Acceptance Review Results BVPS-1 and 2 Relief Request VRR1 (ME7684 and ME7685)
ML113540260
Person / Time
Site: Beaver Valley
Issue date: 12/19/2011
From: Nadiyah Morgan
Plant Licensing Branch 1
To: Lashley P, Firestone J
FirstEnergy Corp
References
TAC ME7684, TAC ME7685
Download: ML113540260 (1)


Text

From:

Morgan, Nadiyah Sent:

Monday, December 19, 2011 4:34 PM To:

'phlashley@firstenergycorp.com'; 'jfirestone@firstenergycorp.com'

Subject:

Acceptance Review Results Re: BVPS-1 and 2 Relief Request VRR1 (ME7684 and ME7685)

Phil/Julie, By letter dated December 2, 2011, FirstEnergy Nuclear Operating Company (the licensee) submitted a relief request for Beaver Valley Power Station, Unit Nos. 1 and 2. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Pursuant to Sections 50.55a(a)(3)(i) of Title 10 of the Code of Federal Regulations, the licensee shall demonstrate that the proposed alternative would provide an acceptable level of quality and safety.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed relief request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

If you have any questions, please contact me.

Thanks, Dee Nadiyah S. Morgan Beaver Valley Project Manager Nuclear Regulatory Commission (301) 415-1016 Nadiyah.Morgan@NRC.GOV