Meeting Summary - Terrapower - Reactor Stability
ML24012A067
Person / Time
Site: 99902100
Issue date: 01/03/2024
From: Brusselmans R
NRC/NRR/DANU/UAL1
To: Jessup W
NRC/NRR/DANU/UAL1
References
EPID L-2021-LRM-0071
Download: ML24012A067 (1)


Text

January 3, 2024 MEMORANDUM TO:

William T. Jessup, Chief Advanced Reactor Licensing Branch 1 Division of Advanced Reactors and Non-Power Production and Utilization Facilities Office of Nuclear Reactor Regulation FROM:

Roel A. Brusselmans, Project Manager /RA/

Advanced Reactor Licensing Branch 1 Division of Advanced Reactors and Non-Power Production and Utilization Facilities Office of Nuclear Reactor Regulation

SUBJECT:

SUMMARY

OF THE JUNE 29, 2023, PARTIALLY CLOSED PUBLIC MEETING WITH TERRAPOWER, LLC, TO DISCUSS REACTOR STABILITY FOR THE NATRIUM DESIGN (EPID NO.

L-2021-LRM-0071)

Meeting Information:

Applicant: TerraPower, LLC (TerraPower)

Project No.: 99902100 Public Meeting Notice Agencywide Documents Access and Management System (ADAMS)

Accession No.: ML23180A063 Applicant Presentation Slides: ML23171B156 Meeting Attendees: See the enclosure for a list of meeting attendees CONTACT:

Roel A. Brusselmans, NRR/DANU (301) 415-0829

W. Jessup 2

Meeting Summary:

On June 29, 2023, the U.S. Nuclear Regulatory Commission (NRC) staff held a partially closed public meeting with TerraPower to provide the NRC staff with an overview of reactor stability for the Natrium design. This meeting was held in anticipation of a forthcoming topical report from TerraPower regarding the same subject. Participants included representatives from TerraPower, General Electric Hitachi, Duke Energy, and members of the general public. The NRC staff conducted the meeting in accordance with NRC Management Directive 3.5, Attendance at NRC Staff-Sponsored Meetings (ML21180A271).

The NRC staff began the meeting with an introduction and explained that a portion of the meeting would be closed to the public to discuss proprietary information. During the public portion of the meeting, TerraPower gave an overview of the Natrium design including a discussion of project goals, plant overview, and graphics explaining the design. The TerraPower team also explained the concept of reactor stability as it applies to sodium fast reactors, the Natrium stability methodology including the relevant principal design criteria, and a discussion of the Nyquist stability criterion which was utilized in TerraPowers analysis for the Natrium design.

Important phenomena with respect to reactor stability for the analysis were also discussed.

TerraPower staff also discussed different reactor sites and designs that provided benchmarking data. Lastly, the TerraPower team explained conclusions from their analysis for the Natrium design showing that significant margin to unstable reactor behavior exists at rated conditions (100% power, 100% flow) and beginning of core life. This conclusion included consideration of input uncertainties and model uncertainties.

During the closed portion of the meeting, TerraPower provided additional details and provided further discussion of its reactor stability analysis methodology for the Natrium design.

TerraPower representatives and the NRC staff discussed the next steps for future interactions regarding the Natrium reactor design.

No regulatory decisions were made as a result of this meeting.

Enclosure:

List of Meeting Attendees cc: TerraPower Natrium via GovDelivery

W. Jessup 3

SUBJECT:

SUMMARY

OF THE JUNE 29, 2023, PARTIALLY CLOSED PUBLIC MEETING WITH TERRAPOWER, LLC, TO DISCUSS REACTOR STABILITY FOR THE NATRIUM DESIGN (EPID NO. L-2021-LRM-0071)

DATED: JANUARY 3, 2024.

DISTRIBUTION:

PUBLIC RidsNrrDanuUal1 Resource RidsNrrDanu Resource MSutton, NRR SDevlin-Gill, NRR CBanks, NRR RBrusselmans, NRR WJessup, NRR RAnzalone, NRR DGreene, NRR PYarsky, RES ASiwy, NRR CdeMessieres, NRR ABielen, RES DWoodyatt, NMSS RAnzalone, NRR ADAMS Accession Number: [ML24012A067 ]

NRR-001 OFFICE NRR/DANU/UAL1:PM NRR/DANU/UAL1:PM NRR/DANU/UAL1:LA NRR/DANU/UAL1:BC NAME RBrusselmans MSutton DGreene WJessup DATE 10/20/2023 10/26/2023 11/2/2023 12/22/2023 OFFICE NRR/DANU/UAL1:PM NAME RBrusselmans DATE 1/3/2024 OFFICIAL RECORD COPY

Enclosure List of Meeting Attendees

SUMMARY

OF THE JUNE 29, 2023, PARTIALLY CLOSED PUBLIC MEETING WITH TERRAPOWER, LLC, TO DISCUSS REACTOR STABILITY FOR THE NATRIUM DESIGN (EPID NO. L-2021-LRM-0071).

June 29, 2023 Name Organization Mallecia Sutton U.S. Nuclear Regulatory Commission (NRC)

Courtney Banks NRC Roel Brusselmans NRC Andrew Proffitt NRC Peter Yarsky NRC Alex Siwy NRC Candace de Messieres NRC Andrew Bielen NRC Diana Woodyatt NRC Reed Anzalone NRC Ryan Sprengel TerraPower, LLC (TerraPower)

Mike Montecalvo TerraPower Matthew Presson TerraPower Marc Hotchkiss TerraPower Shane Scanlon TerraPower Caroline Tilton TerraPower Josh Richard General Electric (GE) Hitachi Tim Enfinger GE Hitachi Preston Decker-Fisk GE Hitachi Maria Pfeffer GE Hitachi Scott Pfeffer GE Hitachi Norman Kunkel Duke Energy