Letter Sequence Supplement |
---|
|
|
|
|
---|
Category:Letter type:L
MONTHYEARL-24-017, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2024-01-24024 January 2024 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative L-23-207, License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2024-01-24024 January 2024 License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs L-23-267, Submittal of Discharge Monitoring Report (Npdes), Permit No. PA00256152023-12-18018 December 2023 Submittal of Discharge Monitoring Report (Npdes), Permit No. PA0025615 L-23-171, CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency2023-12-0808 December 2023 CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency L-23-260, Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station2023-12-0707 December 2023 Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station L-23-243, Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation L-23-244, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation L-23-229, Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports2023-11-29029 November 2023 Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports L-23-247, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-11-17017 November 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-238, Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 202023-11-10010 November 2023 Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 20 L-23-052, Submittal of the Updated Safety Analysis Report, Revision 232023-10-27027 October 2023 Submittal of the Updated Safety Analysis Report, Revision 23 L-23-227, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 20232023-10-20020 October 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 2023 L-23-215, Changes to Emergency Plan2023-10-19019 October 2023 Changes to Emergency Plan L-23-208, Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA00256152023-09-14014 September 2023 Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA0025615 L-23-167, Twenty-Third Refueling Outage Inservice Inspection Summary Report2023-09-13013 September 2023 Twenty-Third Refueling Outage Inservice Inspection Summary Report L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-206, Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD2023-09-12012 September 2023 Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-001, License Amendment Request to Remove the Table of Contents from the Technical Specifications2023-08-0707 August 2023 License Amendment Request to Remove the Table of Contents from the Technical Specifications L-23-175, Submittal of Fifth Ten Year Inservice Testing Program2023-08-0101 August 2023 Submittal of Fifth Ten Year Inservice Testing Program L-23-174, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2023-07-19019 July 2023 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative L-23-179, Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA00256152023-07-18018 July 2023 Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA0025615 L-23-146, License Renewal Application for the Perry Nuclear Power Plant2023-07-0303 July 2023 License Renewal Application for the Perry Nuclear Power Plant L-23-165, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-06-26026 June 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-051, Plan, Nineteenth Inservice Inspection Summary Report2023-06-22022 June 2023 Plan, Nineteenth Inservice Inspection Summary Report L-23-050, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-06-22022 June 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-034, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-06-13013 June 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-139, Response to Request for Additional Information Regarding Fall 2022 180-Day Steam Generator Tube Inspection Report2023-06-13013 June 2023 Response to Request for Additional Information Regarding Fall 2022 180-Day Steam Generator Tube Inspection Report L-22-249, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener2023-06-0505 June 2023 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener L-23-135, Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-05-31031 May 2023 Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations L-23-055, Submittal of the Updated Final Safety Analysis Report, Revision 342023-05-23023 May 2023 Submittal of the Updated Final Safety Analysis Report, Revision 34 L-23-134, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-23023 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report L-23-137, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-05-18018 May 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-125, Cycle 24 Core Operating Limits Report2023-05-17017 May 2023 Cycle 24 Core Operating Limits Report L-23-101, Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station - 20222023-05-12012 May 2023 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station - 2022 L-23-131, Readiness for Resumption of NRC Supplemental Inspection2023-05-12012 May 2023 Readiness for Resumption of NRC Supplemental Inspection L-23-132, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-10010 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations L-23-129, Response to Request for Additional Information for 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations2023-05-0505 May 2023 Response to Request for Additional Information for 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations L-23-092, Occupational Radiation Exposure Report for Year 20222023-04-27027 April 2023 Occupational Radiation Exposure Report for Year 2022 L-23-115, Submittal of 2022 Annual Radioactive Effluent Release Report, 2022 Annual Radiological Environmental Operating Report, and 2022 Annual Environmental Operating Report (Non-Radiological2023-04-27027 April 2023 Submittal of 2022 Annual Radioactive Effluent Release Report, 2022 Annual Radiological Environmental Operating Report, and 2022 Annual Environmental Operating Report (Non-Radiological L-23-121, Annual Radiological Effluent Release Report2023-04-26026 April 2023 Annual Radiological Effluent Release Report L-23-122, Annual Radiological Environmental Operating Report2023-04-26026 April 2023 Annual Radiological Environmental Operating Report L-23-126, Discharge Monitoring Report (Npdes), Permit No. PA00256152023-04-22022 April 2023 Discharge Monitoring Report (Npdes), Permit No. PA0025615 L-23-053, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-04-14014 April 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-061, Submittal of the Decommissioning Funding Status Reports2023-03-31031 March 2023 Submittal of the Decommissioning Funding Status Reports L-23-049, Core Operating Limits Report for Operating Cycle 202023-03-30030 March 2023 Core Operating Limits Report for Operating Cycle 20 L-23-037, and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments2023-03-29029 March 2023 and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments L-23-058, 180-Day Steam Generator Tube Inspection Report2023-03-27027 March 2023 180-Day Steam Generator Tube Inspection Report 2024-01-24
[Table view] Category:Report
MONTHYEARML23355A2682023-12-21021 December 2023 NRC Comments - Comanche Peak LRA Supplement 3 (1) CP-202300566, (Cpnpp), Special Report 1-SR-23-001-00, Inoperable Post Accident Monitoring Instrumentation2023-12-12012 December 2023 (Cpnpp), Special Report 1-SR-23-001-00, Inoperable Post Accident Monitoring Instrumentation L-23-171, CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency2023-12-0808 December 2023 CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency CP-202300401, 10CFR50.59 Evaluation Summary Report 024, 10CFR72.48 Evaluation Summary Report 009, and Commitment Material Change Evaluation Report 0182023-08-15015 August 2023 10CFR50.59 Evaluation Summary Report 024, 10CFR72.48 Evaluation Summary Report 009, and Commitment Material Change Evaluation Report 018 L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments CP-202300285, Response to Request for Additional Information Regarding Review of the License Renewal Application - Set 12023-07-12012 July 2023 Response to Request for Additional Information Regarding Review of the License Renewal Application - Set 1 CP-202300263, Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements2023-06-15015 June 2023 Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements L-22-253, Submittal of Pressure and Temperature Limits Report, Revision 52023-01-10010 January 2023 Submittal of Pressure and Temperature Limits Report, Revision 5 CP-202200419, (CPNPP) - Unit 1 Refueling Outage 22 (1RF22) Steam Generator 180 Day Report2022-11-0303 November 2022 (CPNPP) - Unit 1 Refueling Outage 22 (1RF22) Steam Generator 180 Day Report L-22-211, Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report2022-09-29029 September 2022 Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report L-22-216, Submittal of Pressure and Temperature Limits Report. Revision 42022-09-27027 September 2022 Submittal of Pressure and Temperature Limits Report. Revision 4 L-22-154, Pressure and Temperature Limits Report Revision2022-07-0606 July 2022 Pressure and Temperature Limits Report Revision CP-202200247, (CPNPP) - 10CFR50.59 Evaluation Summary Report 023, 10CFR72.48 Evaluation Summary Report 008 and Commitment Material Change Evaluation Report 0172022-06-30030 June 2022 (CPNPP) - 10CFR50.59 Evaluation Summary Report 023, 10CFR72.48 Evaluation Summary Report 008 and Commitment Material Change Evaluation Report 017 L-22-149, Post Accident Monitoring Report2022-06-23023 June 2022 Post Accident Monitoring Report ML22202A4362022-04-0808 April 2022 Enclosure F: Updated Inputs to 52 EFPY P-T Operating Curves ML22202A4372022-03-0202 March 2022 Enclosure G: Framatome Inc. Document 86-9344713-000, Davis-Besse Reactor Vessel Embrittlement Fluence Reconciliation Through 60 Years L-22-054, Steam Generator Inspection Report- Fall 2021 Refueling Outage2022-02-10010 February 2022 Steam Generator Inspection Report- Fall 2021 Refueling Outage IR 05000346/20210902021-12-16016 December 2021 Reissue Davis-Besse NRC Inspection Report (05000346/2021090) Preliminary White Finding ML21322A2892021-12-0909 December 2021 Approval of Plant-Specific Analysis of Certain Reactor Vessel Internal Components in Accordance with License Renewal Commitment No. 53 ML22020A1792021-11-0404 November 2021 Fall 2021 Steam Generator Tube Inspections Discussion Input IR 05000334/20210052021-09-0101 September 2021 Updated Inspection Plan for the Beaver Valley Power Station, Units 1 and 2 (Report 05000334/2021005 and 05000412/2021005) ML21131A0242021-05-17017 May 2021 Review of Reactor Pressure Vessel Capsule Y Analysis Report CP-202100127, Transmittal of Pressure and Temperature Limits Report, ERX-07-003, Revision 62021-03-16016 March 2021 Transmittal of Pressure and Temperature Limits Report, ERX-07-003, Revision 6 ML21055A0582021-03-10010 March 2021 Review of the Refueling Outage 21 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and F* Reports L-21-045, 10 CFR 50.55a Request Number VR-4, Revision 0, Exercising Test Frequency, VR-6, Revision 0, Position Verification Testing, and VR-8, Revision 0, Valve Test Frequency Extension2021-02-0808 February 2021 10 CFR 50.55a Request Number VR-4, Revision 0, Exercising Test Frequency, VR-6, Revision 0, Position Verification Testing, and VR-8, Revision 0, Valve Test Frequency Extension L-21-063, Facility Id 04-13361, Unit 2 Emergency Diesel Generator Day Tanks2021-02-0101 February 2021 Facility Id 04-13361, Unit 2 Emergency Diesel Generator Day Tanks ML21026A3372021-01-26026 January 2021 Steam Generator Inspection Report Revision - Spring 2020 Refueling Outage CP-202000462, Submittal of 10CFR50.59 Evaluation Summary Report 022, 007, and Commitment Material Change Evaluation Report 0162020-09-29029 September 2020 Submittal of 10CFR50.59 Evaluation Summary Report 022, 007, and Commitment Material Change Evaluation Report 016 ML20302A3022020-09-25025 September 2020 1 to Technical Requirements Manual L-20-257, Request for One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Pandemic2020-09-22022 September 2020 Request for One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Pandemic L-21-135, ODCM: Liquid Effluents2020-07-17017 July 2020 ODCM: Liquid Effluents ML21127A1652020-07-17017 July 2020 ODCM: Index, Matrix and History of ODCM Changes ML21127A1482020-07-17017 July 2020 ODCM: Controls for RETS and REMP Programs ML20153A7442020-06-0404 June 2020 Review of the Fall 2018 Steam Generator Tube Inspection Report L-20-116, CFR 50.55a Request Number VRR6, Revision 0, Motor-Operated Valve Test Frequency2020-04-0101 April 2020 CFR 50.55a Request Number VRR6, Revision 0, Motor-Operated Valve Test Frequency ML19280A0382019-10-22022 October 2019 Ti 2515-191 Summary of Findings ML19255H0992019-10-10010 October 2019 Staff Assessment of Flooding Focused Evaluation CP-201900467, (CPNPP) - Biennial Review of Procedures and Station Operations Review Committee Meetings2019-08-14014 August 2019 (CPNPP) - Biennial Review of Procedures and Station Operations Review Committee Meetings L-19-189, 54010-CALC-01, Davis-Besse Nuclear Power Station: Evaluation of Risk Significance of Permanent ILRT Extension.2019-07-29029 July 2019 54010-CALC-01, Davis-Besse Nuclear Power Station: Evaluation of Risk Significance of Permanent ILRT Extension. ML21127A1562019-07-17017 July 2019 ODCM: Gaseous Effluents CP-201900378, Transmittal of Seventeenth Refueling Outage (2RF17) Steam Generator 180 Day Report2019-06-10010 June 2019 Transmittal of Seventeenth Refueling Outage (2RF17) Steam Generator 180 Day Report ML22262A1522019-05-0101 May 2019 Framatome Inc., Document ANP-2718NP, Revision 007, Appendix G Pressure-Temperature Limits for 52 EFPY for the Davis-Besse Nuclear Power Station ML22202A4332019-04-30030 April 2019 Enclosure C: Framatome ANP-2718NP, Rev. 7, Appendix G Pressure-Temperature Limits for 52 EFPY for the Davis-Besse Nuclear Power Station CP-201900126, Special Report 2-SR-19-001-00, Inoperable Post Accident Monitoring Instrumentation Report.2019-02-25025 February 2019 Special Report 2-SR-19-001-00, Inoperable Post Accident Monitoring Instrumentation Report. L-19-053, Emergency Response Data System Data Point Library Update2019-02-20020 February 2019 Emergency Response Data System Data Point Library Update ML19051A1092019-02-20020 February 2019 LTR-SDA-18-054-NP, Revision 0 - Technical Justification to Support the Extended Volumetric Examination Interval for Beaver Valley Unit 2 Reactor Vessel Inlet Nozzle to Safe End Dissimilar Metal Welds CP-201800652, Special Report 1-SR-18-001-00, Inoperable Post Accident Monitoring Instrumentation Report2018-09-12012 September 2018 Special Report 1-SR-18-001-00, Inoperable Post Accident Monitoring Instrumentation Report L-18-186, Proposed Alternative to Use ASME Code Case N-8312018-09-0707 September 2018 Proposed Alternative to Use ASME Code Case N-831 L-18-037, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2018-06-18018 June 2018 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-18-108, Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformance Identified in Response to Regulatory Issue Summary 2015-06, Tornado Missile....2018-04-12012 April 2018 Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformance Identified in Response to Regulatory Issue Summary 2015-06, Tornado Missile.... 2023-08-07
[Table view] Category:Miscellaneous
MONTHYEARCP-202300566, (Cpnpp), Special Report 1-SR-23-001-00, Inoperable Post Accident Monitoring Instrumentation2023-12-12012 December 2023 (Cpnpp), Special Report 1-SR-23-001-00, Inoperable Post Accident Monitoring Instrumentation L-23-171, CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency2023-12-0808 December 2023 CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency CP-202300401, 10CFR50.59 Evaluation Summary Report 024, 10CFR72.48 Evaluation Summary Report 009, and Commitment Material Change Evaluation Report 0182023-08-15015 August 2023 10CFR50.59 Evaluation Summary Report 024, 10CFR72.48 Evaluation Summary Report 009, and Commitment Material Change Evaluation Report 018 L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments CP-202300263, Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements2023-06-15015 June 2023 Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements CP-202200247, (CPNPP) - 10CFR50.59 Evaluation Summary Report 023, 10CFR72.48 Evaluation Summary Report 008 and Commitment Material Change Evaluation Report 0172022-06-30030 June 2022 (CPNPP) - 10CFR50.59 Evaluation Summary Report 023, 10CFR72.48 Evaluation Summary Report 008 and Commitment Material Change Evaluation Report 017 IR 05000346/20210902021-12-16016 December 2021 Reissue Davis-Besse NRC Inspection Report (05000346/2021090) Preliminary White Finding ML22020A1792021-11-0404 November 2021 Fall 2021 Steam Generator Tube Inspections Discussion Input IR 05000334/20210052021-09-0101 September 2021 Updated Inspection Plan for the Beaver Valley Power Station, Units 1 and 2 (Report 05000334/2021005 and 05000412/2021005) ML21131A0242021-05-17017 May 2021 Review of Reactor Pressure Vessel Capsule Y Analysis Report ML21055A0582021-03-10010 March 2021 Review of the Refueling Outage 21 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and F* Reports L-21-063, Facility Id 04-13361, Unit 2 Emergency Diesel Generator Day Tanks2021-02-0101 February 2021 Facility Id 04-13361, Unit 2 Emergency Diesel Generator Day Tanks CP-202000462, Submittal of 10CFR50.59 Evaluation Summary Report 022, 007, and Commitment Material Change Evaluation Report 0162020-09-29029 September 2020 Submittal of 10CFR50.59 Evaluation Summary Report 022, 007, and Commitment Material Change Evaluation Report 016 L-20-257, Request for One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Pandemic2020-09-22022 September 2020 Request for One-Time Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Pandemic ML20153A7442020-06-0404 June 2020 Review of the Fall 2018 Steam Generator Tube Inspection Report L-19-053, Emergency Response Data System Data Point Library Update2019-02-20020 February 2019 Emergency Response Data System Data Point Library Update L-18-186, Proposed Alternative to Use ASME Code Case N-8312018-09-0707 September 2018 Proposed Alternative to Use ASME Code Case N-831 L-18-037, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2018-06-18018 June 2018 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-18-108, Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformance Identified in Response to Regulatory Issue Summary 2015-06, Tornado Missile....2018-04-12012 April 2018 Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformance Identified in Response to Regulatory Issue Summary 2015-06, Tornado Missile.... L-18-017, Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformances Identified in Response to Regulatory Issue Summary 2015-06, Tornado.2018-03-15015 March 2018 Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformances Identified in Response to Regulatory Issue Summary 2015-06, Tornado. L-17-229, Mitigating Strategies Assessment (MSA) for Flooding2017-07-24024 July 2017 Mitigating Strategies Assessment (MSA) for Flooding L-17-039, 2016 Annual Report of Emergency Core Cooling System Errors and Model Changes2017-04-0505 April 2017 2016 Annual Report of Emergency Core Cooling System Errors and Model Changes L-17-088, Independent Spent Fuel Storage Installation Changes, Tests and Experiments2017-03-27027 March 2017 Independent Spent Fuel Storage Installation Changes, Tests and Experiments CP-201700033, Mitigating Strategies Assessment Flood Report, NEI 12-06, Appendix G, Revision 2, G.4.1 Path2017-02-0909 February 2017 Mitigating Strategies Assessment Flood Report, NEI 12-06, Appendix G, Revision 2, G.4.1 Path ML17024A0362016-12-31031 December 2016 Operating Data Report for 2016 ML16312A3112016-11-0707 November 2016 Spent Fuel Pool Evaluation Supplemental Report. Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force (Ntif) Review... L-16-093, Report of Facility Changes, Tests and Experiments2016-06-0303 June 2016 Report of Facility Changes, Tests and Experiments L-16-148, Fatigue Monitoring Program Evaluation of Reactor Coolant Pressure Boundary Components for Effects of the Reactor Coolant Environment on Fatigue Usage (I.E., Environmentally-Assisted Fatigue)2016-04-21021 April 2016 Fatigue Monitoring Program Evaluation of Reactor Coolant Pressure Boundary Components for Effects of the Reactor Coolant Environment on Fatigue Usage (I.E., Environmentally-Assisted Fatigue) L-16-065, Transmittal of 180-Day Steam Generator Tube Inspection Report - Technical Specification 5.6.6.22016-04-0606 April 2016 Transmittal of 180-Day Steam Generator Tube Inspection Report - Technical Specification 5.6.6.2 L-16-091, Revision of Flood Hazard Reevaluation Report in Response to NRC Request for Additional Information, Per 10CFR50.54(f) Regarding the Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force (NTTF) Review of Insights from the Fukush2016-03-24024 March 2016 Revision of Flood Hazard Reevaluation Report in Response to NRC Request for Additional Information, Per 10CFR50.54(f) Regarding the Flooding Aspects of Recommendation 2.1 of the Near-Term Task Force (NTTF) Review of Insights from the Fukush CP-201600093, Transmittal of 10CFR50.59 Evaluation Summary Report 019, 10CFR72.48 Evaluation Summary Report 004, and Commitment Material Change Evaluation Report 0132016-02-24024 February 2016 Transmittal of 10CFR50.59 Evaluation Summary Report 019, 10CFR72.48 Evaluation Summary Report 004, and Commitment Material Change Evaluation Report 013 ML16014A1252016-01-22022 January 2016 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50 Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force L-16-006, Submittal of Annual Report Pursuant to 10 CFR 75.11, Location Information2016-01-20020 January 2016 Submittal of Annual Report Pursuant to 10 CFR 75.11, Location Information L-15-386, Post Accident Monitoring Report Regarding Inoperability of One of the Source Range Nuclear Excore Instrumentation Channel for a Period in Excess of the 30-Day Restoration Time2016-01-0505 January 2016 Post Accident Monitoring Report Regarding Inoperability of One of the Source Range Nuclear Excore Instrumentation Channel for a Period in Excess of the 30-Day Restoration Time L-15-337, Completion of Required Action by NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and NRC Order EA-12-051, Reliable Spent Fuel Pool..2015-12-21021 December 2015 Completion of Required Action by NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events and NRC Order EA-12-051, Reliable Spent Fuel Pool.. L-15-281, Submittal of Report of Facility Changes, Tests and Experiments2015-10-23023 October 2015 Submittal of Report of Facility Changes, Tests and Experiments ML15274A3072015-10-0505 October 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50 Section 50.54 Seismic Hazard Reevaluations for Recommendation 2.1of the Near-Term Task Force Review L-15-187, Submittal of 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2015-09-16016 September 2015 Submittal of 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models ML15230A2892015-08-25025 August 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50 Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review ML15208A0342015-08-0303 August 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force L-15-193, Submittal of the 2015 Silicone Sealant Report Pursuant to License Commitment 172015-06-12012 June 2015 Submittal of the 2015 Silicone Sealant Report Pursuant to License Commitment 17 ML15132A4962015-05-22022 May 2015 Review of the 2014 Steam Generator Tube Inspection Report (TAC No. M4620) L-15-108, ISFSI - Summary Report of Changes, Tests and Experiments for the Period of January 1, 2013 Through December 31, 20142015-04-0303 April 2015 ISFSI - Summary Report of Changes, Tests and Experiments for the Period of January 1, 2013 Through December 31, 2014 ML15062A0302015-02-25025 February 2015 Work Plan for Completing a Once Through Cooling Water Study for Total Dissolved Solids, Chlorides, and Sulfates ML15027A2352015-01-28028 January 2015 Regulatory Audit in Support of the License Amendment Request to Implement a Risk-Informed, Performance-Based, Fire Protection Program (Tac Nos. MF3301 & MF3302) L-14-401, First Energy Nuclear Operating Company (FENOC) Expedited Seismic Evaluation Process (ESEP) Reports Response to NRC Request for Information Pursuant to 10 CFR50.54(f) Regarding Recommendation.1 of the Near-Term Task Force (NTTF) Review of In2014-12-19019 December 2014 First Energy Nuclear Operating Company (FENOC) Expedited Seismic Evaluation Process (ESEP) Reports Response to NRC Request for Information Pursuant to 10 CFR50.54(f) Regarding Recommendation.1 of the Near-Term Task Force (NTTF) Review of In L-14-352, Steam Generator Tube Inspection Report - Technical Specification 5.6.6.22014-11-0505 November 2014 Steam Generator Tube Inspection Report - Technical Specification 5.6.6.2 ML14353A0602014-11-0303 November 2014 2734296-R-010, Rev. 0, Expedited Seismic Evaluation Process (ESEP) Report Davis-Besse Nuclear Power Station CP-201401268, Fourteenth Refueling Outage (2RF14) Steam Generator 180 Day Report2014-10-21021 October 2014 Fourteenth Refueling Outage (2RF14) Steam Generator 180 Day Report L-14-259, Firstenergy Nuclear Operating Company'S (Fenoc'S) Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2014-08-28028 August 2014 Firstenergy Nuclear Operating Company'S (Fenoc'S) Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) 2023-08-07
[Table view] |
Text
Energy Harbor Nuclear Corp.
168 E. Market Street Akron, Ohio 44308 David B. Hamilton 330-436-1360 President and Chief Nuclear Officer August 7, 2023 10 CFR 50.80 L-23-188 10 CFR 50.90 10 CFR 72.50 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
SUBJECT:
Comanche Peak Nuclear Power Plant, Units 1 and 2 Docket No. 50-445, License No. NPF-87 Docket No. 50-446, License No. NPF-89 Comanche Peak Nuclear Power Plant, Units 1 and 2, Independent Spent Fuel Storage Installation (ISFSI)
Docket No. 72-74 Beaver Valley Power Station, Unit Nos. 1 and 2 Docket No. 50-334, License No. DPR-66 Docket No. 50-412, License No. NPF-73 Beaver Valley Power Station, Unit Nos. 1 and 2, ISFSI Docket No. 72-1043 Davis-Besse Nuclear Power Station, Unit No. 1 Docket No. 50-346, License No. NPF-3 Davis-Besse Nuclear Power Station, Unit No. 1, ISFSI Docket No. 72-14 Perry Nuclear Power Plant, Unit No. 1 Docket No. 50-440, License No. NPF-58 Perry Nuclear Power Plant, Unit No. 1, ISFSI Docket No. 72-69 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments By letter dated April 14, 2023 (Accession No. ML23104A423), as supplemented by letter dated April 20, 2023 (Accession No. ML23110A788), Vistra Operations Company LLC (VistraOps), acting on behalf of itself, Comanche Peak Power Company LLC and certain other affiliates, and Energy Harbor Nuclear Corp. (EHNC), acting on behalf of itself and Energy Harbor Nuclear Generation LLC (EHNG), submitted an application requesting that the U.S. Nuclear Regulatory Commission (NRC) consent to the indirect transfer of control of the licenses for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 (CPNPP) and its generally licensed independent spent fuel storage installation
Comanche Peak Nuclear Power Plant, Units 1 and 2 Comanche Peak Nuclear Power Plant, Units 1 and 2 ISFSI Beaver Valley Power Station, Unit Nos. 1 and 2 Beaver Valley Power Station, Unit Nos. 1 and 2 ISFSI Davis-Besse Nuclear Power Station, Unit No. 1 Davis-Besse Nuclear Power Station, Unit No. 1 ISFSI Perry Nuclear Power Plant, Unit No. 1 Perry Nuclear Power Plant, Unit No. 1 ISFSI L-23-188 Page 2 facility ("ISFSI"); the indirect transfer of control of the licenses to own the Beaver Valley Power Station, Unit Nos. 1 and 2 (collectively "BVPS" and individually "BVPS-1" and "BVPS-2"), Davis-Besse Nuclear Power Station, Unit No. 1 ("DBNPS"), and Perry Nuclear Power Plant, Unit No. 1 ("PNPP"), and their respective generally licensed ISFSls (collectively, the "EH Facilities"); and the direct transfer of the operating licenses for the EH Facilities to VistraOps as a consequence of Vistra Corp.'s transaction with Energy Harbor Corp., the parent company of EHNG and EHNC.
Within the application, changes to the EHNC facility operating licenses were shown in Exhibit H, with clean pages provided in Exhibit I. Following submittal of the application, it was identified that several occurrences of EHNC currently in the operating licenses were not indicated to be changed to VistraOps. This has been entered into the Corrective Action Program. It was also noted that "LLC" was inadvertently omitted in one instance for VistraOps. Corrected marked-up versions of the affected pages are provided in Attachment 1 to supplement Exhibit H. Clean versions of these corrected pages are provided in Attachment 2 to supplement Exhibit I.
There is no impact to the previous no significant hazards consideration as a result of this supplement to the application.
There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Phil H. Lashley, Manager -
Fleet Licensing, at (330) 696-7208.
I declare under penalty of perjury that the foregoing is true and correct. Executed on August _1 _ , 2023.
Sincerely, David B. Hamilton Attachments:
- 1. Corrected Facility Operating License Pages (Changes)
- 2. Corrected Facility Operating License Pages (Clean Pages)
Comanche Peak Nuclear Power Plant, Units 1 and 2 Comanche Peak Nuclear Power Plant, Units 1 and 2 ISFSI Beaver Valley Power Station, Unit Nos. 1 and 2 Beaver Valley Power Station, Unit Nos. 1 and 2 ISFSI Davis-Besse Nuclear Power Station, Unit No. 1 Davis-Besse Nuclear Power Station, Unit No. 1 ISFSI Perry Nuclear Power Plant, Unit No. 1 Perry Nuclear Power Plant, Unit No. 1 ISFSI L-23-188 Page 3 cc: Raymond Lorson, Region I [rkl@nrc.gov]
John Giessner, Region III [John.Giessner@nrc.gov]
Robert Lewis, Region IV [Robert.Lewis@nrc.gov]
Dennis Galvin, NRR [Dennis.Galvin@nrc.gov]
John Ellegood, Senior Resident Inspector, CPNPP [John.Ellegood@nrc.gov]
David Nani, Resident Inspector, CPNPP [David.Nani@nrc.gov]
Robert Kuntz, NRC Project Manager, EHNC Fleet [robert.kuntz@nrc.gov]
Neil Day, NRC Senior Resident Inspector, BVPS [nday@energyharbor.com]
Russ Cassara, NRC Senior Resident Inspector, DBNPS
[rcassara@energyharbor.com]
James Beavers, NRC Senior Resident Inspector, PNPP
[jbeavers@energyharbor.com]
Bryan Werner, Director BRP/DEP [brwerner@pa.gov]
David Baracco, Director BRP/DEP [dbaracco@pa.gov]
Wade DeHaas, Site BRP/DEP [wdehaas@pa.gov]
Chris Salz, URSB and OEMA, State of Ohio [cmsalz@dps.ohio.gov]
Robert Free, Tex. Dept. of State Health Svc. [robert.free@dshs.state.tx.us]
Attachment 1 L-23-188 Corrected Facility Operating License Pages (Changes)
(5 pages follow)
Additional page for Beaver Valley Power Station, Unit 1 G. UFSAR Supplement Changes The information in the UFSAR supplement, as revised, submitted pursuant to 10 CFR54.21(d), shall be incorporated into the UFSAR as required by 10 CFR 50.71(e) following the issuance of this renewed operating license. Until that update is complete, Energy Harbor Nuclear Corp.Vistra Operations Company LLC may not make changes to the information in the supplement.
Following incorporation into the UFSAR, the need for prior Commission approval of any changes will be governed by 10 CFR 50.59.
H. Capsule Withdrawal Schedule For the renewed operating license term, all capsules in the reactor vessel that are removed and tested must meet the test procedures and reporting requirements of American Society for Testing and Materials (ASTM) E 185-82 to the extent practicable for the configuration of the specimens in the capsule. Any changes to the capsule withdrawal schedule, including spare capsules, must be approved by the NRC prior to implementation.
I. Containment Liner Volumetric Inspection a) If degradation (greater than 10 percent of the nominal thickness not attributable to fabrication/erection practices) is identified in the non-random areas examined using ultrasonic testing (UT) as described in Supplement 1 of NUREG-1929, UT examinations shall be performed at additional non-random areas, to be selected based on this operating experience. Should additional degradation be identified, additional non-random areas shall be UT examined until no further degradation (greater than 10 percent of the nominal thickness) is identified. All areas with degradation shall be reexamined over at least the next three successive inspection periods to ensure that progression of the degradation is not occurring.
b) If degradation (greater than 10 percent of the nominal thickness not attributable to fabrication/erection practices) is identified in the random samples examined using ultrasonic testing (UT) as described in Supplement 1 of NUREG 1929, UT examinations shall be performed on additional random samples, to ensure a 95 percent confidence that 95 percent of the unexamined accessible containment liner is not degraded. If additional degradation is identified, the sample size for UT examinations shall be further expanded until the statistical sampling has achieved the 95 percent confidence goal described previously. All areas with degradation shall be reexamined over at least the next three successive inspection periods to ensure that progression of the degradation is not occurring.
- 3. This renewed operating license is effective as of the date of issuance and shall expire at midnight on January 29, 2036.
FOR THE NUCLEAR REGULATORY COMMISSION ORIGINAL SIGNED BY:
Eric J. Leeds, Director Office of Nuclear Reactor Regulation Attachments:
- 1. Appendix A - Technical Specifications
- 2. Appendix C - Additional Conditions Date of Issuance: November 05, 2009 Amendment No. 304 Beaver Valley Unit 1 Renewed Operating License DPR-66
Replacement page for Beaver Valley Power Station, Unit 2 (2) The facility requires an exemption from the requirements of 10 CFR 50, Appendix J, Section III.D.2(b)(ii). The justification of this exemption is contained in Section 6.2.6 of Supplement 5 to the Safety Evaluation Report and modified by a letter dated July 26, 1995. The staff's environmental assessment was published on May 12, 1987 (52 FR 17651) and on June 9, 1995 (60 FR 30611). Therefore, pursuant to 10 CFR 50.12(a)(1) and 10 CFR 50.12(a)(2)(ii) and (iii), Beaver Valley Power Station, Unit 2 is exempt from the quoted requirements and instead, is required to perform the overall air lock leak test at pressure P a before establishing containment integrity if air lock maintenance has been performed that could affect the air lock sealing capability. Local leak rate testing at a pressure of not less than Pa may be substituted for an overall air lock test where the design permits.
E. Physical Security Energy Harbor Nuclear Corp.Vistra Operations Company LLC shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contains Safeguards Information protected under 10 CFR 73.21 is entitled: "Beaver Valley Power Station (BVPS) Physical Security Plan" submitted by letter September 9, 2004, and supplemented September 30, 2004, October 14, 2004, and May 12, 2006.
Energy Harbor Nuclear Corp.Vistra Operations Company LLC shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The Beaver Valley Power Station CSP was approved by License Amendment No. 174, and amended by License Amendment No. 183.
F. Fire Protection Program Energy Harbor Nuclear Corp.Vistra Operations Company LLC shall implement and maintain in effect all provisions of the approved fire protection program that comply with 10 CFR 50.48(a) and 10 CFR 50.48(c) as specified in the license amendment request dated December 23, 2013, (as supplemented by letters dated February 14, 2014; April 27, May 27, June 26, November 6, and December 21, 2015; February 24 and May 12, 2016; and January 30, April 21, June 23, August 22, October 25, and November 29, 2017), and as approved in the safety evaluation dated January 22, 2018. Except where NRC approval for changes or deviations is required by 10 CFR 50.48(c), and provided no other regulation, technical specification, license condition, or requirement would require prior NRC approval, the licensee may make changes to the fire protection program without prior approval of the Commission if those changes satisfy the provisions set forth in 10 CFR 50.48(a) and 10 CFR 50.48(c), the change does not require a change to a technical specification or a license condition, and the criteria listed below are satisfied.
Amendment No. 194 Beaver Valley Unit 2 Renewed Operating License NPF-73
Replacement page for Perry Nuclear Power Plant C. This license shall be deemed to contain and is subject to the conditions specified in the Commissions regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1) Maximum Power Level Energy Harbor Nuclear Corp.Vistra Operations Company LLC is authorized to operate the facility at reactor core power levels not in excess of 3758 megawatts thermal (100% power) in accordance with the conditions specified herein.
(2) Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 200, are hereby incorporated into the license. Energy Harbor Nuclear Corp.Vistra Operations Company LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
(3) Antitrust Conditions
- a. Energy Harbor Nuclear Generation LLC shall comply with the antitrust conditions delineated in Appendix C to this license; Appendix C is hereby incorporated into this license.
Amendment No. 199
Additional page for Perry Nuclear Power Plant APPENDIX A TO FACILITY OPERATING LICENSE NO. NPF-58 PERRY NUCLEAR POWER PLANT UNIT 1 ENERGY HARBOR NUCLEAR CORP.VISTRA OPERATIONS COMPANY LLC DOCKET NO. 50-440 TECHNICAL SPECIFICATIONS ARE FILED IN THE TECHNICAL SPECIFICATION MANUAL Amendment No. 187
Additional page for Perry Nuclear Power Plant APPENDIX B TO FACILITY OPERATING LICENSE NO. NPF-58 PERRY NUCLEAR POWER PLANT UNIT 1 ENERGY HARBOR NUCLEAR CORP.VISTRA OPERATIONS COMPANY LLC DOCKET NOS. 50-440 AND 50-441 ENVIRONMENTAL PROTECTION PLAN (NONRADIOLOGICAL)
November 13, 1986 Amendment No. 187
Attachment 2 L-23-188 Corrected Facility Operating License Pages (Clean Pages)
(5 pages follow)
G. UFSAR Supplement Changes The information in the UFSAR supplement, as revised, submitted pursuant to 10 CFR54.21(d), shall be incorporated into the UFSAR as required by 10 CFR 50.71(e) following the issuance of this renewed operating license. Until that update is complete, Vistra Operations Company LLC may not make changes to the information in the supplement. Following incorporation into the UFSAR, the need for prior Commission approval of any changes will be governed by 10 CFR 50.59.
H. Capsule Withdrawal Schedule For the renewed operating license term, all capsules in the reactor vessel that are removed and tested must meet the test procedures and reporting requirements of American Society for Testing and Materials (ASTM) E 185-82 to the extent practicable for the configuration of the specimens in the capsule. Any changes to the capsule withdrawal schedule, including spare capsules, must be approved by the NRC prior to implementation.
I. Containment Liner Volumetric Inspection a) If degradation (greater than 10 percent of the nominal thickness not attributable to fabrication/erection practices) is identified in the non-random areas examined using ultrasonic testing (UT) as described in Supplement 1 of NUREG-1929, UT examinations shall be performed at additional non-random areas, to be selected based on this operating experience. Should additional degradation be identified, additional non-random areas shall be UT examined until no further degradation (greater than 10 percent of the nominal thickness) is identified. All areas with degradation shall be reexamined over at least the next three successive inspection periods to ensure that progression of the degradation is not occurring.
b) If degradation (greater than 10 percent of the nominal thickness not attributable to fabrication/erection practices) is identified in the random samples examined using ultrasonic testing (UT) as described in Supplement 1 of NUREG 1929, UT examinations shall be performed on additional random samples, to ensure a 95 percent confidence that 95 percent of the unexamined accessible containment liner is not degraded. If additional degradation is identified, the sample size for UT examinations shall be further expanded until the statistical sampling has achieved the 95 percent confidence goal described previously. All areas with degradation shall be reexamined over at least the next three successive inspection periods to ensure that progression of the degradation is not occurring.
- 3. This renewed operating license is effective as of the date of issuance and shall expire at midnight on January 29, 2036.
FOR THE NUCLEAR REGULATORY COMMISSION ORIGINAL SIGNED BY:
Eric J. Leeds, Director Office of Nuclear Reactor Regulation Attachments:
- 1. Appendix A - Technical Specifications
- 2. Appendix C - Additional Conditions Date of Issuance: November 05, 2009 Amendment No. TBD Beaver Valley Unit 1 Renewed Operating License DPR-66
(2) The facility requires an exemption from the requirements of 10 CFR 50, Appendix J, Section III.D.2(b)(ii). The justification of this exemption is contained in Section 6.2.6 of Supplement 5 to the Safety Evaluation Report and modified by a letter dated July 26, 1995. The staff's environmental assessment was published on May 12, 1987 (52 FR 17651) and on June 9, 1995 (60 FR 30611). Therefore, pursuant to 10 CFR 50.12(a)(1) and 10 CFR 50.12(a)(2)(ii) and (iii), Beaver Valley Power Station, Unit 2 is exempt from the quoted requirements and instead, is required to perform the overall air lock leak test at pressure P a before establishing containment integrity if air lock maintenance has been performed that could affect the air lock sealing capability. Local leak rate testing at a pressure of not less than Pa may be substituted for an overall air lock test where the design permits.
E. Physical Security Vistra Operations Company LLC shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contains Safeguards Information protected under 10 CFR 73.21 is entitled: "Beaver Valley Power Station (BVPS) Physical Security Plan" submitted by letter September 9, 2004, and supplemented September 30, 2004, October 14, 2004, and May 12, 2006.
Vistra Operations Company LLC shall fully implement and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).
The Beaver Valley Power Station CSP was approved by License Amendment No. 174, and amended by License Amendment No. 183.
F. Fire Protection Program Vistra Operations Company LLC shall implement and maintain in effect all provisions of the approved fire protection program that comply with 10 CFR 50.48(a) and 10 CFR 50.48(c) as specified in the license amendment request dated December 23, 2013, (as supplemented by letters dated February 14, 2014; April 27, May 27, June 26, November 6, and December 21, 2015; February 24 and May 12, 2016; and January 30, April 21, June 23, August 22, October 25, and November 29, 2017), and as approved in the safety evaluation dated January 22, 2018. Except where NRC approval for changes or deviations is required by 10 CFR 50.48(c), and provided no other regulation, technical specification, license condition, or requirement would require prior NRC approval, the licensee may make changes to the fire protection program without prior approval of the Commission if those changes satisfy the provisions set forth in 10 CFR 50.48(a) and 10 CFR 50.48(c), the change does not require a change to a technical specification or a license condition, and the criteria listed below are satisfied.
Amendment No. TBD Beaver Valley Unit 2 Renewed Operating License NPF-73
C. This license shall be deemed to contain and is subject to the conditions specified in the Commissions regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1) Maximum Power Level Vistra Operations Company LLC is authorized to operate the facility at reactor core power levels not in excess of 3758 megawatts thermal (100% power) in accordance with the conditions specified herein.
(2) Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 200, are hereby incorporated into the license. Vistra Operations Company LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
(3) Antitrust Conditions
- a. Energy Harbor Nuclear Generation LLC shall comply with the antitrust conditions delineated in Appendix C to this license; Appendix C is hereby incorporated into this license.
Amendment No. TBD
APPENDIX A TO FACILITY OPERATING LICENSE NO. NPF-58 PERRY NUCLEAR POWER PLANT UNIT 1 VISTRA OPERATIONS COMPANY LLC DOCKET NO. 50-440 TECHNICAL SPECIFICATIONS ARE FILED IN THE TECHNICAL SPECIFICATION MANUAL Amendment No. TBD
APPENDIX B TO FACILITY OPERATING LICENSE NO. NPF-58 PERRY NUCLEAR POWER PLANT UNIT 1 VISTRA OPERATIONS COMPANY LLC DOCKET NOS. 50-440 AND 50-441 ENVIRONMENTAL PROTECTION PLAN (NONRADIOLOGICAL)
November 13, 1986 Amendment No. TBD