Summary of March 15, 2022, and April 7, 2022, Closed Meetings with Terrapower, LLC to Discuss the Human Factors Engineering for Natrium Reactor
ML22144A415
Person / Time
Site: 99902100
Issue date: 06/13/2022
From: Mallecia Sutton
NRC/NRR/DANU/UARL
To: William Kennedy
NRC/NRR/DANU/UARL
Wagner K
References
EPID L-2021-LRM-0071
Download: ML22144A415 (3)


Text

MEMORANDUM TO:

William B. Kennedy, Acting Chief Advanced Reactor Licensing Branch 1 Division of Advanced Reactors and Non-Power Production and Utilization Facilities Office of Nuclear Reactor Regulation FROM:

Mallecia A. Sutton, Senior Project Manager Advanced Reactor Licensing Branch 1 Division of Advanced Reactors and Non-Power Production and Utilization Facilities Office of Nuclear Reactor Regulation

SUBJECT:

SUMMARY

OF MARCH 15, 2022, AND APRIL 7, 2022, CLOSED MEETINGS WITH TERRAPOWER, LLC TO DISCUSS THE HUMAN FACTORS ENGINEERING FOR THE NATRIUM REACTOR (EPID NO. L-2021-LRM-0071)

On March 15, 2022, the U.S. Nuclear Regulatory Commission (NRC) staff held a closed videoconference meeting with TerraPower, LLC (TerraPower) to provide the NRC staff with an overview of the human factors engineering for the Natrium Reactor. The meeting was continued on April 7, 2022. The presentation slides can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) at Accession No. ML22074A221. Participants included personnel from the NRC staff, TerraPower, General Electric Hitachi, Bechtel, and Duke Energy.

The public meeting notice for the March 15, 2022, meeting, dated February 17, 2022, can be found at ML22049A028. The public meeting notice for the April 7, 2022, meeting, dated April 4, 2022, can be found at ML22095A003. The Enclosure provides the list of meeting attendees.

The NRC staff began the meeting with an introduction and explanation of logistical information.

During the meeting, TerraPower provided the NRC staff with an overview of the human factors engineering for the Natrium Reactor, including the human factors engineering program scope and elements. The NRC staff asked questions about the information presented and Terrapower representatives responded. Finally, the TerraPower representatives and the NRC staff discussed next steps for future pre-application activities.

Project No. 99902100

Enclosure:

List of Attendees CONTACT: Mallecia Sutton, NRR/DANU 301-415-0673 June 13, 2022 Signed by Sutton, Mallec on 06/13/22

ML22144A415 NRR-106 OFFICE NRR/DANU/UAL1/PM NRR/DANU/UAL1/PM NRR/DANU/UAL1/LA NAME KWagner MSutton DGreene DATE 5/27/2022 6/8/2022 6/10/2022 OFFICE NRR/DANU/UAL1/BC(A) NRR/DANU/UAL1/PM NAME WKennedy MSutton DATE 6/10/2022 6/13/2022

Enclosure List of Attendees Closed Meeting with TerraPower, LLC to Discuss the Human Factors Engineering for the Natrium Reactor Tuesday, March 15, 2022, 1:00 p.m. - 2:00 p.m. and Thursday, April 7, 2022, 1:00 p.m. - 2:00 p.m.

Name Organization Mallecia Sutton U.S. Nuclear Regulatory Commission (NRC)

William Kennedy NRC Steve Philpott NRC Brian Green NRC David Desaulniers NRC Katherine Wagner NRC Alex Siwy NRC Jesse Seymour NRC Eric Williams TerraPower, LLC (TerraPower)

Benoit Dionne TerraPower Mark Werner TerraPower Ryan Sprengel TerraPower Nick Kellenberger TerraPower Erin Wisler TerraPower Mike Montecalvo TerraPower Jeff Grogan General Electric Hitachi (GEH)

Lisa Schichlein GEH Stephanie Foerster GEH Denise Brooks GEH Steve Kline Bechtel Chris Nolan Duke Energy