ML112780054

From kanterella
Jump to navigation Jump to search

Acceptance Review Results for Fenco License Amendment Request Changes to LLC
ML112780054
Person / Time
Site: Beaver Valley, Davis Besse, Perry
Issue date: 10/03/2011
From: Michael Mahoney
Plant Licensing Branch III
To: Lashley P
FirstEnergy Corp
mahoney, m NRR/DORL/LPLIII-2 415-3867
References
TAC ME7156, TAC ME7157, TAC ME7158, TAC ME7159
Download: ML112780054 (2)


Text

From:

Mahoney, M Sent:

Wednesday, To:

Wohl, Marily

Subject:

FW: Accepta Changes to L Michael Mahoney Davis-Besse, Perry and FENOC Fleet Pro U. S. Nuclear Regulatory Commission Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Phone: (301)415-3867 Email: Michael.Mahoney@NRC.GOV From: Mahoney, Michael Sent: Monday, October 03, 2011 10:54 To: 'phlashley@firstenergycorp.com'; 'cj kmnesser@firstenergycorp.com Cc: Zimmerman, Jacob

Subject:

Acceptance Review Results fo Nos. ME7156 through ME7159 Phil Lashley Licensing Supervisor FirstEnergy Nuclear Operating Com

Dear Mr. Lashley,

By letter L-11-282 dated September Management System (ADAMS) Acc Company submitted a license amen Unit No. 1, Perry Nuclear Power Pla and 2 (the plants). The proposed am licenses of the plants to reflect the n Generation Corp, to FirstEnergy Nuc The purpose of this e-mail is to prov (NRC) staffs acceptance review of th determine if there is sufficient techni complete its detailed technical review whether the application has any read characterization of the regulatory req Michael

, October 05, 2011 8:34 AM yn ance Review Results for FENOC License Amendment R LLC - TAC Nos. ME7156 through ME7159 oject Manager, Licensing Branch III-2 g

4 AM cjheintz@firstenergycorp.com'; kjnevins@firstenergyco or FENOC License Amendment Request RE: Changes t October 3, 2011 pany r 20, 2011 (Agencywide Documents Access and cession No. ML11260246), FirstEnergy Nuclear O ndment request for the Davis-Besse Nuclear Pow ant, Unit No. and Beaver Valley Power Station, Un mendment is administrative in nature and will rev name change of an owner licensee from FirstEne clear Generation, LLC.

vide the results of the U.S. Nuclear Regulatory Co his application. The acceptance review was perf ical information in scope and depth to allow the N

w. The acceptance review is also intended to ide dily apparent information insufficiencies in its quirements or the licensing basis of the plant.

Request RE:

orp.com; to LLC - TAC Operating wer Plant, nit Nos. 1 vise the rgy Nuclear ommission formed to NRC staff to entify

Consistent with Section 50.90 of Titl amendment to the license must fully applicable, the form prescribed for o content of technical information requ design and operating characteristics considerations.

The NRC staff has reviewed your ap information in sufficient detail to ena and make an independent assessm in terms of regulatory requirements a environment. If additional informatio you will be advised by separate corr If you have any questions, please co available in ADAMS.

Docket Nos. 50-346, 50-440, 50-334 Sincerely, Michael Mahoney Davis-Besse, Perry and FENOC Fleet Pro U. S. Nuclear Regulatory Commission Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Phone: (301)415-3867 Email: Michael.Mahoney@NRC.GOV e 10 of the Code of Federal Regulations (10 CFR y describe the changes requested, and following a original applications. Section 50.34 of 10 CFR add uired. This section stipulates that the submittal a s, unusual or novel design features, and principal pplication and concluded that it does provide tech able the staff to proceed with its detailed technica ent regarding the acceptability of the proposed a and the protection of public health and safety and on is needed for the staff to complete its technica respondence.

ontact me. A copy of this email will be made pub 4 and 50-412 oject Manager, Licensing Branch III-2 g

R), an as far as dresses the ddress the safety hnical al review mendment d the al review, blicly