|
---|
Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML23107A0262023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 3, Reactor ML23107A0552023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 2, Tables ML23107A0202023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 12, Figures ML23107A0502023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 2, Site and Environment ML23107A0542023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 1, References ML23107A0462023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 7, Appendices ML23107A0402023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 1, Figures ML23107A0592023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 1, Tables ML23107A0472023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 13, Initial Tests and Operations ML23107A0572023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 10, Figures ML23107A0352023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 8, References ML23107A0342023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 9, References ML23107A0382023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 8, Electrical Systems ML23107A0302023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 11, Tables ML23107A0132023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 5, Design of Structures, Systems, and Components ML23107A0452023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 11, References ML23107A0312023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 12, Conduct of Operations ML23107A0422023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 9, Tables ML23107A0562023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 4, Primary Coolant System ML23107A0192023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 10, Tables ML23107A0232023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 5, Figures ML23107A0152023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safeguards Systems ML23107A0122023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 2, Figures ML23107A0292023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 8, Figures ML23107A0162023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 5, Tables ML23107A0272023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML23107A0252023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management and Radiation Protection ML23107A0612023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 1, Introduction & General Description of Plant ML23107A0282023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, List of Effective Pages ML23107A0242023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 15, Figures ML23107A0392023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 15, Quality Assurance Program ML23107A0482023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 6, References ML23107A0172023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 8, Tables ML23107A0492023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 7, References ML23107A0322023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 4, Tables ML23107A0332023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Table of Contents ML23107A0582023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 6, Figures ML23107A0182023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 7, Figures PNP 2023-002, 6 to Updated Final Safety Analysis Report2023-03-31031 March 2023 6 to Updated Final Safety Analysis Report ML23107A0142023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 14, Figures ML23107A0412023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 11, Figures ML23107A0522023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 3, Tables ML23107A0532023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 14, Safety Analysis ML23107A0432023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 2, References ML23107A0602023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems ML23107A0362023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 3, Figures ML23107A0372023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 14, Tables ML23107A0512023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 6, Tables ML23107A0212023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls ML23107A0222023-03-31031 March 2023 6 to Updated Final Safety Analysis Report, Chapter 9, Figures 2023-03-31
[Table view] |
Text
DSAR CHAPTER 11 - RADIOACTIVE WASTE MANAGEMENT AND Revision 36 REFERENCES RADIATION PROTECTION Page 11-1 of 11-2
- 1.
Special Report 5 titled "Palisades Plant Modification, Radioactive Waste Circulating Water, Detailed System Description," Washington Correspondence PW 721201, R L Haueter, CP Co, to J F O'Leary, NRC.
- 2.
Hough, J L, David, R A and Keeley, G S, "Lake Michigan Hydrology Near Palisades Park, Michigan" Consumers Power Company Report.
- 3.
"Municipal Water Facilities" Public Health Service Publication No 775, Volume 5, 1964.
- 4.
ICRP Standard Man Mode 1.
- 5.
LADTAP, NRC NUREG/CR-1276, May 1980. Users' Manual for LADTAP 11-A Computer Program (computer program for calculating radiation exposure to man from routine releases of nuclear reactor liquid effluent).
- 6.
Spigarelli, S A, Cesium-137 Activities in Fish Residing in Thermal Discharges to Lake Michigan, Health Physics 30, 411-413 (1976).
- 7.
GASPAR, NRC NUREG-0597, June 1980. Users' Guide for GASPAR Code (computer program for calculating radiation exposure to man from routine releases of nuclear reactor gaseous effluent).
- 8.
"Manual of Respiratory Protection Against Airborne Radioactive Materials,"
NUREG-0041, October 1976.
- 9.
Deleted
- 10.
John A Zwolinski, Chief, Operating Reactors Branch 5, USNRC, to David J VandeWalle, Nuclear Licensing Administrator, CP Co, "Radiological Effluent Technical Specifications," November 9, 1984.
- 11.
CPCo's letters, T.C. Bordine to NRC Document Control Desk, November 12, 1987 and January 25, 1988.
- 12.
Deleted
- 13.
CPCo's supplement to Reference (1), J.L. Kuemin to NRC Document Control Desk, June 27, 1988.
- 14.
CPCo's supplement to References (1, 2), G.B. Slade to NRC Document Control Desk, August 31, 1990.
- 15.
Deleted
- 16.
NRC Letter, Brian Holian to G.B. Slade, CPCo, June 7, 1991, "Approval and Conditions to Retain Soil in Place".
DSAR CHAPTER 11 - RADIOACTIVE WASTE MANAGEMENT AND Revision 36 REFERENCES RADIATION PROTECTION Page 11-2 of 11-2
- 17.
Appendix I Analysis, Palisades Plant, NUS Corporation, May 1976.
- 18.
NRC Licensing Topical Report, CNSI-DW-11118-01-P, CNSI Dewatering Control Process Containers Topical Report, dated June 11, 1985.
- 19.
ANSI/ANS-18.1-1999, Radioactive Source Term for Normal Operation of Light Water Reactors, approved September 21, 1999.