ND-18-1087, July 31, 2018, Licensing Activities Readiness Meeting Material

From kanterella
Jump to navigation Jump to search
July 31, 2018, Licensing Activities Readiness Meeting Material
ML18226A261
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 08/10/2018
From: Yox M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of New Reactors
Shared Package
ML18226A260 List:
References
ND-18-1087
Download: ML18226A261 (8)


Text

Michael J. Yox 7825 River Road Regulatory Affairs Director Waynesboro, GA 30830 Vogtle 3 & 4 706 848-6459 tel 410 474-8587 cell myox@southernco.com August 10, 2018 Docket Nos.: 52-025 ND-18-1087 52-026 10 CFR 52.99(a)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Units 3 and 4 Vogtle 3 & 4 July 31, 2018 Licensing Activities Readiness Meeting Material Ladies and Gentlemen:

On July 31, 2018, Southern Nuclear Operating Company (SNC) and Nuclear Regulatory Commission (NRC) staff members met to discuss planning for future licensing activities. The purpose of the meeting was to provide an opportunity to identify upcoming licensing activities to allow for resource planning by SNC and the NRC. Material used to facilitate the meeting is included in enclosure 2. The meeting material contains schedule information that is not publicly available. contains an affidavit from SNC supporting the requested withholding under 10 CFR 2.390. contains the material used to support the July 31, 2018 meeting.

SNC requests that Enclosure 2, Vogtle 3 & 4 July 31, 2018 Licensing Activities Readiness Meeting Material, be withheld from public disclosure under 10 CFR 2.390.

This letter contains no regulatory commitments.

Should you have questions regarding the enclosed information, please contact Kelli Roberts at (706) 848-6991.

U. S. Nuclear Regulatory Commission ND-18-1087 Page 2 of4 Director Vogtle 3&4 MJY/SCUamw

Enclosures:

1) Affidavit from Southern Nuclear Operating Company for Withholding Under 10 CFR 2.390
2) Vogtle 3 & 4 July 31,2018 Licensing Activities Readiness Meeting Material {Withhold from Public Disclosure under 10 CFR 2.390}

U. S. Nuclear Regulatory Commission ND-18-1087 Page 3 of 4 Cc:

Southern Nuclear Operating Company/ Georgia Power Company Mr. D. H. Jones (w/o enclosures)

Mr. M. J. Yox Mr. B. H. Whitley Ms. A. L. Pugh Mr. W. A. Sparkman Ms. K. M. Stacy Ms. A. C. Chamberlain Ms. A. Aughtman Mr. T. G. Petrak Mr. J. T. Todd Mr. P. W. Marcotte Ms. S. Gambaro-Perazza Document Services RTYPE: VND.LI.L06 File AR.01.02.06 Nuclear Regulatory Commission Mr. W. Jones Ms. A. Bradford Ms. J. Dixon-Herrity Mr. R. Taylor Mr. S. Smith Mr. P. Krohn Mr. C. P. Patel Ms. S. E. Temple Mr. C. J. Even Ms. N. Coovert Ms. A. Johnson Ms. J Rankin Westinghouse Electric Company, LLC Mr. M. M. Corletti Mr. Z. S. Harper

U. S. Nuclear Regulatory Commission ND-18-1087 Page 4 of 4 Not Used

Southern Nuclear Operating Company ND-18-1087 Enclosure 1 Affidavit from Southern Nuclear Operating Company for Withholding Under 10 CFR 2.390

ND-18-1087 Enclosure 1 Affidavit from Southern Nuclear Operating Company for Withholding Under 10 CFR 2.390 SNC Affidavit

1. My name is Michael Vox. I am a Regulatory Affairs Director for Southern Nuclear Operating Company (SNC). I have been delegated the function of reviewing proprietary information sought to be withheld from public disclosure and am authorized to apply for its withholding on behalf of SNC).
2. I am making this affidavit on personal knowledge, in conformance with the provisions of 10 CFR Section 2.390 of the Commission's regulations, and in conjunction with SNC's presentation material referenced during a closed project status and licensing action planning meeting.
3. I have personal knowledge of the criteria and procedures used by SNC to designate information as a trade secret, privileged or as confidential commercial or financial information.
4. Based on the reason(s) at 10 CFR 2.390(a)(4), this affidavit seeks to withhold from public disclosure the materials covered during a closed project status and licensing action planning meeting. Materials include confidential schedule, financial and other project business-related information.
5. The following is furnished for consideration by the Commission in determining whether the information sought to be withheld from public disclosure should be withheld.
a. The information sought to be withheld from public disclosure has been held in confidence by SNC.
b. The information is of a type customarily held in confidence by SNC and not customarily disclosed to the public.
c. The release of the information might result in the loss of an existing or potential competitive advantage to SNC. The information sought to be withheld contains Page 1 of 2

ND-18-1087 Enclosure 1 Affidavit from Southern Nuclear Operating Company for Withholding Under 10 CFR 2.390 aspects of SNC's development plans, the release of which will likely cause harm by allowing other entities to gain a competitive advantage through prior knowledge of SNC's construction and procurement plans.

5. The information is being transmitted to the Commission in confidence and, under the provisions of 10 CFR Section 2.390, it is to be received in confidence by the Commission.
6. To the best of my knowledge and belief, the information sought to be protected is not available in public sources or available information has not been previously employed in the same original manner or method.

I declare under penalty of perjury that the foregoing is true and correct.


1!:.~~~~~4~:fl42~~=---------

~

Executed on 16t,o1B D ~

Page 2 of 2

Southern Nuclear Operating Company ND-18-1087 Enclosure 2

{Withhold from Public Disclosure under 10 CFR 2.390}

Vogtle 3 & 4 July 31, 2018 Licensing Activities Readiness Meeting Material