Letter Sequence Acceptance Review |
---|
EPID:L-2020-LLL-0023, WCAP-18558-NP, Analysis of Capsule Y from the Beaver Valley Unit 2 Reactor Vessel Radiation Surveillance Program. Part 4 of 4 (Approved, Closed) |
|
|
|
---|
Category:Acceptance Review Letter
MONTHYEARML24144A1082024-05-22022 May 2024 Acceptance Review Adoption of TSTF-569, Revise Response Time Testing Definition (EPID L-2024-LLA-0059) - Email ML22304A6882022-11-16016 November 2022 Withdrawal of Requested Licensing Action Amendment Request for Fire Protection Program Changes ML20329A4562020-11-24024 November 2020 Acceptance of License Amendment Request: Beaver Valley RCS and PTLR TS Changes ML20324A0872020-11-19019 November 2020 Acceptance of Requested Licensing Action: Beaver Valley Unit 2 Capsule Pull ML20275A2032020-09-30030 September 2020 Acceptance of Requested Licensing Action, One-Time Acceptance for Review: Beaver Valley of Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Pandemic ML20197B4802020-07-15015 July 2020 Acceptance Review for Beaver Valley - Steam Generator Tube Sleeve Inspection and Repair LAR ML20197C3872020-07-15015 July 2020 Acceptance Review for Beaver Valley - Non-Conservative Heat Flux Factor TS LAR ML20059J6792020-02-27027 February 2020 Acceptance Review for Beaver Valley - TS Change for Permanently Defueled Condition (Epids L-2020-LLA-0025) ML19256B5062019-09-20020 September 2019 Acceptance of Requested Licensing Action ML19249A6742019-09-0505 September 2019 Acceptance Review for Beaver Valley Units 1 and 2 - Impracticality for Inservice Inspection for Certain Welds - 2 Relief Requests (L-2019-LLR-0083 and L-2019-LLR-0082) ML19070A2692019-03-11011 March 2019 Acceptance Review - Beaver Valley Unit 2: Request for Alternative Examination Frequency for Reactor Vessel Nozzle to Safe-End Welds ML18094A7992018-04-0303 April 2018 Acceptance Review for Beaver Valley - Relief Request from ASME Section XI Code - 5th ISI Interval ML17264A6252017-09-25025 September 2017 FENOC-Beaver Valley Power Station, Unit Nos. 1 and 2; Davis-Besse Nuclear Power Station, Unit No. 1; and Perry Nuclear Power Plant, Unit No. 1 - Results of Acceptance Review Proposed Alternative for the Use of ASME Code Case N-513-4 ML17262A7232017-09-20020 September 2017 FENOC Fleet - Results of Acceptance Review of the Exemption Request Exemption from the Definition of Physical Barrier in 10 CFR 73.2 for Physical Security Plans ML17192A4942017-07-12012 July 2017 Acceptance for Review of Application Concerning Administrative License Amendment Request to Reflect a Change in the Entity Providing a $400 Million Support Agreement ML17184A1862017-07-0505 July 2017 Acceptance of Requested Licensing Action License Amendment Request to Revise Technical Specifications to Adopt TSTF-547-A, Revision 1 ML17074A0192017-03-16016 March 2017 Acceptance of Requested Licensing Action Proposed Alternative to ASME Code Reactor Pressure Vessel Head Penetration Examination Frequency Requirements (Request 1-TYP-4-RV-05) ML16295A2462016-12-29029 December 2016 Letter to M. Richey, FENOC Notice of Consideration of Approval of Transfer of Facility Operating License and Conforming Amendment, Opportunity for a Hearing, and Order ML16347A1322016-12-15015 December 2016 Acceptance of Requested Licensing Action Relief Request for Proposed Alternative Examination of Reactor Vessel Head Penetration J-Groove Weld Repairs ML16172A2322016-06-20020 June 2016 FENOC- Bv 1 & 2, DBNPS, PNPS - Acceptance of Requested Licensing Action - Request an Alternative to the ASME Code Case OMN-20, CAC Nos. MF7780, MF7781, MF7782, MF7783 ML14310A8532014-11-0606 November 2014 E-mail from J. Whited to P. Lashley Beaver Valley Power Station Unit 1 Acceptance of Requested Licensing Action Relief Request 1TYP-4-RV-04 ML14240A5882014-08-28028 August 2014 E-mail from J.Whited to P.Lashley Acceptance Review of FENOC Relief Request BV3-N-789 for Beaver Valley Power Station Units 1 and 2 ML14224A2212014-08-14014 August 2014 Acceptance of Requested Licensing Action License Amendment Request to Revise Technical Specification 4.3.2, Spent Fuel Storage Pool Minimum Inadvertent Drainage Elevation (Tac MF4213) ML14142A0832014-05-22022 May 2014 E-mail from J. Whited to T. Lentz Acceptance of BVPS LAR to Extend Containment Leakage Test Frequency ML14108A4082014-04-22022 April 2014 Acceptance of Requested Licensing Action License Amendment Request to Adopt National Fire Protection Association (NFPA) 805 Performance-Based Standard for Fire Protection for Light-Water Generating Plants ML13326A7512013-11-22022 November 2013 Acceptance of Requested Licensing Action Adoption of TSTF-425 ML1210904752012-04-18018 April 2012 Acceptance Review of Proposed BVPS Emergency Preparedness Plan Using Nuclear Energy Institute 99-01, Revision 5 ML1202304412012-01-23023 January 2012 Acceptance Review Email, Relief Request for Alternative Examination Requirements for Reactor Vessel Sage-End Welds ML1135402602011-12-19019 December 2011 Acceptance Review Results BVPS-1 and 2 Relief Request VRR1 (ME7684 and ME7685) ML1127800542011-10-0303 October 2011 Acceptance Review Results for Fenco License Amendment Request Changes to LLC ML1126404122011-09-20020 September 2011 Acceptance Review Results for VC Summer Relief Request (ME6879) ML1108804692011-03-29029 March 2011 Acceptance Review Results Regarding Relief Request VRR3, VRR4, and VRR5 (ME5749, ME5750, ME5752, ME5781, and ME5782) ML1026405442010-09-21021 September 2010 Acceptance Review: FENOC Delta Mururoa Blu Suit ML1023707202010-08-25025 August 2010 Email: Acceptance Review Results Regarding Service Water Pump Testing Relief Requests (ME4385 and ME4393) ML1021702002010-08-0505 August 2010 Acceptance Review Email Cyber Security Plan License Amendment (ME4383 and ME4384) ML1010604872010-04-16016 April 2010 Acceptance Review Results - Parental Guaranty ML1000403452010-01-0404 January 2010 Acceptance Review - Request for Exemption from Portions of 10 CFR Part 26 ML1000704802009-11-23023 November 2009 Alternative Weld Repair Method for Reactor Vessel Head Relief Request Acceptance Review (ME2608) ML0922300412009-08-0606 August 2009 Acceptance Review Letter (ME1776) ML0919706292009-07-14014 July 2009 Elimination of Recirculation Spray Pump Response Time SR (ME1501 and ME1502) ML0913202212009-05-12012 May 2009 Request No. BV1-IWE-2-2 Acceptance Review Results (ME1166) ML0832205572008-11-14014 November 2008 Alloy 800 SGT Sleeving LAR Acceptance Review Results (MD9969) 2024-05-22
[Table view] Category:E-Mail
MONTHYEARML24204A0012024-07-17017 July 2024 NRR E-mail Capture - Request for Additional Information Vistraops Fleet Exemption for the Requirements in 10 CFR 50.71 Pertaining to the Submittal of Updated Final Safety Analysis Reports ML24144A1082024-05-22022 May 2024 Acceptance Review Adoption of TSTF-569, Revise Response Time Testing Definition (EPID L-2024-LLA-0059) - Email ML24061A1002024-03-29029 March 2024 Energy Harbor Fleet- Closing of Transaction Between Vistra Operations Company LLC and Energy Harbor Nuclear Corporation (Email) ML24080A3922024-03-20020 March 2024 NRR E-mail Capture - Beaver Valley Power Station, Unit Nos. 1 and 2, Davis-Besse Power Station Unit No. 1, and Perry Nuclear Power Plant, Unit No. - Acceptance of Requested Licensing Action Exemption for Final Safety Analysis Report Update ML23129A3122023-05-0909 May 2023 NRR E-mail Capture - Beaver Valley Unit 2 - Verbal Authorization of Alternative Request, 2-TYP-4-RV-06 ML23128A1612023-05-0808 May 2023 NRR E-mail Capture - Comanche Peak Nuclear Power Plant, Units 1 and 2, Beaver Valley Power Station, Unit Nos. 1 and 2, Davis-Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit No. 1 - Acceptance of Requested Licensing ML23125A1462023-05-0505 May 2023 NRR E-mail Capture - Beaver Valley - RAI Regarding Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations ML23125A1602023-05-0505 May 2023 NRR E-mail Capture - Correction to Beaver Valley - RAI Regarding Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations ML23122A0342023-05-0202 May 2023 NRR E-mail Capture - Beaver Valley - Request for Additional Information Regarding Unit 1 - 180 Day Steam Generator Tube Inspection Report ML23089A1252023-03-30030 March 2023 NRR E-mail Capture - Beaver Valley Upcoming Steam Generator Tube Inservice Inspection ML23079A1202023-03-20020 March 2023 NRR E-mail Capture - Acceptance Review for Beaver Valley 1 & 2 Exemption from Specific Provisions in 10 CFR 50 Appendix H ML23065A0782023-03-0303 March 2023 Final RAIs Regarding the Beaver Valley Emergency LAR (EPID L-2023-LLA-002) - Email ML22321A2392022-11-17017 November 2022 NRR E-mail Capture - (External_Sender) Beaver Valley Power Station, Units 1&2 - Clarification on LAR to Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time ML22312A5912022-11-0808 November 2022 NRR E-mail Capture - Beaver Valley Power Station, Units 1&2 - Request for Additional Information LAR to Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time ML22273A1132022-09-30030 September 2022 NRR E-mail Capture - Acceptance of Requested Licensing Action to Add Full Spectrum LOCA Methodology to COLR ML22277A5122022-09-19019 September 2022 NRR E-mail Capture - (External_Sender) Eh Response to Corrected SE Associated with Beaver Valley Amendments 315 and 205 Changes to the EPP ML22238A2812022-08-25025 August 2022 Request for Additional Information for Beaver Valley Unit 2 - 2R22 Steam Generator 180 Day Report ML22202A4642022-06-29029 June 2022 Emergency Plan Safety Evaluation ML22178A1322022-06-24024 June 2022 Request for Additional Information for Beaver Valley Unit 2 Steam Generator Inspection Report - Fall 2021 Refueling Outage ML22173A0402022-06-21021 June 2022 NRR E-mail Capture - Acceptance of Requested Licensing Action Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time ML22147A0392022-05-27027 May 2022 NRR E-mail Capture - (External_Sender) NRC Notification to the State of Pennsylvania Regarding a Beaver Valley, Units 1 & 2 Amendment - Revise TS 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start and Separation Instrumentation ML22129A0122022-05-0606 May 2022 NRR E-mail Capture - (External_Sender) NRC Notification to the State of Pennsylvania Regarding a Beaver Valley Power Station, Unit 2 Amendment - Correct TS 3.1.7 Change Made by TSTF-547 ML22123A0232022-05-0202 May 2022 NRR E-mail Capture - Acceptance of Requested Licensing Action for Beaver Valley Power Station, Units 1 and 2 - Adoption of TSTF-501, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML22153A5212022-04-15015 April 2022 Email Error in Energy Harbor Submittal and Associated SE for Beaver Valley 1 & 2 - Containment Isolation Valve Relief Request ML22101A0122022-04-0808 April 2022 NRR E-mail Capture - (External_Sender) NRC Notification to the State of Pennsylvania Regarding a Beaver Valley Power Station, Units 1 and 2 Amendment - Revise Technical Specification 5.6.3, Core Operating Limits Report (COLR) ML22087A1302022-03-28028 March 2022 NRR E-mail Capture - (External_Sender) NRC Notification to the State of Pennsylvania Regarding a Beaver Valley Power Station, Units 1 and 2 Amendment - Adopt TSTF-577 ML22080A2512022-03-18018 March 2022 NRR E-mail Capture - (External_Sender) ASME OM Code Case OMN-27, Alternative Requirements for Testing Category a Valves (Non- Piv/Civ) ML22068A1822022-03-0909 March 2022 NRR E-mail Capture - Beaver Valley Power Station, Units 1 & 2 - Request for Additional Information for License Amendment Request to Revise Technical Specification 3.3.5 ML21344A0392021-12-0909 December 2021 NRR E-mail Capture - Beaver Valley TSTF-577-A Acceptance Review ML21321A3782021-11-16016 November 2021 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSEL Unit 1 - Acceptance of License Amendment Request Adoption of TSTF-554 EPID-L-2021-LLA-0193 ML21286A7892021-10-0707 October 2021 NRR E-mail Capture - Beaver Valley Acceptance Review for LAR Regarding TS 3.1.7.2 to Correct a Logic Error (L-2021-LLA-0160) ML21266A2222021-09-23023 September 2021 NRR E-mail Capture - Beaver Valley Loss of Power Diesel Generator Start and Bus Separation Instrument ML21259A1642021-09-16016 September 2021 NRR E-mail Capture - Request for Additional Information Regarding the LAR for Core Operating Limits ML21225A0362021-08-12012 August 2021 NRR E-mail Capture - Beaver Valley Unit Nos. 1 and 2 - Acceptance Review Determination Emergency Plan Amendment Request ML21197A0242021-07-15015 July 2021 NRR E-mail Capture - Beaver Valley No. 1 and 2 - Supplemental Information Needed for Acceptance of Requested Licensing Action Emergency Plan Amendment Request ML21137A0082021-05-14014 May 2021 Acceptance of License Amendment Request: Beaver Valley COLR TS LAR ML21119A2152021-04-28028 April 2021 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSE Unit 1 - Acceptance of Relief Request Proposed Alternative to Use ASME OM Code Case OMN-27 ML21102A1542021-04-0909 April 2021 Request for Additional Information (2nd Round) - Steam Generator Tube Sleeve LAR ML21082A4942021-03-23023 March 2021 Final RAIs for GL 04-02 Closure (Email) ML21068A3502021-03-0909 March 2021 Final Request for Additional Information for Reactor Coolant System (RCS) and Pressure and Tempature Limits Report(Ptlr) TS LAR ML21053A0252021-02-20020 February 2021 NRR E-mail Capture - Request for Additional Information (Rais) - LaSalle Request for Exemption from Pre-Access Drug and Alcohol Testing ML21032A2582021-02-0101 February 2021 Acceptance of License Amendment Request: Beaver Valley Steam Generator Inspection Deferral ML21015A5762021-01-14014 January 2021 Final RAIs for Steam Generator 180 Day Tube Inspection Report ML21014A1142021-01-12012 January 2021 Correction Letter Notification from Licensee ML21007A3732021-01-0707 January 2021 NRR E-mail Capture - (External_Sender) (External) Request for Additional Information Regarding License Amendment Request to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff, ML21004A1442020-12-30030 December 2020 NRR E-mail Capture - Request for Additional Information Regarding License Amendment Request to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff ML20329A4562020-11-24024 November 2020 Acceptance of License Amendment Request: Beaver Valley RCS and PTLR TS Changes ML20325A2312020-11-20020 November 2020 Request for Additional Information - Beaver Valley Request for Exemption - Part 73 Force-on-Force Exemption ML20324A0872020-11-19019 November 2020 Acceptance of Requested Licensing Action: Beaver Valley Unit 2 Capsule Pull ML20323A0452020-11-17017 November 2020 2.206 Petition 2024-07-17
[Table view] |
Text
From: Tobin, Jennifer To: jjgrabnar@energyharbor.com Cc: Lashley, Phil H
Subject:
Acceptance of Requested Licensing Action: Beaver Valley Unit 2 Capsule Pull (EPID No. L-2020-LLL-0023)
Date: Thursday, November 19, 2020 8:05:00 AM
Dear Mr. Grabnar,
By letter dated October 28, 2020 (ADAMS Accession No. ML20302A376), EnergyHarbor Nuclear Corp. (the licensee) submitted a licensing action related to a capsule pull for Beaver Valley Unit 2. The purpose of this e-mail is to provide the results of the U.S.
Nuclear Regulatory Commission (NRC) staffs acceptance review. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the report has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your report and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed action in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 60 hours6.944444e-4 days <br />0.0167 hours <br />9.920635e-5 weeks <br />2.283e-5 months <br /> to complete. The NRC staff expects to complete this review no later than October 31, 2021. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.
These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, and unanticipated addition of scope to the review. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.
Please contact me if you have any questions. A copy of this email will be made publicly available in ADAMS.
- Thanks,
-Jenny