ND-22-0070, ITAAC Closure Notification on Completion of ITAAC 3.3.00.16 (Index Number 821)

From kanterella
(Redirected from ML22047A296)
Jump to navigation Jump to search

ITAAC Closure Notification on Completion of ITAAC 3.3.00.16 (Index Number 821)
ML22047A296
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 02/16/2022
From: Yox M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ND-22-0070
Download: ML22047A296 (6)


Text

^ 1I KI I Michael J. Yox 7825 River Road iSk Southern Nuclear Regulatory Affairs Director Waynesboro, GA 30830 Vogtle 3 & 4 706-848-6459 tel FEB 1 6 2022 Docket No.: 52-025 ND-22-0070 10 CFR 52.99(c)(1)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 ITAAC Closure Notification on Completion of ITAAC 3.3.00.16 [Index Number 8211 Ladies and Gentlemen:

In accordance with 10 CFR 52.99(c)(1), the purpose of this letter is to notify the Nuclear Regulatory Commission (NRC)of the completion of Vogtle Electric Generating Plant(VEGP) Unit 3 Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item 3.3.00.16 [Index Number 821].

This ITAAC confirms that secondary security power supply equipment for alarm annunciator equipment and non-portable communication equipment is located within a vital area. The closure process for this ITAAC is based on the guidance described in Nuclear Energy Institute (NEI) 08-01, "Industry Guideline for the ITAAC Closure Process Under 10 CFR Part 52," which was endorsed by the NRC in Regulatory Guide 1.215.

This letter contains no new NRC regulatory commitments. Southern Nuclear Operating Company (SNC) requests NRC staff confirmation of this determination and publication of the required notice in the Federal Register per 10 CFR 52.99.

If there are any questions, please contact Kelli Roberts at 706-848-6991.

Respectfully submitted, Michael J. Yo>

Regulatory Affairs Dj/ector Vogtle 3 & 4

Enclosure:

Vogtle Electric Generating Plant(VEGP) Unit 3 Completion of ITAAC 3.3.00.16 [Index Number 821]

MJY/RLB/sfr

U.S. Nuclear Regulatory Commission ND-22-0070 Page 2 of 3 To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. Peter P. Sena III Mr. D. L. McKinney Mr. H. Nieh Mr. G. Chick Mr. S. Stimac Mr. P. Martino Mr. J. B. Williams Mr. M. J. Yox Mr. A. S. Parton Ms. K. A. Roberts Ms. J.M. Coleman Mr. C. T. Defnall Mr. C. E. Morrow Mr. K. J. Drudy Mr. J. M. Fisher Mr. R. L. Beiike Mr. S. Leighty Ms. A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE: VND.LI.L06 File AR.01.02.06 cc; Nuclear Reoulatorv Commission Ms. M. Bailey Mr. M. King Mr. G. Bowman Ms. A. Veil Mr. C. P. Patel Mr. G. J. Khouri Mr. C. J. Even Mr. B. J. Kemker Ms. N. C. Coovert Mr. C. Welch Mr. J. Gaslevic Mr. O. Lopez-Santiago Mr. G. Armstrong Mr. M. Webb Mr. T. Fredette Mr. C. Santos Mr. B. Davis Mr. J. Vasquez Mr. J. Eargle Mr. T. Fanelli Ms. K. McCurry Mr. J. Parent Mr. B. Griman Mr. V. Hall

U.S. Nuclear Regulatory Commission ND-22-0070 Page 3 of 3 Oqlethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. 8. M. Jackson Daiton Utilities Mr. T. Bundros Westinqhouse Electric Company. LLC Dr. L. Oriani Mr. D. C. Durham Mr. M. M. Corletti Mr. Z. 8. Harper Mr. J. L. Coward Other Mr. 8. W. Kline, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr., Ph.D., CDS Associates, inc.

Mr. 8. Roetger, Georgia Pubiic Service Commission Mr. R. L. Trokey, Georgia Pubiic Service Commission Mr. K. C. Greene, Troutman Sanders Mr. 8. Blanton, Baich Bingham

U.S. Nuclear Regulatory Commission ND-22-0070 Enclosure Page 1 of 3 Southern Nuclear Operating Company ND-22-0070 Enclosure Vogtle Electric Generating Plant(VEGP) Unit 3 Completion of ITAAC 3.3.00.16[Index Number 821]

U.S. Nuclear Regulatory Commission ND-22-0070 Enclosure Page 2 of 3 ITAAC Statement Desion Commitment

16. Secondary security power supply system for alarm annunciator equipment and non-portable communications equipment is located within a vital area.

Inspections/Tests/Analvses An inspection will be performed to ensure that the location of the secondary security power supply equipment for alarm annunciator equipment and non-portable communications equipment is within a vital area.

Acceptance Criteria Secondary security power supply equipment for alarm annunciator equipment and non-portable communication equipment is located within a vital area.

ITAAC Determination Basis An inspection of the secondary security power supply system for alarm annunciator equipment and non-portable communications equipment was performed to confirm the Vogtle Electric Generating Plant(VEGP) Unit 3 secondary security power supply equipment for alarm annunciator equipment and non-portable communication equipment is located within a vital area and satisfies the applicable secondary security power supply system location requirements of the VEGP Unit 3 and Unit 4 Physical Security Plan associated with 10 CFR 73.55(e)(9)(vi). The VEGP Unit 3 Plant Security System ITAACs only cover the Unit 3 plant security system design commitment scope.

The secondary security power supply equipment for alarm annunciator equipment and non portable communications equipment is installed in accordance with approved installation specifications and drawings issued for construction. An inspection was performed to verify that the secondary security power supply system for alarm annunciator equipment and non-portable communications equipment is located within a vital area. The inspection was performed as described in ITAAC Technical Report SV3-SES-ITR-800821 (Reference 1) and documented performance of visual observations to compare the installed secondary security power supply equipment locations to the approved drawings. The results of the inspection are documented in Reference 1.

Reference 1 exists, and concludes that inspections confirm that the secondary security power supply system for alarm annunciator equipment and non-portable communication equipment is located within a vital area.

Reference 1 is available for NRG inspection as part of the Unit 3 ITAAC 3.3.00.16 Completion Package (Reference 2).

ITAAC Finding Review In accordance with plant procedures for ITAAC completion, Southern Nuclear Operating Company(SNC) performed a review of all findings pertaining to the subject ITAAC and associated corrective actions. This review found there were no relevant ITAAC findings

U.S. Nuclear Regulatory Commission ND-22-0070 Enclosure Page 3 of 3 associated with this ITAAC. The ITAAC completion review is documented in the ITAAC Completion Package for ITAAC 3.3.00.16 (Reference 2) and is available for NRC review.

ITAAC Completion Statement Based on the above information, SNC hereby notifies the NRC that ITAAC 3.3.00.16 was performed for VEGP Unit 3 and that the prescribed acceptance criteria was met.

Systems, structures, and components verified as part of this ITAAC are being maintained in their as-designed, ITAAC compliant condition in accordance with approved plant programs and procedures.

References(available for NRC inspection)

1. SV3-SES-ITR-800821, Walkdown Inspection for Secondary Security Power Supply Locations: ITAAC 3.3.00.16, Rev 0(SRI)
2. 3.3.00.16-U3-CP-RevO, ITAAC Completion Package