPR-46
Dear Sir or Madam:
The purpose of this letter is to provide to the Nuclear Regulatory Commission the Inservice Inspection OAR-I Owner's Activity Report for the Spring 2011 Refueling Outage at Cooper Nuclear Station (CNS). This report is submitted in accordance with the requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code,Section XI, Code Case N-532-4. The enclosure contains the completed OAR-I Owner's Activity Report form, a table identifying the description of items with flaws or relevant conditions that required evaluation for continued service, and a table providing an abstract of repair/replacement activities required for continued service.
Should you have any questions regarding this matter, please contact me at (402) 825-2904.
Sincerely, David W. Van Der Kamp Licensing Manager
/dm Enclosure cc: Regional Administrator w/enclosure NPG Distribution w/o enclosure USNRC - Region IV Senior Resident Inspector w/enclosure CNS Records w/enclosure USNRC - CNS Cooper Project Manager w/enclosure USNRC - NRR Project Directorate IV-1 COOPER NUCLEAR STATION P0. Box 98 / Brownville, NE 68321-0098 Telephone: (402) 825-3811 / Fax: (402) 825-5211 www.nppd.com
.......... Foim OAR-I10wner'sArtivlty Report ..
Report Number RE26-1 Plant Cooper Nuclear Station. P.O. Box 98. 72676 648A Ave, Brownvllle, NE 68321 (Name and Addrews of Plant)
Unit No. 1 Commercial Service Date 71111974 Refueling Outage No. RE26 (if applkable)
Current Inspection Interval 4th Interval (Class 1, 2, 3); 2nd Interval (Class MC)
(11.2nd. 3rd, 4th, other)
Current Inspection Period 2nd Period (Class 1.2. 3); 1st Period (Class MC)
(Is, 2nd, 3rd)
Edition and Addenda of Section X1 applicable to the Inspection plans 2001 Edition, 2003 Addenda Date and Revision of Inspection plans Rev 2.5 for Class 1, 2, 3 approved on 31712011; Rev 1.1 for Class MC approved on 91/92010 Edition and Addenda of Section Xl applicable to repair/replacement activities. if different than the inspection plans Same Code Case used: N-460. N-686 (approved via Relief Request RI-37); N-532-4 (If applicable)
CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section Xl; and (c) the repair/replacement activities and evaluations supporting the completion of RE26 conform to the requirements of Section Xl. (Refueling Outage Number)
Signed Kent Sutton-Engineering Support Manag*ac.-- '-1;;ý Date - - /'
Owners or 0-&e's Designee. Moe-CERTIFICATE OF INSERVICE INSPECTION I. the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Nebraska and employed by HSBCT of Hartford, Connecticut have inspected the items described in this Owner's ActivityRepor, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section Xl.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal Injury or property damage or loss of any kind arising from or connected with this inspection, PatdckMcCarth * ~7 "*,-' Commissions iuM* 3I/12
tnspecloxs Signature National Board, Stale, Province. and Endorsements Date - " ,* I I 8/2/2011 ScheduleWorks V. 8.1 Page I - I
Cooper Nuclear Station Table 1 Items with Flaws or Relevant Conditions That Required Evaluation for Continued Service Examination Item Description Evaluation Description Category and Item Number F-A/F1.10B RR-SB1-A - Sway Strut two (2), A loose lock nut was identified during a VT-3 examination per work order 4737600. Load settings Reactor Recirculation (RR) System were noted and evaluated as acceptable using the methodology contained in Cooper Nuclear Station (CNS) Procedure 7.2.57. A loose lock nut does not constitute a "loose support item" since it is not a load carrying member therefore the Acceptance Standards of IWF-3410(a)(2) were not exceeded and examination is considered SAT. The relevant indication was documented in the CNS Corrective Action Program per CR-CNS-2011-4144.
F-A/F1.20C MSH-1 21 - Variable Spring Excessive clamping force was reported during a VT-3 examination per work order 4768348. The Trapeze, Main Steam (MS) System relevant indication was documented in the CNS Corrective Action Program per CR-CNS-201 1-2185 and evaluated by engineering as acceptable.
E-A/E1.11 SP-EXT - Suppression Chamber Multiple suspect areas were identified with blistering paint, arc strikes, peeling paint, etc. during a Exterior Accessible Surface Areas, General Visual examination of the accessible areas of the Torus shell. The following provides a Primary Containment (PC) System detailed summary of issues in consideration with the requirements of 50.55a(b)(2)(ix)(A):
CR-CNS-2011-2269 and -2505 were generated in the CNS Corrective Action Program to document various indications on the torus exterior. Sixteen (16) locations were identified. Seven indications associated with coating degradation did not meet the requirements of IWE-3510.1 and therefore needed to be cleaned, re-examined to VT-1 requirements to further assess condition of torus shell, then repaired as needed. It should be noted that no Repair/Replacement activities were required.
Repairs were considered more cosmetic in nature and did not impact the overall structural integrity of the torus shell. The following summarizes the review of these indications CR-CNS-2011-2269 documented the following six (6) indications:
- EXT.TOR-1: Flaking and blistering paint identified with some bare metal spots showing, however, no metal loss was observed. WO 4819959 initiated to further assess condition of the base metal and to recoat as necessary. A VT-1 post cleaning examination of the bare metal area was performed SAT and the area was recoated.
- EXT.TOR-2: Two weld attachment sites discovered with and evaluated as not impacting the structural integrity of shell. WO 4819959 initiated to smooth out the attachment sites without disturbing the base metal, assess the condition of the bare metal surface and recoat as necessary. A VT-1 post cleaning examination of the bare metal area was performed SAT and the area was recoated.
- EXT.TOR-3: Several scratches to the paint were observed. WO 4819959 was initiated to assess and recoat as necessary. A VT-1 post cleaning examination of the bare metal area was performed SAT and the area was recoated.
" EXT.TOR-4: Stained area determined to be acceptable as is. No additional actions were
Cooper Nuclear Station Table 1 Items with Flaws or Relevant Conditions That Required Evaluation for Continued Service Examination Item Description Evaluation Description Category and Item Number required.
- EXT.TOR-5: Previously identified location. Area determined to be acceptable as primer is still intact. No additional actions were required.
" EXT.TOR-6: Coating at this area appears to have been heated when a welded attachment was installed to the interior side of the torus shell causing a discoloration of the coating.
Inspections on the inside of the Torus confirmed the installation of a piping hanger welded to the inside of the Torus. WO 4819959 was initiated to assess and recoat as necessary.
VT-1 post cleaning examination performed SAT and the area was subsequently recoated.
CR-CNS-2011-2505 documented the following seven (7) indications:
" EXT.TOR-7: Previously identified indication with no change from previous examination.
Indication previously evaluated by CNS analysis. Therefore no additional actions were required.
- EXT.TOR-8: Previously identified indication with no change from previous examination.
Indication previously evaluated by CNS analysis. Therefore no additional actions were required.
- EXT.TOR-9, EXT.TOR-10, EXT.TOR-1 1: Arc strikes were new indications. These indications are minor in nature and are bounded by the CNS analysis that previously accepted the arc strike identified in photo EXT.TOR-1 2. Therefore no additional actions were required.
" EXT.TOR-1 3: New indication that appeared to be a concrete or grout type material. Areas of the base metal adjacent appear to be intact with areas of the top coat missing but no degradation of the base metal was evident. WO 4819959 was initiated to clean and recoat as necessary. A VT-1 post cleaning examination of the bare metal area was performed SAT and the area was recoated.
" EXT.TOR-14: New indication where base metal was exposed and coating is stained.
Degradation of the coating appears to be from leakage of a Service Water (SW) valve located directly above the area. WO 4819959 was initiated to clean and recoat as necessary. A VT-1 post cleaning examination of the bare metal area was performed SAT and the area was recoated.
" EXT.TOR-15: New indication that appeared to be similar to the indication identified in photo EXT.TOR-1 3. WO 4819959 initiated to assess and recoat as necessary. A VT-1 post cleaning examination of the bare metal area was performed SAT and the area was recoated.
- EXT.TOR-16: Indication previously identified and evaluated by CNS as acceptable.
Therefore no additional actions were recauired.
Cooper Nuclear Station Table 1 Items with Flaws or Relevant Conditions That Required Evaluation for Continued Service Examination Item Description Evaluation Description Category and Item Number B-N-2/B13.40 TPGD-HDWARE Top Guide Indications were identified on the top guide aligner pins during VT-1 (BWRVIP-26-A) and VT-3 Hardware and Rim Weld: (Hold (ASME Section XI) examinations requiring evaluation for continued operation in accordance with Down Latches and Horizontal IWB-3142.4. The evaluation concluded the indications were acceptable for one cycle of operation Alignment Pins at 0, 90, 180, and until the next re-examination is performed. The indications were evaluated documented in the CNS 270 degree azimuth), bolting, rim Corrective Action Program per CR-CNS-2011-3909 and -4619.
pins, rim weld.
TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Description of Repair/Replacement Plan Code Class Item Description Work Date Completed Number 3 SW-Pipe Replace Piping 3/29/2011 11-008 1 RCIC-MOV-MO15 Weld Repair Valve 7/6/2011 11-020
ATTACHMENT 3 LIST OF REGULATORY COMMITMENTS© 4 i ATTACHMENT 3 LIST OF REGULATORY COMMITMENTS©0 Correspondence Number: NLS2011082 The following table identifies those actions committed to by Nebraska Public Power District (NPPD) in this document. Any other actions discussed in the submittal represent intended or planned actions by NPPD. They are described for information only and are not regulatory commitments. Please notify the Licensing Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.
COMMITMENT COMMITTED DATE COMMITMENT NUMBER OR OUTAGE None N/A N/A
- 4. 4 4.
PROCEDURE 0.42 REVISION 27 PAGE 18 OF 25