Letter Sequence Other |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance, Acceptance, Acceptance
- Supplement
Results
Other: ML20295A413, ML20295A415, ML20295A416, ML20295A417, ML20295A418, ML20295A419, ML20295A420, ML20295A421, ML20329A323, ML21118A864, ML21118A865, ML21118A866, ML21118A867, ML21118A868, ML21118A869, ML21118A870, ML21168A352, ML21168A353, ML21168A354, ML21168A355, ML21168A356, ML21168A357, ML21168A358, ML21168A359, ML21168A361, ML21168A362, ML21168A363, ML21168A364, ML21223A048, ML21223A049, ML21223A050, ML21223A056, ML21237A177, ML22028A372, ML22196A086, ML22243A274, ML22243A278, ML22325A338, ML23005A002, ML23005A006, ML23005A275, ML23013A340, ML23013A341, ML23013A342, ML23013A343, ML23013A344, ML23013A345, ML23013A346, ML23013A347, ML23074A102... further results
|
MONTHYEARML20128J2922020-04-27027 April 2020, 28 April 2020 International, Submittal of Responses to Nrc,S 1st Round RAIs for HI-STORM 100 Amendment Number 15 Project stage: Request ML20128J2932020-04-28028 April 2020 International, Submittal of Responses to Nrc,S 1st Round RAIs for HI-STORM 100 Amendment Number 15 Project stage: Request ML20136A4752020-05-15015 May 2020 Holtec International Submittal of Responses to Nrc'S RAIs 3-1 and 3-6 for HI-STORM 100 Amendment Number 15 Project stage: Request ML20164A2942020-06-12012 June 2020 International Submittal of Supplemental Information to RAI 8-1 Response for HI-STORM 100 Amendment Number 15 Project stage: Request ML20245E4632020-09-0101 September 2020 International - Submittal of Supplemental Information on HI-STORM 100 Amendment 15 Project stage: Request ML20269A4252020-09-25025 September 2020 International - Submittal of Supplemental Information on HI-STORM 100 Amendment 15 Project stage: Request ML20318A3212020-11-13013 November 2020 Submittal of Clarification RAI Responses on HI-STAR 100 License Renewal Project stage: Request ML20329A3232020-11-24024 November 2020 International, Clarification RAI Responses on HI-STAR 100 License Renewal Updated Project stage: Other ML20295A4222021-01-27027 January 2021 Preliminary CoC 1014 Amendment No. 15 Safety Evaluation Report Project stage: Approval ML20295A4192021-01-27027 January 2021 Proposed CoC 1014 Amendment No. 15 Appendix D Project stage: Other ML20295A4162021-01-27027 January 2021 Proposed CoC 1014 Amendment No. 15 Appendix a Project stage: Other ML20295A4132021-01-27027 January 2021 User Need for Rulemaking for the Holtec HI-STORM 100 Cask System, Amendment No. 15 Project stage: Other ML20295A4212021-01-27027 January 2021 Proposed CoC 1014 Amendment No. 15 Appendix B-100U Project stage: Other ML20295A4152021-01-27027 January 2021 Proposed CoC 1014 Amendment No. 15 for Holtec Intl Project stage: Other ML20295A4172021-01-27027 January 2021 Proposed CoC 1014 Amendment No. 15 Appendix B Project stage: Other ML20295A4182021-01-27027 January 2021 Proposed CoC 1014 Amendment No. 15 Appendix C Project stage: Other ML20295A4202021-01-27027 January 2021 Proposed CoC 1014 Amendment No. 15 Appendix A-100U Project stage: Other ML21068A3612021-03-0909 March 2021 International, Submittal of HI-STORM 100 Multipurpose Canister Storage System Amendment 16 Request Project stage: Request ML21118A8682021-05-13013 May 2021 Certificate of Compliance 1014 - Amendment No. 15, Appendix D, Approved Contents and Design Features for the Hi-Storm 100S Version E Cask and Hi-Trac Ms Project stage: Other ML21118A8652021-05-13013 May 2021 Certificate of Compliance 1014, Amendment No. 15, Appendix a Technical Specifications for the Hi-Storm 100 Cask System Project stage: Other ML21118A8642021-05-13013 May 2021 Certificate of Compliance 1014 - Amendment No. 15 Project stage: Other ML21118A8662021-05-13013 May 2021 Certificate of Compliance 1014 - Amendment No. 15, Appendix B, Approved Contents and Design Features for the Hi-Storm 100 Cask System Project stage: Other ML21118A8702021-05-13013 May 2021 Certificate of Compliance 1014 - Amendment No. 15, Appendix B-100U Approved Contents and Design Features for the Hi-Storm 100 Cask System (Model No. 100U Addition) Project stage: Other ML21118A8672021-05-13013 May 2021 Certificate of Compliance 1014 - Amendment No. 15, Appendix C, Technical Specifications for the Hi-Storm 100S Version E Cask Project stage: Other ML21118A8632021-05-13013 May 2021 Issuance of Certificate of Compliance No. 1014, Amendment No. 15 for the HI-STORM 100 Multipurpose Canister Storage System Project stage: Approval ML21118A8712021-05-13013 May 2021 Certificate of Compliance 1014 - Amendment No. 15. Final Safety Evaluation Report Project stage: Approval ML21118A8692021-05-13013 May 2021 Certificate of Compliance 1014 - Amendment No. 15, Appendix A-100U Technical Specifications for the Hi-Storm 100 Cask System (Model N. 100U Addition) Project stage: Other ML21168A3522021-06-28028 June 2021 User Need Memo for Renewal of CoC No. 1008 (HI-STAR 100) Project stage: Other ML21168A3512021-06-28028 June 2021, 9 September 2021 Rulemaking for the Renewal of CoC No. 1008, HI-STAR 100 Cask System Project stage: Request ML21179A1792021-07-12012 July 2021 Acceptance Review of Request for Amendment No. 16 to Certificate of Compliance No. 1014 for HI-STORM 100 Multipurpose Canister Storage System, Request for Supplemental Information Project stage: Acceptance Review ML21237A0422021-07-23023 July 2021, 25 August 2021 Summary of July 27, 2021, Public Meeting on HI-STORM 100, Amendment No. 16, Graded Approach Project stage: Request ML21201A0282021-07-23023 July 2021 Handout for Meeting with Holtec on HI-STORM 100 Amendment No. 16 (July 27, 2021) Project stage: Request ML21223A0452021-08-10010 August 2021, 11 August 2021 HI-STORM 100 Amendment 16 Responses to Requests for Supplemental Information Project stage: Request ML21223A0562021-08-10010 August 2021 Attachment 10: Affidavit in Accordance with 10 CFR 2.390 Project stage: Other ML21223A0492021-08-11011 August 2021 Attachment 3: HI-STORM 100 Amendment 16 Certificate of Compliance Appendix D, Changed Pages (non-proprietary) Project stage: Other ML21223A0482021-08-11011 August 2021 Attachment 2: HI-STORM 100 Amendment 16 Rsi Responses (non-proprietary) Project stage: Other ML21223A0462021-08-11011 August 2021 HI-STORM 100 Amendment 16 Responses to Requests for Supplemental Information Project stage: Supplement ML21223A0502021-08-11011 August 2021 Attachment 4: HI-STORM 100 FSAR Proposed Revision 21A, Changed Pages (non-proprietary) Project stage: Other ML21237A0432021-08-25025 August 2021 Summary of July 27, 2021, Public Meeting with Holtec International to Discuss Certificate of Compliance No. 1014 for the HI-STORM 100, Amendment No. 16, Graded Approach Project stage: Meeting ML21237A1772021-08-25025 August 2021 Request for Supplemental Information for Amendment No. 7 to Certificate of Compliance No. 1032 for the Hi-Storm Flood/Wind Multipurpose Canister Storage System Project stage: Other ML21168A3582021-09-0909 September 2021 Proposed Technical Specifications (Appendix B) for CoC No. 1008, Renewed Amendment No. 1 Project stage: Other ML21168A3532021-09-0909 September 2021 Proposed CoC No. 1008, Renewed Amendment No. 0 Project stage: Other ML21168A3622021-09-0909 September 2021 Proposed CoC No. 1008, Renewed Amendment No. 3 Project stage: Other ML21168A3552021-09-0909 September 2021 Proposed Technical Specifications (Appendix B) for CoC No. 1008, Renewed Amendment No. 0 Project stage: Other ML21168A3542021-09-0909 September 2021 Proposed Technical Specifications (Appendix a) for CoC No. 1008, Renewed Amendment No. 0 Project stage: Other ML21168A3612021-09-0909 September 2021 Proposed Technical Specifications (Appendix B) for CoC No. 1008, Renewed Amendment No. 2 Project stage: Other ML21168A3632021-09-0909 September 2021 Proposed Technical Specifications (Appendix a) for CoC No. 1008, Renewed Amendment No. 3 Project stage: Other ML21168A3642021-09-0909 September 2021 Proposed Technical Specifications (Appendix B) for CoC No. 1008, Renewed Amendment No. 3 Project stage: Other ML21168A3652021-09-0909 September 2021 Preliminary Safety Evaluation Report for Renewed CoC No. 1008, Amendment Nos. 0, 1, 2, and 3 Project stage: Approval ML21168A3562021-09-0909 September 2021 Proposed CoC No. 1008, Renewed Amendment No. 1 Project stage: Other 2021-01-27
[Table View] |
|
---|
Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML24309A2902024-11-0404 November 2024 International, Attachment 3: HI-STORM 100 FSAR Proposed Revision 25a, Chapters 1, 2 and 6 Revised Pages ML23263B1252023-09-20020 September 2023 Attachment 2: HI-STORM 100 FSAR Proposed Revision 21G, Changed Pages (non-proprietary) ML23251A2542023-09-0808 September 2023 Attachment 3: HI-STORM 100 Amendment 18 Proposed FSAR Revision 22D Pages ML23005A0062023-01-0404 January 2023 Attachment 4 - HI-STORM 100 FSAR Proposed Text Changes, Changed Pages ML21349B4212021-12-15015 December 2021 Attachment 2: Proposed HI-STORM 100 FSAR Revision 22A (non-proprietary) ML21118A8712021-05-13013 May 2021 Certificate of Compliance 1014 - Amendment No. 15. Final Safety Evaluation Report ML20245E4662020-09-0101 September 2020 HI-STORM 100 FSAR Proposed Changed Pages (Proposed Rev 17E) ML18067A2222018-03-0808 March 2018 Enclosure 2: Proposed Changes to FSAR Section 5.4.10 (03/08/2018 E-Mail from Y. Chen to N. Royston Question on Irradiated Dummy Rods Analysis) ML18067A2212018-03-0808 March 2018 Enclosure 1:Proposed Changes to FSAR Section 2.1.2 (03/08/2018 E-Mail from Y. Chen to N. Royston Question on Irradiated Dummy Rods Analysis) ML22331A0142016-11-18018 November 2016 Attachment 11 - HI-2002444Holtec International Final Safety Analysis Report for the HI-STORM 100 Cask System ML0901505462009-01-0909 January 2009 Pages from the Shearon Harris FSAR to Support the Amendment to Change to the Metamic Fuel Absorber in the Spent Fuel Pool 2024-11-04
[Table view] |
Text
in the vicinity of the transfer lid or pool lid. For example, if the missile shield was a 2 inch thick steel plate, the gamma dose rate would be reduced by approximately 90%.
The dose to any real individual at or beyond the controlled area boundary is required to be below 25 mrem per year. The minimum distance to the controlled area boundary is 100 meters from the ISFSI. As mentioned, only the MPC-24 was used in the calculation of the dose rates at the controlled area boundary. Table 5.1.9 presents the annual dose to an individual from a single HI-STORM 100S Version B cask and various storage cask arrays, assuming an 8760 hour0.101 days <br />2.433 hours <br />0.0145 weeks <br />0.00333 months <br /> annual occupancy at the dose point location. The minimum distance required for the corresponding dose is also listed. These values were conservatively calculated for a burnup of 60,000 MWD/MTU and a 3-year cooling time. In addition, the annual dose was calculated for a burnup of 45,000 MWD/MTU with a corresponding cooling time of 9 years. BPRAs were included in these dose estimates. Additionally, Section 5.4.11 shows the annual dose results for the limiting contents, which encompass all allowable fuel burnups and cooling times from Section 2.1.9 permitted for these canisters. It is noted that these data are provided for illustrative purposes only. A detailed site-specific evaluation of dose at the controlled area boundary must be performed for each ISFSI in accordance with 10CFR72.212. The site-specific evaluation will consider dose from other portions of the facility and will consider the actual conditions of the fuel being stored (burnup and cooling time). For guidance on fuel parameters for site -specific analyses see Subsection 5.2.5.4.
Figure 5.1.3 is an annual dose versus distance graph for the HI-STORM 100 cask array configurations provided in Table 5.1.9. This curve, which is based on an 8760 hour0.101 days <br />2.433 hours <br />0.0145 weeks <br />0.00333 months <br /> occupancy, is provided for illustrative purposes only and will be re-evaluated on a site-specific basis.
Section 5.2 lists the gamma and neutron sources for the design basis fuels. Since the source strengths of the GE 6x6 intact and damaged fuel and the GE 6x6 MOX fuel are significantly smaller in all energy groups than the intact design basis fuel source strengths, the dose rates from the GE 6x6 fuels for normal conditions are bounded by the MPC -68 analysis with the design basis intact fuel. Therefore, no explicit analysis of the MPC-68 with either GE 6x6 intact or damaged or GE 6x6 MOX fuel for normal conditions is required to demonstrate that the MPC-68 with GE 6x6 fuels will meet the normal condition regulatory requirements. Section 5.4.2 evaluates the effect of generic damaged fuel in the MPC-24E, MPC-32 and the MPC-68.
Section 5.2.6 lists the gamma and neutron sources from the Dresden Unit 1 Thoria rod canister and demonstrates that the Thoria rod canister is bounded by the design basis Dresden Unit 1 6x6 intact fuel.
Section 5.2.4 presents the Co-60 sources from the BPRAs, TPDs, CRAs and APSRs t hat are permitted for storage in the HI-STORM 100 System. Section 5.4.6 discusses the increase in dose rate as a result of adding non-fuel hardware in the MPCs.
Section 5.4.7 demonstrates that the Dresden Unit 1 fuel assemblies containing antimony-beryllium neutron sources are bounded by the shielding analysis presented in this section.
HOLTEC INTERNATIONAL COPYRIGHTED MATERIAL HI-STORM 100 FSAR Proposed Rev. 21BG REPORT HI-2002444 5-11
5.4.11 Limiting Content Evaluation
5.4.11.1 General
As discussed in Section 5.1, results are presented for the representative burnup and cooling times that result in radial dose rates consistent with the dose limits selected for ALARA purposes. The additional shielding calculations in this section are performed to illustrate the maximum dose rates for the HI-STORM 100 System under normal conditions, when loaded with the limiting contents specified in Section 2.1.9. Specifically, all allowable fuel burnups and cooling times from Section 2.1.9 permitted for the MPC-24, MPC-32 and MPC-68 canisters are evaluated, and the maximum possible dose rate over the entire range of qualified content is determined separately for each relevant dose location. Note that the maximum dose rate at different locations may be from different burnup and cooling time combinations. Hence the reported maximum dose rates for all principal locations may not be from a single burnup and cooling time combination out of the set. The initial enrichments used in the analysis are discussed in Section 5.4.11.2.
In order to perform a bounding shielding analysis, all burnups and cooling time combinations are analyzed in the HI-STORM 100S Version B overpack and 100-ton HI-TRAC transfer cask, which produce higher dose rates. The calculations are performed using the MCNP5-1.51 code and the source terms determined by the TRITON/ORIGAMI sequence from SCALE 6.2.1.
Results of the calculations, showing only total dose rates for all relevant surface and 1 m dose locations, are summarized and compared in Tables 5.4.21 and 5.4.22. Table 5.4.23 presents the annual dose to an individual from a single HI-STORM 100S Version B cask and various storage cask arrays at or beyond the controlled area boundary as well as the minimum distance required for the corresponding dose, assuming 100% annual occupancy (8760 hours0.101 days <br />2.433 hours <br />0.0145 weeks <br />0.00333 months <br />) and the conservative top surface contribution of 10%. The dose rates presented for the MPC-24 and MPC-32 canisters include the contribution from BPRAs. The results and comparisons show that for bounding content, the external dose rates would be unacceptably high, justifying the introduction of the dose limit. However, these are just examples provided to the users of the system, the only formal restriction is the dose rate limits on the outside of the casks. It should be noted that bounding content is used in the analysis of the accident conditions in Section 5.1, to avoid any complication in showing compliance with the corresponding regulatory requirements. Hence additional site specific evaluations for accident conditions are not required.
5.4.11.2 Fuel Enrichment
As discussed in Subsection 5.2.2, enrichments have a significant impact on neutron dose rates, with lower enrichments resulting in higher neutron dose rates for the same burnup and cooling time. For assemblies with higher burnups (where the neutron contribution to the total dose rate is higher) and/or locations that are more neutron dominated, the enrichment would therefore be important in order to present dose rates in a conservative way. However, it would be impractical
HOLTEC INTERNATIONAL COPYRIGHTED MATERIAL HI-STORM 100 FSAR Proposed Rev. 21BG REPORT HI-2002444 5-158
Table 5.4.23
ANNUAL DOSE FOR ARRAYS OF HI-STORM 100S VERSION B FOR DIFFERENT MPCs WITH THE BOUNDING CONTENT
Array Configuration 1 cask 2x2 2x3 2x4 2x5 MPC-24 Annual Dose1 (mrem/year) 14.60 15.13 22.70 12.32 15.40 Distance to Controlled Area Boundary2 400 500 500 600 600 (meters)
MPC-32 Annual Dose (mrem/year) 16.51 15.76 23.64 13.25 16.56 Distance to Controlled Area Boundary 400 500 500 600 600 (meters)
MPC-68 Annual Dose (mrem/year) 16.33 16.25 24.38 14.47 18.09 Distance to Controlled Area Boundary 400 500 500 600 600 (meters)
1 8760 hr. annual occupancy is assumed.
2 Dose location is at the center of the long side of the array.
HOLTEC INTERNATIONAL COPYRIGHTED MATERIAL HI-STORM 100 FSAR Proposed Rev. 21BG REPORT HI-2002444 5-183