ND-20-0979, ITAAC Closure Notification on Completion of ITAAC 2.2.02.10c (Index Number 153)

From kanterella
(Redirected from ML22115A241)
Jump to navigation Jump to search

ITAAC Closure Notification on Completion of ITAAC 2.2.02.10c (Index Number 153)
ML22115A241
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 04/25/2022
From: Coleman J
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ND-20-0979
Download: ML22115A241 (7)


Text

Jamie M. Coleman A Southern Nuclear 7825 River Road Regulatory Affa irs Director Waynesboro, GA 30830 Vogtle 3 & 4 706-848-6926 APR 2*5 2022 Docket No.: 52-025 ND-20-0979 10 CFR 52.99(c)(1)

U.S. Nuclear Regulatory Commission Document Control Desk Washington , DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 ITAAC Closure Notification on Completion of ITAAC 2.2.02.10c [Index Number 1531 Ladies and Gentlemen:

In accordance with 10 CFR 52.99(c)(1 ), the purpose of this letter is to notify the Nuclear Regulatory Commission (NRC) of the completion of Vogtle Electric Generating Plant (VEGP)

Unit 3 Inspections, Tests , Analyses, and Acceptance Criteria (ITAAC) Item 2.2.02.10c [Index Number 1531, to verify that the remotely operated valves identified in Combined License (COL)

Appendix C Table 2.2.2-1 as having Diverse Actuation System (DAS) control perform an active function after receiving a signal from the DAS. The closure process for this ITAAC is based on the guidance described in NEI 08-01, "Industry Guideline for the ITAAC Closure Process under 10 CFR Part 52," which was endorsed by the NRC in Regulatory Guide 1.215.

This letter contains no new NRC regulatory commitments . Southern Nuclear Operating Company (SNC) requests NRC staff confirmation of this determination and publication of the required notice in the Federal Register per 10 CFR 52.99.

If there are any questions, please contact Kelli Roberts at 706-848-6991.

Respectfully submitted,

~ an~

Regulatory Affairs Director Vogtle 3 & 4

Enclosure:

Vogtle Electric Generating Plant (VEGP) Unit 3 Completion of ITAAC 2.2.02.10c [Index Number 1531 JMC/DLW/sfr

U.S. Nuclear Regulatory Commission ND-20-0979 Page 2 of 3 To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. Peter P. Sena Ill Mr. D. L. McKinney Mr. H. Nieh Mr. G. Chick Mr. S. Stimac Mr. P. Martino Mr. J.B. Williams Mr. A. S. Parton Ms. K. A. Roberts Ms. J.M. Coleman Mr. C. T. Defnall Mr. C. E. Morrow Mr. K. J. Drudy Mr. J. M. Fisher Mr. R. L. Beilke Mr. S. Leighty Ms. A. C . Chamberlain Mr. J.C. Haswell Document Services RTYPE: VND.LI.L06 File AR.01 .02.06 Nuclear Regulatory Commission Ms. M. Bailey Mr. M. King Mr. G. Bowman Ms. A. Veil Mr. C. P. Patel Mr. G. J. Khouri Mr. C. J. Even Mr. B. J. Kemker Ms. N. C. Coovert Mr. C. Welch Mr. J. Gaslevic Mr. 0 . Lopez-Santiago Mr. G. Armstrong Mr. M. Webb Mr. T. Fredette Mr. C. Santos Mr. B. Davis Mr. J. Vasquez Mr. J. Eargle Ms. K. Mccurry Mr. J. Parent Mr. B. Griman Mr. V. Hall

U.S. Nuclear Regulatory Commission ND-20-0979 Page 3 of 3 Oglethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. S. M. Jackson Dalton Utilities Mr. T. Bundros Westinghouse Electric Company, LLC Dr. L. Oriani Mr. D. C. Durham Mr. M. M. Corletti Mr. Z. S. Harper Ms. S.L. Zwack Other Mr. S. W. Kline , Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr., Ph.D. , GOS Associates, Inc.

Mr. S. Roetger, Georgia Public Service Commission Mr. R. L. Trokey, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. S. Blanton, Balch Bingham

U.S. Nuclear Regulatory Commission ND-20-0979 Enclosure Page 1 of 4 Southern Nuclear Operating Company ND-20-0979 Enclosure Vogtle Electric Generating Plant (VEGP) Unit 3 Completion of ITAAC 2.2.02.1 0c [Index Number 153]

U.S. Nuclear Regulatory Commission ND-20-0979 Enclosure Page 2 of 4 ITAAC Statement Design Commitment 10.c) The valves identified in Table 2.2.2-1 as having DAS control perform an active safety function after receiving a signal from the DAS.

Inspections/Tests/Analyses Testing will be performed on remotely operated valves listed in Table 2.2.2-1 using real or simulated signals into the DAS.

Acceptance Criteria The remotely operated valves identified in Table 2.2.2-1 as having DAS control perform the active function identified in the table after receiving a signal from the DAS.

ITAAC Determination Basis Testing was performed in accordance with Unit 3 preoperational test procedure and work order listed in Reference 1 to verify that the remotely operated valves identified in Combined License (COL) Appendix C Table 2.2.2-1 (Attachment A) as having Diverse Actuation System (DAS) control perform an active safety function after receiving a signal from DAS. Real signals were provided into the DAS and the valves in Attachment A were confirmed to perform the active function after receiving a signal from the DAS.

The preoperational testing confirms that each of the Passive Containment Cooling Water Storage Tank (PCCWST) isolation valves that have DAS control receive a signal from DAS and perform the required active function. Initially, the valves were verified to be in the non-actuated position (closed). The valves were remotely operated by manually initiating a containment cooling signal at the DAS panel in the Main Control Room (MCR) and verifying the valves perform their active function (transfer open). Each valve was verified to open using the Main Control Room (MCR) display as well as local inspection of each valve.

The Unit 3 preoperational test results in Reference 1 documented that the remotely operated valves listed in Attachment A as having DAS control perform the active function identified in Attachment A after receiving a signal from the DAS.

Reference 1 is available for NRC inspection as part of the ITAAC 2.2.02.10c Completion Package (Reference 2).

ITAAC Finding Review In accordance with plant procedures for ITAAC completion, Southern Nuclear Operating Company (SNC) performed a review of all findings pertaining to the subject ITAAC and associated corrective actions. This review found there were no relevant findings associated with this ITAAC. The review is documented in the ITAAC Completion Package (Reference 2) and is available for NRC review.

U.S. Nuclear Regulatory Commission ND-20-0979 Enclosure Page 3 of 4 IT AAC Completion Statement Based on the above information, SNC hereby notifies the NRG that ITAAC 2.2.02.10c was performed for VEGP Unit 3 and that the prescribed acceptance criteria were met.

Systems, structures, and components verified as part of this ITAAC are being maintained in their as-designed, ITAAC compliant condition in accordance with approved plant programs and procedures.

References (available for NRC inspection)

1. SV3-PCS-ITR-800153, Rev. 0, "Unit 3 Passive Containment Cooling System Valve Testing:

ITAAC 2.2.02.10c NRG Index Number: 153"

2. ITAAC 2.2.02 .10c-U3-CP-Rev0, "ITAAC Completion Package"

U.S. Nuclear Regulatory Commission ND-20-0979 Enclosure Page 4 of 4 Attachment A Excerpt from COL Appendix C Table 2.2.2-1 Tag No. Component Name Active Function PCS-PL-V001 A PCCWST Isolation Valve Transfer Open PCS-PL-V001 B PCCWST Isolation Valve Transfer Open PCS-PL-V001 C PCCWST Isolation Valve MOV Transfer Open