Category:Decommissioning Funding Plan DKTs 30
MONTHYEARML24365A2032024-12-30030 December 2024 ISFSI - 10 CFR 72.30 Decommissioning Funding Plan ML24260A2192024-09-16016 September 2024 Decommissioning Trust Fund Disbursement - Revision to Previous Thirty-Day Written Notification ML24088A2352024-03-26026 March 2024 Decommissioning Funding Status Report ML23089A3722023-03-30030 March 2023 Decommissioning Funding Status Report ML23089A3852023-03-30030 March 2023 Decommissioning Funding Status Report ML22280A1702022-11-0202 November 2022 Connecticuts Decommissioning Funding Status Report for Millstone Power Station Docket No 50-245 ML22089A1862022-03-30030 March 2022 Decommissioning Fund Status Report ML21355A2852021-12-14014 December 2021 ISFSI, 10 CFR 72.30 Decommissioning Funding Plan ML21085A5662021-03-25025 March 2021 Decommissioning Funding Status Report ML21085A5772021-03-25025 March 2021 Decommissioning Funding Status Report ML20087M7152020-03-26026 March 2020 Decommissioning Funding Status Report ML19092A2932019-03-26026 March 2019 Decommissioning Funding Status Report ML19092A2942019-03-26026 March 2019 Decommissioning Funding Status Report ML18361A5752018-12-19019 December 2018 Independent Spent Fuel Storage Installation (Sfsi) - 10 CFR 72.30 Decommissioning Funding Plan ML18092A0802018-03-21021 March 2018 Decommissioning Funding Status Report ML17271A0532017-09-29029 September 2017 2017 Summary of Annual Decommissioning Funding Status Reports for Reactors in Decommissioning ML17094A5182017-03-30030 March 2017 Submittal of Decommissioning Funding Status Report ML17094A5202017-03-30030 March 2017 Submittal of Decommissioning Funding Status Report ML17086A0582017-03-28028 March 2017 Consultation Letter: Fws Response for Millstone (E-Mail 11-07-2016 from D. Simmons/Fws to R. Baum/Nrc/Nmss) ML16085A3462016-03-24024 March 2016 Decommissioning Funding Status Report ML15093A1022015-03-26026 March 2015 Decommissioning Funding Status Report ML14098A2602014-03-31031 March 2014 Decommissioning Funding Status Report ML13098A0872013-03-28028 March 2013 Decommissioning Funding Status Report ML12082A1782012-03-22022 March 2012 Decommissioning Funding Status Report ML1118101552011-06-14014 June 2011 Submittal of Decommissioning Funding Status Report: Response to Request for Addition Information ML1109003752011-03-29029 March 2011 Decommissioning Funding Status Report ML1009101272010-03-30030 March 2010 Decommissioning Funding Status Report ML1034205822009-06-23023 June 2009 2008 Decommissioning Cost Update for Millstone Nuclear Power Plant, Unit 1 ML0909101482009-03-30030 March 2009 Decommissioning Funding Status Report ML0809100942008-03-28028 March 2008 Decommissioning Funding Status Report ML0709300382007-03-29029 March 2007 Decommissioning Funding Status Report ML0608705292006-03-28028 March 2006 Decommissioning Funding Status Report ML0508904182005-03-29029 March 2005 Decommissioning Funding Status Report Notification of Intent to Remove Parent Guarantee ML0409800272004-03-29029 March 2004 Decommissioning Funding Status Report and Update to Parent Company Guaranty B18852, Decommissioning Funding Status Report and Update to Millstone Unit 1 Parent Guarantee2003-03-31031 March 2003 Decommissioning Funding Status Report and Update to Millstone Unit 1 Parent Guarantee ML0209803782002-04-0101 April 2002 Part 1 of 2, Millstone Nuclear Power Station, Unit Nos. 1, 2 & 3, 2001 Decommissioning Funding Status Report & Update to Parent Guarantee B18614, Part 2 of 2, Millstone Nuclear Power Station, Unit Nos. 1, 2 & 3, 2001 Decommissioning Funding Status Report & Update to Parent Guarantee, Results in Uncertain Times2002-04-0101 April 2002 Part 2 of 2, Millstone Nuclear Power Station, Unit Nos. 1, 2 & 3, 2001 Decommissioning Funding Status Report & Update to Parent Guarantee, Results in Uncertain Times 2024-09-16
[Table view] Category:40
MONTHYEARML24365A2032024-12-30030 December 2024 ISFSI - 10 CFR 72.30 Decommissioning Funding Plan ML24260A2192024-09-16016 September 2024 Decommissioning Trust Fund Disbursement - Revision to Previous Thirty-Day Written Notification ML24088A2352024-03-26026 March 2024 Decommissioning Funding Status Report ML23089A3852023-03-30030 March 2023 Decommissioning Funding Status Report ML23089A3722023-03-30030 March 2023 Decommissioning Funding Status Report ML22280A1702022-11-0202 November 2022 Connecticuts Decommissioning Funding Status Report for Millstone Power Station Docket No 50-245 ML22089A1862022-03-30030 March 2022 Decommissioning Fund Status Report ML21355A2852021-12-14014 December 2021 ISFSI, 10 CFR 72.30 Decommissioning Funding Plan ML21085A5662021-03-25025 March 2021 Decommissioning Funding Status Report ML21085A5772021-03-25025 March 2021 Decommissioning Funding Status Report ML20087M7152020-03-26026 March 2020 Decommissioning Funding Status Report ML19092A2932019-03-26026 March 2019 Decommissioning Funding Status Report ML19092A2942019-03-26026 March 2019 Decommissioning Funding Status Report ML18361A5752018-12-19019 December 2018 Independent Spent Fuel Storage Installation (Sfsi) - 10 CFR 72.30 Decommissioning Funding Plan ML18092A0802018-03-21021 March 2018 Decommissioning Funding Status Report ML17271A0532017-09-29029 September 2017 2017 Summary of Annual Decommissioning Funding Status Reports for Reactors in Decommissioning ML17094A5182017-03-30030 March 2017 Submittal of Decommissioning Funding Status Report ML17094A5202017-03-30030 March 2017 Submittal of Decommissioning Funding Status Report ML17086A0582017-03-28028 March 2017 Consultation Letter: Fws Response for Millstone (E-Mail 11-07-2016 from D. Simmons/Fws to R. Baum/Nrc/Nmss) ML16085A3462016-03-24024 March 2016 Decommissioning Funding Status Report ML15093A1022015-03-26026 March 2015 Decommissioning Funding Status Report ML14098A2602014-03-31031 March 2014 Decommissioning Funding Status Report ML13098A0872013-03-28028 March 2013 Decommissioning Funding Status Report ML12082A1782012-03-22022 March 2012 Decommissioning Funding Status Report ML1118101552011-06-14014 June 2011 Submittal of Decommissioning Funding Status Report: Response to Request for Addition Information ML1116002102011-06-13013 June 2011 Exhibit D (Part 1): Excerpt from the Millstone License Transfer Application Part 2, August 31, 2000 ML1109003752011-03-29029 March 2011 Decommissioning Funding Status Report ML1009101272010-03-30030 March 2010 Decommissioning Funding Status Report ML1034205822009-06-23023 June 2009 2008 Decommissioning Cost Update for Millstone Nuclear Power Plant, Unit 1 ML0909101482009-03-30030 March 2009 Decommissioning Funding Status Report ML0809100942008-03-28028 March 2008 Decommissioning Funding Status Report ML0720003862007-07-13013 July 2007 License Amendment Request, Stretch Power Uprate ML0709300382007-03-29029 March 2007 Decommissioning Funding Status Report ML0633804082006-12-0404 December 2006 Supplement to Post Maintenance/Modification Surveillance Requirements License Amendment Request ML0608705292006-03-28028 March 2006 Decommissioning Funding Status Report ML0508904182005-03-29029 March 2005 Decommissioning Funding Status Report Notification of Intent to Remove Parent Guarantee ML0409800272004-03-29029 March 2004 Decommissioning Funding Status Report and Update to Parent Company Guaranty B18852, Decommissioning Funding Status Report and Update to Millstone Unit 1 Parent Guarantee2003-03-31031 March 2003 Decommissioning Funding Status Report and Update to Millstone Unit 1 Parent Guarantee ML0209803782002-04-0101 April 2002 Part 1 of 2, Millstone Nuclear Power Station, Unit Nos. 1, 2 & 3, 2001 Decommissioning Funding Status Report & Update to Parent Guarantee B18614, Part 2 of 2, Millstone Nuclear Power Station, Unit Nos. 1, 2 & 3, 2001 Decommissioning Funding Status Report & Update to Parent Guarantee, Results in Uncertain Times2002-04-0101 April 2002 Part 2 of 2, Millstone Nuclear Power Station, Unit Nos. 1, 2 & 3, 2001 Decommissioning Funding Status Report & Update to Parent Guarantee, Results in Uncertain Times 2024-09-16
[Table view] Category:50
MONTHYEARML24365A2032024-12-30030 December 2024 ISFSI - 10 CFR 72.30 Decommissioning Funding Plan ML24260A2192024-09-16016 September 2024 Decommissioning Trust Fund Disbursement - Revision to Previous Thirty-Day Written Notification ML24088A2352024-03-26026 March 2024 Decommissioning Funding Status Report ML23089A3722023-03-30030 March 2023 Decommissioning Funding Status Report ML23089A3852023-03-30030 March 2023 Decommissioning Funding Status Report ML22280A1702022-11-0202 November 2022 Connecticuts Decommissioning Funding Status Report for Millstone Power Station Docket No 50-245 ML22089A1862022-03-30030 March 2022 Decommissioning Fund Status Report ML21355A2852021-12-14014 December 2021 ISFSI, 10 CFR 72.30 Decommissioning Funding Plan ML21085A5662021-03-25025 March 2021 Decommissioning Funding Status Report ML21085A5772021-03-25025 March 2021 Decommissioning Funding Status Report ML20087M7152020-03-26026 March 2020 Decommissioning Funding Status Report ML19092A2932019-03-26026 March 2019 Decommissioning Funding Status Report ML19092A2942019-03-26026 March 2019 Decommissioning Funding Status Report ML18361A5752018-12-19019 December 2018 Independent Spent Fuel Storage Installation (Sfsi) - 10 CFR 72.30 Decommissioning Funding Plan ML18092A0802018-03-21021 March 2018 Decommissioning Funding Status Report ML17271A0532017-09-29029 September 2017 2017 Summary of Annual Decommissioning Funding Status Reports for Reactors in Decommissioning ML17094A5182017-03-30030 March 2017 Submittal of Decommissioning Funding Status Report ML17094A5202017-03-30030 March 2017 Submittal of Decommissioning Funding Status Report ML17086A0582017-03-28028 March 2017 Consultation Letter: Fws Response for Millstone (E-Mail 11-07-2016 from D. Simmons/Fws to R. Baum/Nrc/Nmss) ML16085A3462016-03-24024 March 2016 Decommissioning Funding Status Report ML15093A1022015-03-26026 March 2015 Decommissioning Funding Status Report ML14098A2602014-03-31031 March 2014 Decommissioning Funding Status Report ML13098A0872013-03-28028 March 2013 Decommissioning Funding Status Report ML12082A1782012-03-22022 March 2012 Decommissioning Funding Status Report ML1118101552011-06-14014 June 2011 Submittal of Decommissioning Funding Status Report: Response to Request for Addition Information ML1109003752011-03-29029 March 2011 Decommissioning Funding Status Report ML1009101272010-03-30030 March 2010 Decommissioning Funding Status Report ML1034205822009-06-23023 June 2009 2008 Decommissioning Cost Update for Millstone Nuclear Power Plant, Unit 1 ML0909101482009-03-30030 March 2009 Decommissioning Funding Status Report ML0809100942008-03-28028 March 2008 Decommissioning Funding Status Report ML0709300382007-03-29029 March 2007 Decommissioning Funding Status Report ML0608705292006-03-28028 March 2006 Decommissioning Funding Status Report ML0508904182005-03-29029 March 2005 Decommissioning Funding Status Report Notification of Intent to Remove Parent Guarantee ML0409800272004-03-29029 March 2004 Decommissioning Funding Status Report and Update to Parent Company Guaranty B18852, Decommissioning Funding Status Report and Update to Millstone Unit 1 Parent Guarantee2003-03-31031 March 2003 Decommissioning Funding Status Report and Update to Millstone Unit 1 Parent Guarantee ML0209803782002-04-0101 April 2002 Part 1 of 2, Millstone Nuclear Power Station, Unit Nos. 1, 2 & 3, 2001 Decommissioning Funding Status Report & Update to Parent Guarantee B18614, Part 2 of 2, Millstone Nuclear Power Station, Unit Nos. 1, 2 & 3, 2001 Decommissioning Funding Status Report & Update to Parent Guarantee, Results in Uncertain Times2002-04-0101 April 2002 Part 2 of 2, Millstone Nuclear Power Station, Unit Nos. 1, 2 & 3, 2001 Decommissioning Funding Status Report & Update to Parent Guarantee, Results in Uncertain Times 2024-09-16
[Table view] Category:70
MONTHYEARML24365A2032024-12-30030 December 2024 ISFSI - 10 CFR 72.30 Decommissioning Funding Plan ML24260A2192024-09-16016 September 2024 Decommissioning Trust Fund Disbursement - Revision to Previous Thirty-Day Written Notification ML24088A2352024-03-26026 March 2024 Decommissioning Funding Status Report ML23089A3852023-03-30030 March 2023 Decommissioning Funding Status Report ML23089A3722023-03-30030 March 2023 Decommissioning Funding Status Report ML22280A1702022-11-0202 November 2022 Connecticuts Decommissioning Funding Status Report for Millstone Power Station Docket No 50-245 ML22089A1862022-03-30030 March 2022 Decommissioning Fund Status Report ML21355A2852021-12-14014 December 2021 ISFSI, 10 CFR 72.30 Decommissioning Funding Plan ML21085A5662021-03-25025 March 2021 Decommissioning Funding Status Report ML21085A5772021-03-25025 March 2021 Decommissioning Funding Status Report ML20087M7152020-03-26026 March 2020 Decommissioning Funding Status Report ML19092A2932019-03-26026 March 2019 Decommissioning Funding Status Report ML19092A2942019-03-26026 March 2019 Decommissioning Funding Status Report ML18361A5752018-12-19019 December 2018 Independent Spent Fuel Storage Installation (Sfsi) - 10 CFR 72.30 Decommissioning Funding Plan ML18092A0802018-03-21021 March 2018 Decommissioning Funding Status Report ML17271A0532017-09-29029 September 2017 2017 Summary of Annual Decommissioning Funding Status Reports for Reactors in Decommissioning ML17094A5182017-03-30030 March 2017 Submittal of Decommissioning Funding Status Report ML17094A5202017-03-30030 March 2017 Submittal of Decommissioning Funding Status Report ML17086A0582017-03-28028 March 2017 Consultation Letter: Fws Response for Millstone (E-Mail 11-07-2016 from D. Simmons/Fws to R. Baum/Nrc/Nmss) ML16085A3462016-03-24024 March 2016 Decommissioning Funding Status Report ML15093A1022015-03-26026 March 2015 Decommissioning Funding Status Report ML14098A2602014-03-31031 March 2014 Decommissioning Funding Status Report ML13098A0872013-03-28028 March 2013 Decommissioning Funding Status Report ML12082A1782012-03-22022 March 2012 Decommissioning Funding Status Report ML1118101552011-06-14014 June 2011 Submittal of Decommissioning Funding Status Report: Response to Request for Addition Information ML1116002102011-06-13013 June 2011 Exhibit D (Part 1): Excerpt from the Millstone License Transfer Application Part 2, August 31, 2000 ML1109003752011-03-29029 March 2011 Decommissioning Funding Status Report ML1009101272010-03-30030 March 2010 Decommissioning Funding Status Report ML1034205822009-06-23023 June 2009 2008 Decommissioning Cost Update for Millstone Nuclear Power Plant, Unit 1 ML0909101482009-03-30030 March 2009 Decommissioning Funding Status Report ML0809100942008-03-28028 March 2008 Decommissioning Funding Status Report ML0720003862007-07-13013 July 2007 License Amendment Request, Stretch Power Uprate ML0709300382007-03-29029 March 2007 Decommissioning Funding Status Report ML0633804082006-12-0404 December 2006 Supplement to Post Maintenance/Modification Surveillance Requirements License Amendment Request ML0608705292006-03-28028 March 2006 Decommissioning Funding Status Report ML0508904182005-03-29029 March 2005 Decommissioning Funding Status Report Notification of Intent to Remove Parent Guarantee ML0409800272004-03-29029 March 2004 Decommissioning Funding Status Report and Update to Parent Company Guaranty B18852, Decommissioning Funding Status Report and Update to Millstone Unit 1 Parent Guarantee2003-03-31031 March 2003 Decommissioning Funding Status Report and Update to Millstone Unit 1 Parent Guarantee ML0209803782002-04-0101 April 2002 Part 1 of 2, Millstone Nuclear Power Station, Unit Nos. 1, 2 & 3, 2001 Decommissioning Funding Status Report & Update to Parent Guarantee B18614, Part 2 of 2, Millstone Nuclear Power Station, Unit Nos. 1, 2 & 3, 2001 Decommissioning Funding Status Report & Update to Parent Guarantee, Results in Uncertain Times2002-04-0101 April 2002 Part 2 of 2, Millstone Nuclear Power Station, Unit Nos. 1, 2 & 3, 2001 Decommissioning Funding Status Report & Update to Parent Guarantee, Results in Uncertain Times 2024-09-16
[Table view] Category:Letter
MONTHYEARIR 05000336/20240042025-02-12012 February 2025 Integrated Inspection Report 05000336/2024004 and 05000423/2024004 ML25022A2962025-01-23023 January 2025 Technical Specification Bases Pages ML25023A0392025-01-23023 January 2025 Senior Reactor and Reactor Operator Initial License Examinations L-25-001, Endorsement of Framatomes Requested Review Schedule for Topical Report ANP-10358P, Revision O Increased Burnup for PWRs2025-01-23023 January 2025 Endorsement of Framatomes Requested Review Schedule for Topical Report ANP-10358P, Revision O Increased Burnup for PWRs ML25014A2862025-01-21021 January 2025 Alternative Request to Defer ASME Code Section XI Inservice Inspection Examinations for Pressurizer and Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles IR 05000336/20244032025-01-13013 January 2025 Cyber Security Inspection Report 05000336/2024403 and 05000423/2024403 (Cover Letter Only) ML24365A2032024-12-30030 December 2024 ISFSI - 10 CFR 72.30 Decommissioning Funding Plan ML24351A2422024-12-19019 December 2024 Reactor Coolant System Alloy 600 Inspection Program for License Renewal Commitment No. 15 ML24351A2412024-12-19019 December 2024 Reactor Vessel Internals Inspections Aging Management Program Submittal Related to License Renewal Commitment No. 13 ML24346A2532024-12-12012 December 2024 Correction to Implementation Date for License Amendment No. 291 Regarding Framatome Gaia Fuel IR 05000336/20243012024-12-0606 December 2024 Initial Operator Licensing Examination Report 05000336/2024301 ML24324A0442024-12-0303 December 2024 Issuance of Amendment No. 292 Regarding Adoption of Technical Specification Task Force Traveler TSTF-421 05000336/LER-2024-002, Two Main Steam Safety Valves Failed to Lift within the Acceptance Criteria Resulting in a Condition Prohibited by Technical Specifications2024-11-26026 November 2024 Two Main Steam Safety Valves Failed to Lift within the Acceptance Criteria Resulting in a Condition Prohibited by Technical Specifications 05000423/LER-2024-002, Door Latch Failure Resulted in Loss of Safety Function for Secondary Containment Boundary2024-11-26026 November 2024 Door Latch Failure Resulted in Loss of Safety Function for Secondary Containment Boundary ML24296B2352024-11-19019 November 2024 Issuance of Amendment No. 291 License Amendment to Support the Implementation of Framatome Gaia Fuel (EPID L-2023-LLA-0150) (Non-Proprietary) ML24317A2562024-11-12012 November 2024 Core Operating Limits Report, Gycle 30 IR 05000245/20240012024-11-12012 November 2024 Safstor Inspection Report 05000245/2024001 IR 05000336/20240032024-11-0707 November 2024 Integrated Inspection Report 05000336/2024003 and 05000423/2024003 and Apparent Violation and Independent Spent Fuel Storage Installation Inspection Report 07200008/2024001 ML24289A0152024-10-21021 October 2024 Review of the Fall 2023 Steam Generator Tube Inspection Report 05000423/LER-2024-001, Loss of Safety Function and Condition Prohibited by Technical Specifications for Loss of Secondary Containment Boundary2024-10-14014 October 2024 Loss of Safety Function and Condition Prohibited by Technical Specifications for Loss of Secondary Containment Boundary IR 05000336/20244022024-10-0808 October 2024 Security Baseline Inspection Report 05000336/2024402 and 05000423/2024402 (Cover Letter Only) ML24281A1102024-10-0707 October 2024 Requalification Program Inspection 05000423/LER-2023-006-02, Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications2024-09-26026 September 2024 Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24260A2192024-09-16016 September 2024 Decommissioning Trust Fund Disbursement - Revision to Previous Thirty-Day Written Notification ML24260A1952024-09-16016 September 2024 Response to Request for Additional Information Regarding Proposed Amendment to Support Implementation of Framatome Gaia Fuel ML24248A2272024-09-0404 September 2024 Operator Licensing Examination Approval ML24240A1532024-09-0303 September 2024 Summary of Regulatory Audit Supporting the Review of License Amendment Request for Implementation of Framatome Gaia Fuel IR 05000336/20240052024-08-29029 August 2024 Updated Inspection Plan for Millstone Power Station, Units 2 and 3 (Reports 05000336/2024005 and 05000423/2024005 IR 05000336/20240022024-08-13013 August 2024 Integrated Inspection Report 05000336/2024002 and 05000423/2024002 ML24221A2872024-08-0808 August 2024 Independent Spent Fuel Storage Installation (ISFSI) - Submittal of Cask Registration for Spent Fuel Storage IR 05000336/20244412024-08-0606 August 2024 Supplemental Inspection Report 05000336/2024441 and 05000423/2024441 and Follow-Up Assessment Letter (Cover Letter Only) ML24212A0742024-08-0505 August 2024 Request for Withholding Information from Public Disclosure - Millstone Power Station, Unit No. 3, Proposed Alternative Request IR-4-13 to Support Steam Generator Channel Head Drain Modification ML24211A1712024-07-25025 July 2024 Associated Independent Spent Fuels Storage Installation, Revision to Emergency Plan - Report of Change ML24200A1062024-07-22022 July 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000336/2024403 and 05000423/2024403 IR 05000336/20245012024-07-0101 July 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000336/2024501 and 05000423/2024501 ML24180A0932024-06-28028 June 2024 Readiness for Additional Inspection: EA-23-144 IR 05000336/20240102024-06-26026 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000336/2024010 and 05000423/2024010 ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 IR 05000336/20244402024-06-24024 June 2024 Final Significance Determination for Security-Related Greater than Green Finding(S) with Assessment Follow-up; IR 05000336/2024440 and 05000423/2024440 and Notice of Violation(S), NRC Investigation Rpt 1-2024-001 (Cvr Ltr Only) ML24281A2072024-06-20020 June 2024 Update to the Final Safety Analysis Report, Revision 37 (Redacted Version) ML24176A2622024-06-20020 June 2024 Update to the Final Safety Analysis Report, Revision 37 ML24176A1782024-06-20020 June 2024 Update to the Final Safety Analysis Report ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24280A0012024-06-20020 June 2024 Update to the Final Safety Analysis Report (Redacted Version) ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code 05000336/LER-2024-001, Control Room Air Conditioning Unit Inoperable Due to Refrigerant Overcharge Resulting in a Condition Prohibited by Technical Specifications2024-06-10010 June 2024 Control Room Air Conditioning Unit Inoperable Due to Refrigerant Overcharge Resulting in a Condition Prohibited by Technical Specifications ML24170A7832024-06-0606 June 2024 ISFSI, Virgil C. Summer, Unit 1, and ISFSI, North Anna, Units 1 & 2, and ISFSI, Surry, Units 1 & 2, and ISFSI - Submittal of Revision 36 of the Quality Assurance Topical Report ML24165A1292024-06-0505 June 2024 ISFSI, 10 CFR 50.59 Annual Change Report for 2023 Annual Regulatory Commitment Change Report for 2023 ML24128A2772024-06-0404 June 2024 Issuance of Amendment No. 290 to Revise TSs for Reactor Core Safety Limits, Fuel Assemblies, and Core Operating Limits Report for Use of Framatome Gaia Fuel (EPID L-2023-LLA-0074) (Non-Proprietary) 2025-02-12
[Table view] |
Text
Dominion Energy Nuclear Connecticut. Inc.
5000 Dominion Boulevard, Glen Allen, VA 23060 DominionEnergy.com ATTN: Document Control Desk December 30, 2024 Director, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Washington, D. C. 20555-0001 DOMINION ENERGY NUCLEAR CONNECTICUT, INC.
MILLSTONE POWER STATION ISFSI 10 CFR 72.30 DECOMMISSIONING FUNDING PLAN Dominion Energy' Serial No.:
24-352 NRA/ENC: RO Docket No.: 72-47 Pursuant to 10 CFR 72.30(b) and (c), Dominion Energy Nuclear Connecticut, Inc. (DENC) submits the attached decommissioning funding plan for the Millstone Power Station Independent Spent Fuel Storage Installation (ISFSI).
Please contact Daniel P. Johnson at (804) 273-2381 if you have any questions or require additional information.
Sincer
()
NML
= t<JJ
7 James E. Holloway Vice President - Nuclear Engineering & Fleet Support Dominion Energy Nuclear Connecticut, Inc.
Attachment:
Decommissioning Funding Plan for Millstone Power Station ISFSI Commitments made in this letter: None cc:
Ms. Yen-Ju Chen NRC Senior Project Manager - ISFSls U. S. Nuclear Regulatory Commission Mail Stop 4834 11545 Rockville Pike Two White Flint North Rockville, Maryland 20852-2738
ATTACHMENT Decommissioning Funding Plan for Millstone Power Station ISFSI Millstone Power Station Independent Spent Fuel Storage Installation Dominion Energy Nuclear Connecticut, Inc. (DENC)
Serial No.: 24-352 Docket No.: 72-47
Serial No.: 24-352 Docket No.: 72-47 Attachment Page 1 of 6 Decommissioning Funding Plan for Millstone Power Station ISFSI General License under 10 CFR 72.210, Docket No. 72-47 Pursuant to 10 CFR 72.30(b), Dominion Energy Nuclear Connecticut, Inc. (DENG) submitted a decommissioning funding plan for the Millstone Power Station (MPS)
Independent Spent Fuel Storage Installation (ISFSI) on December 19, 2018 (ADAMS Accession No. ML18361A575). 10 CFR 72.30(c) requires each holder of a license under Part 72 to submit a decommissioning funding plan at the time of license renewal and at intervals not to exceed three (3) years with adjustments as necessary to account for changes in costs and the extent of contamination. In accordance with 10 CFR 72.30(c),
the information below provides DENC's periodic update to the MPS ISFSI decommissioning funding plan.
Pursuant to 10 CFR 72.30(b), a decommissioning funding plan must contain:
(1)
Information on how reasonable assurance will be provided that funds will be available to decommission the ISFSI or MRS [Monitored Retrievable Storage Installation].
MPS Unit 1 (MPS1) is currently maintaining its spent fuel in wet storage and is not relying on an ISFSI. DENG and the MPS Unit 3 (MPS3) co-owners1 provide financial assurance for decommissioning MPS Unit 2 (MPS2) and MPS3 through the prepayment method. The nuclear decommissioning trusts for MPS2 and MPS3 are allocated to radiological decommissioning.
Table 1 below shows crediting 2% real earnings on the prepaid funds through 3.5 years after license expiration as permitted by 10 CFR 50.75(e)(1)(i). The amounts accumulated in the nuclear decommissioning trusts for MPS2 and MPS3 as of December 31, 2023 exceed that required to meet the Nuclear Regulatory Commission (NRC) minimum and the ISFSI radiological decommissioning cost estimate (DCE) combined. The amounts reported in Table 1 reflect the total amount of funds in the MPS Trusts including those of the MPS3 co-owners. The NRC Minimum and ISFSI DCE amounts are also reported at the 100% level.
1 MPS3 is jointly owned by Dominion Energy Nuclear Connecticut, Inc. (93.4707%), Green Mountain Power Corporation (1.7303%), and Massachusetts Municipal Wholesale Electric Company (4.7990%).
Table 1. Total Funds and Allocated Radiological Funds as of December 31, 2023 (in millions of dollars)
MPS2 and MPS3 Table 2024 Update Total Funds in Total Funds in Funds in Excess of Funds in Excess of Unit External Trusts External Trusts NRC Minimum NRC Minimum NRC Minimum End of License Year (12/31/2023 $)
(Future $)11, (Future $)12l (Future $)11 ll2l (12/31/2023 $)(3)
Millstone Unit 2
$1,089.00
$1,468.09
$571.19
$896.89
$665.31 2035 million million million million million Millstone Unit 3
$1,089.66
$1,802.61
$607.28
$1,195.32
$722.60 2045 million million million million million Serial No.: 24-352 Docket No.: 72-47 Attachment Page 2 of 6 ISFSI DCE (12/31/2023 $)(4)
$2.12 million (1]
Total Funds in External Trusts (Future $) = 2% Real Rate of Return applied to growth of funds in the External Trust to 3.5 years after Start of Decommissioning for each unit.
[2]
NRC Minimum (Future$)= NRC Minimum amount reflects December 31, 2023 NRC Minimum Amount due to the application of a 2% Real Rate of Return to growth of funds in the External Trusts and keeping the NRC Minimum amount constant. The MPS NRC Minimum amounts are presented representing 100% responsibility of decommissioning costs.
[3]
Funds in excess of NRC Minimum (12/31/2023 $) are calculated by applying a 2% discount rate to the Funds in Excess of NRC Minimum (Future$).
[4]
ISFSI DCE amount as reported in Table 2 of this filing.
Serial No.: 24-352 Docket No.: 72-47 Attachment Page 3 of 6 (2)
A detailed cost estimate for decommissioning, in an amount reflecting:
(i)
The cost of an independent contractor to perform all decommissioning activities; (ii) An adequate contingency factor; and (iii) The cost of meeting the §20.1402 of this chapter criteria for unrestricted use, provided that, if the applicant or licensee can demonstrate its ability to meet the provisions of §20.1403 of this chapter, the cost estimate may be based on meeting §20.1403 criteria.
General Methodology Used to Develop ISFSI Decommissioning Cost Estimates A site-specific ISFSI DCE based on 10 CFR 72.30 requirements was prepared for the MPS ISFSI in 2020. The ISFSI DCE was based on the assumption that a third-party contractor would perform decommissioning. To determine the cost of using a third-party contractor, fully burdened labor rates (labor costs plus employee benefits and taxes) were used as a basis and a premium was added to represent a third-party contractor's profit margin.
The site-specific ISFSI DCE includes undistributed costs (for support activities and costs such as staff, security, insurance, energy, materials, and services) allocated to the ISFSI decommissioning period. The site-specific ISFSI DCE includes 25%
contingency in accordance with NUREG-1757, "Consolidated Decommissioning Guidance," Volume 3, Revision 1. Table 2 below shows the contingency as one line item.
The site-specific ISFSI DCE is based on remediating the site to a residual radioactivity level consistent with 10 CFR 20.1402 (i.e., unrestricted use). As shown in Table 2, the estimated cost to decommission the ISFSI at MPS is $2.12 million in 2023 dollars (100% decommissioning responsibility).
Serial No.: 24-352 Docket No.: 72-4 7 Attachment Page 4 of 6 Table 2. MPS Site-Specific Cost Estimates Applicable to ISFSI Decommissioning Costs - 10 CFR 72.30 (in thousands of dollars)
Millstone Power Station Site Specific Cost Estimates Applicable to ISFSI Decommissioning Costs - 10 CFR 72.30 (in thousands of dollars, differences due to rounding) 25%
Total ISFSI Decommissioning Activity Description Labor Equipment Disposal Other Contingency 2023 $
Distributed (Direct) Cost Preparation and NRC Review of License Termination Plan 131 $
182 313 Verification Survey of Horizontal Storage Modules 239 63 301 Preparation of Final Report on Decommissioning and NRC Review 131 $
182 $
313 Total Distributed (Direct) Cost 500 63 364 926 Total Undistributed (Allocated) Cost 773 773 Total Millstone ISFSI Decommissioning Cost 1,273 63 364 1,699 25% Contingency Applied to Total Millstone ISFSI Decommissioning Cost Estimate 425 425 Total Millstone ISFSI Decommissioning Cost Estimate with Contingency 2,124
Information required by 10 CFR 72.30(c)
Serial No.: 24-352 Docket No.: 72-47 Attachment Page 5 of 6 10 CFR 72.30(c) requires an updated decommissioning funding plan to specifically consider the effect of the following events on decommissioning costs:
(1)
Spil/s of radioactive material producing additional residual radioactivity in onsite subsurface material.
There have been no reported spills at the ISFSI.
(2)
Facilities modifications.
There have been no facility modifications affecting the ISFSI DCE.
(3)
Changes in authorized possession limits.
As stated below, the ISFSI DCE is based on an ISFSI sized, when used in conjunction with the spent fuel pool, to accommodate the spent fuel generated over the life of the station. There have been no changes in authorized possession limits affecting the DCE.
(4)
Actual remediation costs that exceed the previous cost estimate.
No actual remediation costs have been incurred.
(3)
Identification of and justification for using key assumptions contained in the DCE.
The DCEs for the MPS ISFSI assumes:
(i)
An ISFSI that is sized, when used in conjunction with the spent fuel pool, to accommodate the spent fuel generated over the life of MPS2 and MPS3.
(ii)
Decommissioning will be performed by an independent contractor.
(iii) Storage canisters will be used to ship the contained spent fuel to the Department of Energy.
(iv) A dry transfer facility will not be necessary.
(v)
The ISFSI pad and support modules are assumed to be free of contamination and left in place.
Serial No.: 24-352 Docket No.: 72-47 Attachment Page 6 of 6 (4)
A description of the method of assuring funds for decommissioning from paragraph {e) of this section, including means for adjusting cost estimates and associated funding levels periodically over the life of the facility.
DENG (for MPS2 and MPS3) and the MPS3 co-owners use the prepayment method of assuring funds for decommissioning MPS2 and MPS3. As shown above, the prepaid funds in the MPS2 and MPS3 decommissioning trusts exceed, with credited earnings, the amount required by the NRC for radiological decommissioning and the ISFSI DCE combined. The MPS decommissioning cost study and the ISFSI DCE are updated approximately every five (5) years. When a site-specific ISFSI Decommissioning Cost Estimate (DCE) is not performed in a reporting year, the ISFSI decommissioning funding plan will adjust the most recent site-specific ISFSI DCE using a CPI indice based annual escalation rate and will consider the need for any further adjustment based on the factors in 10 CFR 72.30(c)(1) - (4).
The CPI indice annual escalation rate mnemonic is as follows:
CPI - U: Urban Consumer - All Items, (Index 1982-84;;:100, SA), U. S. Bureau of Labor Statistics (BLS); Moody's Analytics (ECCA) Forecast, Quarterly, United States.
(5)
The volume of onsite subsurface material containing residual radioactivity that will require remediation to meet the criteria for license termination.
Onsite subsurface material is assumed to have no residual radioactivity that will require remediation to meet the criteria for license termination. The spent fuel storage casks are sealed and contain no liquid.
(6)
A certification that financial assurance for decommissioning has been provided in the amount of the cost estimate for decommissioning.
DENG certifies that financial assurance for the estimated cost of decommissioning the MPS ISFSI has been provided as discussed above.