Letter Sequence Other |
---|
EPID:L-2022-LLA-0127, License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements (Approved, Closed) |
|
|
|
---|
Category:E-Mail
MONTHYEARML24204A0012024-07-17017 July 2024 NRR E-mail Capture - Request for Additional Information Vistraops Fleet Exemption for the Requirements in 10 CFR 50.71 Pertaining to the Submittal of Updated Final Safety Analysis Reports ML24144A1082024-05-22022 May 2024 Acceptance Review Adoption of TSTF-569, Revise Response Time Testing Definition (EPID L-2024-LLA-0059) - Email ML24061A1002024-03-29029 March 2024 Energy Harbor Fleet- Closing of Transaction Between Vistra Operations Company LLC and Energy Harbor Nuclear Corporation (Email) ML24080A3922024-03-20020 March 2024 NRR E-mail Capture - Beaver Valley Power Station, Unit Nos. 1 and 2, Davis-Besse Power Station Unit No. 1, and Perry Nuclear Power Plant, Unit No. - Acceptance of Requested Licensing Action Exemption for Final Safety Analysis Report Update ML23129A3122023-05-0909 May 2023 NRR E-mail Capture - Beaver Valley Unit 2 - Verbal Authorization of Alternative Request, 2-TYP-4-RV-06 ML23128A1612023-05-0808 May 2023 NRR E-mail Capture - Comanche Peak Nuclear Power Plant, Units 1 and 2, Beaver Valley Power Station, Unit Nos. 1 and 2, Davis-Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit No. 1 - Acceptance of Requested Licensing ML23125A1462023-05-0505 May 2023 NRR E-mail Capture - Beaver Valley - RAI Regarding Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations ML23125A1602023-05-0505 May 2023 NRR E-mail Capture - Correction to Beaver Valley - RAI Regarding Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations ML23122A0342023-05-0202 May 2023 NRR E-mail Capture - Beaver Valley - Request for Additional Information Regarding Unit 1 - 180 Day Steam Generator Tube Inspection Report ML23089A1252023-03-30030 March 2023 NRR E-mail Capture - Beaver Valley Upcoming Steam Generator Tube Inservice Inspection ML23079A1202023-03-20020 March 2023 NRR E-mail Capture - Acceptance Review for Beaver Valley 1 & 2 Exemption from Specific Provisions in 10 CFR 50 Appendix H ML23065A0782023-03-0303 March 2023 Final RAIs Regarding the Beaver Valley Emergency LAR (EPID L-2023-LLA-002) - Email ML22321A2392022-11-17017 November 2022 NRR E-mail Capture - (External_Sender) Beaver Valley Power Station, Units 1&2 - Clarification on LAR to Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time ML22312A5912022-11-0808 November 2022 NRR E-mail Capture - Beaver Valley Power Station, Units 1&2 - Request for Additional Information LAR to Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time ML22273A1132022-09-30030 September 2022 NRR E-mail Capture - Acceptance of Requested Licensing Action to Add Full Spectrum LOCA Methodology to COLR ML22277A5122022-09-19019 September 2022 NRR E-mail Capture - (External_Sender) Eh Response to Corrected SE Associated with Beaver Valley Amendments 315 and 205 Changes to the EPP ML22238A2812022-08-25025 August 2022 Request for Additional Information for Beaver Valley Unit 2 - 2R22 Steam Generator 180 Day Report ML22202A4642022-06-29029 June 2022 Emergency Plan Safety Evaluation ML22178A1322022-06-24024 June 2022 Request for Additional Information for Beaver Valley Unit 2 Steam Generator Inspection Report - Fall 2021 Refueling Outage ML22173A0402022-06-21021 June 2022 NRR E-mail Capture - Acceptance of Requested Licensing Action Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time ML22147A0392022-05-27027 May 2022 NRR E-mail Capture - (External_Sender) NRC Notification to the State of Pennsylvania Regarding a Beaver Valley, Units 1 & 2 Amendment - Revise TS 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start and Separation Instrumentation ML22129A0122022-05-0606 May 2022 NRR E-mail Capture - (External_Sender) NRC Notification to the State of Pennsylvania Regarding a Beaver Valley Power Station, Unit 2 Amendment - Correct TS 3.1.7 Change Made by TSTF-547 ML22123A0232022-05-0202 May 2022 NRR E-mail Capture - Acceptance of Requested Licensing Action for Beaver Valley Power Station, Units 1 and 2 - Adoption of TSTF-501, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML22153A5212022-04-15015 April 2022 Email Error in Energy Harbor Submittal and Associated SE for Beaver Valley 1 & 2 - Containment Isolation Valve Relief Request ML22101A0122022-04-0808 April 2022 NRR E-mail Capture - (External_Sender) NRC Notification to the State of Pennsylvania Regarding a Beaver Valley Power Station, Units 1 and 2 Amendment - Revise Technical Specification 5.6.3, Core Operating Limits Report (COLR) ML22087A1302022-03-28028 March 2022 NRR E-mail Capture - (External_Sender) NRC Notification to the State of Pennsylvania Regarding a Beaver Valley Power Station, Units 1 and 2 Amendment - Adopt TSTF-577 ML22080A2512022-03-18018 March 2022 NRR E-mail Capture - (External_Sender) ASME OM Code Case OMN-27, Alternative Requirements for Testing Category a Valves (Non- Piv/Civ) ML22068A1822022-03-0909 March 2022 NRR E-mail Capture - Beaver Valley Power Station, Units 1 & 2 - Request for Additional Information for License Amendment Request to Revise Technical Specification 3.3.5 ML21344A0392021-12-0909 December 2021 NRR E-mail Capture - Beaver Valley TSTF-577-A Acceptance Review ML21321A3782021-11-16016 November 2021 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSEL Unit 1 - Acceptance of License Amendment Request Adoption of TSTF-554 EPID-L-2021-LLA-0193 ML21286A7892021-10-0707 October 2021 NRR E-mail Capture - Beaver Valley Acceptance Review for LAR Regarding TS 3.1.7.2 to Correct a Logic Error (L-2021-LLA-0160) ML21266A2222021-09-23023 September 2021 NRR E-mail Capture - Beaver Valley Loss of Power Diesel Generator Start and Bus Separation Instrument ML21259A1642021-09-16016 September 2021 NRR E-mail Capture - Request for Additional Information Regarding the LAR for Core Operating Limits ML21225A0362021-08-12012 August 2021 NRR E-mail Capture - Beaver Valley Unit Nos. 1 and 2 - Acceptance Review Determination Emergency Plan Amendment Request ML21197A0242021-07-15015 July 2021 NRR E-mail Capture - Beaver Valley No. 1 and 2 - Supplemental Information Needed for Acceptance of Requested Licensing Action Emergency Plan Amendment Request ML21137A0082021-05-14014 May 2021 Acceptance of License Amendment Request: Beaver Valley COLR TS LAR ML21119A2152021-04-28028 April 2021 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSE Unit 1 - Acceptance of Relief Request Proposed Alternative to Use ASME OM Code Case OMN-27 ML21102A1542021-04-0909 April 2021 Request for Additional Information (2nd Round) - Steam Generator Tube Sleeve LAR ML21082A4942021-03-23023 March 2021 Final RAIs for GL 04-02 Closure (Email) ML21068A3502021-03-0909 March 2021 Final Request for Additional Information for Reactor Coolant System (RCS) and Pressure and Tempature Limits Report(Ptlr) TS LAR ML21053A0252021-02-20020 February 2021 NRR E-mail Capture - Request for Additional Information (Rais) - LaSalle Request for Exemption from Pre-Access Drug and Alcohol Testing ML21032A2582021-02-0101 February 2021 Acceptance of License Amendment Request: Beaver Valley Steam Generator Inspection Deferral ML21015A5762021-01-14014 January 2021 Final RAIs for Steam Generator 180 Day Tube Inspection Report ML21014A1142021-01-12012 January 2021 Correction Letter Notification from Licensee ML21007A3732021-01-0707 January 2021 NRR E-mail Capture - (External_Sender) (External) Request for Additional Information Regarding License Amendment Request to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff, ML21004A1442020-12-30030 December 2020 NRR E-mail Capture - Request for Additional Information Regarding License Amendment Request to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff ML20329A4562020-11-24024 November 2020 Acceptance of License Amendment Request: Beaver Valley RCS and PTLR TS Changes ML20325A2312020-11-20020 November 2020 Request for Additional Information - Beaver Valley Request for Exemption - Part 73 Force-on-Force Exemption ML20324A0872020-11-19019 November 2020 Acceptance of Requested Licensing Action: Beaver Valley Unit 2 Capsule Pull ML20323A0452020-11-17017 November 2020 2.206 Petition 2024-07-17
[Table view] |
Text
From: McCreary, Dave M <dmccreary@energyharbor.com>
Sent: Monday, September 19, 2022 8:33 AM To: Brent Ballard Cc: Osting, Steven J; Lashley, Phil H
Subject:
[External_Sender] RE: RE: [External] Beaver Valley Power Station, Units 1 and 2 - Correction of Errors in Safety Evaluation Associated with License Amendments 315 and 205 re: Changes to the EPP
- Brent,
The corrected safety evaluation has been reviewed and there is one remaining item that wasnt fully aligned with our request.
The initial request drew the distinction between the Joint Information Center being staffed as compared to the previous distinction of having it activated within 60 minutes. Additionally, the proposed plan did not provide a timeframe to have the JIC staffed. Reference of Section 6.2.3.
The SE that was issued on 5/6/22 stated, The current Beaver Valley EPP activates the TSC and OSC at the declaration of an Alert or higher ECL and activates the EOF and JIC at the declaration of a Site Area Emergency or higher ECL. Energy Harbor proposes to activate the TSC, OSC, EOF, and JIC within 60 minutes of declaring an Alert or higher ECL. Although activation of the EOF and JIC would not be required until the declaration of a Site Area Emergency or higher ECL is in effect per the guidance in the Revised Table B-1, the proposed ERO staffing changes to the Beaver Valley EPP require the TSC, OSC, EOF, and JIC to activate at the declaration of an Alert or higher ECL.
This change from what was proposed was pointed out in the email that was sent on 6/29/22.
The revised SE that was issued 9/1/22 stated, The current Beaver Valley EPP activates the TSC and OSC at the declaration of an Alert or higher ECL, and activates the EOF and staffs the JIC at the declaration of a Site Area Emergency or higher ECL. Energy Harbor proposes to activate the TSC, OSC, EOF, and staff the JIC within 60 minutes of declaring an Alert or higher ECL. Although activation of the EOF and JIC would not be required until the declaration of a Site Area Emergency or higher ECL is in effect per the guidance in the Revised Table B-1, the proposed ERO staffing changes to the Beaver Valley EPP require the activation of the TSC, OSC, EOF, and the staffing of the JIC at the declaration of an Alert or higher ECL.
The references to have the JIC staffed within 60 minutes would be above and beyond what was requested in our submittal. Please review with your technical staff and let me know if we need to have any further discussion to resolve the concern.
- Regards,
Dave
From: Ballard, Brent <Brent.Ballard@nrc.gov>
Sent: Friday, September 2, 2022 8:13 AM To: McCreary, Dave M <dmccreary@energyharbor.com>; Lashley, Phil H
<phlashley@energyharbor.com>
Subject:
[External] Beaver Valley Power Station, Units 1 and 2 - Correction of Errors in Safety Evaluation Associated with License Amendments 315 and 205 re: Changes to the EPP
Hi Dave and Phil,
The corrected SE for the emergency preparedness plan amendments (Nos. 315 and 205 for Beaver Valley, Units 1 and 2, respectively) is attached.
Thank you, Brent
Brent Ballard Project Manager Plant Licensing Branch 1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 301-415-0680
Electronic Confidentiality and Privacy Notice: This e-mail, and any attachments, contains information that may be confidential, constitutes non-public information, may be protected by electronic communication privacy laws, or is a privileged communication (attorney-client or otherwise). The information contained in this message is intended only for the personal and confidential use of the recipient(s) named above. If the reader of this message is not the intended recipient or an agent responsible for delivering it to the intended recipient, you are hereby notified that you have received this document in error and that any review, use, disclosure, dissemination, distribution, or copying of this message is strictly prohibited. If you have received this communication in error, please notify the sender immediately by reply e-mail or by phone, and destroy all copies of the original message.
Electronic Confidentiality and Privacy Notice: This e-mail, and any attachments, contains information that may be confidential, constitutes non-public information, may be protected by electronic communication privacy laws, or is a privileged communication (attorney-client or otherwise). The information contained in this message is intended only for the personal and confidential use of the recipient(s) named above. If the reader of this message is not the intended recipient or an agent responsible for delivering it to the intended recipient, you are hereby notified that you have received this document in error and that any review, use, disclosure, dissemination, distribution, or copying of this message is strictly prohibited. If you have received this communication in error, please notify the sender immediately by reply e-mail or by phone, and destroy all copies of the original message.
Hearing Identifier: NRR_DRMA Email Number: 1797
Mail Envelope Properties (SA1P110MB097378A8F1E196E7742CCB24C74D9)
Subject:
[External_Sender] RE: RE: [External] Beaver Valley Power Station, Units 1 and 2
- Correction of Errors in Safety Evaluation Associated with License Amendments 315 and 205 re:
Changes to the EPP Sent Date: 9/19/2022 8:33:14 AM Received Date: 9/19/2022 8:33:27 AM From: McCreary, Dave M
Created By: dmccreary@energyharbor.com
Recipients:
"Osting, Steven J" <sjosting@energyharbor.com>
Tracking Status: None "Lashley, Phil H" <phlashley@energyharbor.com>
Tracking Status: None "Brent Ballard" <Brent.Ballard@nrc.gov>
Tracking Status: None
Post Office: SA1P110MB0973.NAMP110.PROD.OUTLOOK.COM
Files Size Date & Time MESSAGE 4887 9/19/2022 8:33:27 AM
Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: