ML23151A735
| ML23151A735 | |
| Person / Time | |
|---|---|
| Site: | Byron |
| Issue date: | 02/27/2023 |
| From: | NRC/RGN-III/DORS/OB |
| To: | NRC/RGN-III |
| Bruce Bartlett | |
| Shared Package | |
| ML19121A194 | List: |
| References | |
| Download: ML23151A735 (1) | |
Text
Facility: Byron Exam Date: December 12, 2022 1
JPM # or title 2
Type (S/P/A) 3 ALT (Y/N) 4 LOD (1-5) 5 JPM Errors 6
U/E/S 7
Explanation SRO ADMIN LOD REF IC TSK CUE CS TL SA-1 Determine Shift Staffing A
N 3
S SA-2 Review Surv 1BOSR SG-1 A
N 3
S SA-3 Determine Plant Barrier Impairment Req.
A N
3 S
Facility: Byron Exam Date: December 12, 2022 1
JPM # or title 2
Type (S/P/A) 3 ALT (Y/N) 4 LOD (1-5) 5 JPM Errors 6
U/E/S 7
Explanation SRO ADMIN LOD REF IC TSK CUE CS TL SA SA-3-06-0 Calc Stay Time A
N 3
X U
S 1.
Misspelled dose as does several times in steps 1 and 2. Corrected 2.
Step 2 gives a calculation with the wrong time value. It shows 6 minutes when it should be 8 minutes. This changes the calculated dose from 0.37 R to 0.49 R. This error carries forward and changes the final answer to 1.65 R instead of 1.77 R. Again, the error carries forward and the calculation becomes 1.65/9.51 =
0.17 hours1.967593e-4 days <br />0.00472 hours <br />2.810847e-5 weeks <br />6.4685e-6 months <br /> or 10.4 minutes instead of the given 11.4 minutes. This error would have led to multiple candidates failing this JPM due to wrong correct answer being given. Corrected initial conditions wrong instead of both values being 8 minutes the second one was supposed to be 6 minutes.
3.
Error bars on the correct answer? Added a margin of error of +0.5 to
N 3
S
Facility: Byron Exam Date: December 12, 2022 1
JPM # or title 2
Type (S/P/A) 3 ALT (Y/N) 4 LOD (1-5) 5 JPM Errors 6
U/E/S 7
Explanation RO ADMIN LOD REF IC TSK CUE CS TL RA-1 AFD Weekly Surv A
N 3
S RA-2 Manual Estimate SG Pri to Sec Leak Rate A
N 3
S RA-3 Read a Print A
N 3
S RA-4 NARS Transmittal A
N 3
S
Facility: Byron Exam Date: December 12, 2022 1
JPM # or title 2
Type (S/P/A) 3 ALT (Y/N) 4 LOD (1-5) 5 JPM Errors 6
U/E/S 7
Explanation CONTROL ROOM/SIM LOD REF IC TSK CUE CS TL a
Dilute RCS to Raise Tavg (No SRO-U)
S Y
3 S
b Iso SI Accum (No SRO-U)
S Y
3 S
c 1.
Comments below are from the OV.
2.
Added steps of Subsection F.1 from procedure 1BOSR 0.5-2.RY.1 to the standard for the examiner information in cue 3.
3.
Revised cue 6 to ensure valve 1RY8000A was closed and made the step a critical task.
4.
Added steps of Subsection F.2 from procedure 1BOSR 0.5-2.RY.1 to the standard for the examiner information in cue 3.
5.
Corrected a typo in the cue before step 12 (are to after).
6.
Deleted step 15 because it was unnecessary.
Test of PORV Block Valve S
N 3
E S
(No SRO-U)
Facility: Byron Exam Date: December 12, 2022 1
JPM # or title 2
Type (S/P/A) 3 ALT (Y/N) 4 LOD (1-5) 5 JPM Errors 6
U/E/S 7
Explanation CONTROL ROOM/SIM LOD REF IC TSK CUE CS TL Comments below are from the OV d
Place RH in SD Cooling Mode (Includes SRO-U)
S Y
3 E
S 1.
Changed the Task Standard from both of the parameters to either of the parameters being exceeded. This will align the steps with the procedure.
Facility: Byron Exam Date: December 12, 2022 1
JPM # or title 2
Type (S/P/A) 3 ALT (Y/N) 4 LOD (1-5) 5 JPM Errors 6
U/E/S 7
Explanation CONTROL ROOM/SIM LOD REF IC TSK CUE CS TL
- e. CR-4S-06-0 CD/CB Pump Trip (Includes SRO-U)
S N
3 E
S
- 1. Is it acceptable to use the hard card without US permission, if not then a cue is required for the examiner to act as the US and give the candidate permission to use the hard card. Yes it is acceptable and they do not need US permission.
- 2. For the examiner state that the actions listed are from the hard card. Note added for the examiner.
- 3. First step should be for the CD/CB pump to trip and there should be a note/que that the standby pump fails to start automatically as required.
Note/cue added.
- 4. In the JPM Summary the JPM states it is not an Alt path but there is an Alt path for a CD pump trip in the 3.2-2.
Which is it? It is not an alt path per NUREG 1021. It is not an Alt path JPM and the form has been corrected to remove Alt Path
- 5. Changed the Initiating Cue so as not to telegraph the panel they will start getting alarms.
Facility: Byron Exam Date: December 12, 2022 1
JPM # or title 2
Type (S/P/A) 3 ALT (Y/N) 4 LOD (1-5) 5 JPM Errors 6
U/E/S 7
Explanation CONTROL ROOM/SIM LOD REF IC TSK CUE CS TL f
Drain the PRT (No SRO-U)
S N
3 S
g Synch DG to Bus (No SRO-U)
S Y
3 S
Comments are from the OV h
Containment Release (RO Only)
S Y
3 S
- 1. Delete step 9 and fold it into step 8 as they both are responding per the BAR.
- 2. Include the steps of the BAR in the standard for the examiners to follow.
- 3. Delete the last two steps as they do not add value.
Facility: Byron Exam Date: December 12, 2022 1
JPM # or title 2
Type (S/P/A) 3 ALT (Y/N) 4 LOD (1-5) 5 JPM Errors 6
U/E/S 7
Explanation INPLANT LOD REF IC TSK CUE CS TL i
Trip Rx Outside the CR P
Y 3
S j
Local Start of DG P
Y 3
S k
Local Operation of PORV Block Valve P
N 3
S
Form 2.3-3 Instructions for Completing the JPM Table 1.
Enter the JPM number and/or title.
2.
Enter the type of JPM(S)imulator, (P)lant, or (A)dministrative.
3.
Enter (Y)es or (N)o for an Alternate Path JPM.
- 4. Rate the level of difficulty (LOD) of each JPM using a scale of 1-5 (easy-difficult). A JPM containing less than two critical steps, a JPM that tests solely for recall or memorization, or a JPM that involves directly looking up a single correct answer is likely LOD = 1 (too easy).
Conversely, a JPM with over 30 steps or a JPM that takes more than 45 minutes to complete is likely LOD = 5 (too difficult).
5.
Check the appropriate block for each JPM error type, using the following criteria:
LOD = 1 or 5 is unsatisfactory (U).
REF: The JPM lacks required references, tools, or procedures (U).
IC: The JPM initial conditions are missing or the JPM lacks an adequate initial cue (U).
CUE: The JPM lacks adequate evaluator cues to allow the applicant to complete the task, or the evaluator cues are subjective or leading (U).
TSK: The JPM lacks a task standard or lacks completion criteria for a task standard (U).
CS: The JPM contains errors in designating critical steps, or the JPM lacks an adequate performance standard for a critical step (U).
TL: The JPM validation times are unreasonable, or a time-critical JPM lacks a completion time (U).
- 6. Mark the JPM as unsatisfactory (U), satisfactory (S), or needs enhancements (E). A JPM is (U) if it has one or more (U) errors as determined in step 5. Examples of enhancements include formatting, spelling, or other minor changes.
- 7. Briefly describe any JPM determined to be unsatisfactory (U) or needing enhancement (E).
Save initial review comments and detail subsequent comment resolution so that each exam-bound JPM is marked by a satisfactory (S) resolution on this form.
Facility: Byron Scenario: # 1 100% Rx. Power Exam Date: December 12, 2022 1
Scenario Event ID/Name 2
Scenario Event Errors 3
U/E/S 4
Explanation Realism/
Credibility Performance Standards Verifiable Actions Critical Task TS 1
Perform 0BOSR 0.5-2.AF.1-1 S
2 1LI-185 Fails High S
3 1A MSIV low pressure alarm S
1.
Font size issue in US notes corrected.
2.
Include the required value in Event 3. TS value of 4850 psig added 4
0A CW MU pump trip S
5 PZR PORV leaking X
E S
1.
TS reference was wrong -
corrected to 3.4.11 Condition B instead of the given Condition A 2.
Listed affected block valve was wrong. Corrected to 1RY8000A instead of the given 1RY8000B.
Event is now SAT.
6 1A HD pump trip S
1.
Attachment C was given as a reference for the examiner instead of the correct Attachment D to 1BOA SEC-1 Secondary Pump Trip Corrected
Facility: Byron Scenario: # 1 100% Rx. Power Exam Date: December 12, 2022 1
Scenario Event ID/Name 2
Scenario Event Errors 3
U/E/S 4
Explanation Realism/
Credibility Performance Standards Verifiable Actions Critical Task TS 7
1B HD pump trip (runback)
S 1.
Add required BA batch addition sizes to the scenario guide. Three batches of 175 gallons added to the guide.
2.
The Note on the bottom of page 20 has an extra are complete. Deleted 8
1A RCP trip w/ATWS. Rod speed fails to 8 spm X
E S
1.
Changed Event 8 to loss of 1C HD pump instead of 1A RCP.
Still get a failed Reactor Trip.
2.
During OV questions arose if CT-54 actually made a difference. Simulator runs showed that if the ATC did not drive rods at 48 steps per minute then high pressure safety limits would be challenged.
Event is now SAT.
9 Turbine fails to auto trips.
Spurious FWI S
Facility: Byron Scenario 2: 84% Due to AND (Advanced Nuclear Dispatch)
Exam Date: December 12, 2022 2
Steam Break 2022-301 2
Scenario event errors 3
U/E/S 4
Explanation Realism/
Credibility Performance Standards Verifiable Actions Critical Task TS 1 - Normal Surveillance S
2 - BA Pump Trip S
3 - Reduce Power S
1.
Both BOP and the ATC get credit for the reactivity change 4 - 1TI-130 Fails Low E
S 1.
Either the BOP or the ATC get credit for this I/C but not both, should be the ATC.
Changed 2.
The ATC identifies the failure of 1TI-130, NOT the crew.
Changed 3.
If the ATC is expected to take manual control of letdown then letdown should not be isolated.
Is the ATC expected to be able to take manual control? With the change above and below this comment is now moot 4.
This failure was in the 2019 and the 2021 exam and is now in this exam. Recommend that it not be re-used in this exam.
The licensee is evaluating changing which failure occurs.
Event is now SAT.
Facility: Byron Scenario 2: 84% Due to AND (Advanced Nuclear Dispatch)
Exam Date: December 12, 2022 2
Steam Break 2022-301 2
Scenario event errors 3
U/E/S 4
Explanation Realism/
Credibility Performance Standards Verifiable Actions Critical Task TS Change the failure to 1CV110B failing to open. Combine events 3 and 4.
5 - CRDM 1D Exhaust Fan Trip S
1.
This I/C was also in Scenario 2 in the 2019 exam. Label it as such. Label added 7 - Major -
Steam Line Break Outside of Containment S
1.
Some actions are designated for both the ATC and the BOP.
Who would normally handle these steps? Clarified 2.
If the MSIVs are manually closed in 1BEP-0 then this step would not meet the criteria for a Major that is in NUREG 1021.
E-0 does not count as an EOP entry and if the MSIVs are closed in E-0 then there would be no need to enter E-2.
The licensee has changed event 7 and where the break is located.
8 - MSIVs Fail to Close S
1.
Event 8 runs long, what can be removed to shorten the event/scenario? Delete part of Attachment B? Attachment B was included for information only even though it made the
Facility: Byron Scenario 2: 84% Due to AND (Advanced Nuclear Dispatch)
Exam Date: December 12, 2022 2
Steam Break 2022-301 2
Scenario event errors 3
U/E/S 4
Explanation Realism/
Credibility Performance Standards Verifiable Actions Critical Task TS event seem much longer than it is. This comment is NA.
2.
During the OV it was determined that this event lacked clear boundary conditions for the Critical Task.
Add 1C MSIV fails to close in auto or manual to transition to another emergency procedure.
Done.
Event is now SAT.
Facility: Byron Scenario: # 3 - 55% Rx Power Exam Date: December 12, 2022 1
Scenario Event ID/Name 2
Scenario event errors 3
U/E/S 4
Explanation Realism/
Credibility Performance Standards Verifiable Actions Critical Task TS 1
Swap Unit 1 SX Pumps S
2 Valve 1CV121 Fails Open S
3 1B AF Pump Local Alarm for the Air Box Trip X
U S
1.
The failure of the 1B AF pump has only one action for the BOP to perform. The placement of the 1B AF pump in Pull Out is not indicative of the operators ability to control evolutions. The original version of this event took credit for the BOP for a component failure.
This has since been removed.
Event is now SAT.
4 1RY455C Drifts Partially Open S
5 1B SX Pump Trip with 1A SX Pump Failure to Manually Start S
1.
Removing the pump from service is called Pull Out in an earlier Event and is call Pull-to-Lock in this event. Make them consistent. Done
Facility: Byron Scenario: # 3 - 55% Rx Power Exam Date: December 12, 2022 1
Scenario Event ID/Name 2
Scenario event errors 3
U/E/S 4
Explanation Realism/
Credibility Performance Standards Verifiable Actions Critical Task TS 6
Tech Spec 3.0.3 Ramp S
1.
Repeat of earlier comment - if you want credit for both the ATC and the BOP for reactivity then they both need to make sure that they change power levels. Done 7
1B Steam Generator Tube Rupture S
8 0A Inaccessible Plenum Exhaust Fan Fails to Properly Align in Auto S
9 1D Steam Generator Tube Rupture S
Facility: Byron Scenario: # 4 - 75% Rx Power Exam Date: December 12, 2022 1
Scenario Event ID/Name 2
Scenario event errors 3
U/E/S 4
Explanation Realism/
Credibility Performance Standards Verifiable Actions Critical Task TS 1
Swap Running EH Pumps S
2 Ramp Up S
3 1B RCP #3 Seal S
4 OC WS Pump Trip and OB Failure to auto start S
5 Loss of RWST Level Channel 1LT-933 S
6 Loss of Bus 131Z S
7 Loss of Bus 143 which causes loss of S
Facility: Byron Scenario: # 4 - 75% Rx Power Exam Date: December 12, 2022 1
Scenario Event ID/Name 2
Scenario event errors 3
U/E/S 4
Explanation Realism/
Credibility Performance Standards Verifiable Actions Critical Task TS condenser vacuum 8
Loss of Bus 143, Large Break LOCA S
9 Loss of containment sump recirc S
Form 2.3-3 Instructions for Completing the Scenario Table
- 1. For each scenario, enter the scenario event names and descriptions.
- 2. Review the individual events contained in each scenario, and identify and mark event errors:
The scenario guide event description is not realistic/credibleunsatisfactory (U).
The scenario guide event description lacks adequate crew/operator performance standardsneeds enhancement (E).
The scenario guide event description lacks verifiable actions for a credited normal event, reactivity event instrument/component malfunction, or technical specification (TS) event (or a combination of these) (U).
The scenario guide event description incorrectly designates an event as a critical task (i.e., a noncritical task labeled as critical or a critical task labeled as noncritical).
This includes critical tasks that do not meet the critical task criteria (i.e., the critical task does not have a measurable performance standard) (U).
The scenario guide event description incorrectly designates entry into TS actions when not required or does not designate entry into TS actions when required (U).
- 3. Based on the outcome in step 2, mark the scenario event as unsatisfactory (U), satisfactory (S), or needs enhancements (E). An event is (U) if it has one or more (U) errors as determined in step 2. Examples of enhancements include formatting, spelling, or other minor changes.
- 4. Briefly describe any scenario event determined to be unsatisfactory (U) or needing enhancement (E). Save initial review comments and detail subsequent comment resolution so that each exam-bound scenario event is marked by a satisfactory (S) resolution on this form.