Form 3.2-2 Control Room/In-Plant Systems Outline Facility: Byron Nuclear Station Date of Examination: 12/12/22 Operating Test Number: 2022-301 Exam Level:
RO SRO-I SRO-U System/JPM Title Type Code Safety Function Control Room Systems
- a. Perform Dilution of the RCS to Raise Tave 004A4.07: Ability to manually operate and/or monitor in the control room: Boration/dilution (4.0)
A, M, S 1
Bank (Modified)
- b. Isolate SI Accumulators per 1BCA-1.1, Step 26 006A4.02; Ability to manually operate and/or monitor in the control room: ECCS valves (4.2 )
A, D, EN, L, S, P
2 2019-2 NRC
- c. Exercise Test of PORV Block Valve (1BOSR 0.5-2.RY.1) 010A4.03: Ability to manually operate and/or monitor in the control room: PORVs and block valves (3.8)
D,S 3
2018 Cert
- d. Place RH in Shutdown Cooling Mode 005A4.01: Ability to manually operate and/or monitor in the control room: Controls and indications for RHR pumps (4.0)
A,L,D,EN,S 4P 2021 Cert
- e. Respond to CD pump trip 056A2.04: Ability to (a) predict the impacts of the following on the Condensate System and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal operations: Loss of condensate pumps (4.0/3.7)
M, S 4S Bank (Modified)
- f.
Drain the PRT 007A4.02 Ability to manually operate and/or monitor in the control room: PRT/quench tank drain valve (2.8)
D, S 5
2019 Cert
- g. Synchronize a D/G to a Bus and Load to 5400 KW (uncontrolled load increase) 064A4.06: Ability to manually operate and/or monitor in the control room: Manual starting, loading, and stopping of the EDG (3.9/3.9)
A,D,EN,S 6
Bank
- h. Containment Release (With Rad Alarm) 029A2.06: Ability to (a) predict the impacts of the following on the Containment Purge System and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal operations: CPS component malfunction (2.9/3.0)
A,D,S 8
2019-1 NRC
In-Plant Systems
- i.
Trip the reactor outside the control room 029EA1.22: Ability to operate and/or monitor the following as they apply to an Anticipated Transient Without Scram: RPS (4.1)
E,D 2
2019 Cert
- j.
Local Start of EDG 064A2.27: Ability to (a) predict the impacts of the following on the Emergency Diesel Generators and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal operations:
Loss of DC power (3.8/3.9)
A, N, E 6
New for 2022 NRC
- k. Local Operation of PZR PORV Block Valve 010A2.03: Ability to (a) predict the impacts of the following on the Pressurizer Pressure Control System and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal operations:
PORV failures (4.3/4.0)
M,E,R 3
BANK (Modified)
Code License Level Criteria RO SRO-I SRO-U (A)lternate path 4-6 6 4-6 2-3 (C)ontrol room (D)irect from bank 9 7 8
4 (E)mergency or abnormal in-plant 1 3 1 3 1
(EN)gineered safety feature (for control room system) 1 3 1
1 (L)ow power/shutdown 1 2 1
1 (N)ew or (M)odified from bank (must apply to at least one alternate path JPM) 2 4 2
1 (P)revious two exams (randomly selected) 3 1 3
2 (R)adiologically controlled area 1 1 1
1 (S)imulator
Form 3.2-2 Control Room/In-Plant Systems Outline Facility: Byron Nuclear Station Date of Examination: 12/12/22 Operating Test Number: 2022-301 Exam Level:
RO SRO-I SRO-U System/JPM Title Type Code Safety Function Control Room Systems
- a. Perform Dilution of the RCS to Raise Tave 004A4.07: Ability to manually operate and/or monitor in the control room: Boration/dilution (4.0)
A, M, S 1
Bank (Modified)
- b. Isolate SI Accumulators per 1BCA-1.1, Step 26 006A4.02; Ability to manually operate and/or monitor in the control room: ECCS valves (4.2 )
A, D, EN, L, S, P
2 2019-2 NRC
- c. Exercise Test of PORV Block Valve (1BOSR 0.5-2.RY.1) 010A4.03: Ability to manually operate and/or monitor in the control room: PORVs and block valves (3.8)
D,S 3
2018 Cert
- d. Place RH in Shutdown Cooling Mode 005A4.01: Ability to manually operate and/or monitor in the control room: Controls and indications for RHR pumps (4.0)
A,L,D,EN,S 4P 2021 Cert
- e. Respond to CD pump trip 056A2.04: Ability to (a) predict the impacts of the following on the Condensate System and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal operations: Loss of condensate pumps (4.0/3.7)
M, S 4S Bank (Modified
- f.
Drain the PRT 007A4.02 Ability to manually operate and/or monitor in the control room: PRT/quench tank drain valve (2.8)
D, S 5
2019 Cert
- g. Synchronize a D/G to a Bus and Load to 5400 KW (uncontrolled load increase) 064A4.06: Ability to manually operate and/or monitor in the control room: Manual starting, loading, and stopping of the EDG (3.9/3.9)
A,D,EN,S 6
Bank
- h.
In-Plant Systems
- i.
Trip the reactor outside the control room 029EA1.12: Ability to operate and/or monitor the following as they apply to an Anticipated Transient Without Scram: RPS (4.1)
E,D 2
2019 Cert
- j.
Local Start of EDG 064A2.27: Ability to (a) predict the impacts of the following on the Emergency Diesel Generators and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal operations:
Loss of DC power (3.8/3.9)
A, N, E 6
New for 2022 NRC
- k. Local Operation of PZR PORV Block Valve 010A2.03: Ability to (a) predict the impacts of the following on the Pressurizer Pressure Control System and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal operations:
PORV failures (4.3/4.0)
M,E,R 3
BANK (Modified)
Code License Level Criteria RO SRO-I SRO-U (A)lternate path 4-6 4-6 5 2-3 (C)ontrol room (D)irect from bank 9
8 6 4
(E)mergency or abnormal in-plant 1
1 3 1
(EN)gineered safety feature (for control room system) 1 1 3 1
(L)ow power/shutdown 1
1 2 1
(N)ew or (M)odified from bank (must apply to at least one alternate path JPM) 2 2 4 1
(P)revious two exams (randomly selected) 3 3 1 2
(R)adiologically controlled area 1
1 1 1
(S)imulator
Form 3.2-2 Control Room/In-Plant Systems Outline Facility: Byron Nuclear Station Date of Examination: 12/12/22 Operating Test Number: 2022-301 Exam Level:
RO SRO-I SRO-U System/JPM Title Type Code Safety Function Control Room Systems
- a.
- b.
- c.
- d. Align RH for S/D cooling 005A4.01: Ability to manually operate and/or monitor in the control room: Controls and indications for RHR pumps (4.0)
A,L,D,EN,S 4P 2021 Cert
- e. Respond to CD pump trip 056A2.04: Ability to (a) predict the impacts of the following on the Condensate System and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal operations: Loss of condensate pumps (4.0/3.7)
M,S 4S Bank (Modified)
- f.
- g.
- h.
In-Plant Systems
- i.
Trip the reactor outside the control room 029EA1.22: Ability to operate and/or monitor the following as they apply to an Anticipated Transient Without Scram: RPS (4.1)
E,D 2
2019 Cert
- j.
Local Start of EDG 064A2.27: Ability to (a) predict the impacts of the following on the Emergency Diesel Generators and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal operations:
Loss of DC power (3.8/3.9)
A, N, E 6
New for 2022 NRC
- k. Local Operation of PZR PORV Block Valve 010A2.03: Ability to (a) predict the impacts of the following on the Pressurizer Pressure Control System and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal operations:
PORV failures (4.3/4.0)
M,E,R 3
BANK (Modified)
Code License Level Criteria RO SRO-I SRO-U (A)lternate path 4-6 4-6 2-3 2 (C)ontrol room (D)irect from bank 9
8 4 2 (E)mergency or abnormal in-plant 1
1 3 1 3 (EN)gineered safety feature (for control room system) 1 1
1 1 (L)ow power/shutdown 1
1 1 1 (N)ew or (M)odified from bank (must apply to at least one alternate path JPM) 2 2
1 3 (P)revious two exams (randomly selected) 3 3
2 0 (R)adiologically controlled area 1
1 1 1 (S)imulator