Meeting Summary - Terrapower - Seismic Isolation Strategy
ML24009A187
Person / Time
Site: 99902100
Issue date: 01/03/2024
From: Brusselmans R
NRC/NRR/DANU/UAL1
To: Jessup W
NRC/NRR/DANU/UAL1
References
EPID L-2021-LRM-0071
Download: ML24009A187 (4)


Text

January 3, 2024 MEMORANDUM TO:

William T. Jessup, Chief Advanced Reactor Licensing Branch 1 Division of Advanced Reactors and Non-power Production and Utilization Facilities Office of Nuclear Reactor Regulation FROM:

Roel A. Brusselmans, Project Manager Advanced Reactor Licensing Branch 1 Division of Advanced Reactors and Non-power Production and Utilization Facilities Office of Nuclear Reactor Regulation

SUBJECT:

SUMMARY

OF THE MAY 25, 2023, CLOSED MEETING WITH TERRAPOWER, LLC TO DISCUSS SEISMIC ISOLATION STRATEGY FOR THE NATRIUM DESIGN (EPID NO. L-2021-LRM-0071)

Meeting Information:

Applicant: TerraPower, LLC (TerraPower)

Project No.: 99902100 Public Meeting Notice Agencywide Documents Access and Management System (ADAMS)

Accession No.: ML23129A745 Applicant Presentation Slides: ML23131A401 Meeting Attendees: See the enclosure for a list of meeting attendees.

CONTACT:

Roel A. Brusselmans, NRR/DANU (301) 415-0829

/RA/

W. Jessup 2

Meeting Summary:

On May 25, 2023, the U.S. Nuclear Regulatory Commission (NRC) staff held a closed meeting with TerraPower to discuss the seismic isolation strategy for the Natrium design. This meeting was also held in anticipation of a forthcoming topical report from TerraPower regarding the same subject. Participants included representatives from TerraPower, General Electric Hitachi, Bechtel, and the Department of Energy. The NRC staff conducted the meeting in accordance with NRC Management Directive 3.5, Attendance at NRC Staff-Sponsored Meetings (ML21180A271).

The NRC staff began the meeting with an introduction and explained that this meeting would be closed to the public to discuss proprietary information. During the meeting, TerraPower representatives presented a summary of seismic isolation strategies for the Natrium design.

This included a discussion of available technologies, benchmarking of other seismic isolation systems, seismic isolation system design considerations, and the regulatory framework related to the topic.

The NRC staff and TerraPower representatives also discussed the next steps for future interactions regarding the Natrium reactor design.

No regulatory decisions were made as a result of this meeting.

Enclosure:

List of Meeting Attendees cc: TerraPower Natrium via GovDelivery

W. Jessup 3

SUBJECT:

SUMMARY

OF MAY 25, 2023, CLOSED PRE-APPLICATION MEETING WITH TERRAPOWER, LLC TO DISCUSS SEISMIC ISOLATION STRATEGY FOR THE NATRIUM DESIGN (EPID NO. L-2021-LRM-0071) DATED: JANUARY 3, 2024 DISTRIBUTION:

PUBLIC RidsNrrDanuUal1 Resource RidsNrrDanuUal2 Resource RidsNrrDanu Resource MSutton, NRR SDevlin-Gill, NRR CBanks, NRR RBrusselmans, NRR RAnzalone, NRR WJessup, NRR DGreene, NRR KManoly, NRR SBailey, NRR GBedi, NRR HPhan, NRR TScarbrough, NRR JPires, RES CdeMessieres, NRR GThomas, NRR ITseng, NRR CBasavaraju, NRR ADAMS Accession Number: [ML24009A187]

NRR-001 OFFICE NRR/DANU/UAL1:PM NRR/DANU/UAL1:PM NRR/DANU/UAL1:LA NRR/DANU/UAL1:BC NAME RBrusselmans MSutton DGreene WJessup DATE 10/20/2023 10/26/2023 11/2/2023 12/22/2023 OFFICE NRR/DANU/UAL1:PM NAME RBrusselmans DATE 1/3/2024 OFFICIAL RECORD COPY

W. Jessup 3

List of Meeting Attendees

SUMMARY

OF MAY 25, 2023, CLOSED PRE-APPLICATION MEETING WITH TERRAPOWER, LLC TO DISCUSS SEISMIC ISOLATION STRATEGY FOR THE NATRIUM DESIGN (EPID NO. L-2021-LRM-0071)

May 25, 2023 Name Organization Mallecia Sutton U.S. Nuclear Regulatory Commission (NRC)

Reed Anzalone NRC Courtney Banks NRC Roel Brusselmans NRC Kamal Manoly NRC Stewart Bailey NRC Gurjendra Bedi NRC Hahn Phan NRC Thomas Scarbrough NRC Jose Pires NRC Candace de Messieres NRC George Thomas NRC Ian Tseng NRC Chakrapani Basavaraju NRC Ryan Sprengel TerraPower, LLC (TerraPower)

Aaron Martin TerraPower Alon Katz TerraPower Calen Kaneko TerraPower Chris Courtenay TerraPower Huy Tran TerraPower Ian Gifford TerraPower Jim Gleason TerraPower Larinda Giegel TerraPower Leslie Holden TerraPower Michael Cohen TerraPower Nick Kellenberger TerraPower Tara Neider TerraPower Zachary Mayfield TerraPower Tim Enfinger General Electric (GE) Hitachi Tobias Greider GE Hitachi Edward Han GE Hitachi George Honma GE Hitachi Steven Kline Bechtel Nathan Howard Department of Energy (DOE)

Timothy Stuhldreher DOE