ND-22-0255, ITAAC Closure Notification on Completion of ITAAC 2.6.03.04i (Index Number 609)
| ML22153A435 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 06/02/2022 |
| From: | Coleman J Southern Nuclear Operating Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| ND-22-0255 | |
| Download: ML22153A435 (9) | |
Text
A Southern Nuclear Docket No.:
52-025 JUN 11111m U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Jamie M. Coleman Regulatory Affairs Director Vogtle 3 & 4 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 7825 River Road Waynesboro, GA 30830 706-848-6926 tel ND-22-0255 10 CFR 52.99(c)(1)
ITAAC Closure Notification on Completion of ITAAC 2.6.03.04i (Index Number 609]
Ladies and Gentlemen:
In accordance with 1 O CFR 52.99(c)(1 ), the purpose of this letter is to notify the Nuclear Regulatory Commission (NRC) of the completion of Vogtle Electric Generating Plant (VEGP) Unit 3 Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item 2.6.03.04i (Index Number 609].
This ITAAC confirms that the Class 1 E DC and Uninterruptible Power Supply System (IDS) supplies an operating voltage at the terminals of the specified Class 1 E motor operated valves that is greater than or equal to the minimum design voltage. The closure process for this ITAAC is based on the guidance described in Nuclear Energy Institute (NEI) 08-01, "Industry Guideline for the ITAAC Closure Process under 10 CFR Part 52," which was endorsed by the NRC in Regulatory Guide 1.215.
This letter contains no new NRC regulatory commitments. Southern Nuclear Operating Company (SNC) requests NRC staff confirmation of this determination and publication of the required notice in the Federal Register per 1 O CFR 52.99.
If there are any questions, please contact Kelli Roberts at 706-848-6991.
Respectfully submitted,
~m~
Regulatory Affairs Director Vogtle 3 & 4
Enclosure:
JMC/GES/sfr Vogtle Electric Generating Plant (VEGP) Unit 3 Completion of ITAAC 2.6.03.04i (Index Number 609]
U.S. Nuclear Regulatory Commission ND-22-0255 Page 2 of 3 To:
Southern Nuclear Operating Company/ Georgia Power Company Mr. Peter P. Sena Ill Mr. D. L. McKinney Mr. H. Nieh Mr. G. Chick Mr. S. Stimac Mr. P. Martino Mr. D. Pitts Mr. J.B. Williams Mr. A. S. Parton Ms. K. A. Roberts Ms. J.M. Coleman Mr. C. T. Defnall Mr. C. E. Morrow Mr. K. J. Drudy Mr. J. M. Fisher Mr. R. L. Beilke Mr. S. Leighty Ms. A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE: VND.LI.L06 File AR.01.02.06 Nuclear Regulatory Commission Ms. M. Bailey Mr. M. King Mr. G. Bowman Ms. A. Veil Mr. C. P. Patel Mr. G. J. Khouri Mr. C. J. Even Mr. B. J. Kemker Ms. N. C. Coovert Mr. C. Welch Mr. J. Gaslevic Mr. 0. Lopez-Santiago Mr. G. Armstrong Mr. M. Webb Mr. T. Fredette Mr. C. Santos Mr. B. Davis Mr. J. Vasquez Mr. J. Eargle Ms. K. Mccurry Mr. J. Parent Mr. B. Griman Mr. V. Hall
U.S. Nuclear Regulatory Commission ND-22-0255 Page 3 of 3 Oglethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. S. M. Jackson Dalton Utilities Mr. T. Bundros Westinghouse Electric Company, LLC Dr. L. Oriani Mr. D. C. Durham Mr. M. M. Corletti Mr. Z. S. Harper Ms. S.L. Zwack Other Mr. S. W. Kline, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.
Dr. W. R. Jacobs, Jr., Ph.D., GOS Associates, Inc.
Mr. S. Roetger, Georgia Public Service Commission Mr. R. L. Trokey, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. S. Blanton, Balch Bingham
U.S. Nuclear Regulatory Commission ND-22-0255 Enclosure Page 1 of 6 Southern Nuclear Operating Company ND-22-0255 Enclosure Vogtle Electric Generating Plant (VEGP) Unit 3 Completion of ITAAC 2.6.03.04i [Index Number 609]
U.S. Nuclear Regulatory Commission ND-22-0255 Enclosure Page 2 of 6 IT AAC Statement Design Commitment 4.i) The IDS supplies an operating voltage at the terminals of the Class 1 E motor operated valves identified in subsections 2.1.2, 2.2.1, 2.2.2, 2.2.3, 2.2.4, 2.3.2, 2.3.6, and 2.7.1 that is greater than or equal to the minimum design voltage.
Inspections/Tests/ Analyses Testing will be performed by measuring the voltage during motor starting at both the IDS battery and motor-operated valve motor terminals while each motor-operated valve is stroked. Analyses will be performed to verify that the voltage at the motor-operated valve motor terminals is greater than or equal to the minimum design voltage of each motor-operated valve with an IDS battery terminal voltage of 21 0 Vdc.
Acceptance Criteria A report exists and concludes that IDS can provide a voltage greater than or equal to each valve's minimum design voltage to the motor terminals of each motor-operated valve when power is supplied under design conditions from IDS batteries with battery terminal voltage at 210 Vdc while each motor-operated valve is stroked.
ITAAC Determination Basis Testing was performed by measuring the voltage during motor starting at both the Class 1 E DC and Uninterruptible Power Supply system (IDS) battery and motor-operated valve (MOV) motor terminals while each MOV is stroked. Analyses were performed to verify that the voltage at the MOV motor terminals is greater than or equal to the minimum design voltage of each MOV with an IDS battery terminal voltage of 21 0 Vdc.
Analyses were performed in accordance with SV3-IDS-E0C-004 (Reference 1) to determine the voltage drop on each power circuit at a battery voltage of 21 0 Vdc and the resulting voltage at the MOV terminals during normal operating conditions, and accident conditions. Reference 1 is the basis of analyses performed in accordance with SV3-IDS-E0C-018 (Reference 2). The analyses determined the expected voltage at the MOV terminals and defined the method for the determination of the minimum acceptance voltage for each MOV during preoperational testing.
Each MOV identified in Combined License (COL) Appendix C, Subsections 2.1.2, 2.2.1,2.2.2, 2.2.3, 2.2.4, 2.3.2, 2.3.6, and 2.7.1 (Attachment A) was stroked individually as documented in SV3-IDS-E0R-005 (Reference 3). The voltage at the battery terminals and at the MOV terminals was recorded during MOV operation using installed maintenance and test equipment. The recorded voltage at the MOV terminals was analyzed in accordance with the method described in Reference 2, to compare proportional values when the tested battery voltage is higher or lower than the nominal voltage assumed in the analyses of Reference 2, to determine the minimum acceptance voltage for each MOV. A resulting proportional voltage that is greater than or equal to the minimum design voltage of each MOV confirms the tested voltage is bounded by the analyses in Reference 2.
U.S. Nuclear Regulatory Commission ND-22-0255 Enclosure Page 3 of 6 The analyses and preoperational test results (References 1 through 3) confirmed that IDS can provide a voltage greater than or equal to each MOV's minimum design voltage to the terminals of each MOV, as specified in Reference 2, when power is supplied under design conditions from IDS batteries with battery terminal voltage at 21 0 Vdc while each MOV is stroked.
References 1 through 3 are available for NRC inspection as part of Unit 3 ITAAC Completion Package (Reference 4).
ITAAC Finding Review In accordance with plant procedures for ITAAC completion, Southern Nuclear Operating Company (SNC) performed a review of all lTAAC findings pertaining to the subject ITAAC and associated corrective actions. This review found there were no relevant findings associated with this ITAAC. The review is documented in the ITAAC 2.6.03.04i Completion Package (Reference
- 4) and is available for NRC review.
IT AAC Completion Statement Based on the above information, SNC hereby notifies the NRC that ITAAC 2.6.03.04i was performed for VEGP Unit 3 and the prescribed acceptance criteria was met.
Systems, structures, and components verified as part of this ITAAC are being maintained in their as-designed, ITAAC compliant condition in accordance with approved plant programs and procedures.
References (available for NRC inspection)
- 1. SV3-IDS-E0C-004, Rev 0, "IDS Power Cable Sizing and Voltage Drop Analysis"
- 3. SV3-IDS-E0R-005, Rev 0, "Vogtle Unit 3 IDS System ITAAC 2.6.03.04i MOV Voltage Test Analysis Report"
- 4. 2.6.03.04i-U3-CP-Rev0, ITAAC Completion Package
U.S. Nuclear Regulatory Commission ND-22-0255 Enclosure Page 4 of 6 Attachment A Table 2.1.2-1
- Equipment Name*
First-staqe ADS Motor-operated Valve (MOV)
First-staqe ADS MOV Second-stage ADS MOV Second-staqe ADS MOV Third-staqe ADS MOV Third-stage ADS MOV First-staqe ADS Isolation MOV First-staqe ADS Isolation MOV Second-staqe ADS Isolation MOV Second-stage ADS Isolation MOV Third-stage ADS Isolation MOV Third-staqe ADS Isolation MOV Fourth-staqe ADS MOV Fourth-stage ADS MOV Fourth-stage ADS MOV Fourth-staqe ADS MOV Table 2.2.1-1
- Equipment Name*
Component Cooling Water System (CCS) Containment Isolation Motor-operated Valve (MOV) - Inlet Line Outside Reactor Containment (ORC)
CCS Containment Isolation MOV - Outlet Line IRC CCS Containment Isolation MOV - Outlet Line ORC SFS Discharqe Line Containment Isolation MOV - ORC SFS Suction Line Containment Isolation MOV - IRC SFS Suction Line Containment Isolation MOV - ORC Vacuum Relief Containment Isolation A MOV - ORC Vacuum Relief Containment Isolation B MOV - ORC Table 2.2.2-1*
Component Name*
PCCWST Isolation Valve MOV PCCWST Isolation Block MOV PCCWST Isolation Block MOV PCCWST Isolation Block MOV
- Excerpts from COL Tables 2.1.2-1, 2.2.1-1, and 2.2.2-1.
Tag No.*
RCS-PL-V001A RCS-PL-V001 B RCS-PL-V002A RCS-PL-V002B RCS-PL-V003A RCS-PL-V003B RCS-PL-V011A RCS-PL-V011 B RCS-PL-V012A RCS-PL-V012B RCS-PL-V013A RCS-PL-V013B RCS-PL-VO 14A RCS-PL-V014B RCS-PL-V014C RCS-PL-V014D Tag No.*
CCS-PL-V200 CCS-PL-V207 CCS-PL-V208 SFS-PL-V038 SFS-PL-V034 SFS-PL-V035 VFS-PL-VB00A VFS-PL-VB00B Tag No.*
PCS-PL-V001 C PCS-PL-V002A PCS-PL-V002B PCS-PL-V002C
U.S. Nuclear Regulatory Commission ND-22-0255 Enclosure Page 5 of 6 Attachment A (Cont.)
Table 2.2.3-1*
Equipment Name*
CMT A Inlet Isolation Motor-operated Valve CMT B Inlet Isolation Motor-operated Valve PRHR HX Inlet Isolation Motor-operated Valve Containment Recirculation A Isolation Motor-operated Valve Containment Recirculation B Isolation Motor-operated Valve Table 2.2.4-1*
Equipment Name*
Power-operated Relief Valve Block Motor-operated Valve Steam Generator 01 Power-operated Relief Valve Block Motor-operated Valve Steam Generator 02 Startup Feedwater Isolation Motor-operated Valve Startup Feedwater Isolation Motor-operated Valve Table 2.3.2-1*
Eauipment Name*
RCS Purification Motor-operated Isolation Valve RCS Purification Motor-operated Isolation Valve RCS Purification Motor-operated Isolation Valve CVS Makeup Line Containment Isolation Motor-operated Valve CVS Makeup Line Containment Isolation Motor-operated Valve Table 2.3.6-1*
Eauipment Name*
RCS Inner Hot Leq Suction Motor-operated Isolation Valve RCS Inner Hot Leg Suction Motor-operated Isolation Valve RCS Outer Hot Lea Suction Motor-operated Isolation Valve RCS Outer Hot Leq Suction Motor-operated Isolation Valve RNS Discharqe Motor-operated Containment Isolation Valve RNS Suction Header Motor-operated Containment Isolation Valve RNS Suction from IRWST Motor-operated Isolation Valve
- Excerpts from COL Tables 2.2.3-1, 2.2.4-1, 2.3.2-1, and 2.3.6-1.
Taa No.*
PXS-PL-V002A PXS-PL-V002B PXS-PL-V101 PXS-PL-V117A PXS-PL-V117B Taa No.*
SGS-PL-V027A SGS-PL-V027B SGS-PL-V067A SGS-PL-V067B Taa No.*
CVS-PL-V001 CVS-PL-V002 CVS-PL-V003 CVS-PL-V090 CVS-PL-V091 TaQ No.*
RNS-PL-V001A RNS-PL-V001 B RNS-PL-V002A RNS-PL-V002B RNS-PL-V011 RNS-PL-V022 RNS-PL-V023
U.S. Nuclear Regulatory Commission NO-22-0255 Enclosure Page 6 of 6 Attachment A (Cont.)
Table 2.7.1-1
- Equipment Name*
MCR Supply Air Isolation Valve MCR Supply Air Isolation Valve MGR Return Air Isolation Valve MGR Return Air Isolation Valve MCR Exhaust Air Isolation Valve MCR Exhaust Air Isolation Valve MCR SOS (Vent) Isolation Valve MCR SOS (Vent) Isolation Valve
- Excerpt from COL Table 2.7.1-1.
Tag No.*
VBS-PL-V186 VBS-PL-V187 VBS-PL-V188 VBS-PL-V189 VBS-PL-V190 VBS-PL-V191 SOS-PL-V001 SOS-PL-V002