ML20353A209
| ML20353A209 | |
| Person / Time | |
|---|---|
| Site: | Technical Specifications Task Force |
| Issue date: | 12/21/2020 |
| From: | Victor Cusumano NRC/NRR/DSS/STSB |
| To: | Technical Specifications Task Force |
| Honcharik,M., NRR/DSS, 301-415-1774 | |
| Shared Package | |
| ML20353A074 | List: |
| References | |
| EPID L-2019-PMP-0181 | |
| Download: ML20353A209 (3) | |
Text
December 21, 2020 Technical Specifications Task Force 11921 Rockville Pike, Suite 100 Rockville, MD 20852
SUBJECT:
DRAFT MODEL SAFETY EVALUATION OF TECHNICAL SPECIFICATIONS TASK FORCE TRAVELER TSTF-554, REVISION 1, REVISE REACTOR COOLANT LEAKAGE REQUIREMENTS (EPID L-2019-PMP-0181)
Dear Members of the Technical Specifications Task Force:
By letter dated January 16, 2020 (Agencywide Documents Access and Management System (ADAMS) Accession No ML20016A233), the Technical Specifications Task Force (TSTF) submitted to the U.S. Nuclear Regulatory Commission (NRC) for review and approval Traveler TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements. The NRC staffs draft model safety evaluation (SE) of the traveler is enclosed.
Thirty calendar days are provided for you to comment on any factual errors or clarity concerns contained in the enclosed draft model SE. The final model SE will be issued after making any necessary changes. To facilitate the NRC staff's review of your comments, please provide a marked-up copy of the draft model SE showing proposed changes and provide a summary table of the proposed changes.
If you have any questions, please contact Michelle Honcharik at 301-415-1774 or via e-mail at Michelle.Honcharik@nrc.gov.
Sincerely, Victor G. Cusumano, Chief Technical Specifications Branch Division of Safety Systems Office of Nuclear Reactor Regulation Project No. 753
Enclosure:
Draft Model SE cc: See next page Victor Cusumano Digitally signed by Victor Cusumano Date: 2020.12.21 14:21:53 -05'00'
Technical Specifications Task Force Project No. 753 cc:
Technical Specifications Task Force c/o EXCEL Services Corporation 11921 Rockville Pike, Suite 100 Rockville, MD 20852 Attention: Brian D. Mann E-mail: brian.mann@excelservices.com James P. Miksa Entergy Nuclear Operations, Inc.
Palisades Nuclear Power Plant 27780 Blue Star Memorial Highway Covert, MI 49043 E-mail: jmiksa@entergy.com Jordan L. Vaughan Duke Energy EC07C / P.O. Box 1006 Charlotte, NC 28202 E-mail: jordan.vaughan@duke-energy.com Ryan M. Joyce Southern Nuclear Operating Company 3535 Colonnade Parkway / Bin N-274-EC Birmingham, AL 35243 E-mail: rmjoyce@southernco.com David M. Gullott Exelon Generation 4300 Winfield Road Warrenville IL 60555 E-mail: David.Gullott@exeloncorp.com Wesley Sparkman Southern Nuclear Operating Company 3535 Colonnade Parkway / Bin N-226-EC Birmingham, AL 35242 E-mail: wasparkm@southernco.com
Package: ML20353A074, Cover letter:,
Draft MODEL SE: ML20311A664
- concurred via e-mail NRR-106 OFFICE NRR/DORL/LSPB/LA*
NRR/DORL/LPL2-1/BC*
NAME JBurkhardt MMarkley DATE 11/13/2020 12/15/2020 OFFICE OGC/NLO*
NRR/DSS/STSB/PM*
NRR/DSS/STSB/BC*
NAME MYoung MHoncharik VCusumano DATE 12/4/2020 12/18/2020 12/21/2020