ML17086A058
ML17086A058 | |
Person / Time | |
---|---|
Site: | Millstone |
Issue date: | 03/28/2017 |
From: | Simmons D US Dept of Interior, Fish & Wildlife Service |
To: | Baum R Division of Spent Fuel Management |
Longmire P | |
References | |
Download: ML17086A058 (1) | |
Similar Documents at Millstone | |
---|---|
Category:Decommissioning Funding Plan DKTs 30
MONTHYEARML24260A2192024-09-16016 September 2024
[Table view]Decommissioning Trust Fund Disbursement - Revision to Previous Thirty-Day Written Notification ML24088A2352024-03-26026 March 2024 Decommissioning Funding Status Report ML23089A3722023-03-30030 March 2023 Decommissioning Funding Status Report ML23089A3852023-03-30030 March 2023 Decommissioning Funding Status Report ML22280A1702022-11-0202 November 2022 Connecticuts Decommissioning Funding Status Report for Millstone Power Station Docket No 50-245 ML22089A1862022-03-30030 March 2022 Decommissioning Fund Status Report ML21355A2852021-12-14014 December 2021 ISFSI, 10 CFR 72.30 Decommissioning Funding Plan ML21085A5662021-03-25025 March 2021 Decommissioning Funding Status Report ML21085A5772021-03-25025 March 2021 Decommissioning Funding Status Report ML20087M7152020-03-26026 March 2020 Decommissioning Funding Status Report ML19092A2932019-03-26026 March 2019 Decommissioning Funding Status Report ML19092A2942019-03-26026 March 2019 Decommissioning Funding Status Report ML18092A0802018-03-21021 March 2018 Decommissioning Funding Status Report ML17271A0532017-09-29029 September 2017 2017 Summary of Annual Decommissioning Funding Status Reports for Reactors in Decommissioning ML17094A5182017-03-30030 March 2017 Submittal of Decommissioning Funding Status Report ML17094A5202017-03-30030 March 2017 Submittal of Decommissioning Funding Status Report ML17086A0582017-03-28028 March 2017 Consultation Letter: Fws Response for Millstone (E-Mail 11-07-2016 from D. Simmons/Fws to R. Baum/Nrc/Nmss) ML16085A3462016-03-24024 March 2016 Decommissioning Funding Status Report ML15093A1022015-03-26026 March 2015 Decommissioning Funding Status Report ML14098A2602014-03-31031 March 2014 Decommissioning Funding Status Report ML13098A0872013-03-28028 March 2013 Decommissioning Funding Status Report ML12082A1782012-03-22022 March 2012 Decommissioning Funding Status Report ML1118101552011-06-14014 June 2011 Submittal of Decommissioning Funding Status Report: Response to Request for Addition Information ML1109003752011-03-29029 March 2011 Decommissioning Funding Status Report ML1009101272010-03-30030 March 2010 Decommissioning Funding Status Report ML1034205822009-06-23023 June 2009 2008 Decommissioning Cost Update for Millstone Nuclear Power Plant, Unit 1 ML0909101482009-03-30030 March 2009 Decommissioning Funding Status Report ML0809100942008-03-28028 March 2008 Decommissioning Funding Status Report ML0709300382007-03-29029 March 2007 Decommissioning Funding Status Report ML0608705292006-03-28028 March 2006 Decommissioning Funding Status Report ML0508904182005-03-29029 March 2005 Decommissioning Funding Status Report Notification of Intent to Remove Parent Guarantee ML0409800272004-03-29029 March 2004 Decommissioning Funding Status Report and Update to Parent Company Guaranty ML0309906022003-03-31031 March 2003 Decommissioning Funding Status Report and Update to Millstone Unit 1 Parent Guarantee ML0209803782002-04-0101 April 2002 Part 1 of 2, Millstone Nuclear Power Station, Unit Nos. 1, 2 & 3, 2001 Decommissioning Funding Status Report & Update to Parent Guarantee ML0209804052002-04-0101 April 2002 Part 2 of 2, Millstone Nuclear Power Station, Unit Nos. 1, 2 & 3, 2001 Decommissioning Funding Status Report & Update to Parent Guarantee, Results in Uncertain Times 2024-09-16 Category:40 MONTHYEARML24260A2192024-09-16016 September 2024
[Table view]Decommissioning Trust Fund Disbursement - Revision to Previous Thirty-Day Written Notification ML24088A2352024-03-26026 March 2024 Decommissioning Funding Status Report ML23089A3722023-03-30030 March 2023 Decommissioning Funding Status Report ML23089A3852023-03-30030 March 2023 Decommissioning Funding Status Report ML22280A1702022-11-0202 November 2022 Connecticuts Decommissioning Funding Status Report for Millstone Power Station Docket No 50-245 ML22089A1862022-03-30030 March 2022 Decommissioning Fund Status Report ML21355A2852021-12-14014 December 2021 ISFSI, 10 CFR 72.30 Decommissioning Funding Plan ML21085A5662021-03-25025 March 2021 Decommissioning Funding Status Report ML21085A5772021-03-25025 March 2021 Decommissioning Funding Status Report ML20087M7152020-03-26026 March 2020 Decommissioning Funding Status Report ML19092A2932019-03-26026 March 2019 Decommissioning Funding Status Report ML19092A2942019-03-26026 March 2019 Decommissioning Funding Status Report ML18092A0802018-03-21021 March 2018 Decommissioning Funding Status Report ML17271A0532017-09-29029 September 2017 2017 Summary of Annual Decommissioning Funding Status Reports for Reactors in Decommissioning ML17094A5182017-03-30030 March 2017 Submittal of Decommissioning Funding Status Report ML17094A5202017-03-30030 March 2017 Submittal of Decommissioning Funding Status Report ML17086A0582017-03-28028 March 2017 Consultation Letter: Fws Response for Millstone (E-Mail 11-07-2016 from D. Simmons/Fws to R. Baum/Nrc/Nmss) ML16085A3462016-03-24024 March 2016 Decommissioning Funding Status Report ML15093A1022015-03-26026 March 2015 Decommissioning Funding Status Report ML14098A2602014-03-31031 March 2014 Decommissioning Funding Status Report ML13098A0872013-03-28028 March 2013 Decommissioning Funding Status Report ML12082A1782012-03-22022 March 2012 Decommissioning Funding Status Report ML1118101552011-06-14014 June 2011 Submittal of Decommissioning Funding Status Report: Response to Request for Addition Information ML1116002102011-06-13013 June 2011 Exhibit D (Part 1): Excerpt from the Millstone License Transfer Application Part 2, August 31, 2000 ML1109003752011-03-29029 March 2011 Decommissioning Funding Status Report ML1009101272010-03-30030 March 2010 Decommissioning Funding Status Report ML1034205822009-06-23023 June 2009 2008 Decommissioning Cost Update for Millstone Nuclear Power Plant, Unit 1 ML0909101482009-03-30030 March 2009 Decommissioning Funding Status Report ML0809100942008-03-28028 March 2008 Decommissioning Funding Status Report ML0720003862007-07-13013 July 2007 License Amendment Request, Stretch Power Uprate ML0709300382007-03-29029 March 2007 Decommissioning Funding Status Report ML0633804082006-12-0404 December 2006 Supplement to Post Maintenance/Modification Surveillance Requirements License Amendment Request ML0608705292006-03-28028 March 2006 Decommissioning Funding Status Report ML0508904182005-03-29029 March 2005 Decommissioning Funding Status Report Notification of Intent to Remove Parent Guarantee ML0409800272004-03-29029 March 2004 Decommissioning Funding Status Report and Update to Parent Company Guaranty ML0309906022003-03-31031 March 2003 Decommissioning Funding Status Report and Update to Millstone Unit 1 Parent Guarantee ML0209803782002-04-0101 April 2002 Part 1 of 2, Millstone Nuclear Power Station, Unit Nos. 1, 2 & 3, 2001 Decommissioning Funding Status Report & Update to Parent Guarantee ML0209804052002-04-0101 April 2002 Part 2 of 2, Millstone Nuclear Power Station, Unit Nos. 1, 2 & 3, 2001 Decommissioning Funding Status Report & Update to Parent Guarantee, Results in Uncertain Times 2024-09-16 Category:50 MONTHYEARML24260A2192024-09-16016 September 2024
[Table view]Decommissioning Trust Fund Disbursement - Revision to Previous Thirty-Day Written Notification ML24088A2352024-03-26026 March 2024 Decommissioning Funding Status Report ML23089A3722023-03-30030 March 2023 Decommissioning Funding Status Report ML23089A3852023-03-30030 March 2023 Decommissioning Funding Status Report ML22280A1702022-11-0202 November 2022 Connecticuts Decommissioning Funding Status Report for Millstone Power Station Docket No 50-245 ML22089A1862022-03-30030 March 2022 Decommissioning Fund Status Report ML21355A2852021-12-14014 December 2021 ISFSI, 10 CFR 72.30 Decommissioning Funding Plan ML21085A5662021-03-25025 March 2021 Decommissioning Funding Status Report ML21085A5772021-03-25025 March 2021 Decommissioning Funding Status Report ML20087M7152020-03-26026 March 2020 Decommissioning Funding Status Report ML19092A2932019-03-26026 March 2019 Decommissioning Funding Status Report ML19092A2942019-03-26026 March 2019 Decommissioning Funding Status Report ML18092A0802018-03-21021 March 2018 Decommissioning Funding Status Report ML17271A0532017-09-29029 September 2017 2017 Summary of Annual Decommissioning Funding Status Reports for Reactors in Decommissioning ML17094A5182017-03-30030 March 2017 Submittal of Decommissioning Funding Status Report ML17094A5202017-03-30030 March 2017 Submittal of Decommissioning Funding Status Report ML17086A0582017-03-28028 March 2017 Consultation Letter: Fws Response for Millstone (E-Mail 11-07-2016 from D. Simmons/Fws to R. Baum/Nrc/Nmss) ML16085A3462016-03-24024 March 2016 Decommissioning Funding Status Report ML15093A1022015-03-26026 March 2015 Decommissioning Funding Status Report ML14098A2602014-03-31031 March 2014 Decommissioning Funding Status Report ML13098A0872013-03-28028 March 2013 Decommissioning Funding Status Report ML12082A1782012-03-22022 March 2012 Decommissioning Funding Status Report ML1118101552011-06-14014 June 2011 Submittal of Decommissioning Funding Status Report: Response to Request for Addition Information ML1109003752011-03-29029 March 2011 Decommissioning Funding Status Report ML1009101272010-03-30030 March 2010 Decommissioning Funding Status Report ML1034205822009-06-23023 June 2009 2008 Decommissioning Cost Update for Millstone Nuclear Power Plant, Unit 1 ML0909101482009-03-30030 March 2009 Decommissioning Funding Status Report ML0809100942008-03-28028 March 2008 Decommissioning Funding Status Report ML0709300382007-03-29029 March 2007 Decommissioning Funding Status Report ML0608705292006-03-28028 March 2006 Decommissioning Funding Status Report ML0508904182005-03-29029 March 2005 Decommissioning Funding Status Report Notification of Intent to Remove Parent Guarantee ML0409800272004-03-29029 March 2004 Decommissioning Funding Status Report and Update to Parent Company Guaranty ML0309906022003-03-31031 March 2003 Decommissioning Funding Status Report and Update to Millstone Unit 1 Parent Guarantee ML0209803782002-04-0101 April 2002 Part 1 of 2, Millstone Nuclear Power Station, Unit Nos. 1, 2 & 3, 2001 Decommissioning Funding Status Report & Update to Parent Guarantee ML0209804052002-04-0101 April 2002 Part 2 of 2, Millstone Nuclear Power Station, Unit Nos. 1, 2 & 3, 2001 Decommissioning Funding Status Report & Update to Parent Guarantee, Results in Uncertain Times 2024-09-16 Category:70 MONTHYEARML24260A2192024-09-16016 September 2024
[Table view]Decommissioning Trust Fund Disbursement - Revision to Previous Thirty-Day Written Notification ML24088A2352024-03-26026 March 2024 Decommissioning Funding Status Report ML23089A3722023-03-30030 March 2023 Decommissioning Funding Status Report ML23089A3852023-03-30030 March 2023 Decommissioning Funding Status Report ML22280A1702022-11-0202 November 2022 Connecticuts Decommissioning Funding Status Report for Millstone Power Station Docket No 50-245 ML22089A1862022-03-30030 March 2022 Decommissioning Fund Status Report ML21355A2852021-12-14014 December 2021 ISFSI, 10 CFR 72.30 Decommissioning Funding Plan ML21085A5662021-03-25025 March 2021 Decommissioning Funding Status Report ML21085A5772021-03-25025 March 2021 Decommissioning Funding Status Report ML20087M7152020-03-26026 March 2020 Decommissioning Funding Status Report ML19092A2932019-03-26026 March 2019 Decommissioning Funding Status Report ML19092A2942019-03-26026 March 2019 Decommissioning Funding Status Report ML18092A0802018-03-21021 March 2018 Decommissioning Funding Status Report ML17271A0532017-09-29029 September 2017 2017 Summary of Annual Decommissioning Funding Status Reports for Reactors in Decommissioning ML17094A5182017-03-30030 March 2017 Submittal of Decommissioning Funding Status Report ML17094A5202017-03-30030 March 2017 Submittal of Decommissioning Funding Status Report ML17086A0582017-03-28028 March 2017 Consultation Letter: Fws Response for Millstone (E-Mail 11-07-2016 from D. Simmons/Fws to R. Baum/Nrc/Nmss) ML16085A3462016-03-24024 March 2016 Decommissioning Funding Status Report ML15093A1022015-03-26026 March 2015 Decommissioning Funding Status Report ML14098A2602014-03-31031 March 2014 Decommissioning Funding Status Report ML13098A0872013-03-28028 March 2013 Decommissioning Funding Status Report ML12082A1782012-03-22022 March 2012 Decommissioning Funding Status Report ML1118101552011-06-14014 June 2011 Submittal of Decommissioning Funding Status Report: Response to Request for Addition Information ML1116002102011-06-13013 June 2011 Exhibit D (Part 1): Excerpt from the Millstone License Transfer Application Part 2, August 31, 2000 ML1109003752011-03-29029 March 2011 Decommissioning Funding Status Report ML1009101272010-03-30030 March 2010 Decommissioning Funding Status Report ML1034205822009-06-23023 June 2009 2008 Decommissioning Cost Update for Millstone Nuclear Power Plant, Unit 1 ML0909101482009-03-30030 March 2009 Decommissioning Funding Status Report ML0809100942008-03-28028 March 2008 Decommissioning Funding Status Report ML0720003862007-07-13013 July 2007 License Amendment Request, Stretch Power Uprate ML0709300382007-03-29029 March 2007 Decommissioning Funding Status Report ML0633804082006-12-0404 December 2006 Supplement to Post Maintenance/Modification Surveillance Requirements License Amendment Request ML0608705292006-03-28028 March 2006 Decommissioning Funding Status Report ML0508904182005-03-29029 March 2005 Decommissioning Funding Status Report Notification of Intent to Remove Parent Guarantee ML0409800272004-03-29029 March 2004 Decommissioning Funding Status Report and Update to Parent Company Guaranty ML0309906022003-03-31031 March 2003 Decommissioning Funding Status Report and Update to Millstone Unit 1 Parent Guarantee ML0209803782002-04-0101 April 2002 Part 1 of 2, Millstone Nuclear Power Station, Unit Nos. 1, 2 & 3, 2001 Decommissioning Funding Status Report & Update to Parent Guarantee ML0209804052002-04-0101 April 2002 Part 2 of 2, Millstone Nuclear Power Station, Unit Nos. 1, 2 & 3, 2001 Decommissioning Funding Status Report & Update to Parent Guarantee, Results in Uncertain Times 2024-09-16 Category:E-Mail MONTHYEARML24213A2602024-07-31031 July 2024
[Table view]Request for Additional Information LAR to Support Implementation of Framatome Gaia Fuel ML24116A0112024-04-25025 April 2024 Acceptance Review Determination for Proposed Alternative Request IR-4-13 Regarding Steam Generator Channel Head Drain Modification ML24115A2622024-04-24024 April 2024 Acceptance Review Determination for Proposed Alternative Request IR-4-14 Regarding Pressurizer and Steam Generator Pressure-Retaining Welds and Full-Penetration Welded Nozzles ML24114A3192024-04-23023 April 2024 Acceptance Review Determination LAR to Extend Inspection Interval for Reactor Coolant Pump Flywheels (TSTF-421) Using the CLIIP ML24113A2502024-04-22022 April 2024 Request for Additional Information (e-mail 4/22/2024) License Renewal Commitment for Aging Management Program of Alloy 600 Components ML24092A1082024-04-0101 April 2024 3R22 RFO ISI Owners Activity Report Extension - NRC Staff Acknowledgement Email (4/1/2024) ML24065A3112024-03-0505 March 2024 Request for Additional Information (Redacted) (03/05/2025 E-mail from R. Guzman to S. Sinha) Framatome Gaia Fuel LOCA LAR ML24058A2322024-02-27027 February 2024 2/27/2024 E-mail from S. Sinha to R. Guzman P-8 Instrument Uncertainty in Support of LAR Framatome Gaia Fuel ML24032A4702024-02-0101 February 2024 Change in Estimated Review Schedule Revision to TS Design Features Section to Remove the Nine Mile Point Unit 3 Nuclear Project, LLC ML24024A2452024-01-24024 January 2024 1/24/2024 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in SE for Amendment No. 288 - Revision to Applicability Term for RCS Heatup and Cooldown Pressure-Temperature Limitations Figures ML24024A0202024-01-24024 January 2024 Correction to Safety Evaluation Associated Wit Amendment No. 288 - Revision to Applicability Term for RCS Heat-Up and Cooldown Pressure-Temperature Limitations Figures ML23326A0132023-11-22022 November 2023 Acceptance Review Determination LAR to Support Implementation of Framatome Gaia Fuel ML23318A0952023-11-14014 November 2023 Request for Additional Information (E-mail Dated 11/14/2023) LAR to Revise TSs Related to Framatome Gaia Fuel ML23317A0732023-11-13013 November 2023 Acceptance Review Determination - License Amendment Request Modification of TS SR 4.3.6.a ML23297A2312023-10-24024 October 2023 E-mail to File - Summary of September 13, 2023, Meeting with Dominion to Discuss Proposed LAR to Support Cycle Reloads Using Framatome Gaia Fuel ML23265A2302023-09-22022 September 2023 Acceptance Review Determination - License Amendment Request Revision to TS Design Features Section to Remove the Nine Mile Point Unit 3 Nuclear Project, LLC ML23258A0552023-08-31031 August 2023 Setup of Online Reference Portal and Audit Plan for the NRC Staffs Review of LAR to Use Framatome Small Break and Realistic Large Break LOCA Methodologies (08/31/2023 e-mail) ML23199A2832023-07-18018 July 2023 Request for Additional Information (E-mail Dated 7/18/2023) LAR to Revise the Pressure-Temperature Limits ML23172A0752023-06-21021 June 2023 Acceptance Review Determination LAR to Revise TSs for Reactor Core Safety Limits, Fuel Assemblies, and COLR Related to Framatome Gaia Fuel ML23171B0522023-06-20020 June 2023 NRR E-mail Capture - RAI for Review of Appendix F to DOM-NAF-2-P (Redacted) ML23145A0052023-05-25025 May 2023 Acceptance Review Determination Exemption to Use Framatome Gaia Fuel Assemblies Containing Fuel Rods Fabricated with M5 Fuel Rod Cladding ML23145A0042023-05-25025 May 2023 Acceptance Review Determination LAR to Use Framatome Small Break and Realistic Large Break LOCA Methodologies ML23115A3022023-04-24024 April 2023 4/24/2023 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in Issuance of Amendments Adoption of TSTF-359, Increase Flexibility in Mode Restraints ML23089A1882023-03-29029 March 2023 Request for Additional Information (E-mail Dated 3/29/2023) Spring 2022 Steam Generator Tube Inspection Report ML23067A2162023-03-0707 March 2023 NRR E-mail Capture - RAI for North Anna, 1 & 2, Surry 1 & 2, Millstone, 2 & 3, Request for Approval of App. F Fleet Report DOM-NAF-2-P, Qual of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion VIPRE-D Computer Code ML23038A0152023-02-0707 February 2023 Acceptance Review Determination LAR to Revise the Applicability Term for RCS Heatup and Cooldown Pressure-Temperature Limitations Figures ML23024A1522023-01-24024 January 2023 Acceptance Review Determination LAR to Supplement Burnup Credit of Criticality Safety Analysis ML23018A0352023-01-17017 January 2023 NRR E-mail Capture - Acceptance Review for Fleet Report Re Appendix F of DOM-NAF-2-P (L-2022-LLT-0003) ML22320A5752022-11-16016 November 2022 E-mail to File - Summary of October 18, 2022, Meeting with Dominion to Discuss Requested Actions for Implementing Framatome Gaia Fuel ML22298A2052022-10-25025 October 2022 Acceptance Review Determination for Alternative Request for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles ML22292A3212022-10-19019 October 2022 Acceptance Review Determination for Alternative Request for Containment RSS Pump Periodic Verification Testing Program ML22297A1802022-10-0707 October 2022 Email Acknowledgement to Dominion Energy Nuclear Decommissioning Trust Fund Disbursement 30 Day Notification for Millstone Power Station Unit 1: Docket No 50-245 ML22278A0932022-10-0505 October 2022 E-mail to File - Summary of September 7, 2022, Meeting with Dominion to Discuss Proposed Supplement to the Spent Fuel Pool Criticality Safety Analysis (EPID L-2022-LRM-0059 ML22272A0332022-09-29029 September 2022 Memo E-mail to File - Summary of August 29, 2022, Meeting with Dominion to Discuss Proposed Alternative Request Post-peening follow-up Volumetric Exam of RPV Head Penetration Nozzle ML22252A1772022-09-0909 September 2022 Memo E-mail to File - Summary of August 9, 2022, Meeting with Dominion to Discuss Proposed Alternative Reqeust Recirculation Spray Pump Flow Testing (EPID L:2022-LRM-0057) ML22242A0452022-08-23023 August 2022 NRR E-mail Capture - Dominion GL 04-02 Response Draft RAIs (L-2017-LRC-0000) ML22174A3552022-06-23023 June 2022 NRR E-mail Capture - Acceptance Review for Dominion Fleet LAR to Implement TSTF-554 (L-2022-LLA-0078) ML22123A0812022-05-0303 May 2022 Acceptance Review Determination for Proposed LAR for TS Change Applicable to TSTF-359, Increase Flexibility in Mode Restraints ML22069A7192022-03-10010 March 2022 E-mail from R. Guzman to S. Sinha - Millstone Unit 3 Steam Generator Outage Conference Call ML22020A4122022-01-11011 January 2022 1/11/2022 State Consultation E-mail, R. Guzman to J. Semancik Millstone Power Station, Unit 3 Planned Issuance of Amendment to Clarify Shutdown Bank TS and Add Alternate Control Rod Position Monitoring Requirements ML21348A7392021-12-14014 December 2021 E-mail - Acceptance Review Determination Alternative Request IR-4-09 for Use Alternative Brazed Joint Assessment Methodology for Class 3 Moderate Energy Piping ML21347A9412021-12-13013 December 2021 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in Safety Evaluation for Amendment No. 280 Measurement Uncertainy Recapture Power Uprate ML21334A1922021-11-30030 November 2021 NRR E-mail Capture - Audit Plan for Reactor Core Thermal-Hydraulics Using the VIPRE-D Appendix E Review ML21326A1502021-11-22022 November 2021 NRR E-mail Capture - Acceptance Review for Relocation of Unit Staff Requirements to the QAPD LAR (L-2021-LLA-0195) ML21306A3302021-11-0202 November 2021 NRR E-mail Capture - Acceptance Review for TSTF-569 LAR ML21297A0072021-10-19019 October 2021 E-mail from R. Guzman to S. Sinha - Acknowledgemnt of Error in SE for Millstone Power Station, Unit 3, Amendment No. 279 Addition of Analytical Methodology to the COLR for LBLOCA ML21286A7372021-10-13013 October 2021 Additional Element Included in the Implementation Plan for the Surry Fuel Melt Safety Limit (SL) LAR ML21223A3042021-08-11011 August 2021 Request for Withholding Information from Public Disclosure Proposed LAR to Add an Analytical Methodology to the COLR for a Large Break LOCA ML21200A2562021-07-19019 July 2021 7/19/2021 E-mail Pressurizer Steam Space Line Classification ML21195A2442021-07-13013 July 2021 NRR E-mail Capture - Draft RAI Appendix E to Topical Report DOM-NAF-2 Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code 2024-07-31 |
Text
From: David Simmons [1]
Sent: Monday, November 07, 2016 5:04 PM To: Baum, Richard <Richard.Baum@nrc.gov>
Subject:
[External_Sender] Milestone Power Station Decommissioning Funding Plan
Dear Mr. Baum,
We received the U.S. Nuclear Regulatory Commissions (NRC) letter stating that the subject project would have no effect on species listed or proposed to be listed under the Endangered Species Act (ESA) and requesting our concurrence with that determination. The letter is dated September 26, 2016, and arrived in our office on October 27, 2016. The ESA does not provide the U.S. Fish and Wildlife Service with a regulatory mechanism for concurring with no effect determinations, and Federal agencies that arrive at no effect determinations can proceed without contacting us.
Nevertheless, we wanted to acknowledge receipt of the letter. We sincerely appreciate NRC considering the effects of the project on listed species and keeping us informed. If you have any questions or concerns about this email, please contact me at your convenience. Regards, David David Simmons Endangered Species Program Supervisor New England Fish and Wildlife Office U.S. Fish and Wildlife Service 70 Commercial Street, Suite 300 Concord, New Hampshire 03301 603.227.6425