Acceptance Review of Proposed BVPS Emergency Preparedness Plan Using Nuclear Energy Institute 99-01, Revision 5
ML121090475
Person / Time
Site: Beaver Valley
Issue date: 04/18/2012
From: Peter Bamford
Plant Licensing Branch 1
To: Lashley P
FirstEnergy Corp
Bamford, Peter J., NRR/DORL 415-2833
References
Download: ML121090475 (1)


Text

From:

Bamford, Pe Sent:

Wednesday, To:

'phlashley@

Subject:

Acceptance Nuclear Ene By letter dated December 21, 2011 Nuclear Operating Company submit level scheme change to a scheme b Beaver Valley Power Station, Units The purpose of this email is to provid (NRC) staff's acceptance review of t determine if there is sufficient techni complete its detailed technical review whether the application has any read characterization of the regulatory req The NRC staff has reviewed your re information in sufficient detail to ena and make an independent assessm terms of regulatory requirements an environment. If additional informatio you will be advised by separate corr In your submittal, you requested an Based on NRC staff resource availa The NRC staff anticipates that it will Peter Bamford NRR/DORL/LPL 1-2 Beaver Valley & TMI-1 Project Manager 301-415-2833 eter

, April 18, 2012 3:19 PM firstenergycorp.com' Review of Proposed BVPS Emergency Preparedness P rgy Institute 99-01, Revision 5 (ADAMS Accession No. ML11362A317), FirstEn tted a request for NRC approval of an emergency based on Nuclear Energy Institute 99-01, Revision 1 and 2.

de the results of the U.S. Nuclear Regulatory Co this request. The acceptance review was perform ical information in scope and depth to allow the N

w. The acceptance review is also intended to ide dily apparent information insufficiencies in its quirements or the licensing basis of the plant.

equest, and concluded that it does provide technic able the staff to proceed with its detailed technica ent regarding the acceptability of the proposed su d the protection of public health and safety and t on is needed for the staff to complete its technica respondence.

expedited review of the proposed change by July ability, this requested disposition date will not be f disposition the request by December 2012.

r Plan Using ergy y action n 5, for mmission med to NRC staff to entify cal al review ubmittal in he al review, y 2, 2012.

feasible.