ML23107A033

From kanterella
Jump to navigation Jump to search
6 to Updated Final Safety Analysis Report, Table of Contents
ML23107A033
Person / Time
Site: Palisades Entergy icon.png
Issue date: 03/31/2023
From:
Holtec Decommissioning International
To:
Office of Nuclear Reactor Regulation
Shared Package
ML23107A065 List: ... further results
References
HDI PNP 2023-002
Download: ML23107A033 (64)


Text

DSAR CHAPTER 1 - INTRODUCTION & GENERAL DESCRIPTION OF FACILITY Revision 36 TABLE OF CONTENTS Page 1 of 5 SECTIONS

1.1 INTRODUCTION

....................................................................................... 1.1-1 1.1.1 GENERAL.................................................................................... 1.1-1 1.1.2 LICENSING HISTORY ................................................................. 1.1-1 1.2 GENERAL PLANT DESCRIPTION ........................................................... 1.2-1 1.2.1 FACILITY SITE ............................................................................ 1.2-1 1.2.2 FACILITY ARRANGEMENT ........................................................ 1.2-1 1.2.3 CONTAINMENT........................................................................... 1.2-2 1.2.4 NUCLEAR STEAM SUPPLY SYSTEM (NSSS) .......................... 1.2-2 1.2.5 TURBINE GENERATOR ............................................................. 1.2-4 1.3 IDENTIFICATION OF CONTRACTORS ................................................... 1.3-1 1.4 PRINCIPAL DESIGN CRITERIA............................................................... 1.4-1 1.4.1 FACILITY DESIGN ...................................................................... 1.4-1 1.4.2 DELETED .................................................................................... 1.4-1 1.4.3 DELETED .................................................................................... 1.4-1 1.4.4 CONTAINMENT SYSTEM ........................................................... 1.4-1 1.4.5 DELETED .................................................................................... 1.4-1 1.4.6 DELETED .................................................................................... 1.4-1 1.4.7 ELECTRICAL SYSTEMS ............................................................ 1.4-1 1.4.8 RADIOACTIVE WASTES AND RADIATION PROTECTION ...... 1.4-2 1.4.9 FUEL HANDLING AND STORAGE ............................................ 1.4-2 1.4.10 FIRE PROTECTION .................................................................... 1.4-2 1.4.11 DELETED .................................................................................... 1.4-2 1.4.12 SECURITY ................................................................................... 1.4-2 1.4.13 EMERGENCY PLANNING .......................................................... 1.4-2 1.4.14 PLANT OPERATION ................................................................... 1.4-3 1.4.15 STRUCTURES............................................................................. 1.4-3 1.4.16 SINGLE FAILURE CRITERIA ..................................................... 1.4-3 1.4.16.1 Licensing Basis........................................................... 1.4-3 1.4.16.2 Active And Passive Failures ...................................... 1.4-4 1.4.16.3 Current Design Considerations ................................. 1.4-5

DSAR CHAPTER 1 - INTRODUCTION & GENERAL DESCRIPTION OF FACILITY Revision 36 TABLE OF CONTENTS Page 2 of 5 1.5 MAJOR PLANT MODIFICATIONS (DESIGN/CONSTRUCTION) ............ 1.5-1 1.6 INSERVICE INSPECTION ........................................................................ 1.6-1 1.6.1 HISTORICAL BACKGROUND .................................................... 1.6-1 1.6.2 GENERAL.................................................................................... 1.6-1 1.7 SECTION DELETED ................................................................................. 1.7-1 1.7.1 DELETED .................................................................................... 1.7-1 1.7.2 DELETED .................................................................................... 1.7-1 1.7.3 DELETED .................................................................................... 1.7-1 1.7.4 DELETED .................................................................................... 1.7-1 1.7.5 DELETED .................................................................................... 1.7-1 1.8 SPECIAL MAJOR PROGRAMS ............................................................... 1.8-1 1.8.1 SYSTEMATIC EVALUATION PROGRAM .................................. 1.8-1 1.8.1.1 Description of Program........................................... 1.8-1 1.8.1.2 SEP Reviews Confirmed Safety of Palisades Design ..................................................... 1.8-3 1.8.1.3 Continuing Applicability and Interpretation of SEP Information .................................................. 1.8-4 1.8.2 TMI ACTION ITEMS (NUREG-0737) ........................................... 1.8-5 1.8.3 PIPE SUPPORT BASEPLATE DESIGNS USING CONCRETE EXPANSION ANCHOR BOLTS (IE BULLETIN 79-02) ............ 1.8-5 1.8.4 SEISMIC ANALYSIS FOR AS-BUILT SAFETY-RELATED PIPING SYSTEMS (IE BULLETIN 79-14) ................................. 1.8-6 1.8.5 UNRESOLVED SAFETY ISSUES (NUREG-0410)...................... 1.8-7 1.8.6 DELETED .................................................................................... 1.8-7 1.8.7 DELETED .................................................................................... 1.8-7 1.8.8 DELETED .................................................................................... 1.8-7 1.8.9 DELETED .................................................................................... 1.8-8 1.8.10 DELETED .................................................................................... 1.8-8 1.8.11 HEAVY LOADS ........................................................................... 1.8-8 1.9 RENEWED FACILITY OPERATING LICENSE ........................................ 1.9-1 1.9.1

SUMMARY

DESCRIPTIONS OF AGING MANAGEMENT PROGRAMS ................................................................................ 1.9-1

DSAR CHAPTER 1 - INTRODUCTION & GENERAL DESCRIPTION OF FACILITY Revision 36 TABLE OF CONTENTS Page 3 of 5 1.9.1.1 Nickel Alloy Program .............................................. 1.9-2 1.9.1.2 ASME Section XI, Subsections IWB, IWC, IWD, IWF Inservice Inspection Program ................................ 1.9-3 1.9.1.3 Bolting Integrity Program ....................................... 1.9-3 1.9.1.4 Boric Acid Corrosion Program ............................... 1.9-3 1.9.1.5 Buried Services Corrosion Monitoring Program .. 1.9-4 1.9.1.6 Closed Cycle Cooling Water Program ................... 1.9-4 1.9.1.7 Containment Inservice Inspection Program ......... 1.9-4 1.9.1.8 Deleted ..................................................................... 1.9-4 1.9.1.9 Diesel Fuel Monitoring and Storage Program ....... 1.9-4 1.9.1.10 Fire Protection Program ......................................... 1.9-5 1.9.1.11 Flow Accelerated Corrosion Program ................... 1.9-5 1.9.1.12 Non-EQ Electrical Commodities Condition Monitoring Program ................................................ 1.9-6 1.9.1.13 One-Time Inspection Program ............................... 1.9-6 1.9.1.14 Open Cycle Cooling Water Program ...................... 1.9-8 1.9.1.15 Overhead Load Handling Systems Inspection Program.................................................................... 1.9-8 1.9.1.16 Deleted ..................................................................... 1.9-8 1.9.1.17 Deleted ..................................................................... 1.9-9 1.9.1.18 Deleted ..................................................................... 1.9-9 1.9.1.19 Structural Monitoring Program .............................. 1.9-9 1.9.1.20 System Monitoring Program ................................ 1.9-10 1.9.1.21 Water Chemistry Program .................................... 1.9-10 1.9.1.22 Inspections of Opportunity for Internal Surfaces Of Selected Components and Corrosion Under Insulation ............................................................... 1.9-10 1.9.1.23 Compressed Air Monitoring Program.................. 1.9-11 1.9.1.24 Oil Sampling and Analysis ................................... 1.9-11 1.9.1.25 Electrical Equipment Qualification Program....... 1.9-12 1.9.1.26 Fatigue Monitoring Program ................................ 1.9-12 1.9.2

SUMMARY

DESCRIPTIONS OF TIME-LIMITED AGING ANALYSES................................................................................ 1.9-12

DSAR CHAPTER 1 - INTRODUCTION & GENERAL DESCRIPTION OF FACILITY Revision 36 TABLE OF CONTENTS Page 4 of 5 1.9.2.1 Deleted ................................................................... 1.9-12 1.9.2.2 Metal Fatigue ......................................................... 1.9-13 1.9.2.3 Deleted ................................................................... 1.9-13 1.9.2.4 Deleted ................................................................... 1.9-13 1.9.2.5 Other Plant-Specific Time-Limited Aging Analyses................................................................. 1.9-13 1.9.3 NEWLY IDENTIFIED STRUCTURES, SYSTEMS, AND COMPONENTS ......................................................................... 1.9-14 REFERENCES ............................................................................................................. 1-1

DSAR CHAPTER 1 - INTRODUCTION & GENERAL DESCRIPTION OF FACILITY Revision 36 TABLE OF CONTENTS Page 5 of 5 LIST OF TABLES 1-1 Chronological Licensing Events 1-2 Palisades Design Characteristics (Nominal Values) 1-3 Systematic Evaluation Program (SEP) and Integrated Assessment Program (IAP),

Palisades Plant - NUREG-0820 1-4 Deleted 1-5 Unresolved Safety Issues 1-6 Estimated Use on March 24, 2031 1-7 RTMAX-X Values for Reactor Vessel at 42.1 Effective Full Power Years 1-8 Summary of Fatigue Usage Factors at NUREG/CR-6260 Sample Locations Applicable to Palisades 1-9 Long-Term Commitments for License Renewal of Palisades Nuclear Plant 1-10 Listing of Newly Identified Systems, Structures, and Components per 10 CFR 50.37(b)

LIST OF FIGURES 1-1 Sh 1 Facility Site Plan 1-1 Sh 2 Facility Area Plan 1-2 Equipment Location - Reactor Building, Plan of Elevation 570'-0 1-3 Equipment Location - Auxiliary Building, Radwaste Modifications Plan of Elevation 590'-0" 1-4 Equipment Location - Auxiliary and Reactor Building, Radwaste Modifications Plan of Elevation 607'-6 1-5 Equipment Location - Auxiliary and Reactor Building, Radwaste Modifications Plan of Elevation 625'-0" 1-6 Equipment Location - Auxiliary Building, Radwaste Modifications Plan of Elevation 649'-0" 1-7 Equipment Location - Reactor Building, Sections A-A, B-B, C-C, D-D and E-E 1-8 Equipment Location - Auxiliary Building, Radwaste Modifications Section F-F 1-9 Equipment Location - Reactor Building, Section G-G 1-10 Equipment Location - Reactor Building, Plan of Elevation 602'-0" and Sections H-H, J-J and K-K 1-11 Equipment Location - Reactor Building, Plan of Elevation 700'-0" 1-12 Sh 1 Equipment Location - Turbine Building, Plan of Elevation 590'-0 1-12 Sh 2 Equipment Location - Turbine Building, Pump Structure Plan of Elevation 590'-0" 1-13 Equipment Location - Turbine Building, Plan of Elevation 607'-6" 1-14 Equipment Location - Turbine Building, Plan of Elevation 625'-0" 1-15 Equipment Location - Turbine Building, Sections 1-16 Equipment Location - Turbine Building, Sections 1-17 Equipment Location - Auxiliary Building, Radwaste Modifications Sections 1-18 General Arrangement - Condensate and Makeup Demin Building

DSAR CHAPTER 2 - SITE AND ENVIRONMENT Revision 36 TABLE OF CONTENTS Page 1 of 4 SECTIONS 2.1 LOCATION ................................................................................................ 2.1-2 2.1.1 TOPOGRAPHY AND LAND USAGE ............................................. 2.1-2 2.1.2 POPULATION ................................................................................ 2.1-3 2.1.3 NEARBY INDUSTRIAL, TRANSPORTATION AND MILITARY FACILITIES .................................................................. 2.1-5 2.2 HYDROLOGY ........................................................................................... 2.2-1 2.2.1 GROUNDWATER ........................................................................... 2.2-1 2.2.2 GENERAL LAKE HYDROLOGY ................................................... 2.2-4 2.3 GEOLOGY ................................................................................................ 2.3-1 2.3.1 PREGLACIAL GEOLOGY ............................................................. 2.3-1 2.3.2 GLACIAL GEOLOGY ..................................................................... 2.3-2 2.3.3 FAULTS.......................................................................................... 2.3-3 2.3.4 ENGINEERING GEOLOGY............................................................ 2.3-3 2.

3.5 CONCLUSION

S ............................................................................. 2.3-5 2.4 SEISMICITY .............................................................................................. 2.4-1 2.4.1 SITE GEOLOGY ............................................................................. 2.4-1 2.4.2 SEISMIC HISTORY ........................................................................ 2.4-2 2.4.3 DISCUSSION ................................................................................. 2.4-3 2.

4.4 CONCLUSION

S ............................................................................. 2.4-4 2.5 METEOROLOGY ...................................................................................... 2.5-1 2.5.1 GENERAL CLIMATOLOGY OF PALISADES FACILITY AREA ... 2.5-1 2.5.2 METEOROLOGICAL PROGRAM HISTORY ................................. 2.5-3 2.5.2.1 Preoperational Program (Reference 21) ................ 2.5-3 2.5.2.2 Interim Program (Reference 21) ............................. 2.5-4 2.5.2.3 Present Program ..................................................... 2.5-4

DSAR CHAPTER 2 - SITE AND ENVIRONMENT Revision 36 TABLE OF CONTENTS Page 2 of 4 2.5.3 DISCUSSION OF EXISTING 1977/1978 DATA ............................. 2.5-5 2.5.3.1 Wind Frequency Distributions ............................... 2.5-5 2.5.3.2 Stability Wind Roses ............................................... 2.5-6 2.5.3.3 Persistence .............................................................. 2.5-6 2.5.3.4 Hourly Data .............................................................. 2.5-7 2.5.3.5 Data Recovery ......................................................... 2.5-8 2.5.4 DIFFUSION CLIMATOLOGY ......................................................... 2.5-8 2.5.4.1 Turbulence and Diffusion Regimes ....................... 2.5-8 2.5.4.2 Shoreline Influences ............................................... 2.5-9 2.5.5 SHORT-TERM DISPERSION PARAMETERS ............................... 2.5-9 2.5.5.1 X/Q Determination for TID Analyses.....2.5-9 2.5.5.2 X/Q Determination for AST Analyses..2.5-10 2.5.5.2.1 Offsite X/Q Determination..2.5-11 2.5.5.2.2 Control Room X/Q Determination2.5-11 2.5.6 LONG-TERM DISPERSION PARAMETERS ............................... 2.5-12 2.6 ENVIRONMENTAL SURVEILLANCE ...................................................... 2.6-1 2.6.1 SAMPLE SENSITIVITY .................................................................. 2.6-2 2.6.2 SAMPLE TYPE AND FREQUENCY .............................................. 2.6-2 2.6.3 SAMPLING STATIONS .................................................................. 2.6-2 2.6.4 SAMPLE TYPES ............................................................................ 2.6-3 2.6.5

SUMMARY

OF PREOPERATIONAL RESULTS ........................... 2.6-3 2.6.6 ADJUSTMENTS TO THE ENVIRONMENTAL SURVEY ............... 2.6-5 REFERENCES ............................................................................................................. 2-1

DSAR CHAPTER 2 - SITE AND ENVIRONMENT Revision 36 TABLE OF CONTENTS Page 3 of 4 LIST OF TABLES 2-1 Agricultural Statistics 2-2 Population Related to Selected Land Use Categories 2-3 People per Dwelling by Township and City 2-4 Permanent Resident Population Distribution 2-5 Transient Population Related to Educational Facilities Within 10 Miles of Palisades 2-6 Major Employer's Work Force Distribution Within 10 Miles of the Palisades Facility 2-7 Motels and Cottages Within 10 Miles of Palisades Facility 2-8 Campsites Within 10 Miles of Palisades Facility 2-9 Maximum Probable Population for All Categories 2-10 Population Growth and Density by County 2-11 Field Permeability Test Results 2-12 Analyses of Soil Samples 2-13 Epicenter Distance From Site Versus Reported Intensity 2-14 Stability Class Comparison by Wind Sector 2-15 Meteorological Data Recovery Rates 2-16 Physical Characteristics of the Routine Release Points for the Palisades Nuclear Facility 2-17 Relative Dispersion (X/Q) Values (s/m3) Versus Averaging Time, Turbine Building Vent - Ground Level Release Exclusion Area Boundary 2-18 Relative Dispersion (X/Q) Values (s/m3) Versus Averaging Time, Turbine Building Vent - Ground Level Release Low Population Zone 2-19 Annual Average X/Q (sec/m3) Values, Turbine Building Vent - Ground Level Release 2-20 Detection Capabilities for Environmental Sample Analysis 2-21 X/Q Values (s/m3) - Ground Level Release - Exclusion Area Boundary 2-22 X/Q Values (s/m3) - Ground Level Release - Low Population Zone

DSAR CHAPTER 2 - SITE AND ENVIRONMENT Revision 36 TABLE OF CONTENTS Page 4 of 4 LIST OF FIGURES 2-1 Population Centers - 1990 Census Over 10,000, 0 to 50 Miles 2-2 Site Layout 2-3 Site Topography, Boring Locations, and Seismic Profiles 2-4 Topography Cross Sections 2-5 Selected Land Use Categories 2-6 Population Centers - 1990 Census Over 1,000, 0 to 50 Miles 2-7 Permanent Residential Population Breakdown (1990) 2-8 Population Distribution (1990), 10 to 50 Miles 2-9 Groundwater Elevations and Area Gradients 2-10 Geologic Map and Cross Section 2-11 1966 Drilling Program, Drill Hole and Cross Section Locations 2-12 1966 Drilling Program, Drill Logs and Soil Penetration Test Results 2-13 1966 Drilling Program, Subsurface Sections 2-14 Regional Structures, Bedrock Geology, Major Faulting and Epicenters 2-15 Compressional (P)Wave Velocities From Seismic Survey 2-16 Seismic Regionalization: Zones of Probable Maximum Intensity (MM) 2-17 Meteorological Tower Locations 2-18 10 Meter Wind Frequency Distribution - Palisades Site, December 1, 1977 through February 28, 1978 2-19 60 Meter Wind Frequency Distribution - Palisades Site, December 1, 1977 through February 28, 1978 2-20 10 Meter Wind Frequency Distribution - Palisades Site, March 1 through May 31, 1978 2-21 60 Meter Wind Frequency Distribution - Palisades Site, March 1 through May 31, 1978 2-22 10 Meter Wind Frequency Distribution - Palisades Site, June 1 through August 31, 1978 2-23 60 Meter Wind Frequency Distribution - Palisades Site, June 1 through August 31, 1978 2-24 10 Meter Wind Frequency Distribution - Palisades Site, September 1 through November 30, 1978 2-25 60 Meter Wind Frequency Distribution - Palisades Site, September 1 through November 30, 1978 2-26 10 Meter Wind Frequency Distribution - Palisades Site, December 1, 1977 through November 30, 1978 2-27 60 Meter Wind Frequency Distribution - Palisades Site, December 1, 1977 through November 30 1978

DSAR CHAPTER 3 - REACTOR Revision 36 TABLE OF CONTENTS Page 1 of 2 SECTIONS

3.1 INTRODUCTION

....................................................................................... 3.1-1 3.2 DESIGN BASES ....................................................................................... 3.2-1 3.2.1 DELETED ....................................................................................... 3.2-1 3.2.2 DELETED ....................................................................................... 3.2-1 3.2.3 FUEL DESIGN LIMITS ................................................................... 3.2-1 3.3 REACTOR DESIGN .................................................................................. 3.3-1 3.3.1 GENERAL

SUMMARY

................................................................... 3.3-1 3.3.2 SECTION DELETED ...................................................................... 3.3-1 3.3.2.1 Deleted ..................................................................... 3.3-1 3.3.2.2 Deleted ..................................................................... 3.3-1 3.3.2.3 Deleted ..................................................................... 3.3-1 3.3.2.4 Deleted ..................................................................... 3.3-1 3.3.2.5 Deleted ..................................................................... 3.3-1 3.3.2.6 Deleted ..................................................................... 3.3-1 3.3.2.7 Deleted ..................................................................... 3.3-1 3.3.2.8 Deleted ..................................................................... 3.3-1 3.3.3 SECTION DELETED ...................................................................... 3.3-1 3.3.3.1 Deleted ..................................................................... 3.3-1 3.3.3.2 Deleted ..................................................................... 3.3-1 3.3.3.3 Deleted ..................................................................... 3.3-1 3.3.3.4 Deleted ..................................................................... 3.3-1 3.3.4 MECHANICAL DESIGN ................................................................. 3.3-1 3.3.4.1 Reactor Internals ..................................................... 3.3-1 3.3.4.2 Control Rod Drive Mechanism ............................... 3.3-5 3.3.4.3 Core Mechanical Design ......................................... 3.3-7

DSAR CHAPTER 3 - REACTOR Revision 36 TABLE OF CONTENTS Page 2 of 2 LIST OF TABLES 3-1 Deleted 3-2 Fuel Bundle Component Description LIST OF FIGURES 3-1 Reactor Arrangement 3-2 Deleted 3-3 Deleted 3-4 Deleted 3-5 Deleted 3-6 Deleted 3-7 Deleted 3-8 Deleted 3-9 Reactor Core Cross Section 3-10 Reactor Arrangement 3-11 Upper Guide Structure Assembly 3-12 Hold Down Ring 3-13 Control Rod Drive Mechanism 3-14 Fuel Bundle Assembly, Sheet 1 of 2 3-15 Fuel Bundle Assembly, Sheet 2 of 2 3-17 Spacer Assembly, HTP 3-18 UO2 Fuel Rod Assembly 3-19 Fuel Rod Assembly, Gadolinia Bearing 3-20 Control Rod

DSAR CHAPTER 4 - PRIMARY COOLANT SYSTEM Revision 36 TABLE OF CONTENTS Page 1 of 4 SECTIONS

4.1 INTRODUCTION

....................................................................................... 4.1-1 4.2 DESIGN BASIS ......................................................................................... 4.2-1 4.2.1 DELETED ....................................................................................... 4.2-1 4.2.2 DELETED ....................................................................................... 4.2-1 4.2.3 DELETED ....................................................................................... 4.2-1 4.2.4 CODES ADHERED TO AND COMPONENT CLASSIFICATION .. 4.2-1 4.2.5 DELETED ....................................................................................... 4.2-1 4.2.6 DELETED ....................................................................................... 4.2-1 4.3 SYSTEM DESIGN .................................................................................... 4.3-1 4.3.1 GENERAL DESCRIPTION ............................................................. 4.3-1 4.3.2 INTERFACES WITH OTHER SYSTEMS ....................................... 4.3-1 4.3.3 REACTOR VESSEL ....................................................................... 4.3-1 4.3.4 STEAM GENERATOR ................................................................... 4.3-2 4.3.4.1 Deleted .................................................................... 4.3-3 4.3.4.2 Steam Generator Replacement .............................. 4.3-3 4.3.5 PRIMARY COOLANT PUMPS ....................................................... 4.3-4 4.3.6 PRIMARY COOLANT PIPING ....................................................... 4.3-4 4.3.7 PRESSURIZER .............................................................................. 4.3-5 4.3.8 QUENCH TANK ............................................................................. 4.3-6 4.3.9 VALVES ......................................................................................... 4.3-6 4.3.9.1 Deleted ..................................................................... 4.3-6 4.3.9.2 Pressurizer Throttling (Spray) Control Valves ...... 4.3-6 4.3.9.3 Power-Operated Relief Valves (PORV) and Block Valves ............................................................ 4.3-6 4.3.9.4 Spring-Actuated Primary Safety Valves ................ 4.3-7 4.3.10 ENVIRONMENTAL PROTECTION ................................................ 4.3-7 4.3.11 DELETED ....................................................................................... 4.3-7 4.3.12 INSULATION .................................................................................. 4.3-7 4.3.13 SYSTEM CHEMICAL TREATMENT .............................................. 4.3-7

DSAR CHAPTER 4 - PRIMARY COOLANT SYSTEM Revision 36 TABLE OF CONTENTS Page 2 of 4 4.4 SECTION DELETED ................................................................................. 4.4-1 4.4.1 DELETED ....................................................................................... 4.4-1 4.4.2 DELETED ....................................................................................... 4.4-1 4.5 INSPECTIONS .......................................................................................... 4.5-1 4.5.1 GENERAL ...................................................................................... 4.5-1 4.5.2 DELETED ....................................................................................... 4.5-1 4.5.3 DELETED ....................................................................................... 4.5-1 4.5.4 NONDESTRUCTIVE TESTS .......................................................... 4.5-1 4.5.5 ADDITIONAL TESTS ..................................................................... 4.5-3 4.5.6 INSERVICE INSPECTION.............................................................. 4.5-4 4.5.7 DELETED ....................................................................................... 4.5-7 4.5.8 NONDESTRUCTIVE TESTS OF OTHER PRIMARY SYSTEM COMPONENTS ......................................................................... 4.5-7 4.6 DELETED .................................................................................................. 4.6-1 4.7 SECTION DELETED 4.7.1 DELETED ....................................................................................... 4.7-1 4.7.2 DELETED ....................................................................................... 4.7-2 4.8 PRIMARY COOLANT GAS VENT SYSTEM ............................................ 4.8-1

DSAR CHAPTER 4 - PRIMARY COOLANT SYSTEM Revision 36 TABLE OF CONTENTS Page 3 of 4 LIST OF TABLES 4-1 Deleted 4-2 Primary Coolant System Codes 4-3 Reactor Vessel Parameters 4-4 Steam Generator Parameters 4-5 Secondary Safety Valve Parameters 4-6 Primary Coolant Pump Parameters 4-7 Piping List 4-8 Pressurizer Parameters 4-9 Deleted 4-10 Deleted 4-11 Quench Tank Parameters 4-12 Deleted 4-13 Deleted 4-14 Pressurizer Power-Operated Relief Valve Parameters 4-15 Materials Exposed to Coolant 4-16 Deleted 4-17 Deleted 4-18 Primary Coolant System Preservice Quality Assurance Program 4-19 Primary Coolant System Inspection CE Requirements 4-20 Deleted

DSAR CHAPTER 4 - PRIMARY COOLANT SYSTEM Revision 36 TABLE OF CONTENTS Page 4 of 4 LIST OF FIGURES 4-1 Sh 1 Piping and Instrumentation Diagram, Primary Coolant System 4-1 Sh 2 Piping and Instrumentation Diagram, Primary Coolant System 4-2 Reactor Vessel 4-3 Steam Generator 4-4 Primary Coolant Circulating Pump 4-6 Enlarged View of Pump Seal Area 4-7 Deleted 4-8 Pressurizer 4-9 Deleted 4-10 Deleted 4-11 Deleted 4-12 Deleted 4-13 Deleted 4-14 Deleted 4-15 Deleted

DSAR CHAPTER 5 - DESIGN OF STRUCTURES, SYSTEMS AND COMPONENTS Revision 36 TABLE OF CONTENTS Page 1 of 13 SECTIONS 5.1 GENERAL DESIGN CRITERIA ..................................................................... 5.1-1 5.

1.1 INTRODUCTION

............................................................................ 5.1-1 5.1.2 GROUP I: OVERALL REQUIREMENTS (CRITERIA 1-5) ............ 5.1-2 5.1.2.1 Criterion 1 - Quality Standards and Records ........ 5.1-2 5.1.2.2 Criterion 2 - Design Bases for Protection Against Natural Phenomena .................................. 5.1-3 5.1.2.3 Criterion 3 - Fire Protection .................................... 5.1-3 5.1.2.4 Criterion 4 - Environmental and Missile Design Bases .......................................................... 5.1-4 5.1.2.5 Criterion 5 - Sharing of Structures, Systems and Components ..................................................... 5.1-5 5.1.2.6 Conclusions ............................................................ 5.1-5 5.1.3 GROUP II: PROTECTION BY MULTIPLE FISSION PRODUCT BARRIERS (CRITERIA 10-19) ...................................................... 5.1-5 5.1.3.1 Criterion 10 - Reactor Design ................................. 5.1-5 5.1.3.2 Criterion 11 - Reactor Inherent Protection ............ 5.1-5 5.1.3.3 Criterion 12 - Suppression of Reactor Power Oscillations .............................................................. 5.1-5 5.1.3.4 Criterion 13 - Instrumentation and Control ........... 5.1-6 5.1.3.5 Criterion 14 - Reactor Coolant Pressure Boundary ................................................................. 5.1-6 5.1.3.6 Criterion 15 - Reactor Coolant System Design ..... 5.1-6 5.1.3.7 Criterion 16 - Containment Design ........................ 5.1-7 5.1.3.8 DELETED 5.1.3.9 Criterion 18 - Inspection and Testing of Electrical Power Systems....................................... 5.1-8 5.1.3.10 Criterion 19 - Control Room ................................... 5.1-9 5.1.3.11 Conclusions ............................................................ 5.1-9 5.1.4 GROUP III: PROTECTION AND REACTIVITY CONTROL SYSTEMS (CRITERIA 20-29) ........................................................ 5.1-9 5.1.4.1 Criterion 20 - Protection System Functions ......... 5.1-9 5.1.4.2 Criterion 21 - Protection System Reliability and Testability ....................................................... 5.1-10 5.1.4.3 Criterion 22 - Protection System Independence ........................................................ 5.1-10 5.1.4.4 Criterion 23 - Protection System Failure Modes ........................................................ 5.1-10 5.1.4.5 Criterion 24 - Separation of Protection and Control Systems ................................................... 5.1-11 5.1.4.6 Criterion 25 - Protection System Requirements for Reactivity Control Malfunctions..................... 5.1-11 5.1.4.7 Criterion 26 - Reactivity Control System Redundancy and Capability ................................. 5.1-11 5.1.4.8 Criterion 27 - Combined Reactivity Control Systems Capability ............................................... 5.1-11 5.1.4.9 Criterion 28 - Reactivity Limits ............................ 5.1-12

DSAR CHAPTER 5 - DESIGN OF STRUCTURES, SYSTEMS AND COMPONENTS Revision 36 TABLE OF CONTENTS Page 2 of 13 5.1.4.10 Criterion 29 - Protection Against Anticipated Operational Occurrences ..................................... 5.1-12 5.1.4.11 Conclusions .......................................................... 5.1-12 5.1.5 GROUP IV: FLUID SYSTEMS (CRITERIA 30-46) ...................... 5.1-12 5.1.5.1 Criterion 30 - Quality of Reactor Coolant Pressure Boundary ............................................... 5.1-12 5.1.5.2 Criterion 31 - Fracture Prevention of Reactor Coolant Pressure Boundary ................................. 5.1-13 5.1.5.3 Criterion 32 - Inspection of Reactor Coolant Pressure Boundary ............................................... 5.1-13 5.1.5.4 Criterion 33 - Reactor Coolant Makeup ............... 5.1-13 5.1.5.5 Criterion 34 - Residual Heat Removal ................. 5.1-14 5.1.5.6 Criterion 35 - Emergency Core Cooling .............. 5.1-14 5.1.5.7 Criterion 36 - Inspection of Emergency Core Cooling System ..................................................... 5.1-14 5.1.5.8 Criterion 37 - Testing of Emergency Core Cooling System ..................................................... 5.1-14 5.1.5.9 Criterion 38 - Containment Heat Removal .......... 5.1-15 5.1.5.10 Criterion 39 - Inspection of Containment Heat Removal System ................................................... 5.1-15 5.1.5.11 Criterion 40 - Testing of Containment Heat Removal System ................................................... 5.1-15 5.1.5.12 Criterion 41 - Containment Atmosphere Cleanup .................................................................. 5.1-16 5.1.5.13 Criterion 42 - Inspection of Containment Atmosphere Cleanup Systems ............................ 5.1-16 5.1.5.14 Criterion 43 - Testing of Containment Atmosphere Cleanup Systems ............................ 5.1-16 5.1.5.15 Criterion 44 - Cooling Water ................................. 5.1-16 5.1.5.16 Criterion 45 - Inspection of Cooling Water System and Criterion 46 - Testing of Cooling Water System ........................................................ 5.1-17 5.1.5.17 Conclusions .......................................................... 5.1-17 5.1.6 GROUP V: REACTOR CONTAINMENT (CRITERIA 50-57) ...... 5.1-18 5.1.6.1 Criterion 50 - Containment Design Basis ............ 5.1-18 5.1.6.2 Criterion 51 - Fracture Prevention of Containment Pressure Boundary ........................ 5.1-18 5.1.6.3 Criterion 52 - Capability for Containment Leakage Rate Testing ........................................... 5.1-18 5.1.6.4 Criterion 53 - Provisions for Containment Testing and Inspection ......................................... 5.1-19 5.1.6.5 Criterion 54 - Piping Systems Penetrating Containment .......................................................... 5.1-19 5.1.6.6 Criterion 55 - Primary Coolant Pressure Boundary Penetrating Containment .................... 5.1-19 5.1.6.7 Criterion 56 - Primary Containment Isolation ..... 5.1-20 5.1.6.8 Criterion 57 - Closed System Isolation Valves..................................................................... 5.1-21 5.1.6.9 Conclusions .......................................................... 5.1-21

DSAR CHAPTER 5 - DESIGN OF STRUCTURES, SYSTEMS AND COMPONENTS Revision 36 TABLE OF CONTENTS Page 3 of 13 5.1.7 GROUP VI: FUEL AND RADIOACTIVITY CONTROL (CRITERIA 60-64) ........................................................................ 5.1-21 5.1.7.1 Criterion 60 - Control of Releases of Radioactive Materials to the Environment .......... 5.1-21 5.1.7.2 Criterion 61 - Fuel Storage and Handling and Radioactivity Control ............................................ 5.1-22 5.1.7.3 Criterion 62 - Prevention of Criticality in Fuel Storage and Handling ........................................... 5.1-23 5.1.7.4 Criterion 63 - Monitoring Fuel and Waste Storage................................................................... 5.1-23 5.1.7.5 Criterion 64 - Monitoring Radioactivity Releases ................................................................ 5.1-24 5.1.7.6 Conclusions .......................................................... 5.1-24 5.1.8 OVERALL CONCLUSION ........................................................... 5.1-24 5.2 CLASSIFICATION OF STRUCTURES, SYSTEMS AND COMPONENTS .... 5.2-1 5.

2.1 BACKGROUND

INFORMATION ................................................... 5.2-1 5.2.1.1 Classification Overview .......................................... 5.2-1 5.2.1.2 Original Palisades Design Review ......................... 5.2-2 5.2.2 CONSUMERS DESIGN CLASSIFICATIONS ................................ 5.2-3 5.2.2.1 Design - Class 1 ...................................................... 5.2-3 5.2.2.2 Design - Class 2 ...................................................... 5.2-4 5.2.2.3 Design - Class 3 ...................................................... 5.2-4 5.2.2.4 Design - Palisades Modifications .......................... 5.2-4 5.2.2.5 Inservice Inspection................................................ 5.2-5 5.2.2.6 Service Quality Group Classification .................... 5.2-5 5.2.2.7 Service - Electrical and Instrumentation and Controls Equipment Classification........................ 5.2-5 5.2.2.8 Safety-Related Classification ................................. 5.2-6 5.2.2.8.1 Safety-Related ......................................................... 5.2-6 5.2.2.8.2 Important to Safety ................................................. 5.2-6 REFERENCES ............................................................................................... 5.2-7 5.3 WIND AND TORNADO LOADINGS .............................................................. 5.3-1 5.3.1 WIND .............................................................................................. 5.3-1 5.3.1.1 Design Parameters.................................................. 5.3-1 5.3.1.2 Forces on Structures .............................................. 5.3-1 5.3.2 TORNADO ..................................................................................... 5.3-2 5.3.2.1 Design Parameters.................................................. 5.3-2 5.3.2.2 Forces on Structures .............................................. 5.3-2 5.3.3 PLANT REEVALUATION .............................................................. 5.3-3 REFERENCES ............................................................................................... 5.3-4

DSAR CHAPTER 5 - DESIGN OF STRUCTURES, SYSTEMS AND COMPONENTS Revision 36 TABLE OF CONTENTS Page 4 of 13 5.4 WATER LEVEL DESIGN ............................................................................... 5.4-1 5.4.1 FLOODING FROM NATURAL SOURCES .................................... 5.4-1 5.4.1.1 Description of Events ............................................. 5.4-1 5.4.1.2 Effects on Consumers Design Class 1 Structures and Safety-Related Equipment ........... 5.4-1 5.4.2 FLOODING AND WETTING FROM FACILITY SOURCES ........... 5.4-2 REFERENCES ............................................................................................... 5.4-4 5.5 MISSILE PROTECTION ................................................................................. 5.5-1 5.5.1 TORNADO MISSILES.................................................................... 5.5-1 5.5.1.1 Design Parameters.................................................. 5.5-1 5.5.1.1.1 Containment Structure, Auxiliary Building (including Radwaste Addition), Turbine Building ......................................................... 5.5-1 5.5.1.1.2 Auxiliary Building TSC/EER/HVAC Addition

....................................................................... 5.5-1 5.5.1.1.3 Diesel Fuel Oil Storage Tank Housing ........ 5.5-1 5.5.1.1.4 Condensate Storage Tank 5.5-2 5.5.1.1.5 Equipment Hatch ......................................... 5.5-3 5.5.1.2 Structural Considerations ........................... 5.5-3 5.5.1.3 Facility Reevaluation .............................................. 5.5-4 5.5.1.3.1 Review Parameters ...................................... 5.5-4 5.5.1.3.2 Summary ....................................................... 5.5-4 5.5.2 SECTION DELETED ...................................................................... 5.5-5 5.5.2.1 Deleted 5.5.2.2 Deleted 5.5.2.3 Deleted 5.5.2.4 Deleted 5.5.3 SECTION DELETED ...................................................................... 5.5-5 5.5.3.1 Deleted 5.5.3.2 Deleted 5.5.4 SITE PROXIMITY MISSILES ......................................................... 5.5-5 REFERENCES ............................................................................................... 5.5-8 5.6 DYNAMIC EFFECTS OF PIPE RUPTURE .................................................... 5.6-1 5.6.1 DELETED ....................................................................................... 5.6-1 5.6.2 SECTION DELETED ...................................................................... 5.6-1 5.6.2.1 Deleted 5.6.2.2 Deleted 5.6.2.3 Deleted 5.6.2.4 Deleted 5.6.3 SECTION DELETED ...................................................................... 5.6-1 5.6.3.1 Deleted 5.6.3.2 Deleted 5.6.3.3 Deleted 5.6.3.4 Deleted 5.6.4 DELETED ....................................................................................... 5.6-1 5.6.5 DELETED ....................................................................................... 5.6-1 5.6.6 SECTION DELETED ...................................................................... 5.6-1

DSAR CHAPTER 5 - DESIGN OF STRUCTURES, SYSTEMS AND COMPONENTS Revision 36 TABLE OF CONTENTS Page 5 of 13 5.6.6.1 Deleted 5.6.6.2 Deleted 5.6.7 HISTORY OF PALISADES HIGH-ENERGY LINE-BREAK ANALYSIS ..................................................................................... 5.6-1 5.6.7.1 Deleted ..................................................................... 5.6-1 5.6.7.2 Deleted ..................................................................... 5.6-1 5.6.7.3 Moderate-Energy System Pipe-Break Evaluation ................................................................ 5.6-1 5.7 SEISMIC DESIGN .......................................................................................... 5.7-1 5.7.1 SEISMIC INPUT ............................................................................. 5.7-1 5.7.1.1 Design Bases .......................................................... 5.7-1 5.7.1.2 Ground Design Response Spectra ........................ 5.7-2 5.7.1.3 Floor Design Response Spectra ............................ 5.7-2 5.7.1.4 Damping Values ...................................................... 5.7-3 5.7.2 SEISMIC ANALYSIS OF MAJOR CP CO DESIGN CLASS 1 STRUCTURES ............................................................................... 5.7-4 5.7.2.1 Containment Building ............................................. 5.7-5 5.7.2.2 Auxiliary Building.................................................... 5.7-6 5.7.3 SEISMIC ANALYSIS OF OTHER CP CO DESIGN CLASS 1 STRUCTURES ............................................................................... 5.7-7 5.7.3.1 Turbine Building...................................................... 5.7-7 5.7.3.1.1 CP Co Design Class 1 Portion..................... 5.7-7 5.7.3.1.2 CP Co Design Class 3 Portion..................... 5.7-7 5.7.3.2 Intake Structure ....................................................... 5.7-9 5.7.3.3 Auxiliary Building Radwaste Addition .................. 5.7-9 5.7.3.4 Auxiliary Building TSC/EER Addition.................. 5.7-10 5.7.3.5 Other Auxiliary Building Additions...................... 5.7-12 5.7.3.6 CP Co Design Class 1 Tank Foundations ........... 5.7-12 5.7.3.7 Miscellaneous Frames and Trusses .................... 5.7-12 5.7.4 SEISMIC ANALYSIS OF CP CO DESIGN CLASS 1 PIPING ..... 5.7-13 5.7.5 SEISMIC ANALYSIS OF MAJOR CP CO DESIGN CLASS 1 SYSTEM AND COMPONENTS ................................................... 5.7-16 5.7.5.1 Primary Coolant System....................................... 5.7-16 5.7.5.1.1 Reactor Vessel Assembly .......................... 5.7-17 5.7.5.1.2 Steam Generators ...................................... 5.7-17 5.7.5.1.3 Primary Coolant Pumps ............................. 5.7-17 5.7.5.1.4 Pressurizer .................................................. 5.7-17 5.7.5.1.5 Primary Coolant System Piping ................ 5.7-18 5.7.5.1.6 Pressurizer Quench Tank .......................... 5.7-18 5.7.5.1.7 Pressurizer Safety and Power-Operated Relief Valves ............................................... 5.7-18 5.7.5.2 Other Major CP Co Design Class 1 Systems and Components .......................................................... 5.7-18 5.7.6 SEISMIC ANALYSIS OF SPENT FUEL STORAGE RACKS ...... 5.7-19 5.7.6.1 Region 1 Racks ..................................................... 5.7-19 5.7.6.2 Region 2 Racks (See Section 9.11) ...................... 5.7-21 5.7.7 SEISMIC ANALYSIS AND TESTING OF OTHER CP CO DESIGN CLASS 1 COMPONENTS ............................................. 5.7-22

DSAR CHAPTER 5 - DESIGN OF STRUCTURES, SYSTEMS AND COMPONENTS Revision 36 TABLE OF CONTENTS Page 6 of 13 5.7.7.1 Electrical Equipment and Instrumentation ......... 5.7-24 5.7.7.2 Tanks...................................................................... 5.7-24 5.7.7.3 Appendages to CP Co Design Class 1 Components .......................................................... 5.7-24 5.7.7.4 Overhead Cranes .................................................. 5.7-25 5.7.7.5 Containment Air Locks ......................................... 5.7-25 5.7.8 SEISMIC ANALYSIS OF BURIED STRUCTURES AND COMPONENTS ............................................................................ 5.7-25 5.7.9 SEISMIC INSTRUMENTATION ................................................... 5.7-25 REFERENCES ............................................................................................. 5.7-26 5.8 CONTAINMENT STRUCTURE ...................................................................... 5.8-1 5.8.1 DESIGN BASIS .............................................................................. 5.8-1 5.8.2 GENERAL DESCRIPTION ............................................................ 5.8-1 5.8.3 LOADS AND LOAD COMBINATIONS .......................................... 5.8-4 5.8.3.1 Containment Structure Concrete ........................... 5.8-4 5.8.3.1.1 Construction Condition ............................... 5.8-4 5.8.3.1.2 Working Stress Condition ........................... 5.8-4 5.8.3.1.3 Yield Strength Condition ............................. 5.8-5 5.8.3.2 Liner Plate System .................................................. 5.8-7 5.8.3.2.1 Liner Plate ..................................................... 5.8-7 5.8.3.2.2 Liner Plate Anchors ..................................... 5.8-7 5.8.3.3 Penetrations ............................................................ 5.8-8 5.8.4 ANALYSIS ..................................................................................... 5.8-8 5.8.4.1 Containment Structure Concrete ........................... 5.8-8 5.8.4.1.1 General .......................................................... 5.8-8 5.8.4.1.2 Axisymmetric Loads .................................... 5.8-9 5.8.4.1.3 Nonaxisymmetric Loads ............................ 5.8-13 5.8.4.2 Prestressing System............................................. 5.8-13 5.8.4.2.1 Tendon Anchorage Zones ......................... 5.8-13 5.8.4.3 Liner Plate System ................................................ 5.8-17 5.8.4.3.1 Liner Plate ................................................... 5.8-17 5.8.4.3.2 Liner Plate Anchors ................................... 5.8-17 5.8.4.4 Penetrations .......................................................... 5.8-18 5.8.5 DESIGN........................................................................................ 5.8-19 5.8.5.1 Design Basis ......................................................... 5.8-19 5.8.5.2 Containment Structure Concrete ......................... 5.8-21 5.8.5.2.1 General Criteria .......................................... 5.8-21 5.8.5.2.2 Construction Condition ............................. 5.8-22 5.8.5.2.3 Working Stress Condition ......................... 5.8-23 5.8.5.2.4 Yield Strength Condition ........................... 5.8-24 5.8.5.2.5 Results ........................................................ 5.8-29 5.8.5.3 Prestressing System............................................. 5.8-29 5.8.5.3.1 Tendons ...................................................... 5.8-29 5.8.5.3.2 Tendon Anchorage Zones ......................... 5.8-31 5.8.5.4 Liner Plate System ................................................ 5.8-32 5.8.5.4.1 General ........................................................ 5.8-32 5.8.5.4.2 Liner Plate ................................................... 5.8-33 5.8.5.4.3 Liner Plate Anchors ................................... 5.8-34

DSAR CHAPTER 5 - DESIGN OF STRUCTURES, SYSTEMS AND COMPONENTS Revision 36 TABLE OF CONTENTS Page 7 of 13 5.8.5.4.4 Brackets ...................................................... 5.8-36 5.8.5.5 Penetrations .......................................................... 5.8-36 5.8.6 PENETRATIONS ......................................................................... 5.8-37 5.8.6.1 Design Basis ......................................................... 5.8-37 5.8.6.2 General Description .............................................. 5.8-37 5.8.6.2.1 Personnel and Equipment Openings ........ 5.8-38 5.8.6.2.2 Other Openings .......................................... 5.8-38 5.8.6.3 Design Criteria ...................................................... 5.8-39 5.8.6.3.1 Concrete Openings .................................... 5.8-39 5.8.6.3.2 Steel Penetrations ...................................... 5.8-40 5.8.6.4 Analysis and Design ............................................. 5.8-43 5.8.6.4.1 Small Penetrations ..................................... 5.8-43 5.8.6.4.2 Large Penetrations ..................................... 5.8-44 5.8.6.4.3 Other Design Details .................................. 5.8-47 5.8.7 CONSTRUCTION......................................................................... 5.8-48 5.8.7.1 Materials ................................................................ 5.8-48 5.8.7.1.1 Concrete ...................................................... 5.8-48 5.8.7.1.2 Reinforcing Steel ........................................ 5.8-49 5.8.7.1.3 Prestressing Tendons and Hardware ....... 5.8-50 5.8.7.1.4 Liner Plate ................................................... 5.8-50 5.8.7.1.5 Steel Penetrations ...................................... 5.8-50 5.8.7.1.6 Sheathing Filler .......................................... 5.8-51 5.8.7.2 Quality Control ...................................................... 5.8-51 5.8.7.2.1 Concrete Mix Design .................................. 5.8-51 5.8.7.2.2 Concrete Materials ..................................... 5.8-52 5.8.7.2.3 Concrete ...................................................... 5.8-53 5.8.7.2.4 Reinforcing Steel and CADWELD Splices ......................................................... 5.8-53 5.8.7.2.5 Prestressing Tendons and Hardware ....... 5.8-54 5.8.7.2.6 Liner Plate ................................................... 5.8-55 5.8.7.2.7 Steel Penetrations ...................................... 5.8-56 5.8.7.2.8 Sheathing Filler .......................................... 5.8-56 5.8.7.3 Construction Methods .......................................... 5.8-56 5.8.7.3.1 Governing Codes ....................................... 5.8-56 5.8.7.3.2 Concrete ...................................................... 5.8-57 5.8.7.3.3 Reinforcing Steel and CADWELD Splices ......................................................... 5.8-57 5.8.7.3.4 Prestressing System .................................. 5.8-58 5.8.7.3.5 Liner Plate ................................................... 5.8-59 5.8.7.4 Construction Problems ........................................ 5.8-60 5.8.7.4.1 Cracking at Welds in Containment Liner Plate ................................................... 5.8-60 5.8.8 SECTION DELETED .................................................................... 5.8-63 5.8.8.1 Deleted 5.8.8.1.1 Deleted 5.8.8.1.2 Deleted 5.8.8.1.3 Deleted 5.8.8.2 Deleted 5.8.8.2.1 Deleted

DSAR CHAPTER 5 - DESIGN OF STRUCTURES, SYSTEMS AND COMPONENTS Revision 36 TABLE OF CONTENTS Page 8 of 13 5.8.8.2.3 Deleted 5.8.8.2.4 Deleted 5.8.8.2.5 Deleted 5.8.8.3 Deleted 5.8.8.3.1 Deleted 5.8.8.3.2 Deleted 5.8.8.3.3 Deleted 5.8.8.3.4 Deleted 5.8.8.3.5 Deleted 5.8.8.4 Deleted 5.8.8.4.2 Deleted 5.8.8.4.3 Deleted 5.8.8.4.4 Deleted 5.8.8.4.5 Deleted 5.8.8.3 Deleted 5.8.8.5.1 Deleted 5.8.8.5.2 Deleted 5.8.8.5.3 Deleted 5.8.8.5.4 Deleted 5.8.8.6 Deleted 5.8.8.6.1 Deleted 5.8.8.6.2 Deleted 5.8.8.6.3 Deleted 5.8.8.6.4 Deleted 5.8.8.6.5 Deleted 5.8.9 STEAM GENERATOR REPLACEMENT CONSTRUCTION OPENING ..................................................................................... 5.8-64 5.8.9.1 General Description .............................................. 5.8-64 5.8.9.2 Containment Reevaluation ................................... 5.8-64 5.8.9.3 Materials ................................................................ 5.8-66 5.8.9.3.1 Concrete ...................................................... 5.8-66 5.8.9.3.2 Reinforcing Steel ........................................ 5.8-67 5.8.9.3.3 Prestressing Tendons and Hardware ....... 5.8-68 5.8.9.3.4 Liner Plate and Hardware ......................... 5.8-68 5.8.9.3.5 Sheathing Filler .......................................... 5.8-68 5.8.9.4 Quality Control ...................................................... 5.8-68 5.8.9.4.1 Concrete Mix Design .................................. 5.8-68 5.8.9.4.2 Concrete Materials ..................................... 5.8-69 5.8.9.4.3 Concrete ...................................................... 5.8-70 5.8.9.4.4 Reinforcing Steel and CADWELD Splices ......................................................... 5.8-70 5.8.9.4.5 Prestressing Tendons ................................ 5.8-71 5.8.9.4.6 Liner Plate ................................................... 5.8-71 5.8.9.4.7 Sheathing Filler .......................................... 5.8-72 5.8.9.5 Construction Methods .......................................... 5.8-72 5.8.9.5.1 Governing Codes ....................................... 5.8-72 5.8.9.5.2 Concrete ...................................................... 5.8-72 5.8.9.5.3 Reinforcing Steel and CADWELD Splices ......................................................... 5.8-73

DSAR CHAPTER 5 - DESIGN OF STRUCTURES, SYSTEMS AND COMPONENTS Revision 36 TABLE OF CONTENTS Page 9 of 13 5.8.9.5.4 Prestressing System .................................. 5.8-73 5.8.9.6 Containment Testing ............................................ 5.8-73 5.8.9.6.1 Integrated Leak Rate Testing .................... 5.8-73 5.8.9.6.2 Structural Integrity Test ............................. 5.8-73 5.8.10 SECTION DELETED .................................................................... 5.8-74 5.8.10.1 Deleted 5.8.10.2 Deleted 5.8.10.2.1 Deleted 5.8.10.2.2 Deleted REFERENCES ............................................................................................. 5.8-75 5.9 OTHER STRUCTURES ................................................................................. 5.9-1 5.9.1 DESIGN CRITERIA ........................................................................ 5.9-1 5.9.1.1 CP Co Design Class 1 Structures .......................... 5.9-1 5.9.1.1.1 Design Methods............................................ 5.9-1 5.9.1.1.2 Loads and Load Combinations ................... 5.9-2 5.9.1.2 CP Co Design Class 2 Structures .......................... 5.9-4 5.9.1.3 CP Co Design Class 3 Structures .......................... 5.9-4 5.9.1.4 Loads Common to All Structures .......................... 5.9-5 5.9.2 CONTAINMENT INTERIOR STRUCTURES ................................. 5.9-5 5.9.2.1 General Description ................................................ 5.9-5 5.9.2.2 Loads ....................................................................... 5.9-6 5.9.2.3 Analysis and Design ............................................... 5.9-7 5.9.2.4 Materials of Construction ....................................... 5.9-9 5.9.3 AUXILIARY BUILDING .................................................................. 5.9-9 5.9.3.1 General Description ................................................ 5.9-9 5.9.3.2 Loads ..................................................................... 5.9-10 5.9.3.3 Analysis and Design ............................................. 5.9-11 5.9.3.4 Materials of Construction ..................................... 5.9-12 5.9.4 TURBINE BUILDING AND INTAKE STRUCTURE ..................... 5.9-12 5.9.4.1 General................................................................... 5.9-12 5.9.5 AUXILIARY BUILDING RADWASTE ADDITION ........................ 5.9-12 5.9.5.1 General Description .............................................. 5.9-12 5.9.5.2 Analysis and Design ............................................. 5.9-13 5.9.5.3 Materials of Construction ..................................... 5.9-13 5.9.6 AUXILIARY BUILDING TSC/EER/HVAC ADDITION .................. 5.9-13 5.9.6.1 General Description .............................................. 5.9-13 5.9.6.2 Loads and Load Combinations ............................ 5.9-14 5.9.6.2.1 Loads ........................................................... 5.9-14 5.9.6.2.2 Load Combinations .................................... 5.9-15 5.9.6.3 Analysis and Design ............................................. 5.9-16 5.9.6.4 Materials of Construction ..................................... 5.9-17 REFERENCES ............................................................................................. 5.9-18

DSAR CHAPTER 5 - DESIGN OF STRUCTURES, SYSTEMS AND COMPONENTS Revision 36 TABLE OF CONTENTS Page 10 of 13 5.10 SYSTEMS AND COMPONENTS ................................................................. 5.10-1 5.10.1 DESIGN CRITERIA FOR CP CO DESIGN CLASS 1 SYSTEMS AND COMPONENTS ................................................................... 5.10-1 5.10.1.1 CP Co Design Class 1 Piping ............................... 5.10-1 5.10.1.2 CP Co Design Class 1 Pipe Supports.................. 5.10-3 5.10.1.3 Other CP Co Design Class 1 Systems and Components .......................................................... 5.10-5 5.10.1.4 Interim Operability Criteria ................................... 5.10-6 5.10.2 DESIGN CRITERIA FOR CP CO DESIGN CLASS 2 AND CLASS 3 SYSTEMS AND COMPONENTS ................................. 5.10-6 5.10.2.1 CP Co Design Class 2 ........................................... 5.10-6 5.10.2.2 CP Co Design Class 3 ........................................... 5.10-6 5.10.3 ANCHORAGE MODIFICATIONS FOR SAFETY-RELATED SYSTEMS AND COMPONENTS ................................................. 5.10-7 5.10.3.1 Piping Systems ..................................................... 5.10-7 5.10.3.1.1 1974 Review ................................................ 5.10-7 5.10.3.1.2 1979 Reanalysis.......................................... 5.10-7 5.10.3.1.3 Revision of Seismic Piping Criteria -

ASME Section III, Code Case N-411 .......... 5.10-8 5.10.3.1.4 Inspection and Enforcement Bulletins ..... 5.10-9 5.10.3.2 Masonry Walls ..................................................... 5.10-11 5.10.3.2.1 History ....................................................... 5.10-11 5.10.3.2.2 Identification ............................................. 5.10-11 5.10.3.2.3 Reevaluation ............................................. 5.10-11 5.10.3.2.4 Modifications ............................................ 5.10-11 5.10.3.3 Electrical Equipment........................................... 5.10-12 5.10.3.3.1 History ....................................................... 5.10-12 5.10.3.3.2 Identification............................................. 5.10-12 5.10.3.3.3 Evaluation and Modifications ................. 5.10-13 5.10.4 QUALITY CONTROL ................................................................. 5.10-13 5.10.4.1 Shop Welding ...................................................... 5.10-13 5.10.4.2 Field Welding ....................................................... 5.10-14 5.10.4.3 Inspection of Piping ............................................ 5.10-15 5.10.4.4 Field Inspection of Mechanical Components, Electrical Components and Instrumentation .... 5.10-16 REFERENCES ........................................................................................... 5.10-17

DSAR CHAPTER 5 - DESIGN OF STRUCTURES, SYSTEMS AND COMPONENTS Revision 36 TABLE OF CONTENTS Page 11 of 13 LIST OF TABLES 5.2-1 Palisades System of Classification for Structures/Systems/Components 5.2-2 Structures Classification 5.2-3 Mechanical System/Component Classification 5.2-4 Electrical Systems/Component Classification 5.2-5 Instrumentation and Control/Component Classification 5.3-1 Tornado Design Pressures 5.4-1 Safety-Related Equipment That Requires Protection From Flooding Due to Failures of Nonclass 1 Systems 5.5-1 Class 1 Structures Wall and Roof Thickness 5.5-2 Deleted 5.6-1 Deleted 5.6-2 Deleted 5.6-3 Deleted 5.6-4 Deleted 5.7-1 List of Computer Codes 5.7-2 Material Damping Values for Various Materials and Types of Construction 5.7-3 Material Damping Values for Various Class 1 Structures 5.7-4 Auxiliary Building TSC/EER Addition Summary of Modal Parameters Flexible Base Analysis 5.7-5 Comparison of Specifications for Seismic Requirements 5.7-6 Major Class 1 Components Seismic Loads 5.7-7 Class 1E Electrical Equipment and Instrumentation Seismic Loads 5.7-8 Class 1 Tanks Seismic Loads 5.7-9 Safety-Related Hydraulic Shock Suppressors (Snubbers) 5.7-10 Safety-Related Mechanical Shock Suppressors (Snubbers) 5.8-1 Containment Structure Summary of Concrete and Reinforcing Steel Stresses 5.8-2 Containment Structure Tendon Anchorage Zone Reinforcement Stresses 5.8-3 Containment Structure Liner Plate Anchor Analysis 5.8-4 Deleted 5.9-1 Major Equipment Supports, Materials of Construction 5.10-1 Class 1 Systems or Portions Thereof Included in the 1974 Review of As-Built Pipe Supports 5.10-2 Systems Containing Safety-Related Piping

DSAR CHAPTER 5 - DESIGN OF STRUCTURES, SYSTEMS AND COMPONENTS Revision 36 TABLE OF CONTENTS Page 12 of 13 LIST OF FIGURES 5.7-1 OBE Horizontal Design Ground Response Spectrum (Housner) 5.7-2 Taft Ground Response Spectrum Versus Housner Ground Response Spectrum (SSE), 4% Damping 5.7-3 Taft Ground Response Spectrum Versus Housner Ground Response Spectrum (SSE), 7-1/2% Damping 5.7-4 Containment Building Dynamic Model 5.7-5 Containment Shell Maximum Seismic Responses (OBE) Comparison of Responses for Fixed Base and Coupled Models 5.7-6 Auxiliary Building, N-S Mathematical Model 5.7-7 Auxiliary Building, E-W Mathematical Model 5.7-8 Electrical Penetration Enclosure, N-S and E-W Dynamic Models and Maximum Seismic Responses (OBE) 5.7-9 Turbine Building, E-W Dynamic Models 5.7-10 Turbine Building, E-W Fundamental Modeshapes, Outside Walls 5.7-11 Turbine Building, E-W Direction, Maximum Seismic Responses (SSE) 5.7-12 Auxiliary Building Radwaste Addition, Dynamic Models 5.7-13 Auxiliary Building TSC/EER Addition, Dynamic Model 5.7-14 Auxiliary Building TSC/EER Addition, Maximum Seismic Responses (OBE) 5.8-1 Sh 1 Containment Structure, Typical Cross Section 5.8-1 Sh 2 Containment Structure, Typical Cross Section 5.8-2 Containment Structure, Typical Piping Penetrations 5.8-3 Containment Structure, Typical Electrical Penetrations 5.8-4 Containment Structure, Reinforcing and Tendon Plan Adjacent to Equipment Hatch 5.8-5 Sh 1 Containment Structure, Tendon Hardware Assembly, Horizontal and Dome Tendons, Shop Buttonheaded End 5.8-5 Sh 2 Containment Structure, Tendon Hardware Assembly, Horizontal and Dome Tendons, Field Buttonheaded End 5.8-5 Sh 3 Containment Structure, Tendon Hardware Assembly, Vertical Tendons, Shop Buttonheaded End 5.8-5 Sh 4 Containment Structure, Tendon Hardware Assembly, Vertical Tendons, Field Buttonheaded End 5.8-6 Containment Structure, Personnel Air Lock 5.8-7 Containment Structure, Escape Air Lock 5.8-8 Containment Structure, Equipment Hatch Door 5.8-9 Containment Structure, Finite Element Mesh 5.8-10 Deleted 5.8-11 Sh 1 Containment Structure, Isostress Plot, Dome and Wall, D + Fi 5.8-11 Sh 2 Containment Structure, Isostress Plot, Dome and Wall, D + Ff + 1.15P 5.8-11 Sh 3 Containment Structure, Isostress Plot, Dome and Wall, D + Ff + 1.5P + Ta 5.8-11 Sh 4 Containment Structure, Isostress Plot, Dome and Wall, D + Ff + Ta 5.8-12 Sh 1 Containment Structure, Isostress Plot, Wall and Base Slab, D + Fi

DSAR CHAPTER 5 - DESIGN OF STRUCTURES, SYSTEMS AND COMPONENTS Revision 36 TABLE OF CONTENTS Page 13 of 13 5.8-12 Sh 2 Containment Structure, Isostress Plot, Wall and Base Slab, D + Ff + 1.15P 5.8-12 Sh 3 Containment Structure, Isostress Plot, Wall and Base Slab, D + Ff + 1.5P + Ta 5.8-12 Sh 4 Containment Structure, Isostress Plot, Wall and Base Slab, D + Ff + Ta 5.8-13 Sh 1 Containment Structure, Stress Resultants, Dead Load (D) 5.8-13 Sh 2 Containment Structure, Stress Resultants, Final Prestress (Ff) 5.8-13 Sh 3 Containment Structure, Stress Resultants, DBA Pressure (P) 5.8-13 Sh 4 Containment Structure, Stress Resultants, DBA Temperature (Ta) 5.8-14 Containment Structure, Finite Element Mesh for Buttress, Plane Strain Analysis 5.8-15 Sh 1 Containment Structure, Buttress Isostress Plot, Maximum Compressive Stresses 5.8-15 Sh 2 Containment Structure, Buttress Isostress Plot, Minimum Compressive or Maximum Tensile Stresses 5.8-16 Sh 1 Containment Structure, Model for Liner Plate Analysis 5.8-16 Sh 2 Containment Structure, Model for Liner Plate Analysis 5.8-17 Containment Structure, Results From Tests on Liner Plate Anchors 5.8-18 Deleted 5.8-19 Containment Structure, Loads on Pipe Penetrations 5.8-20 Containment Structure, Stress Concentrations at Equipment Hatch Opening 5.8-21 Containment Structure, Liner Plate, Weld Cracking at Backing Strip Discontinuities 5.8-22 Sh 1 Containment Structure, Liner Plate Test Sample, Elevation 600'0",

Azimuth 113° 5.8-22 Sh 2 Containment Structure, Liner Plate Test Sample, Elevation 600'0",

Azimuth 275° 5.8-23 Sh 1 Containment Structure, Liner Plate, Inspection and Method of Repair, Elevation 583' 6" 5.8-23 Sh 2 Containment Structure, Liner Plate, Inspection and Method of Repair, Elevation 588' 6" 5.8-23 Sh 3 Containment Structure, Liner Plate, Inspection and Method of Repair, Elevation 590' 0" 5.8-24 Deleted 5.8-25 Sh 1 Deleted 5.8-25 Sh 2 Deleted 5.8-26 Deleted 5.8-27 Sh 1 Deleted 5.8-27 Sh 2 Deleted 5.8-28 Deleted 5.8-29 Construction Opening Plan, Elevations, and Sections 5.8-30 Construction Opening Tendon Detensioning and Post Tensioning Sequence 5.8-31 Miscellaneous Gas Supply Systems 5.9-1 Containment Structure, Interior Construction

DSAR CHAPTER 6 - ENGINEERED SAFEGUARDS SYSTEMS Revision 36 TABLE OF CONTENTS Page 1 of 3 SECTIONS 6.1 SAFETY INJECTION SYSTEM ................................................................ 6.1-1 6.1.1 DESIGN BASES ............................................................................ 6.1-1 6.1.2 SYSTEM DESCRIPTION AND OPERATION ................................ 6.1-1 6.1.2.1 General Description ................................................ 6.1-1 6.1.2.2 Component Design ................................................. 6.1-2 6.1.2.3 Deleted ..................................................................... 6.1-5 6.1.3 TESTING ........................................................................................ 6.1-5 6.1.3.1 Deleted ..................................................................... 6.1-5 6.1.3.2 Deleted ..................................................................... 6.1-5 6.1.4 DESIGN ANALYSIS....................................................................... 6.1-5 6.2 CONTAINMENT SPRAY SYSTEM ........................................................... 6.2-1 6.2.1 DESIGN BASIS .............................................................................. 6.2-1 6.2.2 SYSTEM DESCRIPTION AND OPERATION ................................ 6.2-1 6.2.2.1 General Description ................................................ 6.2-1 6.2.2.2 Component Description ......................................... 6.2-1 6.2.2.3 Deleted ..................................................................... 6.2-1 6.2.3 SECTION DELETED ...................................................................... 6.2-1 6.2.3.1 Deleted 6.2.3.2 Deleted 6.2.3.3 Deleted 6.3 CONTAINMENT AIR COOLERS .............................................................. 6.3-1 6.3.1 DESIGN BASES ............................................................................ 6.3-1 6.3.2 SYSTEM DESCRIPTION AND OPERATION ................................ 6.3-1 6.3.2.1 General Description ................................................ 6.3-1 6.3.2.2 Deleted ..................................................................... 6.3-1 6.3.3 DELETED ....................................................................................... 6.3-1 6.3.4 COMPONENT TESTING................................................................ 6.3-1 6.3.4.1 Coils ......................................................................... 6.3-1 6.3.4.2 Fans.......................................................................... 6.3-2 6.3.4.3 Testing ..................................................................... 6.3-2 6.4 CONTAINMENT SUMP pH CONTROL .................................................... 6.4-1 6.4.1 DESIGN BASIS .............................................................................. 6.4-1 6.4.2.1 General Description ................................................ 6.4-1 6.4.2.2 Deleted ..................................................................... 6.4-1 6.4.2.3 Materials .................................................................. 6.4-1 6.4.2.4 Paint ......................................................................... 6.4-1 6.5 CONTAINMENT VENTING CHARCOAL FILTER .................................... 6.5-1 6.5.1 GENERAL ...................................................................................... 6.5-1 6.6 DELETED

DSAR CHAPTER 6 - ENGINEERED SAFEGUARDS SYSTEMS Revision 36 TABLE OF CONTENTS Page 2 of 3 6.7 SECTION DELETED ................................................................................ 6.7-1 6.7.1 DELETED 6.7.2 DELETED 6.7.2.1 Deleted 6.7.2.2 Deleted 6.7.2.3 Deleted 6.7.3 DELETED 6.7.3.1 Deleted 6.7.3.2 Deleted 6.8 REACTOR CAVITY FLOODING SYSTEM ............................................... 6.8-1 6.8.1 SYSTEM OPERATION .................................................................. 6.8-1 6.9 INSERVICE INSPECTION OF ASME CLASSES 1, 2 AND 3 SYSTEMS AND COMPONENTS ................................................................................ 6.9-1 6.9.1 STRUCTURAL INTEGRITY EXAMINATION ................................. 6.9-2 6.9.2 SECTION DELETED ...................................................................... 6.9-2 6.9.2.1 Deleted 6.9.2.2 Deleted 6.10 CONTROL ROOM HABITABILITY ........................................................ 6.10-1 6.10.1 DELETED ..................................................................................... 6.10-1 6.10.2 SYSTEM DESIGN ........................................................................ 6.10-1 6.10.3 DELETED ..................................................................................... 6.10-1 REFERENCES ............................................................................................................. 6-1 LIST OF TABLES 6-1 Safety Injection and Refueling Water Tank Design Parameters 6-2 Low Pressure Safety Injection Pump Data Summary 6-3 High Pressure Safety Injection Pump Data Summary 6-4 Shutdown Cooling Heat Exchanger Data Summary 6-5 Safety Injection Tank Design Parameters 6-6 Containment Spray System Component Description 6-7 Containment Air Cooler Component Description 6-8 Deleted 6-9 Deleted 6-10 ECCS Component Systems 6-11 Deleted 6-12 ISI Major Components and/or Systems List 6-13 Deleted 6-14 Deleted

DSAR CHAPTER 6 - ENGINEERED SAFEGUARDS SYSTEMS Revision 36 TABLE OF CONTENTS Page 3 of 3 LIST OF FIGURES 6-1 Sh 1 Piping & Instrument Diagram, Safety Injection Containment Spray and Shutdown Cooling System 6-1 Sh 2 Piping & Instrument Diagram, Safety Injection Containment Spray and Shutdown Cooling System 6-2 Sh 1 Piping & Instrument Diagram, Safety Injection Containment Spray and Shutdown Cooling System 6-2 Sh 1A Piping & Instrument Diagram, Safety Injection Containment Spray and Shutdown Cooling System 6-2 Sh 1B Piping & Instrument Diagram, Safety Injection Containment Spray 6-3 Deleted 6-4 Containment Vent Filter 6-5 Sh 1 Containment Penetrations 6-5 Sh 2 Containment Penetrations 6-5 Sh 2A Containment Penetrations 6-5 Sh 3 Containment Penetrations 6-6 Reactor Cavity Flooding System 6-7 Deleted

DSAR CHAPTER 7 - INSTRUMENTATION AND CONTROLS Revision 36 TABLE OF CONTENTS Page 1 of 4 SECTIONS

7.1 INTRODUCTION

....................................................................................... 7.1-1 7.2 REACTOR PROTECTIVE SYSTEM ......................................................... 7.2-1 7.2.1 GENERAL ...................................................................................... 7.2-1 7.2.2 DELETED ....................................................................................... 7.2-2 7.2.3 SECTION DELETED ...................................................................... 7.2-2 7.2.3.1 Deleted 7.2.3.2 Deleted 7.2.3.3 Deleted 7.2.3.4 Deleted 7.2.3.5 Deleted 7.2.3.6 Deleted 7.2.3.7 Deleted 7.2.3.8 Deleted 7.2.3.9 Deleted 7.2.3.10 Deleted 7.2.4 SECTION DELETED ...................................................................... 7.2-2 7.2.5 SECTION DELETED ...................................................................... 7.2-2 7.2.5.1 Deleted 7.2.5.2 Deleted 7.2.5.3 Deleted 7.2.6 DELETED ....................................................................................... 7.2-2 7.2.7 DELETED ....................................................................................... 7.2-2 7.2.8 DELETED ....................................................................................... 7.2-2 7.2.9 SECTION DELETED ...................................................................... 7.2-2 7.2.9.1 Deleted 7.2.9.2 Deleted 7.2.10 SECTION DELETED ...................................................................... 7.2-2 7.3 SECTION DELETED ................................................................................ 7.3-1 7.3.1 DELETED 7.3.2 DELETED 7.3.2.1 Deleted 7.3.2.2 Deleted 7.3.2.3 Deleted 7.3.3 DELETED 7.3.3.1 Deleted 7.3.3.2 Deleted 7.3.3.3 Deleted 7.3.4 DELETED 7.3.4.1 Deleted 7.3.4.2 Deleted 7.3.4.3 Deleted 7.3.5 DELETED 7.3.5.1 Deleted 7.3.5.2 Deleted

DSAR CHAPTER 7 - INSTRUMENTATION AND CONTROLS Revision 36 TABLE OF CONTENTS Page 2 of 4 7.4 OTHER SAFETY RELATED PROTECTION, CONTROL AND DISPLAY SYSTEMS ................................................................................ 7.4-1 7.4.1 DELETED ....................................................................................... 7.4-1 7.4.2 SECTION DELETED ...................................................................... 7.4-1 7.4.2.1 Deleted 7.4.2.2 Deleted 7.4.3 SECTION DELETED ...................................................................... 7.4-1 7.4.3.1 Deleted 7.4.3.2 Deleted 7.4.4 SECTION DELETED ...................................................................... 7.4-1 7.4.4.1 Deleted 7.4.5 VENTILATION AND EFFLUENT RELEASES CONTROLS .......... 7.4-1 7.4.5.1 Deleted ..................................................................... 7.4-1 7.4.5.2 Deleted ..................................................................... 7.4-1 7.4.5.3 Radwaste Area ........................................................ 7.4-1 7.4.5.4 Fuel Handling Areas ............................................... 7.4-1 7.4.5.5 Waste Gas Decay Tank ........................................... 7.4-1 7.4.6 SECTION DELETED ...................................................................... 7.4-1 7.4.6.1 Deleted 7.4.6.2 Deleted 7.4.6.3 Deleted 7.4.6.4 Deleted 7.5 NONSAFETY-RELATED REGULATING CONTROLS ............................ 7.5-1 7.5.1 SECTION DELETED ...................................................................... 7.5-1 7.5.1.1 Deleted 7.5.1.2 Deleted 7.5.1.3 Deleted 7.5.1.4 Deleted 7.5.1.5 Deleted 7.5.1.6 Deleted 7.5.1.7 Deleted 7.5.2 SYSTEM DESIGN .......................................................................... 7.5-1 7.5.2.1 Reactor Regulating ................................................. 7.5-1 7.5.2.2 Deleted ..................................................................... 7.5-1 7.5.2.3 Deleted ..................................................................... 7.5-1 7.5.2.4 Deleted ..................................................................... 7.5-1 7.5.2.5 Steam Dump and Bypass ....................................... 7.5-1 7.5.2.6 Turbine Generator Controls ................................... 7.5-2 7.5.3 SECTION DELETED ...................................................................... 7.5-2 7.5.3.1 Deleted 7.5.3.2 Deleted 7.5.3.3 Deleted 7.5.3.4 Deleted 7.5.3.5 Deleted 7.5.3.6 Deleted

DSAR CHAPTER 7 - INSTRUMENTATION AND CONTROLS Revision 36 TABLE OF CONTENTS Page 3 of 4 7.6 PLANT PROCESS COMPUTER AND MISCELLANEOUS INSTRUMENTATION .............................................................................. 7.6-1 7.6.1 DESIGN BASES ............................................................................ 7.6-1 7.6.1.1 Deleted ..................................................................... 7.6-1 7.6.1.2 Deleted ..................................................................... 7.6-1 7.6.1.3 Deleted ..................................................................... 7.6-1 7.6.1.4 Deleted ..................................................................... 7.6-1 7.6.1.5 Palisades Plant Computer (PPC) ........................... 7.6-1 7.6.2 SYSTEM DESCRIPTION ............................................................... 7.6-2 7.6.2.1 Deleted ..................................................................... 7.6-2 7.6.2.2 Nuclear Instrumentation ......................................... 7.6-2 7.6.2.3 Deleted ..................................................................... 7.6-2 7.6.2.4 Deleted ..................................................................... 7.6-2 7.6.2.5 Palisades Plant Computer ...................................... 7.6-2 7.7 OPERATING CONTROL STATIONS ....................................................... 7.7-1 7.7.1 GENERAL LAYOUT ...................................................................... 7.7-1 7.7.2 CONTROL ROOM.......................................................................... 7.7-1 7.7.3 ENGINEERED SAFEGUARDS AUXILIARY PANEL (C-33) ......... 7.7-3 7.7.4 AUXILIARY HOT SHUTDOWN CONTROL PANELS (C-150/C-150A) .............................................................................. 7.7-3 7.7.5 RADWASTE SYSTEM LOCAL CONTROL PANEL ...................... 7.7-3 7.7.6 MISCELLANEOUS LOCAL CONTROL STATIONS ..................... 7.7-3 7.7.7 FEATURES WHICH ENHANCE SAFE OPERATION.................... 7.7-4 7.7.8 IN-PLANT COMMUNICATION SYSTEM ....................................... 7.7-4 7.7.9 OUT-OF-PLANT COMMUNICATION SYSTEM ............................. 7.7-4 7.8 SECTION DELETED ................................................................................ 7.8-1 7.8.1 DELETED 7.8.2 DELETED 7.8.3 DELETED 7.8.4 DELETED 7.8.5 DELETED 7.8.6 DELETED 7.8.7 DELETED REFERENCES ............................................................................................................. 7-1 APPENDICES Appendix 7A, Deleted Appendix 7C, "Regulatory Guide 1.97 Rev 3, Parameter Summary Table LIST OF TABLES 7-1 Deleted 7-2 Deleted 7-3 Deleted

DSAR CHAPTER 7 - INSTRUMENTATION AND CONTROLS Revision 36 TABLE OF CONTENTS Page 4 of 4 7-4 Deleted 7-5 Deleted LIST OF FIGURES Figure 7-1 through 7-59 Deleted 7-60 Piping Drawing, Nuclear Detector Wells 7-61 Block Diagram, Critical Functions Monitor System

DSAR CHAPTER 8 - ELECTRICAL SYSTEMS Revision 36 TABLE OF CONTENTS Page 1 of 4 SECTIONS

8.1 INTRODUCTION

....................................................................................... 8.1-1 8.1.1 DESIGN BASIS .............................................................................. 8.1-1 8.

1.2 DESCRIPTION

AND OPERATION ................................................ 8.1-2 8.1.3 DELETED ....................................................................................... 8.1-3 8.1.4 SEISMIC QUALIFICATION OF ELECTRICAL EQUIPMENT ........ 8.1-3 8.1.5 DELETED ....................................................................................... 8.1-4 8.2 NETWORK INTERCONNECTION ............................................................ 8.2-1 8.2.1 DESIGN BASIS .............................................................................. 8.2-1 8.

2.2 DESCRIPTION

AND OPERATION ................................................ 8.2-1 8.2.3 DESIGN ANALYSIS ....................................................................... 8.2-2 8.2.4 TRANSMISSION SYSTEM OWNERSHIP...................................... 8.2-3 8.3 STATION DISTRIBUTION ........................................................................ 8.3-1 8.3.1 4,160 VOLT SYSTEM..................................................................... 8.3-1 8.3.1.1 Design Basis ............................................................ 8.3-1 8.3.1.2 Description and Operation ..................................... 8.3-1 8.3.1.3 Design Analysis ....................................................... 8.3-1 8.3.2 2,400 VOLT SYSTEM..................................................................... 8.3-2 8.3.2.1 Design Basis ............................................................ 8.3-2 8.3.2.2 Description and Operation ..................................... 8.3-2 8.3.2.3 Design Analysis ....................................................... 8.3-4 8.3.3 480 VOLT SYSTEM........................................................................ 8.3-5 8.3.3.1 Design Basis ............................................................ 8.3-5 8.3.3.2 Description and Operation ..................................... 8.3-5 8.3.3.3 Design Analysis ....................................................... 8.3-6 8.3.4 SECTION DELETED ...................................................................... 8.3-6 8.3.4.1 Deleted ..................................................................... 8.3-6 8.3.4.2 Deleted ..................................................................... 8.3-6 8.3.4.3 Deleted ..................................................................... 8.3-6

DSAR CHAPTER 8 - ELECTRICAL SYSTEMS Revision 36 TABLE OF CONTENTS Page 2 of 4 8.3.5 DC AND PREFERRED AC SYSTEMS........................................... 8.3-6 8.3.5.1 Design Basis ............................................................ 8.3-6 8.3.5.2 Description and Operation ..................................... 8.3-6 8.3.5.3 Deleted ................................................................... 8.3-10 8.3.6 INSTRUMENT AC SYSTEM ........................................................ 8.3-10 8.3.6.1 Design Basis .......................................................... 8.3-10 8.3.6.2 Description and Operation ................................... 8.3-10 8.3.6.3 Design Analysis ..................................................... 8.3-11 8.4 EMERGENCY POWER SOURCES .......................................................... 8.4-1 8.4.1 EMERGENCY GENERATORS ...................................................... 8.4-1 8.4.1.1 Deleted ..................................................................... 8.4-1 8.4.1.2 Description and Operation ..................................... 8.4-1 8.4.1.3 Design Analysis ....................................................... 8.4-2 8.4.2 STATION BATTERIES ................................................................... 8.4-4 8.4.2.1 Design Basis ............................................................ 8.4-4 8.4.2.2 Description and Operation ..................................... 8.4-5 8.4.2.3 Deleted ..................................................................... 8.4-5 8.4.2.4 Dedicated Battery Supply to Address Fire Scenarios..8.4.5 8.4.3 SECTION DELETED ...................................................................... 8.4-5 8.4.3.1 Deleted 8.4.3.2 Deleted 8.4.4 SECTION DELETED ...................................................................... 8.4-5 8.4.4.1 Deleted 8.4.4.2 Deleted 8.4.5 SUPPLEMENTAL 2400 VOLT POWER SUPPLY ......................... 8.4-5 8.4.5.1 Design Basis ............................................................ 8.4-5 8.4.5.2 Description and Operation ..................................... 8.4-5

DSAR CHAPTER 8 - ELECTRICAL SYSTEMS Revision 36 TABLE OF CONTENTS Page 3 of 4 8.5 RACEWAY AND CABLING SYSTEM ...................................................... 8.5-1 8.5.1 DESIGN BASIS .............................................................................. 8.5-1 8.5.1.1 Fire Protection Features ......................................... 8.5-1 8.5.1.2 Deleted ..................................................................... 8.5-1 8.5.2 DESIGN DESCRIPTION................................................................. 8.5-1 8.5.3 DESIGN EVALUATION .................................................................. 8.5-2 8.5.3.1 Compliance With Regulatory Guide 1.75............... 8.5-2 8.5.3.2 Raceway and Cabling Separation Criteria............. 8.5-3 8.5.3.3 Raceway and Cabling Fire Barriers ....................... 8.5-4 8.5.3.4 Cable Spreading Room Protection Design ........... 8.5-4 8.5.3.5 Cable Penetration Rooms Protection Design ....... 8.5-5 8.5.3.6 Raceway Runs Protection Design ......................... 8.5-5 8.5.3.7 Safety-Related Cabling Routing Via Nonsafety-Related Areas ........................................ 8.5-6 8.5.3.8 Containment Building Routing Protection ............ 8.5-6 8.5.3.9 Other Areas Routing Protection ............................. 8.5-7 8.6 SECTION DELETED ................................................................................. 8.6-1 8.6.1 DELETED 8.6.2 DELETED 8.6.3 DELETED 8.6.3.1 Deleted 8.6.3.2 Deleted 8.7 PHYSICAL SEPARATION AND SUPPORT SYSTEMS ........................... 8.7-1 8.7.1 DELETED ....................................................................................... 8.7-1 8.7.2 PHYSICAL SEPARATION ............................................................. 8.7-1 8.7.2.1 General ..................................................................... 8.7-1 8.7.2.2 Transformers ........................................................... 8.7-1 8.7.2.3 Protection Against Water Damage ......................... 8.7-1 8.7.2.4 Smoke Control ......................................................... 8.7-2 8.7.2.5 Switchgear Rooms Protection ............................... 8.7-2 8.7.2.6 Emergency Generators Rooms Protection ........... 8.7-3 8.7.2.7 Battery Rooms Protection ...................................... 8.7-4 8.7.3 SUPPORT SYSTEMS .................................................................... 8.7-5

DSAR CHAPTER 8 - ELECTRICAL SYSTEMS Revision 36 TABLE OF CONTENTS Page 4 of 4 8.7.3.1 Ventilation ................................................................ 8.7-5 8.8 MOTOR OPERATED VALVES ................................................................. 8.8-1 8.9 LIGHTING SYSTEMS ............................................................................... 8.9-1 8.10 QUALITY CONTROL .............................................................................. 8.10-1 REFERENCES ............................................................................................................. 8-1 LIST OF TABLES 8-1 Switchyard System Ratings and Construction of Components 8-2 4,160 Volt System Ratings and Construction of Components 8-3 2,400 Volt System Ratings and Construction of Components 8-4 480 Volt System Ratings and Construction of Components 8-5 DC and Preferred AC Systems Ratings and Construction of Components 8-6 Deleted 8-7 Deleted LIST OF FIGURES 8-1 Sh 1 Single Line Meter & Relay Diagram, 480 Volt Motor Control Center - Warehouse 8-1 Sh 2 Plant Single Line Diagram 8-1 Sh 3 Plant Single Line Diagram 8-2 Substation 8-3 Sh 1 Single Line Meter & Relay Diagram, Generator & 4160 V System 8-3 Sh 2 Single Line Meter & Relay Diagram, Cooling Tower Systems 8-4 Single Line Meter & Relay Diagram, 2400 Volt System 8-5 Sh 1 Single Line Meter & Relay Diagram, 480 Volt Load Centers 8-5 Sh 2 Single Line Meter & Relay Diagram, 480 Volt Load Centers 8-5 Sh 3 Single Line Meter & Relay Diagram, Cooling Tower Systems 8-6 Sh 1 Single Line Meter & Relay Diagram, 480 Volt Motor Control Centers 8-6 Sh 2 Single Line Meter & Relay Diagram, 480 Volt Motor Control Centers 8-6 Sh 3 Single Line Meter & Relay Diagram, 480 Volt Motor Control Centers 8-6 Sh 4 Single Line Meter & Relay Diagram, Radwaste System 8-7 Sh 1 Single Line Meter & Relay Diagram, 125V DC, 120V Instrument &

Preferred AC System 8-7 Sh 2 Single Line Meter & Relay Diagram, 125V DC, 120V Instrument &

Preferred AC System 8-8 125V DC System, Auxiliary Shutdown Layout 8-9 Substation 120/240V AC & 125V DC Power Distribution Center 8-10 Voltage Protection Sensors Location 8-11 Piping & Instrument Diagram, Lube Oil, Fuel Oil and Diesel Generator Systems 8-12 Battery Supply for Alternate Controls Credited in Fire Scenario

DSAR CHAPTER 10 - STEAM AND POWER CONVERSION SYSTEM Revision 36 TABLE OF CONTENTS Page 1 of 1 SECTIONS 10.1 DESIGN BASIS ................................................................................... 10.1-1 10.2 SYSTEM DESCRIPTION AND OPERATION ......................................... 10.2-1 10.2.1 SYSTEM GENERAL DESCRIPTION........................................... 10.2-1 10.2.2 STEAM TURBINE ........................................................................ 10.2-2 10.2.2.1 High-Pressure Turbine ............................................. 10.2-2 10.2.2.2 Low-Pressure Turbine .............................................. 10.2-3 10.2.2.3 Electrical Generator10.2-4 10.2.2.4 Exciter....10.2-4 10.2.3 CONDENSATE AND FEEDWATER.10.2-4 10.2.3.1 Condensate System..10.2-4 10.2.3.2 Condensate Demineralizer System......10.2-4 10.2.3.3 Deleted.....10.2-5 10.2.4 CIRCULATING WATER SYSTEM........10.2-5 10.2.4.1 Cooling Towers.. ...10.2-5 10.2.4.2 Deleted .................................10.2-5 10.2.4.3 Deleted ....10.2-5 10.2.5 CODES AND STANDARDS...10.2-6 10.3 SECTION DELETED..10.3-1 10.3.1 DELETED 10.4 TESTS AND INSPECTIONS....10.4-1 10.4.1 PIPE WALL THINNING INSPECTION PROGRAM..10.4-1 REFERENCES..None LIST OF TABLES 10-1 Turbine Casing Properties 10-2 Stud Mechanical Properties 10-3 Deleted 10-4 Cooling Tower Design Summary 10-5 Cooling Tower Pumps LIST OF FIGURES 10-1 System Diagram, Main Steam, Main and Auxiliary Turbine Systems 10-2 System Diagram, Extractions, Heaters Vents and Drain Systems 10-3 Sh 1 Piping and Instrument Diagram, Steam Generator Blowdown Modification 10-3 Sh 2 Piping and Instrument Diagram, Steam Generator Blowdown Modification 10-3 Sh 3 Piping and Instrument Diagram, Steam Generator Blowdown Modification 10-4 System Diagram, Feedwater and Condensate System 10-5 General Assembly Electrical Generator 10-6 System Diagram, Cooling Tower System

DSAR CHAPTER 11 - RADIOACTIVE WASTE MANAGEMENT AND Revision 36 RADIATION PROTECTION Page 1 of 4 TABLE OF CONTENTS SECTIONS 11.1 SOURCE TERMS ................................................................................... 11.1-1 11.2 LIQUID RADIOACTIVE WASTE SYSTEM ............................................. 11.2-1 11.2.1 DESIGN BASES .......................................................................... 11.2-1 11.2.1.1 Design Objective ................................................... 11.2-1 11.2.1.2 Design Criteria ...................................................... 11.2-1 11.2.1.3 Codes ..................................................................... 11.2-1 11.2.2 SYSTEM DESCRIPTION ............................................................. 11.2-2 11.2.2.1 Clean Waste Section ............................................. 11.2-2 11.2.2.2 Dirty Waste Section .............................................. 11.2-4 11.2.2.3 Laundry Waste Section ........................................ 11.2-4 11.2.3 RADIOACTIVE RELEASES ........................................................ 11.2-5 11.2.3.1 Clean Waste Section ............................................. 11.2-5 11.2.3.2 Dirty Waste Section .............................................. 11.2-7 11.2.3.3 Laundry Waste Section ........................................ 11.2-7 11.2.4 BALANCE OF PLANT (BOP) INTERFACE ................................ 11.2-7 11.2.4.1 Clean Waste Section ............................................. 11.2-8 11.2.4.2 Dirty Waste Section .............................................. 11.2-8 11.2.4.3 Laundry Waste Section ........................................ 11.2-8 11.2.4.4 Alternate Radwaste Processing System...11.2-8 11.2.5 SYSTEM EVALUATION ......................................................................... 11.2-8 11.3 GASEOUS RADIOACTIVE WASTE SYSTEM ....................................... 11.3-1 11.3.1 DESIGN BASIS ............................................................................ 11.3-1 11.3.2 SYSTEM DESCRIPTION ............................................................. 11.3-1 11.3.2.1 Gas Collection Header .......................................... 11.3-1 11.3.2.2 Waste Gas Processing System ............................ 11.3-2 11.3.3 RADIOACTIVE RELEASES ........................................................ 11.3-2 11.3.4 BOP INTERFACE ........................................................................ 11.3-3 11.3.5 SYSTEM EVALUATION .............................................................. 11.3-3 11.4 SOLID WASTE MANAGEMENT SYSTEM............................................. 11.4-1 11.4.1 DESIGN BASIS ............................................................................ 11.4-1 11.4.2 SYSTEM DESCRIPTION ............................................................. 11.4-2 11.4.2.1 System Modifications ........................................... 11.4-2 11.4.2.2 Radioactive Waste Storage Facilities .................. 11.4-3 11.4.2.3 Alternate Radwaste Processing Standard Dewatering System ................................................................... 11.4-8 11.4.3 RADIOACTIVE RELEASES ........................................................ 11.4-8 11.4.4 BOP INTERFACE ........................................................................ 11.4-9 11.4.5 SYSTEM EVALUATION .............................................................. 11.4-9 11.4.6 REQUEST TO RETAIN SOIL IN ACCORDANCE WITH 10CFR20.302 ..................................................................... 11.4-9

DSAR CHAPTER 11 - RADIOACTIVE WASTE MANAGEMENT AND Revision 36 RADIATION PROTECTION Page 2 of 4 TABLE OF CONTENTS 11.5 PROCESS AND EFFLUENT RADIOLOGICAL MONITORING AND SAMPLING SYSTEM ............................................................................. 11.5-1 11.5.1 DESIGN BASIS ............................................................................ 11.5-1 11.5.2 SYSTEM DESCRIPTION ............................................................. 11.5-1 11.5.3 EFFLUENT MONITORING AND SAMPLING .............................. 11.5-2 11.5.4 SYSTEM EVALUATION .............................................................. 11.5-3 11.6 RADIATION PROTECTION .................................................................... 11.6-1 11.6.1 GENERAL .................................................................................... 11.6-1 11.6.1.1 Radiation Exposure of Personnel ........................ 11.6-1 11.6.1.2 Radiation Exposure of Materials and Components ................................................... 11.6-1 11.6.2 RADIATION ZONING AND ACCESS CONTROL ....................... 11.6-2 11.6.3 GENERAL DESIGN CONSIDERATIONS .................................... 11.6-3 11.6.3.1 Specific Design Values ......................................... 11.6-3 11.6.3.2 Reactor Core Data ................................................. 11.6-3 11.6.4 SHIELDING DESIGN ................................................................... 11.6-4 11.6.4.1 Containment Building Shell ................................. 11.6-4 11.6.4.2 Containment Building Interior ............................. 11.6-4 11.6.4.3 Auxiliary Building (Including Radwaste Building Addition) ................................................. 11.6-4 11.6.4.4 Turbine Building.................................................... 11.6-6 11.6.4.5 General Plant Yard Areas ..................................... 11.6-6 11.6.4.6 Other Buildings ..................................................... 11.6-6 11.6.5 AREA RADIATION MONITORING SYSTEMS ............................ 11.6-7 11.6.5.1 Design Basis ......................................................... 11.6-7 11.6.5.2 System Description............................................... 11.6-7 11.6.5.3 Testing and Maintenance ..................................... 11.6-8 11.6.6 HEALTH PHYSICS ...................................................................... 11.6-8 11.6.6.1 Facilities................................................................. 11.6-8 11.6.6.2 Tool and Equipment Decontamination Facility .. 11.6-9 11.6.6.3 Calibration Facility ................................................ 11.6-9 11.6.6.4 Radiation Control .................................................. 11.6-9 11.6.6.5 Shielding .............................................................. 11.6-10 11.6.6.6 Access Control .................................................... 11.6-10 11.6.6.7 Facility Contamination Control .......................... 11.6-11 11.6.6.8 Personnel Contamination Control ..................... 11.6-12 11.6.6.9 Airborne Contamination Control ....................... 11.6-13 11.6.6.9.1 Respiratory Protection Program ............. 11.6-13 11.6.6.10 External Radiation Dose Determination ............ 11.6-15 11.6.6.11 Internal Radiation Dose Determination ............. 11.6-15

DSAR CHAPTER 11 - RADIOACTIVE WASTE MANAGEMENT AND Revision 36 RADIATION PROTECTION Page 3 of 4 TABLE OF CONTENTS 11.6.7 RADIATION PROTECTION INSTRUMENTATION.................... 11.6-16 11.6.7.1 Counting Room Instrumentation ....................... 11.6-16 11.6.7.2 Portable Radiation Detecting Instrumentation . 11.6-16 11.6.7.3 Air Sampling Instrumentation ............................ 11.6-16 11.6.7.4 Personal Monitoring Instrumentation ............... 11.6-17 11.6.7.5 Emergency Instrumentation ............................... 11.6-17 11.6.8 TESTS AND INSPECTIONS ...................................................... 11.6-17 11.6.8.1 Shielding .............................................................. 11.6-17 11.6.8.2 Area and Process Radiation Monitors .............. 11.6-18 11.6.8.3 Continuous Air Monitors .................................... 11.6-18 11.6.8.4 Radiation Protection Instrumentation ............... 11.6-18 11.6.9 CONTROL OF BYPRODUCT, SOURCE OR SPECIAL NUCLEAR MATERIAL (SNM) SOURCES ........................................ 11.6-19 11.6.10 RADIOACTIVE MATERIAL STORAGE FACILITIES ......... 11.6-20 REFERENCES ........................................................................................................... 11-1 LIST OF TABLES 11-1 Primary Coolant Fission and Corrosion Product Activities 11-2 Radioactive Waste Quantities of Significant Activity 11-3 Equipment Ratings and Construction Codes - Original Equipment 11-4 Equipment Ratings and Construction Codes - Additional Equipment Installed 1971-1973 11-5 Primary System Drain Tank 11-6 Equipment Drain Tank 11-7 Dirty Waste Drain Tank 11-8 Liquid Radwaste 11-9 Maximum Calculated Tritium Release Due to Evaporation From Refueling Cavity and Spent Fuel Pool 11-10 LADTAP Input Data and Results Maximum Individual Dose Calculations 11-11 Activity in Gaseous Waste 11-12 Special Location GASPAR Input Data 11-13 Dose Results for Special Locations, Maximum Individual Doses by Age Group and Organ 11-15 Process Radiation Service and Equipment 11-16 Area Radiation Detectors 11-17 Primary Coolant Fission and Corrosion Product Activities for AST Dose Analyses

DSAR CHAPTER 11 - RADIOACTIVE WASTE MANAGEMENT AND Revision 36 RADIATION PROTECTION Page 4 of 4 TABLE OF CONTENTS LIST OF FIGURES 11-1 Sh 1 P&ID Radioactive Waste Treatment System Clean 11-1 Sh 1A P&ID Radioactive Waste Treatment System Clean 11-1 Sh 1B P&ID Radioactive Waste Treatment System Clean 11-1 Sh 1C P&ID Radioactive Waste Treatment System Clean 11-1 Sh 2 P&ID Radioactive Waste Treatment System Clean 11-1 Sh 3 P&ID Radwaste Evaporator System Clean Wastes 11-2 Sh 1 P&ID Dirty Waste & Gaseous Waste 11-2 Sh 2 P&ID Radwaste Evaporator System Miscellaneous Waste 11-2 Sh 2A P&ID Radwaste Evaporator System Miscellaneous Waste 11-2 Sh 2B P&ID Radwaste Evaporator System Miscellaneous Waste 11-3 Sh 1 P&ID Radioactive Waste Treatment System Gaseous Waste 11-3 Sh 2 P&ID Radioactive Waste Treatment System Gaseous Waste 11-4 Sh 1 Spent Resin Storage and Radwaste Packaging System 11-4 Sh 2 P&ID Radwaste Solidification System 11-4 Sh 3 P&ID Liquid Volume Reduction System 11-5 Sh 1 P&ID Radiation Monitoring and Sampling Systems 11-5 Sh 1A P&ID Radiation Monitoring and Sampling Systems 11-5 Sh 1B P&ID Radiation Monitoring and Sampling Systems 11-5 Sh 2 P&ID Radiation Monitoring and Sampling Systems 11-6 Gaseous Effluent Monitoring System 11-7 Architectural Access Control and Radiation Zoning (Plant in Operation) 11-8 Architectural Access Control and Radiation Zoning (Plant in Operation) 11-9 Architectural Access Control and Radiation Zoning (Plant in Operation)

DSAR CHAPTER 12 - CONDUCT OF OPERATIONS Revision 36 TABLE OF CONTENTS Page 1 of 1 SECTIONS 12.1 ORGANIZATION AND RESPONSIBILITY ............................................. 12.1-1 12.1.1 MANAGEMENT AND TECHICAL SUPPORT ORGANIZATIONS .................................................................. 12.1-1 12.2 TRAINING .................................................................................... 12.2-1 12.2.1 PLANT STAFF TRAINING PROGRAM.................................. 12.2-1 12.2.1.1 Plant Access Training............................................... 12.2-1 12.2.1.2 Radiation Worker Training (RWT) ............................ 12.2-1 12.2.1.3 Certified Fuel Handler Training Program ................ 12.2-2 12.2.1.4 Instrumentation and Controls (I&C) Technician Training Programs ................................................ 12.2-2 12.2.1.5 Mechanical and Electrical Maintenance Personnel Training Program .................................................. 12.2-2 12.2.1.6 Radiological Protection Technician Training Program .................................................. 12.2-2 12.2.1.7 Chemistry Technician Training Program ................ 12.2-3 12.2.1.8 Engineering Support Personnel Training Program .................................................. 12.2-3 12.2.1.9 Fire Protection Training............................................ 12.2-3 12.2.2 TRAINING EFFECTIVENESS EVALUATION ........................ 12.2-3 12.3 PLANT PROCEDURES .......................................................................... 12.3-1 12.3.1 PROCEDURE CONTROL REQUIREMENTS ......................... 12.3-1 12.3.2 DELETED ............................................................................... 12.3-1 12.3.3 OPERATING REQUIREMENTS MANUAL (ORM) ................. 12.3-1 12.4 REVIEW AND ASSESMENT .................................................................. 12.4-1 12.5 EMERGENCY PLANNING ..................................................................... 12.5-1 12.6 INDUSTRIAL SECURITY ....................................................................... 12.6-1 REFERENCES .......................................................................................................... None TABLES .................................................................................................................... None LIST OF FIGURES 12-1 Palisades Nuclear Plant Organization 12-2 Deleted 12-3 Deleted

DSAR CHAPTER 13 - INITIAL TESTS AND OPERATIONS Revision 36 TABLE OF CONTENTS Page 1 of 1 SECTIONS 13.1 TESTS PRIOR TO REACTOR FUELING ............................................... 13.1-1 13.2 SECTION DELETED .............................................................................. 13.2-1 13.2.1 DELETED 13.2.2 DELETED 13.2.3 DELETED 13.3 SECTION DELETED ...13.3-1 13.3.1 DELETED 13.3.2 DELETED 13.3.3 DELETED 13.4 OPERATION RESTRICTIONS.....13.4-1 13.4.1 SAFETY PRECAUTIONS....13.4-1 13.4.2

SUMMARY

.13.4-1 REFERENCES..None TABLES.None FIGURESNone

DSAR CHAPTER 14 - SAFETY ANALYSIS Revision 36 TABLE OF CONTENTS Page 1 of 10 SECTIONS

14.1 INTRODUCTION

..................................................................................... 14.1-1 14.1.1 DELETED ............................................................................... 14.1-1 14.1.2 DELETED ............................................................................... 14.1-1 14.1.3 DELETED ............................................................................... 14.1-1 14.2 SECTION DELETED .............................................................................. 14.2-1 14.2.1 DELETED 14.2.1.1 Deleted 14.2.1.2 Deleted 14.2.1.2.1 Deleted 14.2.1.2.2 Deleted 14.2.1.2.3 Deleted 14.2.1.3 Deleted 14.2.1.4 Deleted 14.2.2 DELETED 14.2.2.1 Deleted 14.2.2.2 Deleted 14.2.2.2.1 Deleted 14.2.2.2.2 Deleted 14.2.2.2.3 Deleted 14.2.2.3 Deleted 14.2.2.4 Deleted 14.2.3 DELETED 14.2.3.1 Deleted 14.2.3.2 Deleted 14.2.3.2.1 Deleted 14.2.3.2.2 Deleted 14.2.3.2.3 Deleted 14.2.3.3 Deleted 14.2.3.4 Deleted 14.3 SECTION DELETED .............................................................................. 14.3-1 14.3.1 DELETED 14.3.2 DELETED 14.3.2.1 Deleted 14.3.2.2 Deleted 14.3.2.3 Deleted 14.3.2.3.1 Deleted 14.3.2.3.2 Deleted 14.3.2.3.3 Deleted 14.3.2.3.4 Deleted 14.3.2.3.5 Deleted 14.3.2.3.6 Deleted 14.3.3 DELETED 14.3.4 DELETED

DSAR CHAPTER 14 - SAFETY ANALYSIS Revision 36 TABLE OF CONTENTS Page 2 of 10 14.4 SECTION DELETED .............................................................................. 14.4-1 14.4.1 DELETED 14.4.1.1 Deleted 14.4.1.2 Deleted 14.4.1.2.1 Deleted 14.4.1.2.2 Deleted 14.4.1.2.3 Deleted 14.4.1.3 Deleted 14.4.1.4 Deleted 14.4.2 DELETED 14.4.2.1 Deleted 14.4.2.2 Deleted 14.4.2.2.1 Deleted 14.4.2.2.2 Deleted 14.4.2.2.3 Deleted 14.4.2.3 Deleted 14.4.2.4 Deleted 14.5 SECTION DELETED .............................................................................. 14.5-1 14.5.1 DELETED 14.5.2 DELETED 14.5.3 DELETED 14.5.4 DELETED 14.6 SECTION DELETED .............................................................................. 14.6-1 14.6.1 DELETED 14.6.1.1 Deleted 14.6.1.2 Deleted 14.6.1.3 Deleted 14.6.1.4 Deleted 14.6.2 DELETED 14.6.2.1 Deleted 14.6.2.2 Deleted 14.6.2.2.1 Deleted 14.6.2.2.2 Deleted 14.6.2.2.3 Deleted 14.6.2.3 Deleted 14.6.2.4 Deleted 14.7 SECTION DELETED .............................................................................. 14.7-1 14.7.1 DELETED 14.7.1.1 Deleted 14.7.1.2 Deleted 14.7.1.2.1 Deleted 14.7.1.2.2 Deleted 14.7.1.2.3 Deleted 14.7.1.3 Deleted 14.7.1.4 Deleted

DSAR CHAPTER 14 - SAFETY ANALYSIS Revision 36 TABLE OF CONTENTS Page 3 of 10 14.7.2 DELETED 14.7.2.1 Deleted 14.7.2.2 Deleted 14.7.2.2.1 Deleted 14.7.2.3 Deleted 14.7.2.4 Deleted 14.7.2.5 Deleted 14.7.2.6 Deleted 14.8 SECTION DELETED .............................................................................. 14.8-1 14.8.1 DELETED 14.9 SECTION DELETED .............................................................................. 14.9-1 14.10 SECTION DELETED ............................................................................ 14.10-1 14.10.1 DELETED 14.10.2 DELETED 14.10.2.1 Deleted 14.10.2.2 Deleted 14.10.2.3 Deleted 14.10.3 DELETED 14.10.4 DELETED 14.11 POSTULATED CASK DROP ACCIDENTS.......................................... 14.11-1 14.11.1 EVENT DESCRIPTION ......................................................... 14.11-1 14.11.2 STRUCTURAL ANALYSIS .................................................. 14.11-2 14.11.2.1 Analysis Method ................................................. 14.11-3 14.11.2.1.1 Analysis of Cask Drop Scenarios ........... 14.11-3 14.11.2.1.2 Cask Overturn Due to Seismic Event .............................................. 14.11-3 14.11.2.2 Bounding Event Input ......................................... 14.11-4 14.11.2.2.1 Analysis of Cask Drop Scenarios .......... 14.11-4 14.11.2.2.2 Cask Overturn Due to Seismic Event ................................................... 14.11-4 14.11.2.3 Analysis Results ................................................. 14.11-5 14.11.2.3.1 Analysis of Cask Drop Scenarios ........... 14.11-5 14.11.2.3.2 Cask Overturn Due to Seismic Event ................................................... 14.11-6 14.11.3 RADIOLOGICAL CONSEQUENCES ................................... 14.11-6 14.11.3.1 Analysis Method ................................................. 14.11-6 14.11.3.1.1 Radiological Consequences of a Cask Drop in the Spent Fuel Pool. ... 14.11-6 14.11.3.1.2 Impact on MTC/MSB Due to Postulated Drop on the VCC in the Track Alley. ........................................ 14.11-7 14.11.3.2 Bounding Event Input ......................................... 14.11-7 14.11.3.2.1 Radiological Consequences of a Cask Drop in the Spent Fuel Pool. ... 14.11-7

DSAR CHAPTER 14 - SAFETY ANALYSIS Revision 36 TABLE OF CONTENTS Page 4 of 10 14.11.3.3 Analysis Results ................................................. 14.11-7 14.11.3.3.1 Radiological Consequences of a Cask Drop in the Spent Fuel Pool. ... 14.11-7 14.11.3.3.2 Drop of the Loaded MTC on to the VCC in the Track Alley ...................... 14.11-7 14.

11.4 CONCLUSION

S.................................................................... 14.11-8 REFERENCES .............................................................................................. 14.11-9 14.12 SECTION DELETED ............................................................................ 14.12-1 14.12.1 DELETED 14.12.2 DELETED 14.12.2.1 Deleted 14.12.2.2 Deleted 14.12.2.3 Deleted 14.12.3 DELETED 14.12.4 DELETED 14.13 SECTION DELETED ............................................................................ 14.13-1 14.13.1 DELETED 14.13.2 DELETED 14.13.2.1 Deleted 14.13.2.2 Deleted 14.13.2.3 Deleted 14.13.3 DELETED 14.13.4 DELETED 14.14 SECTION DELETED ............................................................................ 14.14-1 14.14.1 DELETED 14.14.2 DELETED 14.14.2.1 Deleted 14.14.2.2 Deleted 14.14.2.3 Deleted 14.14.3 DELETED 14.14.3.1 Deleted 14.14.3.2 Deleted 14.14.3.3 Deleted 14.14.4 DELETED 14.15 SECTION DELETED ............................................................................ 14.14-1 14.15.1 DELETED 14.15.2 DELETED 14.15.2.1 Deleted 14.15.2.2 Deleted 14.15.2.3 Deleted 14.15.3 DELETED 14.15.3.1 Deleted 14.15.3.2 Deleted 14.15.3.3 Deleted

DSAR CHAPTER 14 - SAFETY ANALYSIS Revision 36 TABLE OF CONTENTS Page 5 of 10 14.15.4 DELETED 14.16 SECTION DELETED ............................................................................ 14.16-1 14.16.1 DELETED 14.16.2 DELETED 14.16.2.1 Deleted 14.16.2.2 Deleted 14.16.2.3 Deleted 14.16.3 DELETED 14.16.3.1 Deleted 14.16.3.1.1 Deleted 14.16.3.1.2 Deleted 14.16.3.1.3 Deleted 14.16.3.2 Deleted 14.16.3.2.1 Deleted 14.16.3.2.2 Deleted 14.16.3.2.3 Deleted 14.16.4 DELETED 14.17 SECTION DELETED ............................................................................ 14.17-1 14.17.1 DELETED 14.17.1.1 Deleted 14.17.1.2 Deleted 14.17.1.2.1 Deleted 14.17.1.2.2 Deleted 14.17.1.2.3 Deleted 14.17.1.3 Deleted 14.17.1.4 Deleted 14.17.2 DELETED 14.17.2.1 Deleted 14.17.2.2 Deleted 14.17.2.2.1 Deleted 14.17.2.2.2 Deleted 14.17.2.2.3 Deleted 14.17.2.3 Deleted 14.17.2.4 Deleted 14.17.3 DELETED .......................................................................... 14.17-13 14.17.3.1 Deleted 14.17.3.2 Deleted 14.17.3.2.1 Deleted 14.17.3.2.2 Deleted 14.17.3.2.3 Deleted 14.17.3.3 Deleted 14.17.3.4 Deleted

DSAR CHAPTER 14 - SAFETY ANALYSIS Revision 36 TABLE OF CONTENTS Page 6 of 10 14.18 SECTION DELETED ............................................................................ 14.18-1 14.18.1 DELETED 14.18.1.1 Deleted 14.18.1.2 Deleted 14.18.1.3 Deleted 14.18.1.3.1 Deleted 14.18.1.3.2 Deleted 14.18.1.3.3 Deleted 14.18.1.4 Deleted 14.18.1.5 Deleted 14.18.2 DELETED 14.18.2.1 Deleted 14.18.2.2 Deleted 14.18.2.2.1 Deleted 14.18.2.2.2 Deleted 14.18.2.2.3 Deleted 14.18.2.3 Deleted 14.18.2.4 Deleted 14.18.3 DELETED 14.18.3.1 Deleted 14.18.3.2 Deleted 14.18.3.2.1 Deleted 14.18.3.2.2 Deleted 14.18.3.2.3 Deleted 14.18.3.3 Deleted 14.18.3.4 Deleted 14.19 FUEL HANDLING INCIDENT ............................................................... 14.19-1 14.19.1 EVENT DESCRIPTION ......................................................... 14.19-1 14.19.2 THERMAL-HYDRAULIC ANALYSIS ................................... 14.19-2 14.19.3 RADIOLOGICAL CONSEQUENCES ................................... 14.19-2 14.19.3.1 Analysis Method ................................................. 14.19-2 14.19.3.2 Bounding Event Input ......................................... 14.19-3 14.19.3.3 Analysis of Results ............................................. 14.19-4 14.

19.4 CONCLUSION

S.................................................................... 14.19-4 REFERENCES...................................................................................... 14.19-5 14.20 LIQUID WASTE INCIDENT .................................................................. 14.20-1 14.20.1 EVENT DESCRIPTION ......................................................... 14.20-1 14.20.2 THERMAL-HYDRAULIC ANALYSIS ................................... 14.20-1 14.20.3 RADIOLOGICAL CONSEQUENCES ................................... 14.20-1 14.20.3.1 Analysis Method ................................................. 14.20-1 14.20.3.2 Bounding Event Input ......................................... 14.20-2 14.20.3.3 Analysis of Results ............................................. 14.20-2 14.

20.4 CONCLUSION

S.................................................................... 14.20-3

DSAR CHAPTER 14 - SAFETY ANALYSIS Revision 36 TABLE OF CONTENTS Page 7 of 10 14.21 WASTE GAS INCIDENT....................................................................... 14.21-1 14.21.1 GAS DECAY TANK RUPTURE............................................ 14.21-1 14.21.1.1 Event Description................................................ 14.21-1 14.21.1.2 Thermal-Hydraulic Analysis ............................... 14.21-1 14.21.1.3 Radiological Consequences .............................. 14.21-1 14.21.1.3.1 Analysis Method ....................................... 14.21-1 14.21.1.3.2 Bounding Event Input .............................. 14.21-2 14.21.1.3.3 Analysis of Results .................................. 14.21-2 14.21.2 DELETED ............................................................................. 14.21-3 14.21.2.1 Deleted 14.21.2.2 Deleted 14.21.2.3 Deleted 14.21.2.3.1 Deleted 14.21.2.3.2 Deleted 14.21.2.3.3 Deleted 14.

21.3 CONCLUSION

S.................................................................... 14.21-3 REFERENCES...................................................................................... 14.19-4 14.22 SECTION DELETED ............................................................................ 14.22-1 14.22.1 DELETED 14.22.2 DELETED 14.22.2.1 Deleted 14.22.2.2 Deleted 14.22.2.3 Deleted 14.22.3 DELETED 14.23 SECTION DELETED ............................................................................ 14.23-1 14.23.1 DELETED 14.23.3 DELETED 14.23.3.2 Deleted 14.23.3.3 Deleted 14.23.4 DELETED 14.24 SECTION DELETED ............................................................................ 14.24-1 14.24.1 DELETED 14.24.2 DELETED 14.24.3 DELETED 14.24.3.1 Deleted 14.24.3.2 Deleted 14.24.3.3 Deleted 14.24.4 DELETED

DSAR CHAPTER 14 - SAFETY ANALYSIS Revision 36 TABLE OF CONTENTS Page 8 of 10 LIST OF TABLES 14.1-1 Deleted 14.1-3 Deleted 14.1-4 Disposition of Events Summary for Palisades Post-Permanent Shutdown 14.1-5 Deleted 14.1-6 Summary of Radiological Consequences of the Chapter 14 Events 14.2.1-1 Deleted 14.2.2-1 Deleted 14.7.1-1 Deleted 14.7.2-1 Deleted 14.10-1 Deleted 14.11-1 Postulated Cask Drop Accidents 14.11-2 Spent Fuel Cask Drop Radiological Analysis - Source Terms 14.11-3 Spent Fuel Cask Drop Radiological Analysis - Inputs and Assumptions 14.12-1 Deleted 14.13-1 Deleted 14.13-2 Deleted 14.13-3 Deleted 14.13-4 Deleted 14.13-5 Deleted 14.14-1 Deleted 14.14-2 Deleted 14.14-3 Deleted 14.14-4 Deleted 14.14-5 Deleted 14.14-6 Deleted 14.14-7 Deleted 14.15-1 Deleted 14.15-2 Deleted 14.15-3 Deleted 14.15-4 Deleted 14.15-5 Deleted 14.15-6 Deleted 14.15-7 Deleted 14.15-8 Deleted 14.15-9 Deleted 14.15-10 Deleted 14.15-11 Deleted 14.16-1 Deleted 14.16-2 Deleted 14.16-3 Deleted 14.17.1-1 Deleted 14.17.1-2 Deleted 14.17.1-3 Deleted 14.17.1-4 Deleted 14.17.1-5 Deleted 14.17.1-6 Deleted

DSAR CHAPTER 14 - SAFETY ANALYSIS Revision 36 TABLE OF CONTENTS Page 9 of 10 14.17.1-7 Deleted 14.17.1-8 Deleted 14.17.2-1 Deleted 14.17.2-2 Deleted 14.17.2-3 Deleted 14.17.2-4 Deleted 14.17.3-1 Deleted 14.17.3-2 Deleted 14.18.1-1 Deleted 14.18.1-2 Deleted 14.18.1-3 Deleted 14.18.1-4 Deleted 14.18.1-5 Deleted 14.18.2-1 Deleted 14.18.2-2 Deleted 14.18.2-3 Deleted 14.18.2-4 Deleted 14.18.3-1 Deleted 14.18.3-2 Deleted 14.18.3-3 Deleted 14.19-1 Fuel Handling Accident (FHA) Radiological Analysis - Inputs and Assumptions 14.19-2 Fuel Handling Accident Radiological Analysis - Source Term 14.19-3 Fuel Handling Accident Radiological Analysis - Release Fractions 14.19-4 Fuel Handling Accident Radiological Analysis - Atmospheric Dispersion Factors 0-2 Hours 14.19-5 Fuel Handling Accident Radiological Analysis Results With 17 Days Total Decay 14.22-1 Deleted 14.22-2 Deleted 14.22-3 Deleted 14.22-4 Deleted 14.22-5 Deleted 14.22-6 Deleted 14.22-7 Deleted 14.22-8 Deleted 14.22-9 Deleted 14.22-10 Deleted 14.23-1 Deleted 14.23-2 Deleted 14.24-1 Deleted 14.24-2 Deleted 14.24-3 Deleted

DSAR CHAPTER 14 - SAFETY ANALYSIS Revision 36 TABLE OF CONTENTS Page 10 of 10 LIST OF FIGURES Figures 14.1-3 through 14.10-5 Deleted 14.11-1 Partial Operating Floor Plan EL 649'-0" Figures 14.12-1 through 14.22-2 Deleted