Letter Sequence Meeting |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
Administration
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, ... further results|Meeting]]
|
MONTHYEARPMNS20211430, Pre-application Meeting with Terrapower to Discuss the Natrium Energy Island Decoupling2021-11-15015 November 2021 Pre-application Meeting with Terrapower to Discuss the Natrium Energy Island Decoupling Project stage: Meeting PMNS20211499, Pre-application Meeting with Terrapower to Discuss the the Methodology Used in Identifying the Risk-Informed, Performance-Based (RIPB) Principal Design Criteria (PDC)2021-11-23023 November 2021 Pre-application Meeting with Terrapower to Discuss the the Methodology Used in Identifying the Risk-Informed, Performance-Based (RIPB) Principal Design Criteria (PDC) Project stage: Meeting PMNS20211473, Pre-application Meeting with Terrapower to Discuss the Environmental Methodology for the Natrium Design2021-11-30030 November 2021 Pre-application Meeting with Terrapower to Discuss the Environmental Methodology for the Natrium Design Project stage: Meeting ML21340A1072021-12-0606 December 2021 Public Meeting Terrapower Natrium PDC Presentation Project stage: Request ML21314A1422022-01-10010 January 2022 Terrapower, LLC - Summary of September 28, 2021, Pre-application Public Meeting to Discuss the Site Selection Process for the Natrium Plant Project stage: Meeting ML22011A0722022-01-11011 January 2022 Terrapower Pre-Application Radiological Source Term Methodology Development Presentation Project stage: Other PMNS20211570, Pre-application Meeting with Terrapower to Discuss the Source Term Methodology Plans for the Natrium Design2022-01-12012 January 2022 Pre-application Meeting with Terrapower to Discuss the Source Term Methodology Plans for the Natrium Design Project stage: Meeting ML21362A6522022-02-14014 February 2022 Summary of November 17, 2021, Pre-application Public Meeting with Terrapower, LLC to Discuss the Natrium Reactor Energy Island Decoupling Project stage: Meeting ML21363A1762022-02-18018 February 2022 Summary of Pre-Application Public Meeting with Terrapower, LLC to Discuss the Digital Instrumentation and Control System for the Natrium Reactor Project stage: Meeting PMNS20220144, Pre-application Meeting with Terrapower to Discuss the Human Factors Engineering on Natrium Plant Design2022-02-18018 February 2022 Pre-application Meeting with Terrapower to Discuss the Human Factors Engineering on Natrium Plant Design Project stage: Meeting ML22074A2212022-03-11011 March 2022 Terrapower, LLC, Human Factors Engineering Program Presentation Material Project stage: Request ML22080A2562022-03-21021 March 2022 Terrapower Submittal of Functional Containment Presentation Material Project stage: Request ML21362A7632022-03-23023 March 2022 Summary of December 1, 2021, Pre-Application Public Meeting with Terrapower, LLC to Discuss the Environmental Methodology for the Natrium Reactor Project stage: Meeting PMNS20220148, Pre-application Meeting with Terrapower to Discuss the Natrium Plant Design Functional Containment2022-03-23023 March 2022 Pre-application Meeting with Terrapower to Discuss the Natrium Plant Design Functional Containment Project stage: Meeting ML22082A2222022-03-23023 March 2022 Terrapower Slide Presentation for Met Tower Water Supply Public Meeting Project stage: Request PMNS20220150, Pre-application Meeting with Terrapower to Discuss the Meteorological Data and Plant Water Source for the Natrium Plant Design2022-03-28028 March 2022 Pre-application Meeting with Terrapower to Discuss the Meteorological Data and Plant Water Source for the Natrium Plant Design Project stage: Meeting ML21348A7402022-03-30030 March 2022 Summary of Public Meeting to Discuss the Structures, Systems and Components Classification for the Natrium Reactor Project stage: Meeting PMNS20220357, Pre-application Meeting with Terrapower to Discuss the Human Factors Engineering on Natrium Plant Design2022-04-0505 April 2022 Pre-application Meeting with Terrapower to Discuss the Human Factors Engineering on Natrium Plant Design Project stage: Meeting ML22073A2762022-04-11011 April 2022 Summary of November 29, 2021, Closed Pre-Application Meeting with Terrapower, LLC to Discuss the Fuel Qualification Methodology for the Natrium Reactor Project stage: Meeting ML22082A2342022-04-11011 April 2022 Summary of January 13, 2022, Pre-Application Public Meeting with Terrapower, LLC to Discuss the Source Term Methodology Plans for the Natrium Reactor Project stage: Meeting ML22082A1392022-04-18018 April 2022 Summary of Public Meeting with Terrapower, LLC to Discuss the Methodology Used in Identifying the Principal Design Criteria Project stage: Meeting PMNS20220416, Pre-application Meeting with Terrapower to Discuss the Fuel Cycle Impacts on Natrium Plant Design2022-04-18018 April 2022 Pre-application Meeting with Terrapower to Discuss the Fuel Cycle Impacts on Natrium Plant Design Project stage: Meeting ML22112A1412022-04-21021 April 2022 Terrapower, LLC, Fuel Cycle: Environmental Impacts Meeting Material Project stage: Request PMNS20220482, Pre-Application Meeting with NRC and Terrapower to Discuss the Testing Plan and Methodology That Will Be Used for the Natrium Design2022-05-0909 May 2022 Pre-Application Meeting with NRC and Terrapower to Discuss the Testing Plan and Methodology That Will Be Used for the Natrium Design Project stage: Meeting ML22132A1522022-05-11011 May 2022 Terrapower Testing Program and Methodology Presentation Material Project stage: Request PMNS20220519, Pre-application Meeting with Terrapower to Discuss the Natrium Plant Overview2022-05-17017 May 2022 Pre-application Meeting with Terrapower to Discuss the Natrium Plant Overview Project stage: Meeting ML22144A4152022-06-13013 June 2022 Summary of March 15, 2022, and April 7, 2022, Closed Meetings with Terrapower, LLC to Discuss the Human Factors Engineering for Natrium Reactor Project stage: Meeting ML22189A2092022-07-20020 July 2022 March 30, 2022, Summary of Public Meeting with Terrapower, LLC to Discuss the Meteorological Data and Plant Water Source for the Natrium Reactor Project stage: Meeting ML22180A2692022-07-21021 July 2022 March 24, 2022, Summary of Pre-Application Public Meeting Between Terrapower, LLC and NRC Staff to Discuss the Natrium Reactor Functional Containment Project stage: Meeting ML22187A1062022-08-11011 August 2022 Summary of May 4, 2022, Closed Meeting with Terrapower, LLC to Discuss the Fuel Cycle Environmental Impacts for the Natrium Reactor Project stage: Meeting PMNS20220920, Pre-application Meeting with Terrapower to Discuss In-Vessel Instrumentation for the Natrium Reactor2022-09-0101 September 2022 Pre-application Meeting with Terrapower to Discuss In-Vessel Instrumentation for the Natrium Reactor Project stage: Meeting ML22263A0372022-09-19019 September 2022 Terrapower In-Vessel Instrumentation Presentation Material Project stage: Request PMNS20220921, Pre-application Meeting with Terrapower to Discuss the Consensus Codes and Standards on Natrium Plant Design2022-09-27027 September 2022 Pre-application Meeting with Terrapower to Discuss the Consensus Codes and Standards on Natrium Plant Design Project stage: Meeting ML22244A2432022-09-29029 September 2022 Summary of the May 23-25, 2022, Closed Pre-Application Public Meeting Between Terrapower, LLC and NRC Staff to Discuss an Overview of the Natrium Reactor Project stage: Meeting PMNS20220992, Pre-application Meeting with Terrapower to Discuss Metal Fuel Operating Experience on Natrium Plant Design2022-10-11011 October 2022 Pre-application Meeting with Terrapower to Discuss Metal Fuel Operating Experience on Natrium Plant Design Project stage: Meeting ML22262A3512022-10-13013 October 2022 Summary of Pre-Application Public Meeting with Terrapower, LLC to Discuss the Testing Plan and Methodology for the Natrium Reactor Project stage: Meeting ML22291A0012022-10-17017 October 2022 Terrapower, LLC, Emergency Planning Zone Sizing Methodology Presentation Material Project stage: Request PMNS20221094, Pre-application Meeting with Terrapower to Discuss Instrumentation and Control (I&C) Systems and Cyber Security for the Natrium Project2022-10-20020 October 2022 Pre-application Meeting with Terrapower to Discuss Instrumentation and Control (I&C) Systems and Cyber Security for the Natrium Project Project stage: Meeting ML22300A2642022-10-27027 October 2022 Terrapower I&C Regulatory Framework & Cyber Security Presentation Material Project stage: Request PMNS20221049, Pre-Application Meeting with NRC and Terrapower to Discuss Emergency Planning Zone (EPZ) Methodology2022-10-31031 October 2022 Pre-Application Meeting with NRC and Terrapower to Discuss Emergency Planning Zone (EPZ) Methodology Project stage: Meeting ML23025A1332023-01-25025 January 2023 PSAR Seismic Analysis and Seismic SSC Classification Approach Project stage: Request PMNS20230077, Pre-Application Meeting with Terrapower to Discuss the Partial Flow Blockage for the Natrium Design2023-01-30030 January 2023 Pre-Application Meeting with Terrapower to Discuss the Partial Flow Blockage for the Natrium Design Project stage: Meeting ML23040A1642023-02-0808 February 2023 Terrapower, LLC, Partial Flow Blockage Methodology Presentation Material Project stage: Request ML23031A0122023-02-14014 February 2023 Terrapower Summary of the September 29, 2022, Open Observation Pre-Application Meeting with Terrapower, LLC, to Discuss the Consensus Codes and Standards on the Natrium Plant Design Project stage: Meeting PMNS20230152, Pre-Application Meeting with NRC and Terrapower to Discuss the Fuel and Control Rod Performance Analysis and Fuel Qualification Plans on the Natrium Design2023-02-22022 February 2023 Pre-Application Meeting with NRC and Terrapower to Discuss the Fuel and Control Rod Performance Analysis and Fuel Qualification Plans on the Natrium Design Project stage: Meeting ML23066A3312023-03-0707 March 2023 Terrapower, LLC, Fuel and Control Assembly Qualification Presentation Material Project stage: Request PMNS20230154, Pre-Application Meeting with NRC and Terrapower to Discuss the Instrumentation and Controls (I&C) Defense-in-Depth and Diversity on the Natrium Design2023-04-11011 April 2023 Pre-Application Meeting with NRC and Terrapower to Discuss the Instrumentation and Controls (I&C) Defense-in-Depth and Diversity on the Natrium Design Project stage: Meeting ML23031A1162023-04-11011 April 2023 September 26, 2022, Summary of the Closed Meeting with Terrapower, LLC, Pre-Application Meeting with Terrapower to Discuss In-Vessel Instrumentation for the Natrium Reactor Project stage: Meeting 2022-04-11
[Table View] |
Text
MEMORANDUM TO:
William Jessup, Chief Advanced Reactor Licensing Branch 1 Division of Advanced Reactors and Non-power Production and Utilization Facilities Office of Nuclear Reactor Regulation FROM:
Mallecia Sutton, Senior Project Manager Advanced Reactor Licensing Branch 1 Division of Advanced Reactors and Non-power Production and Utilization Facilities Office of Nuclear Reactor Regulation
SUBJECT:
SUMMARY
OF THE APRIL 13, 2023, OPEN OBSERVATION PRE-APPLICATION MEETING WITH TERRAPOWER, LLC TO DISCUSS I&C DEFENSE-IN-DEPTH AND DIVERSITY (EPID NO.
L-2021-LRM-0071)
Meeting Information:
Applicant: TerraPower, LLC (TerraPower)
Docket/Project No.: 99902100 Public Meeting Notice Agencywide Documents Access and Management System (ADAMS)
Accession No.: ML23101A092 Applicant Presentation Slides ADAMS Accession No.: ML23100A225 July 27, 2023 Signed by Sutton, Mallec on 07/27/23
W.Jessup Meeting Summary:
The U.S. Nuclear Regulatory Commission (NRC) staff conducted the meeting in accordance with NRC Management Directive 3.5, Attendance at NRC Staff-Sponsored Meetings (ADAMS Accession No. ML21180A271).
On April 13, 2023, the NRC staff held an open meeting with TerraPower to discuss the Instrumentation and Controls (I&C) Defense-in-Depth and Diversity (D3) assessment for the Natrium design. Participants included representatives from TerraPower, General Electric Hitachi, Bechtel, the U.S. House of Representatives, and the Department of Energy. The enclosure provides the list of meeting attendees.
The NRC staff began the public meeting with introductions and an explanation of logistical information. During the meeting TerraPower representatives presented an overview of the Safety Case Methodology, Licensing Basis Event Selection, Defense-In-Depth Adequacy and I&C Support of the Natrium Safety Case for the Natrium design.
The NRC staff and TerraPower representatives discussed the next steps for future interactions regarding the Natrium reactor design.
CONTACT:
Mallecia Sutton, NRR/DANU (301) 415-0673
Enclosure:
List of Meeting Attendees Cc:Distribution via list serv
W.Jessup
SUBJECT:
SUMMARY
OF APRIL 13, 2023, OPEN OBSERVATION PRE-APPLICATION MEETING WITH TERRAPOWER, LLC TO DISCUSS I&C DEFENSE-IN-DEPTH AND DIVERSITY (EPID NO. L-2021-LRM-0071) DATED: JULY 27, 2023 DISTRIBUTION:
PUBLIC RidsNrrDanuUal1 Resource RidsNrrDanu Resource MSutton, NRR WJessup, NRR ADAMS Accession Number: ML23192A628 NRR-001 OFFICE NRR/DANU/UAL1/PM NRR/DANU/UAL1/PM NRR/DANU/UAL1/BC NRR/DANU/UAL1/PM NAME CBanks MSutton WJessup MSutton DATE 7/20/2023 7/20/2023 7/27/2023 7/27/2023
Enclosure OFFICIAL RECORD COPY List of Meeting Attendees Open Observation Pre-Application Meeting with TerraPower, LLC to Discuss I&C Defense-in-Depth and Diversity April 13, 2023 Name Organization Mallecia Sutton U.S. Nuclear Regulatory Commission (NRC)
Reed Anzalone NRC Courtney Banks NRC Andrew Proffitt NRC Dinesh Taneja NRC Calvin Cheung NRC Reed Anzalone NRC Hahn Phan NRC Joseph Ashcraft NRC Michele Hart NRC Scott Burnell NRC Mihaela Biro NRC Candace de Messieres NRC James Leavitt U.S. House of Representatives Brian Johnson TerraPower, LLC (TerraPower)
Mike Dunevant TerraPower Mike Montecalvo TerraPower Bob Hirmanpour TerraPower Chris Hope TerraPower Erin Wisler TerraPower John Biersdorf TerraPower Richard Beck TerraPower Ryan Miller TerraPower Baofu Lu TerraPower Wayne Pettay Bechtel Altheia Wyche Bechtel Eric Pearson General Electric Hitachi (GEH)
Sean Kelly GEH Allen Fisher GEH Jonathan Turner GEH Lisa Schichlein GEH