ML20294A099

From kanterella
Jump to navigation Jump to search
NRC-2018-000103 - Resp 6 - Interim, Agency Records Subject to Request Enclosed
ML20294A099
Person / Time
Issue date: 12/08/2017
From: Stephanie Blaney
NRC/OCIO/GEMSD/FLICB
To: Lochbaum D
Union of Concerned Scientists
Shared Package
ML20294A094 List:
References
FOIA, FOIA-2018-0010, NRC-2018-000103
Download: ML20294A099 (128)


Text

NRC FORM 464 Part I U.S. NUCLEAR REGULATORY COMMISSION FOIA RESPONSE NUMBER (03-2017)

,. r.i>""' '"""<*~\

.)

RESPONSE TO FREEDOM OF I 2018-0010 11 6

I

-'~.q .I".

= i INFORMATION ACT (FOIA) REQUEST

RESPONSE

INTERIM FINAL

    • .--11' TYPE REQUESTER: DATE:

David Lochbaum, Union of Concerned Scientists I I 12/08/2017 I

DESCRIPTION OF REQUESTED RECORDS:

Records corresponding to items 29, 34, 38, 64, and 97, as further explained in the Comments Section, below.

PART I. -- INFORMATION RELEASED You have the right to seek assistance from the NRC's FOIA Public Liaison. Contact information for the NRC's FOIA Public Liaison is available at https://www.nrc.gov/reading-rm/foia/contact-foia.html Agency records subject to the request are already available on the Public NRC Website, in Public ADAMS or on microfiche in the NRC Public Document Room.

Agency records subject to the request are enclosed.

Records subject to the request that contain information originated by or of interest to another Federal agency have been referred to that agency (see comments section) for a disclosure determination and direct response to you.

We are continuing to process your request.

See Comments.

PART I.A -- FEES NO FEES AMOUNT*

You will be billed by NRC for the amount listed.

Due to our delayed response, you will Minimum fee threshold not met.

II II You will receive a refund for the amount listed.

  • See Comments for details Fees waived. not be charged fees.

PART I.B -- INFORMATION NOT LOCATED OR WITHHELD FROM DISCLOSURE We did not locate any agency records responsive to your request. Note: Agencies may treat three discrete categories of law enforcement and national security records as not subject to the FOIA ("exclusions"). 5 U.S.C. 552(c). This is a standard notification given to all requesters; it should not be taken to mean that any excluded records do, or do not, exist.

We have withheld certain information pursuant to the FOIA exemptions described, and for the reasons stated, in Part II.

Because this is an interim response to your request, you may not appeal at this time. We will notify you of your right to appeal any of the responses we have issued in response to your request when we issue our final determination.

You may appeal this final determination within 90 calendar days of the date of this response by sending a letter or e-mail to the FOIA Officer, at U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or FOIA.Resource@nrc.gov. Please be sure to include on your letter or email that it is a "FOIA Appeal." You have the right to seek dispute resolution services from the NRC's Public Liaison, or the Office of Government Information Services (OGIS). Contact information for OGIS is available at https://ogis.archives.gov/about-ogis/contact-information.htm PART I.C COMMENTS ( Use attached Comments continuation page if required)

This sixth interim response addresses five additional records, or groups of records, described in your request. Although the records bearing ML numbers starting with "16" have been removed from ADAMS, because the NRC was able to locate them by the accession numbers during the processing of several FOIA requests seeking the same records within the past year, we have processed the records as described below. We have processed these records, taking into account the privacy waiver furnished by Lawrence Criscione, and to the extent applicable, the privacy waivers of third parties whose personally identifiable information (e.g., cell phone numbers, email addresses) were included in some of these records.

Signature - Freedom of Information Act Officer or Designee Digitally signed by Stephanie A. Blaney Stephanie A. Blaney Date: 2017.12.08 11:11:59 -05'00' NRC Form 464 Part I (03-2017) Page 2 of 4

NRC FORM 464 Part I U.S. NUCLEAR REGULATORY COMMISSION FOIA RESPONSE NUMBER (03-2017)

RESPONSE TO FREEDOM OF INFORMATION I 2018-0010 11 6

I ACT (FOIA) REQUEST Continued

RESPONSE

TYPE INTERIM FINAL REQUESTER: DATE:

David Lochbaum, Union of Concerned Scientists I I 12/08/2017 I

PART I.C COMMENTS (Continued)

ML16216A709 (item 29) is a copy of an email to various NRC officials, including the FOIA Officer at that time, attaching a letter, in which the sender, Mr. Criscione, raises concerns about the lack of a timely response to several pending FOIA appeals. It is enclosed with this response.

ML16232A001 (item 34) is an email from Mr. Criscione to another staff member in the Office of Regulatory Research (RES), to which he attached several Forms 655, ADAMS Document Submission; it is enclosed.

ML16236A230 (item 38) is an early draft document, "Generic Issue Program Proposal - Random Failure of an Upstream Dam." The NRC is exercising its discretion to release this record in its entirety; it is enclosed.

ML16244A008 (item 64) consists of an email from Mr. Criscione to then-Commissioner Ostendorff, in which he forwarded an email exchange he had had with another NRC staff member and attached several other records. This email and the attached records were previously released in part as ML15128A610; we have revisited the material that had been redacted pursuant to exemption 5 as it incorporates the deliberative process privilege. We continue to assert exemption 6 for a cell number of another NRC staff member. The record, with the content restored, is enclosed. The November 14, 2012 letter to Senator Boxer is also enclosed with Mr. Criscione's PII restored, in light of the privacy waiver he furnished.

In item 97 of your request, you asked for copies of the records responsive to several specified FOIA requests. We note that most of the FOIA requests and the NRC's responses to them have been included in public ADAMS; we have included the ML numbers for the web packages corresponding to the FOIA request numbers, as applicable). The records that were the subject of FOIA-2013-0008 (ML14065A198) (which was appealed in 2013-0015A for lack of a timely response and administratively closed once the agency responded to the request), 2013-0013 (ML14065A204), 2013-0127 (ML14065A224) (which was appealed in 2013-0010A for lack of a timely response and administratively closed once the agency responded to the request), 2013-0239 (ML14065A233) (which was appealed in 2013-0018A (MLl4087A357) for lack of a timely response and administratively closed due to the settlement reached in PEER v. NRC, No. 1:13-cv-00942-RMC (ML14065A233 and ML13352A341); 2013-0262 (which was appealed in 2013-0022A (ML15118A439) for lack of a timely response and administratively closed once the agency responded to the request and later appealed as to the denial of information in FOIA-2015-0027A (ML15155A891)), and 2015-0331 (which was administratively closed when the requester did not submit a payment for fees that were estimated to exceed $250) all concern the Oconee Nuclear Station, and the risks posed by possible flooding from the Jocassee dam located upstream of the plant. Because the records were the subject of multiple FOIA requests over time, they have been reviewed by subject matter experts on several occasions and re-processed. Ultimately, each of the following records was made available to the public in its entirety. You may find them in public ADAMS as follows:

1) ML081640244 2) ML090570779 3) ML101730329
4) ML101900305 5) ML103490330 6) ML101610083
7) ML111460063 8) ML091170104 9) ML082750106 The agency's initial response to FOIA-2013-0262 was not made publicly available; as such, we have enclosed the Form 464 response and released records. Please note that, in light of the passage of time, we have made modest changes to the way in which these pages are being released to you; i.e., certain portions of text, previously marked as "non-responsive", have now been considered responsive, and a few portions of previously redacted text have been restored as a matter of discretionary release. Moreover, in light of a privacy waiver provided by David Lochbaum, his PII has been restored. However, a personal email address of a third party appearing on an email that Mr. Criscione (the requester in FOIA-2013-0262) had

[continued on next page]

NRC Form 464 Part I (03-2017) Page 3 of 4

NRC FORM 464 Part I U.S. NUCLEAR REGULATORY COMMISSION FOIA RESPONSE NUMBER (03-2017)

RESPONSE TO FREEDOM OF INFORMATION I 2018-0010 11 6

I ACT (FOIA) REQUEST Continued

RESPONSE

TYPE INTERIM FINAL REQUESTER: DATE:

David Lochbaum, Union of Concerned Scientists I I 12/08/2017 I

PART I.C COMMENTS (Continued) sent, which was not redacted in the FOIA-2013-0262 response to him, has been redacted herein on the basis of exemption 6 as its disclosure would constitute an unwarranted invasion of personal privacy. We continue to assert exemptions 5 as it incorporates the deliberative process, attorney-client, and/or work product privileges, or exemption 6 for other third parties' personally identifiable information (PII), respectively, in the material that remains redacted from these records. Finally, the email and accompanying letter that Mr. Criscione wrote (then) Chairman Macfarlane about Oconee, which were the responsive records in FOIA-2013-0127 and 2013-0239, were made publicly available as ML13256A370 and ML13256A372, respectively, with only the author's home address and cell number redacted. Since he has provided a privacy waiver, we have enclosed copies of these two records in their entirety.

NRC Form 464 Part I (03-2017) Page 4 of 4

NRC FORM 464 Part II U.S. NUCLEAR REGULATORY COMMISSION FOIA (03-2017) l

,)o>'* lllfr;a_c,(..,.,.,

13;,A.o

~

RESPONSE TO FREEDOM OF I 2018-0010#6 I

~,,,q I j

  • INFORMATION ACT (FOIA) REQUEST DATE:

I 12/08/2017 I

PART II.A -- APPLICABLE EXEMPTIONS Records subject to the request are being withheld in their entirety or in part under the FOIA exemption(s) as indicated below (5 U.S.C. 552(b)).

Exemption 1: The withheld information is properly classified pursuant to an Executive Order protecting national security information.

Exemption 2: The withheld information relates solely to the internal personnel rules and practices of NRC.

Exemption 3: The withheld information is specifically exempted from public disclosure by the statute indicated.

Sections 141-145 of the Atomic Energy Act, which prohibits the disclosure of Restricted Data or Formerly Restricted Data (42 U.S.C. 2161-2165).

Section 147 of the Atomic Energy Act, which prohibits the disclosure of Unclassified Safeguards Information (42 U.S.C. 2167).

41 U.S.C. 4702(b), which prohibits the disclosure of contractor proposals, except when incorporated into the contract between the agency and the submitter of the proposal.

Exemption 4: The withheld information is a trade secret or confidential commercial or financial information that is being withheld for the reason(s) indicated.

The information is considered to be proprietary because it concerns a licensee's or applicant's physical protection or material control and accounting program for special nuclear material pursuant to 10 CFR 2.390(d)(1).

The information is considered to be another type or confidential business (proprietary) information.

The information was submitted by a foreign source and received in confidence pursuant to 10 CFR 2.390(d)(2).

Exemption 5: The withheld information consists of interagency or intraagency records that are normally privileged in civil litigation.

Deliberative process privilege.

Attorney work product privilege.

Attorney-client privilege.

Exemption 6: The withheld information from a personnel, medical, or similar file, is exempted from public disclosure because its disclosure would result in a clearly unwarranted invasion of personal privacy.

Exemption 7: The withheld information consists of records compiled for law enforcement purposes and is being withheld for the reason(s) indicated.

(A) Disclosure could reasonably be expected to interfere with an open enforcement proceeding.

(C) Disclosure could reasonably be expected to constitute an unwarranted invasion of personal privacy.

(D) The information consists of names and other information the disclosure of which could reasonably be expected to reveal identities of confidential sources.

(E) Disclosure would reveal techniques and procedures for law enforcement investigations or prosecutions, or guidelines that could reasonably be expected to risk circumvention of the law.

(F) Disclosure could reasonably be expected to endanger the life or physical safety of an individual.

Other I I PART II.B -- DENYING OFFICIALS In accordance with 10 CFR 9.25(g) and 9.25(h) of the U.S. Nuclear Regulatory Commission regulations, the official(s) listed below have made the determination to withhold certain information responsive to your request.

APPELLATE OFFICIAL DENYING OFFICIAL TITLE/OFFICE RECORDS DENIED EDO SECY IStephanie A. Blaney 1 1FOIA Officer Ithird party PII, internal deliberations I Rochelle Bavol 11 Exec Asst to the Secretary to the Commission Iatty-client advice; work product, deliberations I 11 I & third party PII Appeals must be made in writing within 90 calendar days of the date of this response by sending a letter or email to the FOIA Officer, at U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or FOIA.Resource@nrc.gov. Please be sure to include on your letter or email that it is a "FOIA Appeal."

NRC Form 464 Part II (03-2017) Page 1 of 1

Criscione, Lawrence From: Criscione, Lawrence Sent: Thursday, August 18, 2016 2:59 PM To: Littlejohn, Jennene

Subject:

FW: 17 ADAMS documents Attachments: NRC Form 665_Criscione_2016-Aug-3.pdf

Jennene, What do I need to do to get the records below declared Official Agency Records?

Larry 573-230-3959 From: Criscione, Lawrence Sent: Wednesday, August 03, 2016 11:48 PM To: Littlejohn, Jennene <Jennene.Littlejohn@nrc.gov>

Subject:

17 ADAMS documents

Jennene, I need the 17 documents listed on the attached NRC Form 665 declared Official Agency Records so that I can reference them in public comments I am making on an NRC report.

I have done a SUNSI review and none of the documents contain any sensitive information:

1. ML16202A536 is an email coordinating a meeting to discuss flooding issues with four attachments already in the public domain.
2. ML16202A537 is an email providing advanced input to a meeting to discuss flooding issues.
3. ML16202A538 is an email providing clarifying information to statements made during a meeting.
4. ML16204A001 is a non-government email sent to some Congressional staffers.
5. ML16204A002 is a letter to the NRC Inspector General that is already in the public domain.
6. ML16216A702 is a non-government email.
7. ML16216A703 is a redacted record released under the Freedom of Information Act.
8. ML16216A704 is a publicly available Linked-In profile.
9. ML16216A705 is a redacted record released under the Freedom of Information Act.
10. ML16216A706 is a FOIA appeal.
11. ML16216A707 is input to a meeting discussing FOIA releases of dam-related information.
12. ML16216A708 is a response to a FOIA inquiry.
13. ML16216A709 is a follow-up to a FOIA appeal.
14. ML16216A710 is a letter providing input to an OIG audit team.
15. ML16216A711 is a briefing package provided by the Union of Concerned Scientists to Chairman Burns and Commissioner Baran.
16. ML16216A712 is a FOIA appeal.
17. ML16216A713 is a table entry showing the dates of when a FOIA request was processed.

I am working from Illinois this week and have limited access to my NRC email account. If you have any questions regarding any of the 17 records, please give me a call at 573-230-3959.

Thanks,

NRC FORM66S 100.20161

,,, -,. U.S. NUCLEAR REGULATORY COMMISSION f¥ j ADAMS DOCUMENT SUBMISSION Instr uctions for completing NRC Form 66t;: * "Cheat Sheet" (ML 1SJ13A310)

Document Owner Originated By Phone No, (Enter 10 digits) Mall Stop LANID Date LS Criscione LS Criscione (301) 415-2 129 TWFN/10844 LSC4 2016-Aug-3 If documents are to be put into a package and ha11e the same release properties, list the Document Tilles or Accvss1on Numbers below In tho ordor they should appear. Documents with dltterent release properties and sensitivity le11els should be listed on add1Uonal fo""s In tho order they should appear. Examples /ML 1603SA18~)

Note: Document Owner Is solely responsible for setting tho Avallablllly, Document Senslll11lty and Document Socur'lty Access Le11el.

Document No. Total Number of Documents In this package 4 Document Title(s) or Accession No. ML16202A538 ML162O2A536, ML162O2A537, Pv1l 282AS38, lvl l162O4AOO1, ML162O4AOO2, ML16216A7O2, ML16216A7O3, M L16216A7O4, ML16216A7O5, M L16216A7O6, ML16216A7O7, ML16216A7O8, ML16216A7O9, M L16216A71O, M L16216A711, ML16216A712, M L16216A713 Package Title (II necessary):

Is this a bnef 11110 that can be changed by DPC according to template Instruction? Yes 0 No 1 Ir

' .. -J ()4,,,,1

[ZJ jInllials ~S'c SUNSI Review has been completed (for Publicly Available Documents) Yes No Document AVAILABILITY (select one) l2J Publicly Available D Non-Publicly Available MD 3.4 Non-Public Item Code (A.3-A 7. 8 1)

(Indicate Release Date) Document SENSITIVITY (select one)

D Immediate Release ID IA.? J Sensitive Internal Info - Periodic Review Required (all other ID jA4 IProprietary Sensitive -

12] Normal Release sensitive internal info)

D ID IA. I Delay Release Unttl ID JA.7 J Sensitive Internal Info - No Periodic Review (attorney work 3 Sensitive-Security Related - Periodic product & client privilege, and Review Required Date pre-decisional enforcement) 12] Non-Sens1hve ID 1A.5 j Sensitive - Fed, State. Foreign ID js.1j Non-Sensitive Gov't, International Agency D Non-Sensitive Copyright Controlled Info Note Package lo be marked for release II two or more documents within the package ID JA.s I(includes Sensitive

  • PA/PII Personally Identifiable ID j s1 I Non-Sensitive -

Copyright are publicly available Information (PII))

Document SECURITY ACCESS LEVEL 12] Document Processing Center = Owner D Limited Document Secunty (Defined by User e g Joe Smith = Owner)

D NRC Users = Viewer Package Aecosslon No. ADAMS Template No. RIDS Code (If applIcable) Other Identifiers Submitted By Phone No. (Enter 10 digits) Mall Stop LAN ID Dale Submitted to DPC ML020170279 Page 1 ol 1

Criscione, Lawrence From: Criscione, Lawrence Sent: Thursday, July 21, 2016 2:56 PM To: Littlejohn, Jennene

Subject:

RE: Emails from May 19, 2016 Thanks From: Littlejohn, Jennene Se nt: Thursday, July 21, 2016 2:54 PM To: Criscione, Lawrence <Lawrence.Criscione@nrc.gov>

Subject:

RE: Emails from May 19, 2016 Completed From: Criscione, Lawrence Se nt: Thursday, July 21, 2016 2:09 PM To: Littlejohn, Jennene <Jennene .Littlejohn@nrc.gov>

Subject:

RE: Emails from May 19, 2016 Thanks Jennene. I just finished the other four.

From: Littlejohn, Jen nene Se nt: Thursday, Ju ly 21, 2016 2:08 PM To: Criscione, Lawrence <Lawrence.Criscione@nrc.gov>

Subje ct: RE: Emails from May 19, 2016 Yes, you gave me the correct access rights From: Criscione, Lawrence Se nt: Thursday, July 21, 2016 2:06 PM To: Littlejohn, Jennene <Jennene.Littlejohn@nrc.gov>

Subject:

RE: Emails from May 19, 2016 I think I got this done for ML16200A049.

I'm working on doing the same thing to the rest, so please let me know if I didn't do it right for ML16200A049.

Thanks, Larry From: Littlejohn, Jennene Sent: Thursday, July 21, 2016 1:59 PM To: Criscione, Lawrence <Lawrence.Criscione@nrc.gov>

Subje ct: RE: Emails from M ay 19, 2016 Okay let me check it for you

From: Criscione, Lawrence Sent: Thursday, July 21, 2016 1:58 PM To: Littlejohn, Jennene <Jennene.Littlej ohn@nrc.gov>

Subject:

RE: Emails from May 19, 2016 Done ( I think)

From: Littlejohn, Jennene Sent: Thursday, July 21, 2016 1:39 PM To: Criscione, Lawrence <Lawrence.Criscione@nrc.gov>

Subject:

RE: Emails from M ay 19, 2016 Hi Larry, I don't have rights to these files, you will need to give NRC users rights as well.

Thanks, Jennene From: Criscione, Lawrence Sent: Wednesday, July 20, 2016 7:54 PM To: Littlejohn, Jennene <Jennene.Littlej ohn@nrc.gov>

Subject:

Emails from May 19, 2016

Jennene, ML16201A086, ML16201A095, ML16201A093 and ML16201A100 are emails that I sent on May 19, 2016 and placed in ADAMS yesterday. I have added the following sentence to the Comments field of their ADAMS profiles:

This document was placed in ADAMS on 2016-July-19 so that it could be referenced in public comments concerning an NRC report.

Attached is the documentation of the SUNSI review. There is no sensitive information in any of the four documents. ML16201A093 concerns a publicly released MOU between the ACRS and the USAGE. ML16201A086 concerns a FOIA request and appeal. ML16201A095 pertains to the agency's practices for controlling access to SUNSI. ML16201A100 concerns the failure of the upper reservoir of the Taum Sauk pump storage stating outside L,esterville, MO on December 14, 2005 and the resultant flooding that occurred.

Please call me if you have any questions.

Thanks, Larry 573-230-3959

Original Message-----

From: NRCDigitalSender@nrc.gov [mailto:NRCDigitalSender@nrc.gov)

Sent: Wednesday, July 20, 2016 7:43 PM To: Criscione, Lawrence <Lawrence.Criscione@nrc.gov>

Subject:

This document was digitally sent to you using Dell Digital Sending device.

NRC FORM665

(()6-2016'1 -~***-""

'~

U.S. NUCLEAR REGULATORY COMMISSION

\ .....:,,)* ADAMS DOCUMENT SUBMISSION Instructions for completing NRC Form 665 - "Cheat Sheet" (ML15313A310)

Document Owner Originated By Phone No. (Enter 10 digits) Mall Stop LANID Date LS Criscione LS Criscione (301) 415-2129 TWFN/10844 LSC4 07/20/2016 If documents are to be put into a package and have the same release properties, list the Document Titles or Accession Numbers below in the order they should appear. Documents with different release properties and sensitivity levels should be listed on additiona I forms in the order they should appear. Examples (ML16035A181)

Note: Document Owner Is solely responsible for setting the Availability, Document Sensitivity and Document Security Access Level.

Document No. Total Number of Documents in this package 4 Document Title(s) or Accession No. ML16201A086 ML16201A095 ML16201A093 ML16201A100 Package Title (If necessary):

[Z] I -.Jc1 * 'T-1.

Is this a brief title that can be changed by DPC according to template instruction?

[Z]

Yes No J Ir SUNSI Review has been completed (for Publidy Available Documents) Yes No J 1nitials --,("5,c.

Documen t AVAILABILITY (select one) 12] Publicly Available D Non-Publicly Available MD 3.4 Non-Public Item Code (A.3-A.7, 81)

(Indicate Release Date) Document SENSITIVITY (select one)

Immediate Release I D I A .7 I Sensitive Internal Info - Periodic I D [ A.4 I Sensitive -

Review Required (all other Proprietary 12] Normal Release sensitive internal l nfo)

IA.7 I Periodic IA.3 I Related D Delay Release Until ID Sensitive Internal Info - No Sensitive-Security I D Review (attorney w ork - Periodic product & client privilege, and Review Required Date pre-decisional enforcement) 12] Non-Sensitive ID [A.6 I Sensitive - Fed, S tate, Foreign ID I 8 .1 I Non-Sensitive Gov't, International Agency D Non-Sensitive Copyright Controlled Info Note Package to be marked for release if two or more documents within the package ID I A.s I(includes Sensitive - PA/PII Personally Identifiable I D I 8 *1 I Non-Sensitive Copyright are publicly available Information (PII))

Docu ment SECURITY ACCESS LEVEL 12] Document Processing Center =Owner D Limited Document Security (Defined by User e g ., Joe Smith= Owner)

D NRC Users =Viewer I

Package Accession No. ADAMS Template No. RIDS Code ( 1f applicable) Other Identifiers Submilled By Phone No. (Enter 10 digits) Mail Stop LANIO Date Submitted to DPC ML020170279 Page 1 of 1

Criscione, Lawrence From: Criscione, Lawrence Sent: Wednesday, July 20, 2016 7:33 PM To: Littlejohn, Jennene

Subject:

ML16200A049 Attachments: image2016-07-20-192330.pdf

Jennene, I placed ML16200A049 in ADAMS two days ago. I need it to be an official agency record so that I can reference it in public comments I am making on the NRC Chairman's response to the Office of Special Counsel.

Attached is the SUNSI review.

The document was originated by Donna Sealing (who's retired). It is a letter she sent to a member of the public in which she gave an agency position on "Official Use Only" information. Although this letter is currently in the public domain, it is not in ADAMS. It was official correspondence written in response to a FOIA request. The version I have of it was used in a FOIA Appeal. I do not have the original version of the record.

I added the following sentence to the document's comments:

This document was placed in ADAMS on 2016-July-18 so that it could be referenced in public comments concerning an NRG report..

Please give me a call if you have any questions.

Thanks, Larry 573-230-3959

Original Message-----

From: NRCDigitalSender@nrc.gov [1]

Sent: Wednesday, July 20, 2016 7:24 PM To: Criscione, Lawrence <Lawrence.Criscione@nrc.gov>

Subject:

This document was digitally sent to you using Dell Digital Sending device.

NRC FORM 665 ,

......_\. U.S. NUCLEAR REGULATORY COMMISSION (CJS.2016\

{ ~ j ADAMS DOCUMENT SUBMISSION

'~..?J Instructions for completing NRC Form 665 - "Cheat Sheet" (ML15313A310)

Document Owner Originated By Phone No. (Enter 10 digits) Mail Stop LAN ID Date LS Criscione DL Sealing (301) 415-2 129 TWFN/10B44 LSC4 07/20/2016 If documents are to be put into a package and have the same release properties, list the Document Titles or Accession Numbers below in the order they should appear. Documents with different release properties and sensitivity levels should be listed on additional forms in the order they should appear. Examples (Ml16035A181J Note: Document Owner is solely responslbl!e for setting the Availability, Document Sensitivity and Document Security Access Level.

Document No. ri. !. 16200A049 Total Number of Documents In this pacl(age Document Title(s) or Accession No.

2012-Nov-15 Letter from the NRC F reedom of Information AcVPrivacy Act O fficer regarding FOIA request 2013-0034 Pacllage T itle (if necessary):

Is this a bnef title that can be changed by DPC according lo template ,nstruat,on? D Yes 0 No I, r I ' ,. I ~ I d SUNSI Review has been completed (for Publicly Available Documents) [Z] Yes No IInitials, ~ ,r Document AVAILABILITY (select one)

[ZJ Publicly Available D Non-Publicly Available MD 3.4 Non-Public Item Code (A.3-A.7, 81)

(Indicate Release Date) Document SENSITIVITY (select one)

Immediate Release I D I A.7 I Sensitive Internal Info - Periodic Review Required (all other I I A.4 I Sensitive -

Proprietary 0 Normal Release sensitive internal Info)

Delay Release Until ID IA.? I Sensitive Internal Info - No ID IA.3 I Sensitive-Security Periodic Review (attorney work Related - Periodic product & client privilege, and Review Required Date pre-decisional enforcement}

Non-Sensitive ID jA.6 I Sensitive - Fed, State, Foreign Gov't, International Agency ID j s .1 j Non-Sensilive Non-Sensitive Copyright Controlled Info Note. Package to be marked for release if two or more documents within the package I D IA.s ISensitive - PA/PII I D I 8*1 j Non-Sensitive -

(includes Personally Identifiable Copyright are publicly available Information (PII))

Document SECURITY ACCESS LEVEL 0 Document Processing Center = Owner D Limited Document Security (Defined by User e.g. Joe Smith = Owner)

NRG Users = Viewer Package Accession No. ADAMS Template No. RIDS Code- (1f applicable) Other Identifiers Submitted By Phone No. (Enter 10 digits) Mail Stop LAN ID Date Submitted to DPC ML020170279 Page 1 ol 1

Generic Issue Program Proposal - Random Failure of an Upstream Dam While reviewing a recent external flooding issue associated with a nuclear power plant (NPP), it was identified that, if a random failure of an adjacent upstream dam was not adequately evaluated, during the external flooding analysis of the NPP, it could have a potential impact on the public health and safety. The impact would be due to the amount of water that the reservoir would release and the associated effects on the environment, as well as on the common defense and security at the site. The overall result of this event at a nuclear site may contribute to an unacceptable level of probability of core damage frequency (CDF).

The Duke Energy Oconee Nuclear Station (ONS) did not originally evaluate the random failure of the Jocassee Dam in the plant design flooding analysis. The random failure of the Jocassee Dam will result in a flooding scenario, where approximately 18.5 feet of water could result at the site . Presently, the plant is only protected for a flood level of approximately 7 feet. Once the dam failure scenario starts, the plant has three hours until the water reaches the site. This amount of water will result in the loss of the switchyard, loss of the emergency power supply (hydro units), loss of the safe shutdown facility, and the loss of other mitigation equipment. With the loss of the above equipment, there will be core damage in 8 to 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br />, followed by containment failure in 59 to 68 hours7.87037e-4 days <br />0.0189 hours <br />1.124339e-4 weeks <br />2.5874e-5 months <br />. The public would receive a significant radiation dose as a result of the combined fuel and contai11ment failure.

The risk and safety significance of this issue has been adequately determined by the NRR staff (i.e., it does not involve phenomena or other uncertainties that would require long-term studies and/or experimental research to establish the risk or safety significance). After reviewing all of the available data, the present calculations show that a dam failure has an initiating event frequency (IEF) of 2.0 x 10-4. This calculated initiating frequency is consistent to the dam failure frequency studies performed by others as listed below in Table 1.

Table 1. Frequency of Occurrence of Dam Failures Reported in the Literature*

Total Dam No. of Failure Area Reference Years Failures Rate o*

(x1 3)

USA Gruner (1963, 1967) 33 71 .0 5 X 10*4 Babb & Mermel (1968) 12 43.0 3 X 10*4 USCOLD (1975) 74 113.0 7 X 10-4 Mark & Stuart-Alexander (1977) 1 4.5 2 X 10*4 World Mark & Stuart-Alexander (1977) 125 300.0 4 X 10*4 Middle brooks { 1953) and Mark &

9 47.0 2 X 10*4 Stuart-Alexander (1977)

Japan T akase ( 1967) 1046 30 000 4 X 10*5 Spain Gruner (1967) 150 235 6 X 10*4 Overall Averaqe Dam Failure Rate 4 X 10*4

  • ACRES International Newsletter, August 2004, "Issues in Dam Safety" (ACRES International, Niagara Falls, Ontario, Canada)

The CDF will be based on the plant configuration. At Oconee, the conditional core damage probability (CCDP) can be has high as 1, due to the loss of the mitigating equipment listed above. With the CCDP of 1, the result will give an overall CDF of 2.0 x 10-4 per year. Based on this outcome, the issue has to be properly evaluated.

The key point here is that a tremendous amount of water, from a random failure of an upstream dam, could reach a downstream nuclear site with the results being catastrophic. The potential catastrophic results would be due to the loses of the plant's mitigating equipment, due to the site flooding , which would lead to fuel failure and containment failure. This issue becomes even more relevant if the site did not adequately evaluate and mitigate a random dam failure scenario for the upstream dam.

Therefore, the NRR staff has determined that this issue is a good candidate for inclusion in the generic issue program (GIP). The issue cannot be readily addressed through other regulatory programs and processes; existing regulations, policies, or guidance; or voluntary industry initiatives. However, this issue can be resolved by a new or revised regulation , policy, or guidance.

Finally, we believe that the issue is well-defined, discrete, and technical, and the resolution of this issue may potentially involve review, analysis, or action by the affected licensees operating the nuclear power plants (NPPs) located downstream of dams.

Based on the potential outcome of this issue, the NRR staff conducted a brief investigation to determine if similar flooding situations existed at other nuclear plant sites, and found that there are, indeed, several sites with the potential of external flooding issues as a result of upstream dam failures.

Attached is Table 2 with a preliminary list of dams located upstream of several INPPs, entitled, "Review of Dam and/or Levee Failures for Nuclear Plants," which was prepared by the Division of Reactor Licensing (DORL)/NRR. This list contains comments (shown as "FSAR Discussion," in the last column of the table) regarding whether an analysis was completed regarding the potential failure of the dams.

Table 2 Prelimina List of Nuclear Sites w/o Dam Failure Evaluations Random Sunny Max. Yard Day Body of Design Grade Site Name State Area Upstream Water Basis (ft.

Dam (ft. msl) msl)

Failure Evaluated Arkansas Arkansas Nuclear AR Stream 361 353 NO River Missouri Cooper NE Stream 906 903 NO River Missouri Fort Calhoun NE Stream 1014 1000 NO River Indian Point NY Stream Hudson River 15  ? NO Mississippi Prairie Island MN Stream 684.5 695 NO River Lake Robinson SC Lake NA 225 NO Robinson Delaware NOT Salem DE Stream 9 NO River AVAILABLE Sur VA Stream James River 28.6 26.5 NO Susquehanna Three Mile Island PA Stream 310 304 NO River In view of the information discussed above, concerning the potential hazards caused by dam breaks at more than a couple of NPPs, we request that you initiate expeditious action to enter the external flooding issue into the GIP. If you have any questions, your staff may contact George Wilson (301-415-1711) or Meena Khanna (301-415-2150).

Criscione, Lawrence From: Criscione, Lawrence Sent: Monday, December 10, 2012 6:53 PM To: Ostendorff, William; Magwood, William Cc: Boska, John; Hiland, Patrick; Evans, Michele; Pascarelli, Robert; Wilson, George; Bartley, Jo nathan; Cook, Christ opher; M iller, Ed; Cheok, Michael; Chen, Yen-Ju; Beasley, Benjamin; Merzke, Daniel; Coffin, Stephanie; Skeen, David; See, Kenneth; Monninger, John; Perkins, Richard; Bensi, M ichelle; Philip, Jacob; Sancalctar, Selim; Galloway, Melanie; Mitman, Jeffrey; Ferrante, Fernando; Bubar, Patrice; Tappert, John

Subject:

Your Meeting Today Concerning Flooding at Oconee from Jocassee Dam Attachments: 2012-12-lO_Briefing_on_Oconee_Flood ing.pdf.pdf; Lack of Transparency Impeding Resolution of Flooding Concerns at Oconee.pdf.pdf; 2009-04-06.pdf Commissioner Ostendorff, It came to my attention today that you and Commissioner Magwood were being briefed by NRR on the flooding vulnerabilities posed to the reactors at Oconee from a catastrophic failure of Jocassee Dam . Attached to this email are the "Commissioner Briefing Notes" prepared by NRR. Also attached are a 2012-11-14 letter from me to the Senate Committee on the Environment & Public Works (E&PW) and an April 6, 2009 Non-Concurrence Form w hich a Deputy Division Director at NRR/DRA (Melanie Galloway) submitted against NRR's pusillanimous treatment of the Oconee/Jocassee concerns.

I do not know exactly what you were told during your briefing today, but if it was limited to the "Commissioner Briefing Notes" then you did not receive all the pertinent fact s.

A major concern of mine, which I addressed in my attached letter to the E&PW, is that, in all the internal documents I have uncovered regarding NRR briefings of the Commissioners on the Jocassee/Oconee flooding issue, the actual risk numbers ca lculated by NR R/DRA are never mentioned and neither is the 2008-09-26 Duke Energy timeline concerning the predicted failure sequence which would occur at Oconee following a catastrophic failure of the Lake Jocassee Dam (for the context of t he quot e below, see p. 10 of Attachment 2 of ML082750106):

The following flood time line is based on the results of the 1992 Inundation Study. In this scenario the dam is assumed to fail at time zero. Notification from Jocassee would occur be/ore o total failure of the dam; however, for purposes of this timeline, notification is assumed to be at the same time the dam fails. Following notification from Jocossee, the reactor(s) are shutdown within approximately 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. The predicted flood would reach ONS in approximately 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />, at which time the SSF walls are overtopped. The SSF is assumed to fail, with no time delay, following the flood level exceeding the height of the SSF wall. The failure scenario results are predicted such that core damage occurs in about 8 to 9 hours1.041667e-4 days <br />0.0025 hours <br />1.488095e-5 weeks <br />3.4245e-6 months <br /> following the dam break and containment failure in about 59 to 68 hours7.87037e-4 days <br />0.0189 hours <br />1.124339e-4 weeks <br />2.5874e-5 months <br />. When containment failure occurs, significant dose to the public would result.

Hopefully you recognize that the above scenario is very similar t o what occurred at Fukushima when a tsunami overtopped their inadequately sized flood wall and disabled their st andby shutdown equipment. Why the above scenario does not ever appear in Commissioner briefing packages, I do not understand. This seems to me like something you would want to know.

Another thing you should know is the annual probability of failure calculated by NRR/DRA for Jocassee Dam . That number is 2.8E*4/year, which is of the same order of magnitude of a 49 foot tsunami striking the Japanese coast at Fukushima . Given this calculated probability of dam failure and the Duke Energy timeline quoted above, it appears that the inadequately sized flood wall at Oconee presents a very similar hazard to the American public as the inadequat ely

sized flood wall at Fukushima presented to the Japanese public. Is this not something of which NRR should be informing the Commissioners?

As noted by Dr. Ferrante in the ema il t rail below, NRR is not a monolithic institution. Specifically, NRR/DRA has a very different position on the Jocassee/Oconee issue as NRR/DORL. See the attached Non-Concurrence from Melanie Galloway as an example.

I do not know who was at your briefing today, but from the invitation attached to this letter it appears that neither were the key personnel from NRR/DRA !Galloway, Mitman, Ferrante) nor were the authors of the Gl-204 Screening Report (Perkins, Bensi, Philip, Sancaktar) invited to attend. It might be helpful to your understanding of the Jocassee/Oconee issue if you were to speak to Ms. Galloway regarding her 2009-04-06 Non-Concurrence, Dr. Ferrante and Mr. Mitman regarding their 2010-03-15 Generic Failure Rate Evaluation for Jocassee Dam, and Richard Perkins regarding his ordeal in routing and releasing the screening analysis for Gl-204 on flooding due to upstream dam failures.

After over 60 years of military service, Admiral Rickover noted:

A major flaw in our system of government, and even in industry, is the latitude to do less than is necessary. Too often officials are willing to accept and adopt to situations they know to be wrong. The tendency is to downplay problems instead of actively trying to correct them.

The NRC first identified the undersized flood wall at Oconee Nuclear Station in March 1994. !tis my concern that the reason this issue is taking more than two decades to address is that Division Directors at NRR have been willing to accept and adapt to situations they know to be wrong. As noticed by Ms. Galloway in April 2009, the tendency in NRR was to downplay the Jocassee/Oconee problem instead of actively trying to correct it. The public looks to the NRC Commissioners to curtail this latitude to do less than is necessary" and to ensure the NRC staff transparently addresses concerns in a timely manner.

I appreciate you taking an interest in this issue and requesting a briefing by NRR. I am concerned, however, that your briefing might not have adequately detailed the vulnerabilities faced at Oconee.

V/r, Larry Lawrence S. Criscione Reliability & Risk Analyst RES/DRA/OEGI B 573-230-3959 If a subordinate always agrees with his superior, he is a useless part of the organization, From: Ferrante, Fernando Sent: Thursday, November 15, 2012 1:58 PM To: Criscione, Lawrence Cc: Mitman, Jeffrey Subject.: RE: Lack of Transparency Impeding Resolution of Flooding Concerns at Oconee In understand, and I think the folks who were involved in it understand as well. l just worry that other folks will look at our affiliations and assume "NRR" means the specific folks listed in the letter.

From: Criscione, Lawrence Sent: Thursday, November 15, 2012 11:42 AM To: Ferrante, Fernando Cc: Mitman, Jeffrey

Subject:

RE: Lack of Transparency Impeding Resolution of Flooding Concerns at Oconee

Thanks Fernando. Jeff sent me the PSA and PSAM papers last month.

When I use "NRR" I mean the dominant position that won out. Hopefully most people understand that in an agency of 4000 people there is no one true NRC position or one true NRR position. Over the past five years it has bothered me to no end that a legitimate FOIA exemption is "pre-decisional information" and that the NRC is able to use it to conceal the internal debate process. I think the public should be able to FOIA the varying NRC positions on issues and to understand how things are internally debated and decisions arrived at.

From: Ferrante, Fernando Sent: Thursday, November 15, 2012 8:04 AM To: Criscione, Lawrence Cc: Mitman, Jeffrey

Subject:

RE: Lack of Transparency Impeding Resolution of Flooding Concerns at Oconee Larry, Thanks for the opportunity to review this letter. For the most part, the facts related to activities I am directly aware of are correct. Regarding the Information Notice (IN) that NRR authored on dam failure probabilities, I will give you some more background information that will hopefully help further clarify the discussion.

The IN came as a direct result of the Oconee/Jocassee issue. Jim Vail. a retired NRR/DRA/APOB staff, was in charge of developing it (with support from the NRR staff in charge of releasing generic communications in NRR/DPR/PGCB) under guidance from Melanie Galloway, then NRR/DRA Deputy Director. Sometime in 2009, I took over the responsibility of re-writing and issuing the IN (in the same manner l was tasked with rewriting NRR's original submittal to RES regarding the creation of what would eventually become Gl-204 ). Since the beginning, there was a lot of resistance and internal struggle regarding this IN. In order to have the IN released I made sure to build consensus between NRR/DRA, NRR/DE, RES/ORA (which had produced an internal dam failure report which supported the information that eventually went into the IN). and others. As more NRC Offices lined up to be included in the IN, the concurrence process started to take longer and this ended up indeed being an exceedingly long turnover for a generic communication. The Gl-204 process continued in parallel until it became bogged down with some of the issues you described in the letter. At some point a presentation was made in an NRR LTIET meeting, and the directive for the IN became to coordinate its release with the release of the Gl-204 report. Because of the delays in the Gl-204 report, this added another 6 months to a year of the release of the IN itself. At some point, when it became clear both releases were imminent, I was asked if the IN should be reclassified as . NON-PUBLIC/SECURITY RELATED," which I rejected on the basis that no information was contained in the IN which was covered in both NRR and NRC guidance regarding the withholding of information. Hence, the IN was eventually released publicly.

I should add that. as part of an effort to publicly release and discuss information that was created during the development of the dam failure report by RES/DRA, two papers were submitted. accepted , and presented at PRA conferences (the most recent in Helsinki. 2012} with concurrence from both NRR/DRA and RES/DRA staff (I can send these papers to you if you are interested). Both papers were reviewed internaffy and, similar to the IN. contained no information that went against guidance regarding withholding of information. Both papers relied in part on data developed by the US Army Corps of Engineers {USACE) which does restrict public release of certain portions of their dam databases, but we followed their guidelines and contacted USACE to make sure no inadvertent release was made. This papers follow the same methodology discussed in the internal NRR/DRA document you referred to in the letter (M L 100780084) which, to my knowledge, is the closest we have come to a more official position on the dam failure rate issue (which was, at least in part, the intent I had when the document was created).

I'm sharing the above information to make sure that readers who are totally unfamiliar with the issue (inside or outside of NRC ), get a clear picture of how NRR/DRA dealt with some of the issues we were faced during the Oconee/Jocassee issue. In several parts of the letter, certain positions regarding the release of information or level of importance the issue deserved are attributed to "NRR" as a whole (e.g .. " ... there was a strong push by NRR to force RES to remove all OUO-SRI material from the screening report for Gl-204.") which I don't think were shared by all staff or Divisions within NRR I am concerned this may be misconstrued by readers who are

completely unaware of the challenges the Oconee/Jocassee issue presented to the technical staff to mean all staff within NRR shared these positions.

Thank you.

Fernando Ferrante, Ph.D.

Office of Nuclear Reactor Regulation (NRR)

Division of Risk Assessment (ORA)

PRA Operational Support Branch (APOB}

Mail Stop: 0-10C15 Phone: 301-415-8385 Fax: 301-415-3577 From: Criscione, Lawrence Sent~ Wednesday, November 14, 2012 10:23 AM To: Zimmerman, Jacob; Vrahoretis, Susan Cc: Beasley, Benjamin; Coe, Doug; COrreia, Richard; Galloway, Melanie; Mitman, Jeffrey; Ferrante, Fernando; Wilson, George; Leeds, Eric

Subject:

FW: Lack of Transparency Impeding Resolution of Flooding Concerns at Oconee Jacob/Susan: Please forward the attached letter to the Commission staff whom you believe should be aware of it.

I have copied on this email some of the NRR staff men1ioned in the letter. Please let me know if I am mis-portraying any of your positions. Please feel free to forward this letter to whomever you believe needs to see it.

Vlr.

Larry Criscione 573-230-3959 From: Criscione, Lawrence Sent: Wednesday, November 14, 2012 9: 15 AM To: 'valerie_manak@epw.senate.gov'; 'nathan_mccray@epw.senate.gov'

Subject:

Lack of Transparency Impeding Resolution of Flooding Concerns at Oconee Please see the attached letter to the Senate Committee on the Environment & Public Works.

November 14, 2012 1412 Dial Court Springfield, IL 62704 Barbara Boxer, Chairman us Senate Committee on the Environment & Public Works 410 Dirksen Senate Office Bldg.

Washington, DC 20510-6175

Dear Senator Boxer:

There are three reactors in Oconee County, South Carolina which face a risk of meltdown and containment failure that is highly similar to the accident which occurred in Japan in March 2011. The staff of the US Nuclear Regulatory Commission has known about these risks since 2007 but has yet to adequately address the issue. I am writing to you because the Commissioners of the NRC failed to bring up the three Oconee Nuclear Station reactors during their March 15, 2012 testimony at the US Senate Committee on the Environment & Public Works hearing and because it is unclear to me whether or not the Commissioners are fully aware of the vulnerabilities at Oconee.

The vulnerability posed to the reactors concerns a catastrophic failure of Jocassee Dam, which is upstream of the Oconee Nuclear Station. The NRC has known since 20061 that the flood wall at Oconee Nuclear Station is 7 to 12 feet too low to protect against the predicted flood height that would occur were Jocassee Dam to catastrophically fail. like the reactors at Fukushima Dai-ichi, the reactors themselves at Oconee and their containment buildings are designed to survive earthquakes and flooding. However, their support systems - that is, the emergency standby equipment needed to safety shut them down and remove decay heat from their cores

- are vulnerable to failure due to flooding which overtops their flood walls. The difference between Oconee and Fukushima is the source of the flood: a dam break instead of a tsunami.

Aside from that difference, the predicted accidents are eerily similar in both their timing sequence and their probability of an unmitigated release of radioactivity to the surrounding countryside.

On September 18, 2012 I wrote a letter to NRC Chairman Macfarlane detailing my concerns regarding the vulnerability posed by Jocassee Dam to the Oconee reactors. Three days after sending my letter, I was informed by my branch chief that he was directed to fill out a NRC Form 183 on me for not adequately designating my letter as "Official Use Only - Security-Related Information". Four weeks after sending my letter I was informed by the Chairman's 1

See pp. 5-9 of the "Oconee Nuclear Station Integrated Inspection Report 05000269/2006002, 05000270/200602.

05000287/2006002". This report is in the NRC's Agencywide Documents Access and Management System (ADAMS) under "Accession Number" ML061180451. Most of the documents I refer to in this letter are non-public and the most efficient way to request them from the NRC is to refer to the ADAMS Accession Number.

legal counsel that my letter had been referred to the NRC's Office of the Inspector General.

Other than these two instances, I have not had any other discussions regarding my letter and am unsure if the Chairman or any of the other Commissioners have read my letter or are aware of the details of my concerns.

I have been directed by the NRC not to further distribute my 2012-09-18 letter because it is not properly designated. I have also been directed to no longer send NRC documents to Congressional staffers without going through my chain of command and the NRC's Office of Congressional Affairs. However, I did copy you on that 2012-09-18 letter, and Valerie Manak and Nathan McCray of the E&PW staff should have electronic copies of it.

Since becoming involved in the Jocassee/Oconee issue in 2007, the NRC's Office of Nuclear Reactor Regulation (NRR) has designated all internal and external correspondence regarding this issue as "Official Use Only - Security-Related Information". This designation not only prohibits the American public from knowing about the grave risks which Jocassee Dam poses to the reactors at Oconee, but, as I will explain below, this designation has also inhibited internal discussion of these concerns within the NRC.

In a September 26, 2008 letter to the US Nuclear Regulatory Commission (ML082750106), Duke Energy provided a harrowing timeline of what would occur at the Oconee Nuclear Station (ONSI were Jocassee Dam to catastrophically fail. Despite the fact that this time line appears in a Wikipedia article on Oconee Nuclear Station, since the NRC considers the Duke Energy letter to be "Official Use Only - Security-Related Information" I cannot quote the letter here. But the scenario provided in the 2008-09-26 Duke Energy letter is essentially the scenario that occurred at Fukushima Oai-ichi except, instead of a tsunami being the source of water overtopping the known inadequately sized flood wall, the source of water at ONS is a flood resulting from the failure of Jocassee Dam.

Prior to the 2011-03-11 tsunami, it was believed that the annual probability of a 45 foot tall tsunami reaching Fukushima Dai-ichi was on the order of once in every 100,000 years. It is now widely held that the annual probability is more likely around once in every 1,000 years.

In the 1980's it was believed the annual probability of Jocassee Dam failing was on the order of one chance in 100,000. 2 However, by 2007 the US NRC believed the actual number was more on the order of one chance in 10,000. 3 When the five Commissioners testified before your committee on March 15, 2012, members of the staff at the US NRC believed that the three reactors at the Oconee Nuclear Station faced a risk eerily similar to what occurred at Fukushima Dai-ichi. Vet none of the Commissioners mentioned that fact when Senator Barrasso brought up the Union of Concerned Scientists' 1 1.3E-5/year was the failure frequency Duke Energy used in some of its risk assessments.

3 2.9E-4/year is the failure rate the NRC has calculated for large rock-filled dams similar to Jocassee.

1

report on the vulnerability of US plants to Fukushima type disasters. Were the Commissioners withholding information from your committee? I don't believe so. I think what actually has happened is that crucial information has been withheld from them. They cannot testify before Congress about vulnerabilities of which they themselves have not been made fully aware.

To me, the most important tool the public has for ensuring good regulation and safety is accurate information. 1n a democratic republic such as ours, openness and transparency are essential in providing our citizens and t heir elected officials with the accurate information they need to make informed decisions.

To my knowledge, concerns that the flood wall at the Oconee Nuclear Station was too small first surfaced internally at Duke Energy in late 1993 and first made it to the NRC's attention in February 1994. The NRC dismissed the concerns in September 1994 as "not credible" because of an inappropriately low assumption regarding the failure rate of Jocassee Dam.

The issue regarding the inadequately sized flood wall resurfaced in March 2006. While attempting to defend a violation he had written against Duke Energy for inadequately controlling a two year breach in the flood wall (Ml061180451), one of the NRC Resident Inspectors at Oconee Nuclear Station began researching the regulatory requirements for the flood wall.

In 2007 NRR's Division of Risk Assessment (NRR/DRA) determined that the annual failure probability of dams similar in construction to Jocassee is around 2.SE-4/year, which equates to 4

a chance of once in every 4000 years (ML100780084). These might seem like good odds, but, given that a catastrophic failure of Jocassee Dam will lead to a Fukushima scenario in South Carolina, these odds make the risk of a significant accident and radiat ion release at Oconee Station about 100 times greater t han the risks associated with a typical US commercial nuclear reactor.

In 2008 the NRC sent Duke Energy a 10CFRS0.54(f} request (M L081640244) to obtain the necessary information to adequately determine if the risks posed to Oconee Nuclear Station by Jocassee Dam were acceptable. A l 0CfRS0.54(() request is a rare occurrence and it undoubtedly got the attention of the Commissioners. However, because by this time the NRC was stamping all documents concerning Jocassee Dam as "Official Use Only - Security-Related Information" (OUO-SRI), it did not get the attention of the public.

My primary reason for bringing t he Jocassee/Oconee issue to your attention is because, to me, it is an example of how lack of discipline regarding transparency has allowed a significant issue to go uncorrected for over six years and counting, with the current deadline for resolution still four years away. I believe that NRR's stamping of all documents concerning Jocassee Dam as 4

Mll00780084 is dated 2010-03-15. This is the formalized version of research and calculations performed in 2007 by Ferrante and Mitman of NRR/DRA.

3

"OUO-SRI" has not only prevented the public scrutiny necessary for our democratic and republican institutions to properly function, but has also inhibited the internal flow of information within the NRC and thereby has been detrimental to both public safety and security.

Duke Energy's response to the NRC's 10CFRS0.54(f) request was, like the original request, withheld from the public under the guise of security. This response is the document which contains the Fukushima-style timeline regarding what would occur to the three reactors at Oconee were Jocassee Dam to catastrophically fail. 5 It is unclear to me whether or not any of the Commissioners reviewed this document. It is ludicrous to expect the Commissioners to review every piece of correspondence received by the NRC - they have a staff of over 4,000 federal employees to assist with that. But I would assume that all important issues make it to their attention during their periodic briefings. However, based on the documents I have reviewed, I question the exact level of detail which they have received regarding the Jocassee/Oconee issue during their briefings from NRR.

On February 3, 2009 Commissioner Peter Lyons traveled to South Carolina to tour Jocassee Dam and Oconee Nuclear Station. In the briefing book prepared from him by NRR (ML090280474) there is a 25-line summary detailing the flooding issues. The 2008-08-15 10CFRS0.54{f) request is mentioned in this summary. However, what did not make it into this summary is NRR/DRA's estimate that the failure rate of Jocassee Dam is about 2.SE-4/year and that in their 2008-09-26 response to the 20CFR50.54(f) request Duke Energy admitted that a catastrophic failure of Jocassee Dam would li'kely lead to the meltdown of all three reactor cores at the Oconee Nuclear Station and possibly the failure of the containment structures.

On February 20, 2009 two engineers from NRR's Division of Risk Assessment, Fernando Ferrante and Jeffrey Mitman, began routing an Information Notice (IN 2012-02) concerning the risks posed to some nuclear reactor sites due to dam failures. The purpose of this information notice (ML090510269} was:

... to alert addressees of a potentially nonconservative screening value for dam failure frequency that originated in 198D's reference documents which may hove been referenced by licensees in their probabilistic risk assessment (PRA) for external events.

Using a nonconservative screening value for dam failure frequency to evaluate the need for on additional detailed analysis may result in underestimating the risks to the plant associated with external flooding or loss of heat sink from the failure of upstream and 5 t cannot quote from Duke Energy's 2008-09-26 letter without the NRC daiming that this letter to you is now "Official Use Only - Security*Related Information" which must only be provided through their Office of Congressional Affairs (NRC/DCA). I respectfully suggest that your staff request ML082750106 and ML112430114 from NRC/OCA. The Fukushima-style timeline appears on p. 10 of attachment 2 of MLOB2750106 and on pp. 8*9 of ML112430114. It is also quoted on the fourth page of my 2012-09*18 letter to NRC Chairman Macfarlane.

4

downstream dams or levees. The NRC expects that recipients will review the information for applicability to their facilities and consider actions, as appropriate, to avoid similar problems.

Please note that this Information Notice was being routed more than two years prior to Fukushima occurring. That is, two years prior to the 2011-03-11 flooding-induced triple reactor accident at Fukushima, the NRC was aware that certain US plants might face a similar scenario were dams upstream of them to fail. However, this information notice was not released until more than three years later (March 5, 2012 which was nearly a year after Fukushima). The reason this information notice took more than three years to route was because of the controversial nature of NRR's indecisiveness regarding how to address the flooding vulnerabilities at Oconee and also because of the debate over whether dam break effects on nuclear reactors is a security concern which needs to be w ithheld from the American public.

In the past year, I have encountered many people, both within the NRC and external, who are adamant that the vulnerability which a failure of Jocassee Dam poses to the reactors at Oconee is a security liability which must be kept from the public. Although I am sympathetic to the desire not to broadcast our security liabilities, I have no tolerance for using concerns over security as a pretext for withholding important safety vulnerabilities from the public. When the Jocassee/Oconee issue first came to light in an April 28, 2006 publicly available inspection report, the issue was not being withheld. At some point in 2007 the NRC, either at the request of Duke Energy or on their own accord, decided to begin withholding from the public all correspondence regarding the safety liability posed by a failure of Jocassee Dam.

Is Jocassee Dam a credible target for terrorists and/or saboteurs? I don't know. But it does make sense to me that, in 2007, the NRC might reasonably want to withhold information regarding Jocassee/Oconee while they determined whether or not a security vulnerability existed and whether or not security measures were required to be put into place to protect it.

What does not make sense to me, however, is that in 2012 we are still withholding from the public information on a vital safety concern under the guise of "Security-Related Information".

After five years, have we not addressed the security concerns?

It is unreasonable to me that a government agency is allowed to withhold a significant public safety concern from the public under the guise of security, yet then not, after 5 years, do any meaningful study of the issue to determine if, in fact, a security vulnerability does exist and what must be done to remove it. Is there a security concern or isn't there? If there is, why, after five years, has it not been addressed? If there is not, then why, after five years, are we still withholding vital information from the public under the guise of security?

In April 2009, NRR was in the process of responding to Duke Energy regarding resolution of the Jocassee/Oconee issue. As part of the routing of that response, NRR's Division of Risk Assessment was asked for their concurrence. The Deputy Director of NRR/DRA, Melanie Galloway, refused to initial her concurrence block and instead submitted a Non-Concurrence 5

form {ML09117010) on April 6, 2009. Like all documents regarding Jocassee/Oconee, Ms.

Galloway's Non Concurrence form is stamped "QUO-SRI" and I cannot quote from it. But a deputy division director submitting a Non-Concurrence is rare; this is a process that is mainly used by lower level staff, and even for them it is rare. Had Ms. Galloway's Non-Concurrence form -which in no way concerns security vulnerabilities - been publicly available, it would have likely gained the attention necessary to get the Jocassee/Oconee issue resolved in a timely manner.

Had intervener groups such as the Union of Concerned Scientists been given access to Melanie Galloway's Non-Concurrence form via publicly available ADAMS, then they would have likely been able to counter the pressure which Duke Energy was placing on NRR. With dozens of their own engineers, lawyers and hired contractors, Duke Energy was able to convince NRR that, in order for improvements to Oconee's flooding defenses to be required, the NRC needed to probabilistically show that Jocassee Dam placed an inordinate risk upon the three reactors at Oconee. Pressure from the Union of Concerned Scientists and other intervener groups, however, would have likely convinced NRR that, per Duke Energy's operating license for the Oconee reactors, in order for Duke Energy to be allowed to continue to operate the three reactors at Oconee they needed to deterministically show that these reactors were adequately protected from a catastrophic failure of Jocassee Dam.

On April 9, 2009 Chairman Jaczko was briefed by NRR on the Jocassee/Oconee issue. I don't exactly know what was said at this briefing. The briefing slides {ML091030172) mentioned that new calculations concerning the failure frequency of Jocassee Dam suggested that core damage frequency (i.e. the annual probability that a meltdown will occur) for the reactors at Oconee might be non-conservative by an order of magnitude. What is not mentioned in the slides is Duke Energy's Fukushima-style scenario jcontained in their 2008-09-26 letter) of what would occur at Oconee Nuclear Station were Jocassee Dam to catastrophically fail.

On January 6, 2010 the leadership of NRR met to discuss the Jocassee/Oconee issue (Ml100280954). The purpose of the meeting was whether NRR should issue an order to Oconee requiring them to, in a timely manner, mitigate the risks posed by a failure of Jocassee Dam, or whether NRR should merely issue another 10CFRS0.54{f) request for information and potentially follow up with an order later. The "Cons" listed for the "10CFR50.54(f) option" were that it was not as enforceable as an order and that it had a slower response time for resolution of the external flooding issue. The "Cons" listed for the "order option" were that there was the potential for a public hearing and that an order required signature authority. In other words, to go the route of an order, the Commission and the public would need to be made aware of the risks which Jocassee Dam posed to Oconee. Despite the slower response time, NRR opted to go the route of the 10CFRS0.54(f) letter and avoid the Commission and public scrutiny an order would entail.

In February 2010 - using information provided by Ferrante and Mitman of NRR/DRA- George Wilson submitted an informal memorandum to the NRC's Office of Nuclear Regulatory 6

Research (RES) requesting that a Generic Issue be assigned to investigate whether external flooding concerns, similar to those posed by Jocassee Dam to the three reactors at Oconee, existed elsewhere in our nation's fleet of 104 commercial reactor plants. George Wilson was the Dam Safety Officer in NRR's Division of Engineering (NRR/DE). At the time, we (i.e.

RES/DRA/OEGIB) deemed Mr. Wilson's February 2010 memo to be too speculative and inflammatory to make it an official agency record; however, I have a copy of it if your committee staff requires it. This memo is an example of just how serious mid-level staffers in the various divisions of NRR viewed the Jocassee/ Oconee issue. Keep in mind, this is over a year prior to the Fukushima accidents, yet the staff within NRR were presciently predicting the nuclear catastrophe that could occur were an inadequately sized flood wall to be overtopped allowing the flooding of the standby shutdown equipment necessary to remove decay heat from the reactor cores and containment buildings. Unfortunately it does not appear the managers at NRR were providing the Commissioners all the details of the NRR staff's concerns.

On June 22, 2010 NRR issued a Confirmatory Action Letter to Duke Energy (MLl0l 730329) requiring them to (1) by August 2, 2010 provide an estimate of the volume of water impounded by the Lake Jocassee Dam to be used for flood height analyses at Oconee Nuclear Station, (2) by November 30, 2010 provide a list of modifications to be made at Oconee to adequately protect the plant from flooding due to a fa ilure of the Lake Jocassee Dam, and 13) by November 30, 2011 have the provided modifications in place.

On July 19, 2010, NRR sent a formal memo to RES requesting a Generic Issue on flooding of nuclear power plant sites following upstream dam failures (Mll01900305). In August 2010, the Operating Experience and Generic Branch (RES/DRA/OEGIB) of the Division of Risk Assessment in the NRC's Office of Nuclear Regulatory Research began working on a screening analysis report for what would become Gl-204 (Generic Issue 204). In my opinion, the 2010-07-19 memo and the attendant screening report are evidence of the NRC staff identifying a significant vulnerability and striving to get it addressed. Please note that this issue was being forwarded without the hindsight of the Fukushima accident and entirely due to the analysis of the NRR staff and their determination to pro-actively address an issue significant to the safety of about a fifth of our nation's nuclear reactor plants.

On August 2, 2010, Duke Energy provided the NRC with an estimated volume of water to be assumed impounded by the Lake Jocassee Dam. Their estimate was a "sunny day" estimate.

For reasons not understood by myself and other staff engineers at the NRC, Duke Energy believes that a failure of Jocassee Dam during an inordinately heavy rainfall (such as the one experienced in Senator Sanders' state in 2011 as the remnants of Hurricane Irene blew over parts of Vermont and New York) is not a credible scenario. In January 2011, Jeff Mitman of NRR/DRA challenged this assumption through the Non-concurrence process (ML110260443).

On November 29, 2010, Duke Energy informed the NRC that it was giving itself an additional 6 months to provide the list of modifications needed to protect the three reactors at Oconee from a failure of the Lake Jocassee Dam (ML103490330). Despite this issue being over four 7

years old in its current incarnation (and over 161/2 years old from its 1994 incarnation), NRR did not object to Duke's 6 month extension.

By March 10, 2011 (the eve of the earthquake and tsunami in Japan), RES/DRA/OEGIB had drafted its screening analysis report for Gl-204 and submitted it for routing. As you are well aware, on March 11, 2011 flooding induced from a tsunami disabled the emergency equipment at the Fukushima Oai-ichi reactors leading to the meltdowns of three reactor cores and the destruction of the buildings housing their containments. In the NRC's Office of Nuclear Regulatory Research, we assume that the accident in Japan would add a sense of urgency to the approval of Gl-204 and the addressing of the flooding concerns at Oconee. Instead, it inordinately delayed both. I am in no position to completely understand what occurred, but from my second-hand vantage point it appears that the management at NRR viewed the true vulnerability exposed by Fukushima not to be the flooding issue at Oconee but rather their multi-year mismanagement of getting it addressed.

On April 29, 2011 Duke Energy provided the NRC the list of modifications it intended to do at Oconee to protect against a failure of Jocassee Dam (ML111460063). In this letter, Duke Energy extended the NRC's due date for implementation of the modifications from Nov. 30, 2011 to a nebulous commitment of 30 months after the approval of the modification plans by the NRC and FERC (the Federal Energy Regulatory Commission).

So, as of April 29, 2011 - seven weeks after the Fukushima accidents - the NRC's deadline for adequately protecting the Oconee reactors from a failure of Jocassee Dam had slid from November 30, 2011 to some indefinite time in roughly mid-2014.

As noted many times to your committee, the NRC has issued orders to all 104 reactor plants to make modifications based on the lessons learned from the Fukushima accident. What has likely not been noted to your committee is that the NRC has allowed Duke Energy to slide their mid-2014 due date for protecting Oconee from a Jocassee Dam failure to 2016 in order to conform with the Fukushima deadlines given to the other US reactor plants. But the three reactors at Oconee are different from the rest of the US fleet. Unlike the other 101 reactors, the three reactors at Oconee had a known external flooding concern that, over nine months prior to the Fukushima accident event occurring, had a November 30, 2011 deadline set (i.e. the 2011-11-30 deadline was established in a 2010-06-22 letter which was delivered to Duke Energy nearly 9 months prior to the 2011-03-11 tsunami occurring). The 2016 deadline is reasonable for the other 101 reactors because this was a new issue for them. But for the three reactors at Oconee, by the time the post-Fukushima orders came out they were already 5 years into the external flooding issue and had a deadline for modifications already set. Does it make sense that their already generous deadline be extended to match everyone else's?

The history I have provided you is little known within the NRC. Because of supposed security concerns, the Jocassee/Oconee issues are not discussed at All Hands Meetings. The issues are not discussed in sessions at the NRC's annual Regulatory Information Conference (RIC). The 8

issues do not appear in articles of Platts, or at American Nuclear Society conferences, or in online nuclear discussion groups, or in Union of Concerned Scientists biogs. Because of the QUO-SRI designation of all correspondence regarding this issue, there is virtually no internal oversight within the NRC to make sure NRR is properly handling this issue. And because of the QUO-SRI designations there was a strong push by NRR to force RES to remove all OUO-SRI material from the screening report for Gl-204.

like briefing packages for the Commissioners, Generic Issue screening reports are typically released to the public as part of the NRC's commitment to transparency. But it must be remembered that these reports are not written for public consumption - they are written for internal use. Briefing packages to the Commissioners are written to concisely inform the Commissioners of important points on key issues. Generic Issue screening reports are written to inform the screening panel members of the issues. Being that the Commissioners and the NRC staff are all authorized to view QUO-SRI documents, why would we water down our internal reports by removing all QUO-SRI material and thereby share less information with ourselves? I do not know the answer to that, but I have a suspicion.

When NRR knows a document - such as a Generic Issue screening report or a Commissioner briefing package - is going to eventually be released to the public, they prefer it be released without redactions. Redactions are a "red flag" for intervener groups like Greenpeace and the Union of Concerned Scientists. If the Fukushima-style timeline from Duke Energy's 2008-09-26 letter were to appear in a briefing book for Commissioner Apostolakis' trip to Oconee, then NRR knows that, when that briefing book is eventually released with a paragraph from the "External Flooding" section redacted, David Lochbaum will be asking his connections on Capitol Hill to request the redacted section. To avoid this, NRR essentially "pre-redacts" it by not even including it in the first place. Unfortunately, in doing this they keep the Commissioners from obtaining vital information that the Commission needs to know to make important decisions.

And likewise for the screening panel for Generic Issue 204. Richard Perkins, the lead author of the "Screening Analysis Report for the Proposed Generic Issue on Flooding of Nuclear Power Plant Sites Following Upstream Dam Failures" (ML112430114), was under constant pressure from NRR to remove the 2008-09-26 Duke Energy timeline from his report (he has a foot tall stack of internal NRC email correspondence to document it). Richard Perkins came to the NRC from the Department of Energy where he worked on the annual certification process for assuring the safety and reliability of America's nuclear weapons. He is a graduate of the National War College and was used to working with Top Secret and Special Compartmentalized Information (TS-SCI) on a daily basis. To him, the notion that the screening panel for Gl-204 did not have a "need to know" the accident timeline from Duke Energy's 2008-09-26 letter was absolutely ludicrous. He has rhetorically asked me on many occasions, "Why would we want to redact this information from our internal report?"

On September 14, 2012 Richard Perkins submitted a letter to the NRC's Inspector General alleging that the NRC had "intentionally mischaracterized relevant and noteworthy safety 9

information as sensitive, security information in an effort to conceal the information from the public." I assume the NRC's Office of the Inspector General (OIG) is investigating his complaint but am unaware of their findings. Given the NRC OIG's proclivity for narrowly focusing on procedural processes and not questioning the broader intent of those processes, I am doubtful that the OIG investigation will be conducted with a broad enough questioning attitude to adequately investigate Mr. Perkins' claims.

On September 12 & 13, 2011, Commissioner Apostolakis visited Jocassee Dam. In the NRR prepared briefing book for that visit (ML11244A024), the 25 line description of the External Flood section provided to Commissioner Lyons had shrunk to 9 lines. Although Commissioner Apostolakis' visit was a mere six months after Fukushima, no mention of Duke Energy's Fukushima-style timeline from their 2008-09-26 letter was made in the briefing book. Nor was there any mention of the failure probability of Jocassee Dam being in the same range as the probability of a 45 foot tsunami hitting the Fukushima DaHchi site.

On February 1, 2012 Commissioner Svinicki visited Jocassee Dam. NRR's briefing book for that visit (ML12026A549) contains a whole page on the External Flooding issue, yet does not mention the facts that (1) the issue has gone on for six years, (2) the Duke Energy accident timeline is very similar to Fukushima, (3) the flooding probability is similar to Fukushima, (4)

NRR had assigned Duke Energy a 2011-11-30 deadline nine months prior to Fukushima, (5) seven weeks after Fukushima that 2011*11-30 deadline was extended by Duke Energy to mid-2014, and (6) the deadline for Duke Energy's propose modifications to their flooding defenses was later moved to 2016 to match the Fukushima action plan for all the plants without known flooding hazards. These are things that, were I Commissioner Svinicki, I would like to know before visiting Oconee - and, for that matter, before testifying before your committee on March 15, 2012.

On February 16, 2012 Duke Energy came to NRC headquarters for a "Drop-in Visit" with Bill Borchardt, the NRC's Executive Director for Operations (EDO). NRR's briefing book for that visit (ML12039A217) contains a page on the External Flooding issue which is similar to the one provided to Commissioner Svinicki. I do not know if Mr. Borchardt is aware of the true risk that Jocassee Dam poses to the three reactors at Oconee, but if all he knows is the summary in his briefing book, then there is much which he is unaware of yet needs to know.

On March 15 all five Commissioner testified before your committee at the Hearing on Post-Fukushima U.S. Reactor Safety. None of the Commissioners mentioned the fact that three reactors in Oconee County, South Carolina face a similar risk as was faced by the reactors at Fukushima Dai-ichi on March 11, 2011. I believe they did not mention it to your committee because it has been kept from them themselves.

On July 11, 2012 Duke Energy again visited Mr. Borchardt for a "Drop-in Visit" and on August 7, 2012 they dropped in on the Commissioners. As before, the briefing books supplied for these 10

visits (ML12188A071 & ML12206A325) did not mention the true risks posed by Jocassee Dam or the delays in resolving these risks.

If you believe the issues I have brought forward in this letter are of interest to your committee, then I respectfully suggest your staff seek answers to the following:

1. What is the official NRC determination as to the best estimate of the annual failure frequency of Jocassee Dam? How does this failure frequency compare to the annual frequency of a tsunami similar to the one in Japan on 2011-03-11 which caused the flooding induced nuclear accident at Fukushima Dai-ichi?
2. What is the official NRC position regarding whether or not a catastrophic failure of Jocassee Dam is a credible risk for which Duke Energy must deterministically show that the three reactors at Oconee Nuclear Station are adequately protected?
3. What is the official NRC position regarding whether or not the current flooding defenses at Oconee are adequate and what, if any, improvements need to be made?
4. What is the official NRC position regarding the most likely accident sequence at Oconee Nuclear Station were Jocassee Dam to catastrophically fail? How does this accident sequence compare to the March 2011 accident at Fukushima?
5. Assuming the catastrophic failure of Jocassee Dam, what is the NRC's best estimate of the likelihood that the operators at Oconee Nuclear Station would be able to restore cooling to the reactors prior to the containment buildings failing? What are the differences between the Oconee reactors and the Fukushima reactors that leads the NRC to believe the Oconee operators will be able to successfully restore cooling prior to containment failures? Has the NRC conducted any formal studies to estimate the success rate of Duke Energy's mitigation strategies to prevent containment failures in the event of a catastrophic failure of Jocassee Dam? If so, when were these studies conducted and what were the results?
6. Has the US NRC or any federal agency conducted an assessment to determine if Jocassee Dam is adequately protected from terrorist threats? If so, what were the results of the assessments? Is access to Jocassee Dam adequately guarded from terrorist attack? Are the employees at the Jocassee Hydro-Electric Facility screened for inside saboteurs to the same level at which nuclear workers at the Oconee reactors are screened? Is it necessary to continue to withhold from the public vital safety information concerning the risks which a failure of Jocassee Dam poses to the three reactors at the Oconee Nuclear Station?
7. Do the Commissioners believe that, prior to their March 15, 2012 testimony before the US Senate Committee on the Environment & Public Works, they were adequately informed of the vulnerability which Jocassee Dam poses to the reactors at the Oconee Nuclear Station?
8. When does the US NRC intend to release to the public their correspondence concerning Jocassee Dam and Oconee Nuclear Station? What is the justification for continuing to withhold this information from the American public and from public intervener groups 11

such as the Union of Concerned Scientists? Does the NRC believe it would benefit from a review of its handling of the Jocassee/Oconee issue conducted by intervener groups?

Enclosed with this letter is a list of NRC correspondence, memos and studies regarding the Jocassee/Oconee issue. As can be seen from the enclosed list, this issue has festered in its current incarnation since 2006 and was originally brought forward to the NRC in 1994. Please note that most of the documents on the enclosed list are being withheld from the American public.

Although I am convinced the risks of a nuclear accident at Oconee are at least an order of magnitude greater than at a typical US reactor plant, I am not yet convinced that these risks are unacceptable. And although I do not know enough about nuclear security to judge whether or not all the security issues have been adequately addressed, at this time I do not believe a credible security threat to Jocassee Dam e)(ists. I am not appealing to your committee with safety or security concerns. My concern is transparency, and how the lack of it has not only impeded this issue from getting the public scrutiny which it requires but may also be impeding this issue from getting the appropriate scrutiny from the Commissioners of the US Nuclear Regulatory Commission.

Very respectfully,

  • '\ .1.-(.... ...... . * . * * . ,*

Lawrence S. Criscione, PE Reliability & Risk Engineer Operating E,cperience & Generic Issues Branch Division of Risk Assessment Office of Nuclear Regulatory Research US Nuclear Regulatory Commission 5 73-230-3959 Enclosure Cc: Senator James lnhofe, Ranking Member, Committee on Environment & Public Works Senator Thomas Carper, Chairman, E&PW Subcommittee on Clean Air & Nuclear Safety Senator John Barrasso, Ranking Member, E&PW Subcom. on Clean Air & Nuclear Safety Senator Sheldon Whitehouse, Chairman, E&PW Subcommittee on Oversight Senator Mike Johanns, Ranking Member, E&PW Subcommittee on Oversight Chairman Allison Macfarlane, US Nuclear Regulatory Commission 12

List ofNRC Correspondence, Memos and Studies Regarding Failure of ]ocassee Dam Date ADAMS Title 1994-FEB-11 letter from Albert F. Gibson, NRC, to J. W. Hampton, Duke, "Notice of Violation and Notice of Deviation (NRC Inspection Report Nos. 50-269/93-25, 50-270/93-25, and 50-287/93-25)," dated February 11, 1994 1994-MAR-14 Letter from J. W. Hampton, Duke, dated March 14, 1994 1994-0CT-6 Internal NRC memo documenting a meeting between Region II and NRR concerning a hypothetical Jocassee Dam failure.

1994-DEC-19 letter from Albert F. Gibson, NRC, to J. W. Hampton, Duke, "Notice of Violation and Notice of Deviation (NRC Inspection Report Nos. 50-269/94-31. 50-270/94-31, and 50-287/94-31)," dated December 19, 1994 2000-MAR-15 Letter from David E. LaBarge, NRC, to W.R. Mccollum, Jr., "Oconee Nuclear Station, Units 1, 2, and 3 Re: Review of Individual Plant Examination of External Events (TAC Nos. M83649, M83650, and M83651)," dated March 15, 2000 2006-APR-28  ;'1,'. L06: 180,F, I OCONEE NUCLEAR STATION - INTEGRATED INSPECTION REPORT 05000269/2006002,05000270/200602,05000287/2006002 2006-AUG-31 I._i.080780: .. 3 IR 05000269-06-016, IR 05000270-06-016, IR 05000287*06-016, on 03/31/2006, Oconee Nuclear Station - Preliminary White Finding 2006-0CT-5 Ml062890206 Oconee, Units 1, 2 & 3

  • Response to Preliminary White Finding 2006-NOV-22 ~~[06326028) IR 05000269-06-017, IR 05000270-06-017, IR 050002.87-06-017, Final Significance Determination for a White Finding and Notice of Violation, Duke Energy Carolinas, LLC 2006DEC-20 Ml063620092 Oconee, Units 1, 2, & 3, Appeal of Final Significance Determination for White Finding and Reply to Notice of Violation; EA-06-199 2007-JAN-19 Ml070440345 Summary of Revised Fragility Evaluation Results for Jocassee Dam 2007-FEB-5 Letter from Bruce H. Hamilton, Duke, to NRC, "Seismic Fragility Study" 2007*FEB-22 ML070590329 Manual Chapter 0609.02 Appeal Panel Recommendations {Oconee Reply to a Notice of Violation and White finding !EA-06-1991) 2007-MAR*l ML070610460 Oconee Appeal Panel Review of Manual Chapter 0609.02 Appeal Panel Review of Oconee Standby Shutdown facility White finding (EA-06-199) 2007-MAY*:I Ml072970510 Oconee, Units 1, 2 and 3 - Request for NRC to Review Appeal of Final Significance Determination for SSF Flood Barrier White Finding 2007 JUN-22 Ml071580259 Consideration of New lnformation Associated with a Final Significance Determination for a White finding - Oconee NS 2007-JUN-28 Phone call between the NRC and Duke Energy 2007-0CT*l ML072770765 10/01/2007, Slides with Notes for Final Regulatory Assessment of Oconee Flood Barrier Issue 2007-0Ci-1 ML072770775 Dam Failure Information 2007-0CT-1 Ml072770777 Questions and Answers Related to Oconee Flood Barrier 2007-NOV-20 ML073241045 Reconsideration of Final Significance Determination Associated with Standby Shutdown Oconee Facility Flood Barrier White Finding 2008-MAY-19 ML081350689 Briefing Package For Drop-In Visit By Duke Energy Chief Nuclear Officer With Chairman Klein And Commissioner Jaczko On May 21, 2008 2008-JUN-23 ML082390669 Proposal for a Risk Analysis of the Failure of the Jocassee and Keowce Dams to Assess the Potential Effects on the Safe Shut Down Facility of the Oconee Nuclear Station, South Carolina 2008-JUL-28 ML082120390 Oconee Nuclear Station - Revisions to the Selected Licensee Commitments Manual (SLC)

Enclosure, page 1

List of NRC Correspondence, Memos and Studies Regarding Failure uf Jocassee Dam Date ADAMS Title 2008-AUG-15 ML081640244 Information Request Pursuant to 10 CFR 50.54(F) Related to External Flooding, Including Failure of the Jocassee Dam at Oconee Nuclear Station, Units 1, 2, and 3 (TAC Nos. MD8224, MD8225, and MD8226) 2008-AUG-26 ML082390690 Kick Off for Risk Analysis of the Failure of the Jocassee and Keowee Dams to Assess the Potential Effects on the Safe Shutdown Facilrty at the Oconee Nuclear Station 2008-AUG-28 ML083300427 08/28/2008 - Summary of Closed Meeting to with Duke Energy Carolinas, LLC to Discuss the August 15, 2008, 50.S4(f) Letter on External Flooding (TAC Nos.

MD8224, MD8225, and M08226) 2008-AUG-28 ML082550290 Meeting with Duke Energy Carollnas, Oconee Flood Protection and the Jocassee Dam Hazard 2008-SEP-6 ML082250166 Oconee Nuclear Station - Communication Plan for Information Request Related to Failure Frequencies for the Jocassee Pumped Storage Dam (Jocassee Dam) at the Oconee Nuclear Station and Potential Generic Implications 2008-SEP-26 ML082750106 Oconee, Units 1, 2 and 3 - Response to 10 CFR 50.S4(f) Request 2008-NOV-5 ML091060761 11/05/08 Summary of Closed Meeting with Duke on External Flooding Issues, including failure of the Jocassee Dam, at Oconee Nuclear Station, Units 1, 2, and 3 2008-NOV-5 ML083390650 11/05/2008 Meeting Slides, "Oconee Site Flood Protection," NRC Meeting with Duke Energy Carolinas, LLC 2008-DEC-4 ML091420319 12/04/2008 Meeting Summary, Meeting to Discuss External Flooding at Oconee Nuclear Station (Reissuance, with Error on Page 3 Corrected) 2008-DEC-4 ML090480044 Oconee Nuclear Station, External F!ood NRR Meeting, Rockville, MD, December 4, 2008 2009-FEB-3 ML090280474 Briefing Package for Commissioner Lyons Visit to Oconee on February 4, 2009 2009-APR-6 ML091170104 Oconee Nuclear Station, Units 1, 2 And 3 - Non-concurrence on Evaluation of Duke Energy Carolinas, LlC September 26, 2008, Response to Nuclear Regulatory Commission Letter Dated August 15, 2008 Related to External Flooding 2009-APR-9 ML091030172 Oconee External Flooding Briefing for Commissioner Jaczko 2009-APR-30 ML090570779 Oconee Nuclear Station Units 1, 2, and 3, Evaluation of Duke Energy Carolinas September 26, 2008, Response to External Flooding, Including Failure of the Jocassee Dam 2009-MAY-11 ML092940769 05/11/2009 Summary of Closed Meeting with Duke Energy Carolinas, LLC, to Discuss Preliminary Results of the Recent Inundation and Sensitivity Studies Concerning Failure of the Jocassee Dam and Resultant Flooding at Oconee Nuclear Station, l, 2, and 3 2009-MAY-1 l ML090820470 5/11/2009 Notice of Forthcoming Closed Meeting with Duke Energy Carolinas, LLC, to Discuss Sensitivity Studies Concerning Failure of the Jocassee Dam & Resultant Flooding at the Oconee Nuclear Station, Unit 1, 2, & 3 2009-MAY-ll ML091380424 Oconee Nuclear Station, Slides for Closing Meeting May 11, 2009 with Duke on the Oconee Flooding Issue 2009-MAY-20 ML091470265 Oconee, Units 1, 2 & 3, Request for Extension of Duke Response Time to Referenced Letter 2009-MAY-26 ML091480116 E-mail re Briefing Package for Visit to Jocassee Dam on June 23, 2009 2009-JUN-l ML091590046 Oconee, Units 1, 2, and 3, Request to Withhold Sensitive Information in Presentation Materials Left with Staff 2009-JUN-10 ML091680195 Oconee, Units 1, 2, and 3 - Interim 30-Dav Response to Reference 2.

Enclosure, page 2

List of NRC Correspondence, Memos and Studies Regarding Failure of Jocassee Dam Date ADAMS Title 2009-JUN-l l ML091620669 6/11/09 Summary of Closed Meeting with Duke Carolina to Discuss External Flooding at Oconee 2009-JUN-25 ML091760072 NRC Site Visit to the Oconee Nuclear Station on June 15, 2009 2009-JUL-9 ML092020480 Oconee, Units 1, 2, & 3, Final 60-Day Response to Reference 2 2009-JUL-28 Ml092230608 Oconee, Submittal of Selected licensee Commitments Manual SLC Revision 2009-AUG* 12 M L09057011 7 Oconee Flood Protection and the Jocassee Dam Hazard Basis for NRC Allowing Continued Operation 2009-AUG-27 Ml092380305 Oconee, Slides for Closed Meeting Regarding External Flood Technical Meeting On August 27, 2009 2009-SEP-25 ML092710344 Site Visit Observation on 09/25/2009 by Joel Munday for Oconee 2009-0CT-28 ML093080034 10/28/09 Slides for Oconee Nuclear Station, Units 1, 2, and 3 - Meeting Slides -

EKternal Flood NRC Technical Meeting 2009-NOV-30 Ml093380701 Oconee Nuclear Station, Units 1, 2, and 3, Oconee External Flood Analyses and Associated Corrective Action Plan 2009-DEC-4 Ml090b80737 12/04/09 Summary of Closed Meeting to Discuss the Ouke Energy Carolinas, LLC.,

09/26/08 Response to NRC's August 15, 2008 50.54(f) Letter on External Flooding at Oconee 2010-JAN-6 Mll00280954 01/06/2010 Briefing to the Executive Team on the Oconee Nuclear Station EKternal Flooding Issue 2010-JAN-11 ML100150066 Request Additional Information Regarding the Oconee External rlooding Issue 201D*JAN-15 ML100210199 Oconee, Units 1, 2 and 3 - Additional Information Regarding Postulated External Flood Threat Issues 2010-JAN-29 ML100271591 Evaluation of Duke Energv Carolina, LLC (Duke), November 30, 2009, Response to Nuclear Regulatory Commission (NRCJ Letter Dated April 30, 2009, Related to External Flooding At Oconee Nuclear Station, Units 1, 2, And 3 (Oconee) 2010-FEB-8 ML100470053 Oconee, Units 1, 2, & 3, External Flood, Response to Request for Additional Information 2010*FEB26 Ml100610674 Oconee, Units 1. 2, & 3, fxternal Flood Revised Commitment Letter 2010-MAR-5 Ml103430047 Oconee Nuclear Station, Units 1, 2, & 3, Letter From Duke Energy Carolinas, LLC Regarding External rlood, Response to Request For Additional Information 2010-MAR-15 Ml 100780084 Generic failure Rate Evaluation for Jocassee Dam Risk Analysis 2010-MAR-18 Ml 100810388 Prepare Briefing Book and Material for Eric Leeds for the Duke rlect Meeting on March 18, 2010 2010-APR-14 ML100760109 Generic Failure Rate Evaluation for Jocassee Dam 2010-MAY-27 Ml101600468 Oconee, Units l, 2 & 3, Response to Requested Information on the Protection Against External rlooding Including a Postulated Failure of the Jocassee Dam 2010-JUN-1 ML101750619 OUO - Communication Plan For Issuance of Confirmatory Action Letter To Duke for Oconee - External Flooding June 2010 2010-JUN-3 ML101&10083 Oconee Nuclear Station, Units 1, 2, and 3, - External Flood Commitments 2010-JUN-22 ML101730329 Oconee, Units 1, 2 & 3, Confirmatory Action Letter (CAL 2-10-003), Commitments to Address External Flooding Concerns 2010-JUN-29 ML101890803 06/29/2010 Summary of Closed Meeting With Duke Energy Carolinas, LLC, to Discuss EKternal Flooding at Oconee 2010-JUL-7 ML101880768 DUO - IR 05000269-10-002, 05000270-10-006, 05000287-10-006; 01/01/2010-03/31/2010; Oconee Nuclear Station Units 1, 2 and 3; Interim Compensatory Measures for External Flood 2010-JUL-19 ML101900305 Identification of a Generic External Flooding Issue Due to Potential Dam Failures Enclosure, page 3

List of NRC Correspondence, Memos and Studies Regarding Failure of Jocassee Dam Date ADAMS Title 2010-AUG-2 ML102170006 Oconee Units 1, 2, & 3, Response to Confirmatory Action Letter (CAL) 2-10-003 2010-OCT-20 ML102910480 NRC Assessment of Oconee External Flooding Issue (October 18, 2010) 2010-OCT-26 ML102990064 NRC Staff Assessment of Duke Energy Carolinas, LLC, Oconee External Flooding Issue (TAC NOS. ME4441, ME4442, and ME4443}

2010-NOV-29 ML103490330 Oconee Nuclear Site, Units 1, 2, and 3, Oconee Response to Confirmatory Action Letter (CAL} 2-10-003 2011-JAN-5 ML110180609 Enclosure 1, Oconee Nuclear Station, Major Project Plans 2011-JAN-10 MLI10260443 Non-concurrence on Oconee Assessment Letter 2011-JAN-28 Mll10280153 Staff Assessment of Duke's Response to Confirmatory Action Letter Regarding Duke's Commitments To Address EMternal Flooding Concerns At The Oconee Nuclear Station, Units 1, 2, And 3 {ONS) {TAC NOS. ME3065, ME3066, and ME3067) 2011-MAR-5 ML103410042 Supplement to Technical Basis for Allowing Oconee Nuclear Station to Remain in Operation Through November 2011, Associated with the External Flooding Issues 2011-MAR-15 Mlll0740482 Analysis Report for the Proposed Generic Issue on Flooding of Nuclear Power Plant Sites Following Upstream Dam Failures 2011-APR-29 Mlll 1460063 Oconee Nuclear Site, Units 1, 2, and 3, Response to Confirmatory Action Letter (CAL) 2-10-003 2011-AUG-16 Ml11229A710 E-mail re Briefing Package for Visit to Oconee Nuclear Power Plant on September 12-13, 2011 2011-AUG-18 Mll 1174Al38 Oconee Nuclear Station, Units 1, 2. and 3, Assessment of Duke Energy Carolinas, LLC April 29, 2011, Response to Confirmatory Action Letter Regarding Modifications to Address hternal Flooding Concerns (TAC Nos. ME6133, ME6134, and ME6135) 2011-AUG-31 Mll 12430114 Screening Analysis Report for the Proposed Generic Issue on Flooding of Nuclear Power Plant Sites Following Upstream Dam Failures 2011-SEP-1 ML11244A024 Briefing Package for Visit to Oconee Nuclear Power Plant on September 12-13, 2011 2011-OCT-3 ML11278Al 73 Oconee Nuclear Station (ONSl, Units 1, 2, and 3, Response to Requests for Additional Information Regarding Necessary Modifications to Enhance the Capability of the ONS Site to Withstand the Postulated Failure of the Jocassee Dam 2011-OCT-17 Ml11294A341 Oconee Nuclear Station (ONSl. Units 1, 2, and 3, Response to Requests for Additional Information Regarding Necessary Modifications to Enhance the Capability of the ONS Site to Withstand the Postulated Failure of the Jocassee Dam 2011-DEC-16 Mlll3500495 Screening Analysis Report for the Proposed Generic Issue on Flooding of Nuclear Power Plant Sites Following Upstream Dam Failures_redacted 2012-JAN-26 ML12026A549 Briefing Package for Commissioner Sviniclc.i Visit to Oconee on February 1. 2012 2012-JAN-31 ML12026A254 Communication Plan for Oconee Nuclear Station (ONS) Following Issuance of Gl-204 2012-FEB-3 ML12039A239 Oconee, Units 1, 2 and 3 - Request for Withholding from Public Disclosure Duke Energy letter Dated May 20, 2009 Involving Postulated Failure of the Jocassee Dam 2012 -FEB-9 Mll2039A217 Briefing Package Request for Meeting with Duke Energy on February 16, 2012 Enclosure, page 4

List of NRC Correspondence, Memos and Studies Regarding Failure of Jocassee Dam Date ADAMS Title 2012-FEB-17 ML12053A016 Duke Energy Carolinas, LLC - Recommended Revisions to the Oconee Nuclear Station Section of NRC's Screenlng Analysis Report for the Proposed Generic Issue on Flooding of Nuclear Plant Sites Following Upstream Dam Failure 2012-FEB-23 ML12058A236 02/23/12 Summary of a Teleconference between the US NRC and Duke Energy Regarding Comments made by Duke Energy Concerning the Issuance of the Screening Analysis Report for Generic Issue 204 2012-MAR-5 ML090510269 NRC Information Notice 2012-002 Potentially Nonconservative Screening Value For Dam Failure Frequency In Probabilistic Risk Assessments 2012-MAY-15 ML12129Al86 Oconee Nuclear Station. Units 1, 2, and 3

  • Request for Additional Information Regarding Modifications to Address the External Flooding Concerns (TAC NOS.

ME7970, ME7971, AND ME7972) 2012-JUN-14 ML12167A372 Oconee, Units 1, 2, and 3, Response to Requests for Additional Information Regarding Modifications to Address External Flooding Concerns 2012-JUL-11 Ml12215A327 07/11/2012 licensee Non-Public Meeting Slides on Oconee External Flood Mitigation 2012-JUL-11 ML12188A07l Briefing Package for Meeting with Duke Energy on July 11, 2012 2012*AUG-7 ML12206A325 Briefing Book for Meeting with Duke Energy on August 7, 2012 2012-SEP-20 ML12268A404 Communication Plan for Flooding September 2012 2012-SEP-20 ML12219Al63 Oconee Nuclear Station, Units 1, 2 and 3 - Response to Questions Regarding Modifications to Address External Flooding Hazards (TAC Nos. ME7970, ME7971, AND ME7972)

Enclosure, page 5

Criscione, Lawrence From: Herr, Linda Sent: Tuesday. Janua,y 08, 2013 2:35 PM To: Criscione, Lawrence

Subject:

RE: Meeting re: Flooding a t Oconee from Jocassee Dam w/Cmr. Ostendorff Perfect, thank you for your patience!


Original Message---

From: Criscione. Lawrence Sent Tuesday, January 08, 20131 :14 PM To: Herr, Linda

Subject:

RE: Meeting re: Flooding at Oconee from Jocassee Dam wJCmr. Ostendcrff Thanks. The 13th is a good day. I will put it on my calendar.


Original Message----*

From: Herr, Linda Sent: Tuesday, January 08, 2013 9:01 AM To: Criscione. Lawrence

Subject:

RE : Meeting re: Flooding at Oconee from Jocassee Dam w/Cmr. Ostendorff Importance: High Hi Larry:

I have scheduled Feb 13. 2013 from 9:30-10:00am - although I was able to look at your calendar, the entire month of February is marked "tentative." so if the 13th doesn't work for you we'll try again:)

Thank you!!

Linda


Original Message-----

From: Criscione, Lawrence Sent: Friday, January 04, 2013 11 :54 AM To: Herr, Linda

Subject:

RE : Meeting re: Flooding at Oconee from Jocassee Dam w/Cmr. Ostendorff I'll be in Illinois on January 22 and 23rd. I am next back in Rockville on January 30th. I've sent you a sharing invitation for my Outlook Calendar. It is up to date through the end of February.

Thanks, Larry

Original Message-*-**

From: Herr, Linda Sent: Thursday, January 03, 2013 1:35 PM To: Criscione, Lawrence

Subject:

RE: Meeting re: Flooding at Oconee from Jocassee Dam w/Cmr. Ostendorff Importance: High Hi Larry:

I know we've played with your meeting a couple of times already and I apologize - Cmr. Ostendorff will now be on travel the week of 1/14 thru 1/18 so may I ask your indulgence and move you one more time? Are you available on Jan 22 at 9:30am; 1:30pm or 3:00pm or on Jan 23 at 9:30am or 1:30pm? If not, please suggest days/times you are available so we can reschedule Jan 17th.

Thank you - again, I apologize.

Regards, Linda


Original Message-----

From: Criscione, Lawrence Sent Monday, December 31, 2012 9:30 AM To: Herr, Linda Subject RE: Meeting re: Flooding at Oconee from Jocassee Dam w/Cmr. Ostendorff

Linda, The later time works for me. Should I plan on meeting with the Commissioner from 1:30 to 2:00pm?

Larry


Original Message-----

From: Herr, Linda Sent: Friday, December 21, 2012 11:03 AM To: Criscione, Lawrence

Subject:

RE: Meeting re: Flooding at Oconee from Jocassee Dam w/Cmr. Ostendorff Morning Lawrence:

Could I request that we moved your meeting to 1:30-2:00pm on the 17th? If that doesn't work for you, we'll leave it at the time it currently is scheduled 1:00-1:30pm.

Thank you for your consideration.

Happy Holidays!!

Linda


Original Message-----

From: Criscione, Lawrence Sent Wednesday, December 19, 2012 1:20 PM To: Herr. Linda

Subject:

RE: Meeting re: Flooding at Oconee from Jocassee Dam w/Cmr. Ostendorff Thank you From: Herr, Linda Sent: Wednesday, December 19, 2012 1:19 PM To: Criscione, Lawrence Cc:Tappert,John

Subject:

RE: Meeting re: Flooding at Oconee from Jocassee Dam w/Cmr. Ostendorff Perfect, have scheduled you from 1:00-1:30pm on Cmr. Ostendorffs calendar in his office OWFN-18 G1.


Original Message----

From: Criscione, Lawrence

Sent: Wednesday, December 19, 2012 1:16 PM To: Herr, Linda Cc: Tappert, John

Subject:

RE: Meeting re: Flooding at Oconee from Jocassee Dam w/Cmr. Ostendorff Yes itwould.

From: Herr, Linda Sent: Wednesday, December 19, 201212:14 PM To: Criscione, Lawrence Cc: Tappert, John

Subject:

Meeting re: Flooding at Oconee from Jocassee Dam w/Cmr. Ostendorff Good Afternoon Lawrence:

Would January 17th from 1:00-1 :30pm work for you?

Thank you, Linda 301-415-1759 From: Tappert, John Sent: Wednesday, December 12, 2012 2:36 PM To: Herr. Linda Subject FW: Your Meeting Today Concerning Flooding at Oconee from Jocassee Dam Linda Please arrange for a meeting in early January. Thanks John R. Tappert, P.E.

Chief of Staff Office of Commissioner William C. Oslendorff U.S. Nuclear Regulatory Commission (301) 415-1811 (office)

!{b)f6) I (mobile)

(301) 415-1757 (fax)

From: Tappert. John Sent: Wednesday, December 12, 2012 10;17 AM To: Criscione. Lawrence Cc: Herr, Linda

Subject:

RE: Your Meeting Today Concerning Flooding at Oconee from Jocassee Dam Larry, Sounds good. l will ask Linda to look for an opportunity in the New Year and we will confirm with you. Thanks John John R. Tappert, P.E.

Chief of Staff Office of Commissioner William C. Ostendorff U.S. Nuclear Regvtatory Commission (301) 415-1811 (office) j(b)/6) I (mobile}

(301)415-1757 (fax)

From: Criscione, Lawrence Sent Tuesday. December 11, 2012 4 :41 PM To:Tappert,John

Subject:

RE: Your Meeting Today Concerning Flooding at Oconee from Jocassee Dam John, Thank you for the invitation. Unfortunately I leave tonight for IUinois and will not be returning until January 8th.

If the Commissioner would be willing to meet with me in January, I would like to meet with him. My Outlook Calendar is up to date through Easter. If you or Linda could put me on the Commissioner's schedule in January, I would appreciate it.

Larry From: Tappert, John Sent: Tuesday, December 11, 2012 3:07 PM To: Criscione, Lawrence Cc: Herr, Linda Subject RE: Your Meeting Today Concerning Flooding at Oconee from Jocassee Dam Larry Thank you for your email. The Commissioner received a briefing yesterday that was based on the first attachment of your email. Consistent with his open door policy, he would be happy to meet with you if you would like. He has some open time on his calendar at the end of next week - Thursday afternoon or Friday -

or Linda Herr, our senior administrative assistant, can arrange for another time. Please let us know. Thanks.

John John R. Tappert, P.E.

Chief of Staff Office of Commissioner W illiam C. Ostendorff U.S. Nuclear Regulatory Commission (301) 415-1811 (office)

!lb)(~ ~ (mobile)

(3 1) 41 5-175(fax)

From: Criscione, Lawrence Sent: Monday, December 10, 2012 6:53 PM To: Ostendorff, William; Magwood, William Cc: Saska, John; Hiland, Patrick: Evans, Michele; Pascarelli, Robert; Wilson, George; Bartley, Jonathan; Cook, Christopher; Miller, Ed; Cheak, Michael; Chen , Yen-Ju; Beasley, Benjamin; Merzke, Daniel; Coffin, Stephanie; Skeen, David; See. Kenneth : Monninger, John; Perkins, Richard; Bensi. Michelle; Philip, Jacob; Sancaktar.

Selim; Galloway, Melanie; Mitman, Jeffrey; Ferrante, Fernando; Bubar, Patrice; Tappert, John

Subject:

Your Meeting Today Concerning Flooding at Oconee from Jocassee Dam Commissioner Ostendorff, It came to my attention today that you and Commissioner Magwood were being briefed by NRR on the flooding vulnerabilities posed to the reactors at Oconee from a catastrophic failure of Jocassee Dam. Attached to this email are the "Commissioner Briefing Notes" prepared by NRR. Also attached are a 2012-11-14 letter from me to the Senate Committee on the Environment & Public Works (E&PW) and an April 6, 2009 Non-Concurrence Form which a Deputy Division Director at NRR/DRA {Melanie Galloway) submitted against NRR's pusiUanimous treatment of the Oconee/Jocassee concerns.

I do not know exactly what you were told during your briefing today, but if it was limited to the "Commissioner Briefing Notes then you did not receive all the pertinent facts.

A major concern of mine, which I addressed in my attached letter to the E&PW, is that, in all the internal documents I have uncovered regarding NRR briefings of the Commissioners on the Jocassee/Oconee flooding issue, the actual risk numbers calculated by NRR/DRA are never mentioned and neither is the 2008-09-26 Duke Energy timeline concerning the predicted failure sequence which would occur at Oconee following a catastrophic failure of the Lake Jocassee Dam (for the context of the quote below. seep. 10 of Attachment 2 of ML082750106):

The following flood timeline is based on the results of the 1992 Inundation Study. In this scenario the dam is assumed to fail at time zero. Notification from Jocassee would occur before a total failure of the dam; however, for purposes of this timeline, notification is assumed to be at the same time the dam fails. Following notification from Jocassee. the reactor(s) are shutdown within approximately 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. The predicted flood would reach ONS in approximately 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />, at which time the SSF walls are overlapped. The SSF is assumed to fail, with no time delay, following the flood level exceeding the height of the SSF wall. The failure scenario results are predicted such that core damage occurs in about 8 to 9 hours1.041667e-4 days <br />0.0025 hours <br />1.488095e-5 weeks <br />3.4245e-6 months <br /> following the dam break and containment failure in about 59 to 68 hours7.87037e-4 days <br />0.0189 hours <br />1.124339e-4 weeks <br />2.5874e-5 months <br />. When containment failure occurs, significant dose to the public would result.

Hopefully you recognize that the above scenario is very similar to what occurred at Fukushima when a tsunami overtopped their inadequately sized flood wall and disabled their standby shutdown equipment. Why the above scenario does not ever appear in Commissioner briefing packages, I do not understand. This seems to me like something you would want to know.

Another thing you should know ls the annual probability of failure calculated by NRR/DRA for Jocassee Dam.

That number is 2.BE-4/year, which is of the same order of magnitude of a 49 foot tsunami striking the Japanese coast at Fukushima. Given this calculated probability of dam failure and the Duke Energy timeline quoted above, it appears that the inadequately sized flood wall at Oconee presents a very similar hazard to the American public as the inadequately sized flood wall at Fukushima presented to the Japanese public. Is this not something of which NRR should be informing the Commissioners?

As noted by Dr. Ferrante in the email trail below, NRR is not a monolithic institution. Specifically, NRR/DRA has a very different position on the Jocassee/Oconee issue as NRR/DORL. See the attached Non-Concurrence from Melanie Galloway as an example.

I do not know who was at your briefing today, but from the invitation attached to this letter it appears that neither were the key personnel from NRR/DRA (Galloway, Mitman, Ferrante) nor were the authors of the Gl-204 Screening Report (Perkins, Bensi, Philip, Sancaktar) invited to attend. It might be helpful to your understanding of the Jocassee/Oconee issue if you were to speak to Ms. Galloway regarding her 2009-04-06 Non-Concurrence, Dr. Ferrante and Mr. Mitman regarding their 2010-03-15 Generic Failure Rate Evaluation for Jocassee Dam, and Richard Perkins regarding his ordeal in routing and releasing the screening analysis for Gl-204 on flooding due to upstream dam failures.

After over 60 years of military service, Admiral Rickover noted:

A major flaw in our system of government, and even in industry, is the latitude to do less than is necessary.

Too often officials are willing to accept and adapt to siluations they know to be wrong. The tendency is to downplay problems instead of actively trying to correct them.

The NRC first identified the undersized flood wall at Oconee Nuclear Station in March 1994. It is my concern that the reason this issue is taking more than two decades to address is that Division Directors at NRR have been willing to accept and adapt to situations they know to be wrong. As noticed by Ms. Galloway in April 2009, the tendency in NRR was to downplay the Jocassee/Oconee problem instead of actively trying to correct it. The public looks to the NRC Commissioners to curtail this "latitude to do less than is necessary" and to ensure the NRC staff transparently addresses concerns in a timely manner.

I appreciate you taking an interest in this issue and requesting a briefing by NRR. I am concerned, however, that your briefing might not have adequately detailed the vulnerabilities faced at Oconee.

Vlr, Larry Lawrence S. Criscione Reliability & Risk Analyst RES/ORA/OE GIB 573-230-3959 If a subordinate always agrees with his superior, he is a useless part of the organization.

From: Ferrante, Fernando Sent: Thursday, November 15, 20121:58 PM To: Criscione, Lawrence Cc: Mitman, Jeffrey

Subject:

RE: Lack of Transparency Impeding Resolution of Flooding Concerns at Oconee In understand, and I think the folks who were involved in it understand as well. I just worry that other folks will look at our affiliations and assume "NRR" means the specific folks listed in the letter.

From: Criscione, Lawrence Sent: Thursday, November 15, 2012 11 :42 AM To: Ferrante, Fernando Cc: Mitman, Jeffrey

Subject:

RE: Lack of Transparency Impeding Resolution of Flooding Concerns at Oconee Thanks Fernando. Jeff sent me the PSA and PSAM papers last month.

When I use "NRR" I mean the dominant position that won out. Hopefully most people understand that in an agency of 4000 people there is no one true NRG position or one true NRR position. Over the past five years it has bothered me to no end that a legitimate FOIA exemption is "pre-decisional information" and that the NRC is able to use it to conceal the internal debate process. 1think the public should be able to FOIA the varying NRG positions on issues and to understand how things are internally debated and decisions arrived at.

From: Ferrante, Fernando Sent: Thursday, November 15, 2012 8:04 AM To: Criscione, Lawrence Cc: Mitman, Jeffrey

Subject:

RE: Lack of Transparency Impeding Resolution of Flooding Concerns at Oconee

Larry, Thanks for the opportunity to review this letter. For the most part, the facts related to activities I am directly aware of are correct. Regarding the Information Notice (IN) that NRR authored on dam failure probabilities, I will give you some more background information that will hopefully help further clarify the discussion.

The IN came as a direct result of the Oconee/Jocassee issue. Jim Vail, a retired NRR/DRA/APOB staff, was in charge of developing it (with support from the NRR staff in charge of releasing generic communications in NRR/DPR/PGCB) under guidance from Melanie Galloway, then NRR/DRA Deputy Director. Sometime in 2009, I took over the responsibility of re-writing and issuing the IN (in the same manner I was tasked with rewriting NRR's original submittal to RES regarding the creation of what would eventually become Gl-204). Since the beginning, there was a lot of resistance and internal struggle regarding this IN. In order to have the IN released I made sure to build consensus between NRR/ORA, NRR/DE. RES/ORA (which had produced an internal dam failure report which supported the information that eventually went into the IN), and others. As more NRC Offices lined up to be included in the IN, the concurrence process started to take longer and this ended up

indeed being an exceedingly long turnover for a generic communication. The Gl-204 process continued in parallel until it became bogged down with some of the issues you described in the letter. At some point a presentation was made in an NRR LT/ET meeting, and the directive for the IN became to coordinate its release with the release of the Gl-204 report. Because of the delays in the Gl-204 report, this added another 6 months to a year of the release of the IN itself. At some point, when it became clear both releases were imminent, I was asked if the IN should be reclassified as "NON-PUBLIC/SECURITY RELATED," which I rejected on the basis that no information was contained in the IN which was covered in both NRR and NRC guidance regarding the withholding of information. Hence, the IN was eventually released publicly.

I should add that, as part of an effort to publicly release and discuss information that was created during the development of the dam failure report by RES/ORA, two papers were submitted, accepted, and presented at PRA conferences (the most recent in Helsinki, 2012) with concurrence from both NRR/DRA and RES/DRA staff (I can send these papers to you if you are interested). Both papers were reviewed internally and, similar to the IN, contained no information that went against guidance regarding withholding of information. Both papers relied in part on data developed by the US Army Corps of Engineers (USACE) which does restrict public release of certain portions of their dam databases, but we followed their guidelines and contacted USACE to make sure no inadvertent release was made. This papers follow the same methodology discussed in the internal NRRIDRA document you referred to in the letter (ML100780084) which, to my knowledge, is the closest we have come to a more official position on the dam failure rate issue (which was, at least in part, the intent I had when the document was created).

I'm sharing the above information to make sure that readers who are totally unfamiliar with the issue (inside or outside of NRG), get a clear picture of how NRR/DRA dealt with some of the issues we were faced during the Oconee/Jocassee issue. In several parts of the letter, certain positions regarding the release of information or level of importance the issue deserved are attributed to "NRRft as a whole (e.g .. ~ ... there was a strong push by NRR to force RES to remove all OUO-SRI material from the screening report for Gl-204.") which I don't think were shared by all staff or Divisions within NRR. 1am concerned this may be misconstrued by readers who are completely unaware of the challenges the Oconee/Jocassee issue presented to the technical staff to mean all staff within NRR shared these positions.

Thank you.

Fernando Ferrante, Ph.D.

Office of Nuclear Reactor Regulation (NRR) Division of Risk Assessment (ORA) PRA Operational Support Branch (APOB) Mail Stop: 0-10C15 Phone: 301-415-8385 Fax: 301-415-3577 From: Criscione, Lawrence Sent: Wednesday, November 14, 2012 10:23 AM To: Zimmerman, Jacob; Vrahoretis, Susan Cc: Beasley, Benjamin; Coe, Doug; Correia, Richard; Galloway, Melanie; Mitman. Jeffrey; Ferrante, Fernando; Wilson, George; Leeds. Eric

Subject:

FW: Lack of Transparency Impeding Resolutton of Flooding Concerns at Oconee Jacob/Susan: Please forward the attached letter to the Commission staff whom you believe should be aware of it.

I have copied on this email some of the NRR staff mentioned in the letter. Please let me know if I am mis-portraying any of your positions. Please feel free to forward this letter to whomever you believe needs to see it.

V/r, Larry Criscione 573-230-3959

f;rom: Criscione, Lawrence Sent: Wednesday, November 14, 2012 9:15 AM To: 'valerie_manak@epw.senate.gov'; 'nathan_ mccray@epw.senate.gov'

Subject:

Lack of Transparency Impeding Resolution of Flooding Concerns at Oconee Please see the attached letter to the Senate Committee on the Environment & Public Works.

NRC FORM 464 Part I U.S. NUCLEAR REGULATORY COMMISSION FOIA/PA RESPONSE NIJIIBER (01-2015)

RESPONSE TO FREEDOM OF 2013-0262 I INFORMATION ACT (FOIA) / PRIVACY ACT (PA) REQUEST RESPONSE INTERIM f71 FINAL TYPE L!..J REQUESTER OATE Lawrence Criscione APR I 3 2015 PART I. - INFORMATION RELEASED Requested records are available through another public distribution program. See Comments section.

No additional agency records subject to the request have been located.

I Agency records subject to the request that are identified in the specified group are already available in public 0 IA GROUP

,__ ___ .., ADAMS or on microfiche in the NRC Public Document Room.

Agency records subject to the request that are contained in the specified group are being made available in public ADAMS.

0 IB GROUP I

......- - - ~ Agency records.subject to the request are enclosed.

referred to that.agency (see comments section) for a disclosure determination and direct response to you.

Records subject to the request that contain information originated by or of interest to another Federal agency have been We are continuing to process your request.

O See Comments.

PART I.A - FEES AMOUNT"

$ I I 0D You will be billed by NRC for the amount listed. IZJ None. Minimum fee threshold not met.

  • See comments for details You will receive a refund for the amount listed. 0 Fees waived.

PART 1.8 - INFORMATION NOT LOCATED OR WITHHELD FROM DISCLOSURE We did not locate any agency records responsive to your request. Note: Congress allowed agencies to treat three discrete categories of law enforcement and national security records as not subject to the FOIA {"exclusions").

See 5 U.S.C. 552(c). This is a standard notification that we give to all requesters; it should not be taken as an indication that any of these excluded records do, or do not, exist.

We have withheld certain information in the records from disclosure pursuant to the FOIA exemptions described, and for the reasons stated, in Part II.

Because this is an interim response to your request, you may not appeal this determination at this time. We will notify you of your right to appeal any of the responses we have issued in response to your request when we issue our final determination on your request.

0 You may appeal this final determination within 30 calendar days of the date of this response, by writing to the FOIA Officer, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001 . Please be sure to mark your letter/envelope or email that it is a "FOIA Appeal."

PART I.C COMMENTS ( Use attached Comments continuation page if required)

We appreciated your patience while your case was being processed.

I.

SIGNATURE. F, ~ OF II FORMATION ACT AND PRIVACY ACT OFFICER

'Roger .53.ndofi'-

NRC FORM 464 Part 1 (01-2015) Page 2 of 3

NRC FORM 464 Part I U.S. NUCLEAR REGULAlORY COMMISSION FotA/PA RESPONSE NUMBER (01-2015)

RESPONSE TO FREEDOM OF 2013-0262 INFORMATION ACT (FOIA) / PRIVACY

RESPONSE

ACT (PA) REQUEST (Continued) TYPE INTERIM [ZjFINAL REQUESTER DATE APR 1 3 2015 Lawrence Criscione PART I.C COMMENTS (Continued)

Part A: The following responsive records can be found electronically:

Records that are Available Publicly in ADAMS:

M L13256A370 ML081640244 ML090570779 ML101610083 MLl 3256A372 ML101730329 ML101900305 MLI03490330 ML111460063 ML13039A084 NRC FORM 464 Part 1 (01-2015) Page 3 of 3

NRC FO.RM 464 Part II U.S. NUCLEAR REGULATORY COMMISSION FOIA/PA (OS-2013) i.**w\

\ I

! RESPONSE TO FREEDOM OF INFORMATION ACT (FOIA) / PRIVACY ACT (PA) REQUEST DATE N"I'( 1 2013-0262 3 LUl:I PART II.A - APPLICABLE EXEMPTIONS G RouP I Exemption Records subject to the request that are contained in the specified group are being withheld in their entirety or in part under the I~----

8 No.(s) of the PA and/or the FOIA as indicated below (5 U.S.C. 552a and/or 5 U.S.C. 552(b)).

Exemption The withheld information relates solely to the internal personnel rules and practices of NRC.

Exemption 1: The withheld information is property classified pursuant to Executive Order 12958.

2:

O Exemption 3: The withheld information is specifically exempted from public disclosure by statute indicated.

Sections 141-145 of the Atomic Energy Act, which prohibits the disclosure of Restricted Data or Formerly Restricted Data (42 U.S.C.

2161-2165).

O Section 147 of the Atomic Energy Act, which prohibits the disclosure of Unclassified Safeguards Information (42 U.S.C. 2167).

41 U.S.C., Section 4702(b), prohibits the disclosure of contractor proposals In the possession and control of an executive agency to any person under section 552 of Title 5, 11.J.S.C. (the FOIA), except when incorporated into the contract between the agency and the submitter of the proposal.

O Exemption 4: The withheld information is a trade secret or commercial or financial informallon that is being withheld for the reason(s) indicated.

The information Is considered to be confidential business (proprietary) information.

The The Information is considered to be proprietary because it concerns a licensee's or applicant's physical protection or material control and accounting program for special nuclear material pursuant to 10 CFR 2.390(d)(1).

Disclosure will harm an identifiable private or governmental interest.

information was submitted by a foreign source and received in confidence pursuant to 10 CFR 2.390(d)(2).

Exemption 5: The withheld information consists of lnteragency or intraagency records that are not available through discovery during litigation.

Applicable privileges:

Deliberative process: Disclosure of predecisional information would tend to inhibit the open and frank exchange of ideas essential to the deliberative process. Where records are withheld In their entirety, the fac)s are inextricably intertwined with the predecisional information.

There also are no reasonably segregable factual portions because the release of the facts would permit an indirect inquiry into the predecisional process of the agency.

Attorney work-product privilege. (Documents prepared by an attorney In contemplatiion of litigation) 0 Attorney-client privilege. (Confidential communications between an attorney and hislher client)

Exemption 6: The withheld information Is exempted from public disclosure because its disclosure would result in a clearly unwarranted 0 Invasion of personal privacy.

Exemption 7: The withheld Information consists of records compiled for law enforcement purposes and is being withheld for the reason(s) indicated.

(A) Disclosure could reasonably be expected to interfere with an enforcement proceeding (e.g., it would reveal the scope, direction, and focus of enforcement efforts, and thus could possibly allow recipients to take action to shield potential wrong doing or a violation of NRC requirements from investigators).

(C) Disclosure could constitute an unwarranted invasion of personal privacy.

(D) The information consists of names of individuals and other information the disclosure of which could reasonably be expected to reveal Identities of confidential sources.

0 (E) Disclosure would reveal techniques and procedures for law enforcement investigations or prosecutions, or guidelines that could reasonably be expected to risk circumvention of the law.

(F) Disclosure could reasonably be expected to endanger the life or physical safety of an individual.

OTHER (Specify)

I PART 11.B ** DENYING OFFICIALS Pursuant to 10 CFR 9.25(9), 9.25(h), and/or 9.65(b) of the U.S. Nuclear Regulatory Commission regulations, it has been determined that the information withheld is exempt from production or disclosure, and that its prodluction or disclosure is contrary to the public interest. The person responsible for the denial are those officials identified below as denying officials and the FOIA/PA Officer for any denials that may *be appealed to the Executive Director for Operations (EDO).

APP£U,,T! o *FICIAL DENYING OFFICIAL TITLE/OFFICE RECORDS DENIED eoo IG Brooke D. Poole Assistant General Counsel for Lg! Counsel Group B 00 Rochelle Bavol Executive Assistant Group B I I l I LJ Appeal must be made in writing within 30 days of receipt of this response. Appeals should be mailed to the FOIA/Privacy Act Officer, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001 , for action by the appropriate appellate off1cial(s). You should clearly state on the envelope and letter that it is a "FOIA/PA Appeal."

NRC FORM 464 Part II (08-2013)

Group_8_

FOIA/PA NO: fJ.tJ/3- ()d_/;,~

RECORDS BEING RELEASED IN PART The following types of inform~tion are being withheld:

Ex. 1:Records properly classified.pursuant to Executive Order 13526 Ex. 2:ORecords regarding personnel rules and/or hwnan capital administration Ex. 3:D Information about the design, manufacture, or utilization of nuclear weapons Information about the protection or security of reactors and nuclear materials Contractor proposals not incorporated into a final contract with the NRC.

Other . .

Ex. 4:OProprietary information provided by a submitter to the NRC ofter - *

  • Ex. 5:uaf)raft documents or other pre~decisional deliberative documents (D.P. Privilege)

D Records prepared by counsel in anticipation of litigation (A.W.P. Privilege)

Privileged communications between counsel and a client (A.C. Privilege)

Qther * *

  • Ex. 6:0"Agency employee PIT, including SSN, contact information, birthdates, etc.

QThird party PIT, including names, phone nwnbers, or other personal information Ex. 7(A):OCopies of ongoing*investigation case files, exhibits, notes, R0I's, etc.'

Records that reference or ~e related to a separate ongoing investigation(s)

Ex. 7(C):OSpecial Agent or other law enforcement PII OPII of third parties referenced in records compiled for law enforcement purposes Ex. 7(D):OWitnesses' and Allegers' PII in law enforcement records . ..*

Confidential Informant or law enforcement information provided by other entity Ex. 7(E): OLaw Enforcement Technique/Procedure used for criminal investigations Technique or procedure used for security or prevention of criminal activity Ex. 7(F): Information that could aid a terrorist or compromise security Other/Comments:._ _ _ _ _ _ _ _ _ __ _ _ __ _ _ _ _ _ __ _ _ _ __

FOIA for Review Fo1A #: zo 1;? -oooB Partial or Final: G00. 2 Approval:

No

Vrahoretis, Susan From: Remsburg, Kristy Se nt: Friday. October 12, 2012 11:40 AM To: Vrahoretis, Susan

Subject:

RE: FOIA-13-0008 - request for letter dated 09/18/12, from Lawrence Criscione to Chrm Macfarlane about Nuclear Plant Vul11erabilities to Flooding tll ')uS,i l1 ,

{b)(5J fh,rnl,5.

1,1,~ly From: Vrahoretis, Susa n Sent: Th1,.1rsday, October 11, 2012 5:42 PM To: Remsburg, Kristy Cc: Vietti-Cook, Annette; Mike, Linda; Bates, Andrew; Lewfs, Antoinette; Zrmmerman1 Jacob; Pace, Patti; Gfbbs, Catina; Cermeno, Andrea; Chairman Temp

Subject:

RE: FOJA-13-0008 - request for letter dated 09/18/12, from Lawrence Criscione to Chrm Macfarlane about Nuclear Plant Vulnerabilities to Flooding Thar1ks, Kristy_

(b)(5)

Sus:111 II.\ n1horl'li~

I ~~:ii l ll lllbl' I

( ) lfa'l' ,,r l 'l i.tintlllll 1\l lbo11 M  :'llncl:1rl.11w i ,1ii1~*d '-,11111:, N11\'l,:n r R,:~11 1:11111') C'\11111111,~icm Oltin:: 1) I 71>07 I 111U il ' '>ll~UtLVnt l1<1r,*li~*tl' llr \.',1!(1\' (ll'l)(;C' 1 J() t )-1 15-1)!34 I From: Remsburg, Kristy Sent: Thursday, October 11, 2012 5:35 PM To: Vrahoretls, Susan

Cc: Vietti-Cook, Annette; Mike, Linda; Bales, Andrew; Lewis, Antoinette; Zimmerman, Jacob; Pace, Patti; Gibbs, catina; Cermeno, Andrea; Chairman Temp

Subject:

RE: FOIA-13*0008 - requesl ror letter dated 09/18/ 12, from Lawrence Criscione to Chrm Macfarlane about Nuclear Planl Vulnerabilllles to Flooding If w1* t.un rurtl1er aslt1s1 you in t his process, please let us know.

From: Vrahorelis, S\Jsan Sent: Wednesday, October l0, 2012 4:2,6 PM To: Remsburg, Kristy; Pace, Patti; Gibbs, Catina; Cermeno, Andrea; Chairman Temp Cc: Vietti-Cook, Annette; Mike, Linda; Bates, Andrew; Lewis, Antoinette; Zimmerman, Jacob

Subject:

RE: FOIA-13-0008 - request for letter dated 09/18/12, from Lawrence Criscione to Chrm Macfarlane about Nuclear Plant Vulnerabilitfes lo Flooding Kr.isty

{b)(5)

I ham, you

," ,ui.:111 11. \ 'rahorl'lb I ~*i,:,tl (\1ut1,l'I Oflicc ut Cllainnan t\ lli~llll M. Mact':irlanc I ,1ill'd ~tal"~ l\11ck-ar lh:gulator) Co111mis~ion

<Jlti._* U I 71ll17

< >t lil*,*: 1Jo 1, .11 5- 1x.1-1 I From: Remsburg, Kristy Sent: Wednesday, October 10, 2012 4:17 PM 2

To: Vrahoretls, Susan; Pace, Patti; Gibbs, Catina; Cermeno, Andrea; Chairman Temp Cc: Vietti-Cook, Annette; Mike, Linda; Bates, Andrew; Lewis, Antoinette

Subject:

FOIA-13-0008

  • request for letter dated 09/ 18/ 12, from Lawrence Criscione to Chrm Macfarlane about Nuclear Plant Vulnerabilities lo Flooding H1 Susan, (O)('.J)

If you have any questions, please let me know.

Thanks, l(risty Kristy Remsburg Office of the Secretary U.S. Nuclear Regulatory Commission Office: 301-415-1667 3

Remsburg, Kristy From: Remsburg, Kristy Sent: Thursday, November 15, 2012 5:02 PM To: FOIA Resource; Kilgore, Linda Cc: FOIAPASECY Resource; Mike, Linda; Lewis, Antoinette; Bates, Andrew

Subject:

FOIA 2013-0008 Attachments: FOIA 2013-0008.doc -

Categories: Green Category

Linda, Please see attached memo and appendices for FOIA 2013-0008. The hard copy is being sent to you Interoffice mail.

This closes action for SECY.

Please let me know if you have any questions.

Thanks, Kristy Kristy Remsburg Office of the Secretary U.S. Nuclear Regulatory Commission Office: 301-415-1667

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, DC 20555

  • 0001 November 15, 2012 MEMORANDUM TO: FOIA/PA Caseworker, Linda Kilgore FOIA/PA Section FROM: Kristy Remsburg IRA/

FOIA Coordinator Office of the Secretary

SUBJECT:

FOIA/PA-2013-0008

_ No records subject to the request.

_ Records already publicly available. (Appendix)

_ Records being released in their entirety. (Appendix)

_ Records being withheld in part. (Appendix)*

_ Records being withheld in their entirety. (Appendix)*

_ Records to be referred to other offices/agencies/companies. (Appendix)

_ Ongoing investigation - 7A Certificati0n attached.

_ Attached is NRC Form 496, "Report of Staff Resources for Processing FOIA Requests."

Place released records in PDR.

_ Do not place released records in PDR.

_ This is a partial response to this request.

.2L This is the final response to this request.

.2L This response contains sensitive security information. (Appendix A)

_ This response does not contain sensitive security information .

..K:Foreseeable harm statement attached for Exemption 5. Provide a statement for Exemptions 1, 3, 4, 6, 7A and 7C only if not obvious.

_ A discretionary release of information was not made in a record(s) subject to this request

_ A discretionary release of information~ made in a record(s) subject to this request.

Information was released which would have qualified for withholding under:

Exemption 2 Exemption 5 (check all that apply)

LOTHER COMMENTS: Some documents have been redacted by NRR, RES and Region II but specific exemptions are not specified in response to this FOIA request. Please refer these documents to these offices and this FOIA will need to be reviewed by OGC before responding to requester.

Attachment( s ):

As stated

Re: FOlA/PA-2013-0008 APPENDIX A RECORDS CONTAINING SENSITIVE SECURITY INFORMATION

{b)/5)

Re: FOIA/PA-2013-0008 (OJl:J)

(0)(5)

Remsburg, Kristy From: Remsburg, Kristy -

Sent: Thursday, November 15, 2012 5:05 PM To: FOIA Resource; Kilgore, Linda Cc: FOIAPASECY Resource; Mike, Linda; Lewis, Antoinette; Bates, Andrew; Remsburg, Kristy

Subject:

FOIA 2013-0013 Attachments: FOIA 2013-0013.doc Categories: Green Category

Linda, Please see attached memo and appendices for FOIA 2013-0013. The hard copy is being sent to you interoffice mail.

This closes action for SECY.

Please let me know if you have any questions.

Thanks, Kristy Kristy Remsburg Office of the Secretary U.S. Nuclear Regulatory Commission Office: 301-415-1667

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, DC 20555

  • 0001 November 15, 2012 MEMORANDUM TO: FOIA/PA Caseworker, Linda Kilgore FOIA/PA Section FROM: Kristy Remsburg IRA/

FOIA Coordinator Office of the Secretary

SUBJECT:

FOIA/PA-2013-0013

_ No records subject to the request.

_ Records already publicly available. (Appendix)

_ Records being released in their entirety. (Appendix)

_ Records being withheld in part. (Appendix)*

_ Records being withheld in their entirety. (Appendix)*

_ Records to be referred to other offices/agencies/companies. (Appendix)

_ Ongoing investigation - 7A Certification attached.

_ Attached is NRC Form 496, "Report of Staff Resources for Processing FOIA Requests."

Place released records in PDR.

_ Do not place released records In PDR.

_ This is a partial response to this request.

L This is the final response to this request.

L This response contains sensitive security information. (Appendix A)

_ This response does not contain sensitive security information.

.X*Foreseeable harm statement attached for Exemption 5. Provide a statement for Exemptions 1, 3, 4, 6, 7A and 7C only if not obvious.

_ A discretionary release of Information was not made in a record(s) subject to this request.

_ A discretionary release of information~ made in a record(s) subject to this request Information was released which would have qualified for withholding under:

Exemption 2 Exemption 5 (check all that apply)

_x_ OTHER COMMENTS: Some documents have been redacted by NRR, RES and Region II but specific exemptions are not specified in response to this FOIA request. Please refer these documents to these offices and this FOIA will need to be reviewed by OGC before responding to requester.

Attachment(s):

As stated

Re: FOIA/PA-2013*0013 APPENDIX A RECORDS CONTAINING SENSITIVE SECURITY INFORMATION (b)(5)

Re: FOIA/PA-2013-0013

lewis, Antoinette From: Vrahoretis. Susan Sent: Friday, March 01, 2013 9:59 AM To: Remsburg, Kristy Cc: Lewis, Antoinette; Mike, Linda

Subject:

RI=* REMINDER: Concurrence: FOJA-2013-0008 - Referral Package for Documents 1 and 2

HI, Kristy, (b)(5)

Susan Susan H. Vrahoretis I,cgal Counsel Office ofChainnan Allison M. Macfarlane United , tates Nudllar Regulatory Commission orlice: () 17007 f -mail* SuSllll.Vrnhor~tisfann:.gov I Officc-: (301)415-1834 I From: Remsbutg, Kristy Sent: Friday, March 01, 2013 9:56 AM To: Vrahoretls, Susan Cc: Lewis. Antoinette; Mike, Linda Subjec.t: 'REMINDER: Concurrence: FOIA-2013-0008

  • Referral Package for Documents 1 and 2 Hi Susan, Kristy Kristy Remsburg Office of the Secretary U.S. Nuclear Regulatory Commission Office: 301-415-1667 From: Remsburg, Kristy Sent: Friday, February 01, 2013 3:19 PM To: Vrahoretis, Susan Cc: Lewis. Antoinette; Mike, Linda Subjec.t~ Concurrence: FOIA-2013-0008
  • Referral Package for Documents 1 and 2

HI Susan, I Please provide your concurrence to the recommendation by. Friday, February 81 2013.

If you have any questions, please let me know.

Thanks, Kristy Kristy Remsburg Office of the Secretory U.S. Nuclear Regulatory Commission Office: 301*415-1667 2

Vrahoretis, Susan From: Vrahoretis, Susan Sent: Wednesday, March 27, 2013 9:32 AM To: Remsburg. Kristy Cc: Niedzielski-Eichner, Phillip

Subject:

Re: FOlA*l3*0008 Thanks Kristy!

Susan Vrahorells Legal Counsel Office of the Chairman (301) 415-1820 NOTE: TIIIS iiieSSdQe iildy co::ral:I 811 attoI11epchCiil pmtlcycd CbiillllbPiiv bli611e::d(s; ao,,I0~ ,,11 ,.... 11w1t li'o POI diSCIVSE com root cu1111111ss1011 dbliidlildddii Sent from my NRC BlackBerry From : Remsburg, Kristy To: Vrahoretls, Susan Sent: Wed Mar 27 09:08:14 2013

Subject:

RE: FOIA* 13-0008 5

Ah1>1llt1\PIV._r_)(- )_ _ _ __ _.

f.1kl* Curi.',

Aris~r Ku~ry r~emsbur(J Of/" I! of t lie Secrewry V ~ N11rleor Heq11lmory Comm1\s1on Oj/1lE' 301 415*1667 from : VrahOretls, S\Jsar, Sent: Wednesday, March 27, 2013 8:40 AM To: Remsburg, Kristy

Subject:

FOIA* 13-0008

H1Kristy, I hope you're having a good week. 1(6H6l I-
Thanks, Susan Sus,in H. Vrahore tis Legal Counsel Office of Chairman Allison M. Macfarlat1e United Stales Nuclear Regulatory Commission

Office: 0 17D07 (301) 415-1834 S11sJn.Vr,1hurcw,@nrq~oll

[NOTE: I iliS l!-iiiJII lliJY (OiitJlii it I I 6Rl4 B'l @LIC!IT @0111 IWtllC,,;mrnc @I 1T+QBDIEY WORK BPODllCI r,Q 140T ftELCl't!JE WFPIIOWT COlllll!ililOtl ,t,PPROI' oI J 2

Remsburg, Kristy From: Vietti-Cook, Annette Sent: Friday, March 29, 2013 10:44 AM To: Remsburg, Kristy Cc: Bates, Andrew

Subject:

Re: Criscione Appeal Definately From: Remsburg, Kristy To: Vietti-Cook, Annette Cc: Bates, Andrew Sent: Fri Mar 29 10:12:47 2013 SUbjec:.t: Criscione Appeal Annette,

' 1*6xs)

-Kristy Kristy Remsburg Office of the Secretary U.S. Nuclear Regulatory Commission Office: 301-415-1667

Vrahoretis, Susan From: Remsburg, Kristy Sent: Thursday, April 04, 2013 5:41 PM To: Vrahoretis, Susan

Subject:

RE: FOIA-13-0008 HI Susan, Kristy Kristy Remsburg Office of the Secretary U.S. Nuclear Regularory Commission Office 301-415-1667 From: Vrahoretis, Susan Sent: Thursday, April 04, 2013 5:40 PM To: Remsburg, Kristy

Subject:

RE: FOIA* 13-0008 Hi Kristy, (b)(5)

Thanks, Susan S 11s1111 H. Vrnhorrtis Legal C:ounsel Oflkc ofC:hairma11 Alli~on M. Mocforlono Uni1c:d Statc:s Nuclear RcgulatOf) Commission Otlice: Ol 7D07

  • ~ r-n1uil s11~an Vrahori,;ljs'u'nrc,gov I Office; (301) ll:5-182(1 j From: Remsburg, Kristy Sent: Thursday, April 04, 2013 1:49 PM To: Vrahoretis, Susan Subject RE: FOIA-13*0008 HISusan, r (5),(b)(6)

let me know.

Thanks,

~

Kristy Re 'l"Sblifg Office of tllt! Secretory U.S. Nuclear Regulatory Comm,ss,on Off,ce 301-415 1667 From: Remsburg, Kristy Sent: Friday, March 29, 2013 11:33 AM To: Vrahoretls, Susan Cc: Mike, Linda; Lewis, Antoinette

Subject:

RE: FOIA-13-0008 I'm sure you have seen the appeal from Mr. Criscione hist checking to see if vou are ~till ;1ble to prov,de us FOIA 201.3-0008 referral package early next week? I will not be in the office on Monday bul Linda and Angie will be.

let me know Thank,;,

~

Knsty Remsburg Office of the Secretary US. Nuclear Regulatory Commission Ojf1ce: 301-415-1667 From: Vrahoretis, Susan Sent: Wednesday, March 27, 2013 8:40 AM To: Remsburg, Kristy

Subject:

FOIA* 13*0008 Hi Kristy, I hope you're having a good week]

(b)(6)

I Thanks, Susan Susan H. Vrahorc ti!t Legal Counsel Office of Chairman Allison M. Macfarlane United States Nuclear Regulatory Commission Office: O17D07 (301) 415-1834 S~11LVr11J*~:ct.15@:: ~

(NOTE: I IIIS i:!-IIIJII liiJj toiitJlit Jt1, OI\.IU! t t:LJl!m1 t!8f*lf*IUIIIG/t1if81l§ 01 s\if'.Jl0R"CY '1'0Rlt PRQQUG"f.

QQ PIQT Rislsli,'t§Ei W!'.JlllBUlf' t:eMMIJJltHf J!IPI ftOU J!IE]

2

Remsburg, Kristy From: Kilgore, Linda Sent: Friday, November 16, 2012 6:45 AM To: Remsburg, Kristy

Subject:

RE: FOIA 2013-0008 Hi Kristy, Thank*s for the response. SECY action will be closed.

Thanks Linda From: Remsburg, Kristy Sent: Thursday, November 15, 2012 5:02 PM To: FOIA Resource; Kilgore, Linda Cc: FOIAPASECY Resource; Mike, Linda; Lewis, Antoinette; Bates, Andrew

Subject:

FOIA 2013-0008

Linda, Please see attached memo and appendices for FOIA 2013-0008. The hard copy is being sent to you interoffice mail.

This closes action for SECY.

Please let me know If you have any questions.

Thanks,

/OJSf!J Kristy Remsburg Office qf the Secretary U.S. Nuclear Regulatory Commission Office: 301-415-1667

Remsburg, Kristy From : Kilgore, Linda -

Sent: Friday, November 16, 2012 6:42 AM To: Remsburg, Kristy

Subject:

RE* FOIA 2013-0013 Hi Kristy, Thanlk s for the response. SECY action will be closed.

Judging by the number of other offices Involved, it will be awhile before the FOIA is completed.

Thanks Linda From: Remsburg, Kristy Sent:' Thursday, November 15, 2012 5:05 PM To: FOIA Resource; KIigore, Linda Cc: FOIAPASECY Resource; Mike, Linda; Lewis, Antoinette; Bates, Andrew; Remsburg, Kristy

Subject:

FOIA 2013-0013

Linda, Please see attached memo and appendices for FOIA 2013-0013. The hard copy is being sent to you interoffice mail.

This closes action for SECY.

Please let me know if you have any questions.

Thanks, Kl,istg Kristy Remsburg Office of the Secretory U.S. Nuclear Regulatory Commission Office: 301-41S-1667

Remsburg, Kristy From: Remsburg, Kristy Se nt: Friday, March 29, 2013 9:53 AM To: Viett1-Cook, Annette Cc: Bates, Andrew; Mike, Linda, Lewis, Antoinette

Subject:

.RE: This Is a FOIA Appeal for FOIA requests 2013-0126, 2013-0127, and 2013*0128 Attachments: FW: FOINPA-2013-00008 Referral Assignment; FOIA-13-0008 HI Annette, rb)t6)

I Here's some In~ on the Criscione FOIA reoues1>,

,nanK.s, Krb;ty Kristy Remsburg Office of cha Secretory U.S. Nuclear Regulatory Commission Office: 301 -415* I 667 From: Vfettl* Cook, Annette Sent: f riday, MarGh 29, 2013 8:56 AM To: Remsburg, Kristy; Farrington, John Cc: Doane, Margaret; Rothschild, Trip; Vrahoretls, Susan

Subject:

Fw: This Is a FOIA Appeal for FOIA requests 2013*0126, 2013*0127, and 2013-0128 Let's discuss status of there foia requests and appeal on monday From: Lawrence Criscione <~~ne@hotma1l.com>

To: CHAIRMAN Resource; Vfettl*Cook, Annette; Borchardt, Bill; Ash, Darren; Sealfng, Donna; Kilgore, Unda; FOIA Resource Cc: Billie Garde <!:!Qaarde@cliffordgarde.com>: ssheoherd@dlffQrdggrde.com <.&heoherd@~liffordqarde.com>; Louis Clark <louisc@wh1stleblower.org>; paut@tfmes.org <paul@tlmes.org>; Kay Drey <tritlum3@sbcqlobal.net>; Carl Stelzer l(bJ(6l t Paul Blanch <gmblaocb@comcast.net>; Joe Carson <iocarson@tds.net>; Jim Riccio

<jrlccio@qreenpeace.org>; Dave Lochbaum <dlochbaum@ucsusa.org>; Tom Zeller <tom@hufflngtonpost.com>;

l

Sullivan, Randy; NTEU, Chapter 208; iryU.robbins-umel@nteu.org <iryll.robblns-umel@nteu.org>

sent: Fri Mar 29 04:05:04 2013

Subject:

This Is a FOIA Appeal for FOIA requests 2013-0126, 2013-0127, and 2013-0128 The letter attached to this email is an appeal for the refusal of the RC to release records which were requested under FOIA/PA 2013-0126, 0127, and 0128. Please note:

  • The NRC has had these three FOIA requests fo r over thirty working days.
  • Two of the records were fonnal correspondence between the NRC and a licensee (MLI I 1460063, ML101610083).
  • One of the records was an internal NRC memo requesting a Generic Issue (ML101900305).
  • One of the records was an internal NRC study on darn fai lures (ML I00780084).
  • One of the records was a Non-Concurrence Form submitted on correspondence with a licensee (ML091 I 70 104).
  • One of the records was a 20 12-09-18 email sent to the NRC Chainnan and another was a letter attached to that email.

All these records should have been easily located and--within thirty working doys--readily reviewed and released. I can see no reason for not being able to relea,;e these records within the thirty working days allotted by the FOIA process.

The attached letter involve.,; seven documents, three FOIA requests (20 13-0 126, 0127 & 0128), and two appeal authorities (SECY and OEDO). You may treat this as one appeal or divide as best suits your needs. All I ask is that I get an answer by May 13, 2013 so that, if all the documents requested are not provided in their entirety, I can continue on with the next step of the appeal process in accordance with IOCFR §9.29(c).

Since I am submitting a FOIA Appeal, by definition I believe the RC is not obeying the Freedom of Information Act. Please note that I believe this disobedience is due to either a lack of understanding of the FOIA process/exemptions on the part of various RC staff members, a lack of leadership on the part of various NRC managers, a lack of allocated resources, or a combinat ion of these factors. I do not believe that anyone involved in the FOIA process at the NRC is guilty of criminal behavior. Nothing in this letter is meant to be an allegation of criminal wrong doing. Please do not tum this letter over to the Office of the Inspector General as "Allegation Material. If anyone is concerned with opinions I express in the attached FOIA Appeal, I ask that in the spirit of an Open and Collaborative Work Environment they engage me and attempt to understand my opinions and my reasons for those opinions. Misconstruing constructive criticisms of our various policies and programs as allegations of criminal wrongdoing is counterproductive. Passing another so-called "Allegation" on to the Inspector General in my name does nothing but waste his resources and the taxpayers' money. lfl have an Allegation of criminal wrongdoing to make, I will come forth to the Inspector General and make it myseff.

Although I live in Springfield, IL, I work in Rockville, MD. Please do not send documents to my home in Springfield, IL as I will not get them in a timely manner. Please send all wrillen correspondence to me via email at I.SCriscione(a hotmail.com. If your processes wi ll not allow you to do this, then please contact me via phone or email and I will come by the FOIA desk to pick up the correspondence.

'I f you cannot accept this attached FOIA Appeal via email, please call me today at 573-230-3959 and I will bring a hard copy by the FOIA office or wherever it must be delivered.

2

Thank you, Larry Lawrence S. Criscione, PE "Human experience shows that people. not organizations or management systems, get things done."

3

Remsburg, Kristy From: Kilgore, Linda Sent: Friday, March 29, 2013 7:14 AM To: FOIAPASECY Resource Cc: '3emsburg, Kristy; Kilgore, Linda

Subject:

FW: FOWPA-2013-00008 Referral Assignmen*

Attachments: *2013-0008.pdf Greetings, Is there anything new on the status of this referral? We have 3 requests which involve the same 2 records and cannot close requests 2013-0008, 2013-0013 and 2013-0127 until we receive a response from SECY Thanks Linda From: Admtn, Admln [maHto:foia.resource@nrc,gQV]

Sent: Friday, January 25, 2013 8:30 AM To: FOIAPASECY Rsource Cc: KIigore: Unda Subject ifOIA/ PA-2013-00008 Referral Assignment A Referral fo( FOIA/PA-20 13-00008 is being assigne<l 10 E Y on January 25, 201 3.

Remsburg, Kristy From: Vrahoretis, Susan Sent: Wednesday, March 27, 2013 8:40 AM To: Remsburg, Kristy

Subject:

FOIA-B -0008 Hi Kristy, I bane v011're bavioa a oood week j16H5)

Thanks, Susan Susan H. Vrahoretis Legal Counsel Ofnce of Chairman Allison M. Macfarlane United States Nuclear Regulatory Commission Office: 017D07

{301) 415-1834 Susan,Yrnboretjs@nrqov

[NOTE: *r 111S e iiiJll liiciY co::tahi nr,01rnE,1 e1:11m, C81 II IUlll@N'fl8PI§ 01 A'P5fi0RU6¥ WORI( PR00ij65fi.

DO lhH IU!Ll!>'<3E 11151" 18U' f!8f1ll 1l§§l 81E /iPPROW.k]

Remsburg, Kristy From: Kilgore, Linda Sent: Friday, April 05, 2013 6:21 AM To: FOIAPASECY Resource

Subject:

RE: FOIA/PA-2013-00106 closeout and FOIA 2013-0008 Hi Kristy, Please call me about this when you have a chance. I will be here until around 3:30 today.

Thanks Linda 415-5775 From: FOIAPASECY Resource sent: Thursday, April 04, 2013 5:47 PM To: Kilgore, Linda Cc: Bate,; Andrew; Mike, Linda; Lewis, Antoinette Subject1RE: FOlA/PA-2013-00106 closeout and FOIA 2013-000ll lmportan~: High Hf Linda, Let me know.

Thanks, Kristy Kristy Remsburg Office of the Secretary U.S. Nuclear Regulatory Comm1ss1em Office. 301-415-1667 From: IKilgore, Linda Sent: Monday, April 01, 2013 1:20 PM To: FOIAPI\SECY Resource

Subject:

IFW: FOIA/PA-2013-00106 doseout Thanks Linda From: Admin, Admin (mailto:foia.resource@nrc.gov]

Sent: Thursday, February 07, 2013 7: 13 AM To: FOIAPASECY Resource Cc: Kflgore, Linda; FOIA Resource

Subject:

FOIA/PA-2013-00106 Action Item/Instructions FEf WAIVER GRANTED

You have been assigned action on the incoming FOIA request available at:

ADAMS ACCESSION# ML13037A217 The incoming request was not added to ADAMS. An electronic copy is attached.

NRR, RES and Region II have already been assigned action. NRR informed us that the Chairman's office should be included.

Since t he requester has been granted a fee waiver, no estimate is r equired. Please proceed to process the request.

Offices Assigned Action on February 7, 201 3 SECY The OJS FOIA/ PA Specialist for this request is indicated in the "cc" to this e~mail.

The FOIA/PA request should be processed in accordance with the standard instructions (How to Respond to an Initial FOIA Request) at ML060590485. You arc encouraged to ask for a scoping discussion with the requester when you believe it will be beneficial. You are encouraged to a<;k for assistance in performing adequate ADAMS searches if you are having difficulty doing a search. Your initial estimate of search and review time and the volume of records is required within four (4) working-days from the date of this transmittal e-mail.

NRC F'o rm 496, Report of Staff Resources for Processing FOIN PA Requests" is now available on lnfonns for your use.

2

Remsburg, Kristy From: Kilgore, Linda Sent: Tuesday, April 09, 2013 6:41 AM To: FOIAPASECY Resource

Subject:

  • FW: FOIA/PA-2013-00008 Referral Assignment Attachments: 2013-0008.pdf Categories: Green Category Hi Kristy, Has the Chairman's office completed the review of the records yet? We have completed the other records related to this case. It would be great if we could close the request soon.

Thanks Linda From: Admin, Admln [2]

Sent: Friday, January 25, 2013 8:30 AM To: FOIAPASECY Resource Cc: Kilgore. Linda SUbject!iFOIA/PA-2013-00008 Referral Assignment A Referrol for FO1/\/PA-20 1J-00008 is being assigned to SECY on January 2S, 2013.

Remsburg, Kristy From: Kilgore, Unda Sent: Tuesday, April 30, 2013 10:48 AM To: fOIAPASECY Resource 1

Subject:

FW: FOIA/PA-2013-00008 Referral Assignment - status Hello Kristy, Have you heard anything new regarding the 2 Commission records?

I know the Chairman's office had issues. Just hoping they may have resolved them.

Thanks Linda From: FOlAPASECY Resource sent: Tuesday, April 09, 2013 9:08 AM To: KilgorP. Linda

Subject:

RE: FOJA/PA*2013*00008 Referral Assignment HI Linda, (b)(~)

Thanks.

Kristy Kristy Remsburg Office ofthe Secretary U.S. Nuclear Regulatory Commission Office: 301 -415-1667 From: Kilgore, Linda Sent: Tuesday, April 09, 2013 6:41 AM To: FOJ APASECY Resource Subject FW: FOIA/PA-2013-00008 Referral Assignment Hi Kristy, Has the Chairman's office completed the review of the records yet? We have completed the other records related to this case. It would be great if we could close the request soon.

Thanks Linda

From: Admin, Admin [mai!to:foja.resource@nrc.gov]

Sent: Friday, January 25, 2013 8:30 AM To: FOlAPASECY Resource Cc: KilgorP_I Inda

Subject:

, 1FOIA/PA-2013-00008 Referral Assignment A Referral for FOINPA-201 3-00008 is being assigned to SECY on January 25, 2013.

2

Remsburg, Kristy From: Remsburg, Kristy Sent: Monday, May 13, 2013 9:21 AM To: Hirsch. Patricia

Subject:

Rf Ocoinee/Jocassee Dam FO!As pending office response regarding 2 Commission records

Pat, Can I call you about this?

Kristy Krist'y Remsburg Office of the Secretary U.S. Nuclear Regulatory Commission Office: 301-415-1667 From: Hirsch, Patricia Sent: Friday, May 10, 2013 1:33 PM To: Remsbura. Kristy

Subject:

FW 'Oconee/Jocassee Dam FOIAs pending office response regarding 2 Commission records

??? I know nothing!!!????

Pat Hirsch Assistant General Counsel for Legal Counsel, Legislation and Special Projects Alternate Agency Ethics Official Office of General Counsel Nuclear Regulatory Commission Mall Stop 0 -15 D21 301-415-0563

~

L.S.NRJ:

--........~ ------

,,,._.,..,1'ttpi,dodWI:*..,.,_

From: Sealing, Donna Sent: Friday, May 10, 2013 10:49 AM To: Hirsch, Patricia Cc: Kilgore, Linda

Subject:

FW: Oconee/Jocassee Dam FOIAs pending office response regarding 2 Commission records

Pal, If we could get these two records back we could close five requests Any1hing you can do to help with this would be greatly appreciated.

Thanks, Donna From: Kilgore, Linda Sent: Friday, May 10, 2013 10:35 AM To: Seallnn. Donna Subject~Oconee/Jocassee Dam FOIAs pending office response regarding 2 Commission records Donna,

[tl)(5)

Thanks Linda 2

Remsburg, Kristy From: FOIAPASECV Resource Sent: Monday, May 13, 2013 10:53 AM To: Yrahoretis, Susan Subject FW: FOIA/PA-2013-00239 - For your information Attachments: 2013-0239.pdf Hi Susan, Please see attached FOIA request. We are not being assigned but it was forwarded to us as Information. Two documents requested in this reque5t pertain to the referral package you have - FOIA 2013-0008.

Let me know.

Thanks, Kristy Kristy Remsburg Office of the Secretory U.S. Nuclear Regulatory Commission Office: 301-415-.1667 From: Kilgore, Undo Sent: Monday, May 13, 2013 10:31 AM To: FOIAPASECY Resource Cc: Kilgore. Linda; Remsburg, Kristy

Subject:

{FW: FOIA/PA-2013-00239 - For your information Although the responsive records related to this request are already in FOIA, the attached new request is being sent for your information because it relates to an open office action in another request.

The request lists 2 records (items 11-12) that are still pending in response to a referral for re-review in FOIA

'>013-0008.

Thanks Linda From: Admin, Admin (mailto:foia.resour,ce@nrc.gov]

Sent: Wednesday, May 08, 2013 6:52 AM To: FOIA Resource Cc: Kilqore. Linda

Subject:

{ FOIA/PA-2013-00239 Action Item/Instructions You have been assigned action on the incoming FOIA request avajfable at:

ADAMS ACCESSION # ML..13l27A295

Offices Assigned Action on May 8, 2013 O1S The O1S FOIA/PA Specialist for this request is indicated in the "cc" to this e-mail.

The FOIA/PA request should be processed in accordance with the standard instructions (How to Respond to an Initial FOIA Request) at ML060590485. You are encouraged to ask for a scoping discussion with the requester when you believe it will be beneficial. You are encouraged to ask for assistance in performing adequate ADAMS searches if you are having difficulty doing a search. Your initial estimate of search and review time and the volume of records is required within four (4) working-days from the date of this transmittal e-mail.

NRC Form 496, "Report of Staff Resources for Processing FOIA/PA Requests" is now avai lable on Informs for your use.

2

Remsburg, Kristy From: Remsburg, Kristy Sent Friday, May 31, 2013 11:08 AM To: Hirsch, Patricia

Subject:

RE: Appeal regarding FO!As 2013-0008 and 2013 -0106 Hi Pat, (b)t:i)

Krist)

Kristy Remsburg Office of the Secretory U.S. Nuclear Regulatory Commission Office; 301-415-1667 From: Hirsch, Patricia Sent: Thursday, May 30, 2013 12:14 PM To: Remsburg, Kristy

Subject:

FW: Appeal regarding FOIAs 2013-0008 and 2013-0106 Importance : High Do you know about this? We need to move this one! So let's talk! Thanks!

From: Sealing, Donna Sent: Thursday, May 30, 2013 11:47 AM To: Hirsch, Patricia

Subject:

RE: Appeal regarding FOIAs 2013-0008 and 2013-0106 Importance: High Pat, Thanks for your help.

Donna From: Hirsch, Patricia Sent: Thursday, May 30, 2013 11:37 AM To: Sealing, Donna

Subject:

RE; Appeal regarding FOIAs 2013-0008 and 2013-0106 Yes, looks okay- what is the document that secy needs to decide on?

From: Sealing, Donna Sent: Thursday, May 30, 2013 9:50 AM

To: Hirsch, Patricia

Subject:

PN: Appeal regarding FOIAs 2013-0008 and 2013-0106 Importance: Hfgh Hi Pat ,

I told Darren I'd coordinate with you and reply to Mr. Lochbaum after the meeting we had yesterday. Here's what I propose to send to him. Could you please take a look at it and let me know if you have any changes/comments.

Thanks, Donna Mr. Lochbaum, I'd like to provide you an update on the status of the FOIA requests you addressed in your May 23 e-ma,1 to Mr. Ash.

FOIA/PA 2013-0008: We are still coordinating the release of this document with the Office of the Secretary. Please be advised that as soon as we receive a releasability determination regarding the record we will provide a response to you.

FOIA/PA 2013-0106: This request was closed on April 1, 2013. The OIG withheld the records in their entirety under Exemption 7A due to their ongoing Investigation. A scanned copy of our response Is attached.

Please let me know if you have any additional questions regarding these requests.

Donna Sealing (301) 415-5804 From: Ash, Darren Sent: Tuesday, May 28, 2013 10: 13 AM To: Sealing, Donna Cc: Olive, Karen; Pretzello, Andrew; Bell, Marvin; Donnell, Tremaine; Rheaume, Cynthia

Subject:

RE: Appeal regarding FOIAs 2013-0008 and 2013-0106

Donna, Thank you very much.

Darren From: Sealing, Donna Sent: Tuesday, May 28, 2013 10:09 AM To: Ash, Darren Cc: Olive, Karen; Pretzello, Andrew; Bell, Marvin; Donnell, Tremaine; Rheaume, Cynthia

Subject:

RE: Appeal regarding FOIAs 2013-0008 and 2013-0106 Good Morning Darren, 2

  • we will open his two new appeals and send acknowledgement letters to him on those. I will respond back to Mr. Lochbaum and cc you once I coordinate with Pat Hirsch. As you probably know we are having a meeting tomorrow and I hope to make progress on these requests.

Donna From: Ash, Darren Sent: Tuesday, May 28, 2013 9:12 AM To: Sealing, Donna Cc: Pearson, Laura; Rheaume, Cynthia; Olive, Karen

Subject:

FW: Appeal regarding FOIAs 2013-0008 and 2013-0106 Donna, Good morning. I received the message below from Mr. Lochbaum. Could you please look into the status. If you wou ld prefer to get back to him directly, as opposed to me, please do. Please cc me on the reply.

'fhank you, Darren From: DaveLochbaum[mailto:pLochbaum@ucsusa.orql Sent: Thursday, May 23, 2013 3:51 PM To: Ash, Darren

Subject:

Appeal regarding FOIAs 2013-0008 and 2013-0106 May 23, 2013 Darren Ash Deputy Executive Director for Corporate Management U.S. Nuclear Regulatory Commission

Dear Mr. Ash:

NRC website http://www.nrc.gov/reading-rm/foia/foia-privacv.html designates you as the NRC Chief FOlA Officer. I am communicating with you in that capacity.

On October 9, 2012, I submitted a FOIA request to the NRC that was accepted that day and assigned no.

FOIA/PA-2013-0008. I requested a single record and identified its date, its author, and its addressee. As of this morning, I still have not received that record. Prior to February 6, 2013, I contacted the FOIA officer and was told that this single document had been obtained and had gone to the Commission for determination whether it could be released and, if so, under what conditions. The FOIA officer offered to released other re1.:ords in the meantime with partial responses. I was confused by this offer because f'd requested a single letter and envisioned partial releases being words or sentences thereof. By letters dated February 6, 2013, February 20, 2013, and April 9, 2013, Lreceived Partial Responses l, 2, and 3 respectively. They turned out to be some of the documents listed as references to the single letter I requested. But I've still not received that single letter or detennination why it is being withheld.

On February 6, 2013, I submitted a FOlA request to the NRC that was accepted that day and assigned no.

FOIA/PA-2013-001106. I sought emai ls to/from an NRC staffer regarding a specific subject matter. As of this morning, this request remains open.

The aforementioned NRC website states this disclaimer:

"Due to the high volume of FOIA requests received as a result of the unexpected events in Japan, response times to requests may be longer than normal." My calendar shows me that the "unexpected events" in Japan 3

occurred more than two full years ago, not recently. The NRC's ability to hid behind this excuse seems to have faded a long time ago.

I am appealing to you to take whatever actions are needed to get me the records I requested as provided for by the FOIA law.

As to the basis for this appeal, I call your attention to a recent court decision available online at http://www.citizensforethics.org/page/-

/PDFs/Legal/CREW%20v.3/4:20FEC%20%28Commissioners%20Correspondence%29/0pinion CREW vs rEC re correspondence DC Ci rcuit 04 2 '.2013.pdf?nocdn= I The NRC did promptly acknowledge my FOIA requests. But I call your attention to the text in the paragraph at the top of page 11 of this court decision:

"The statutory requirement would not make a lot of sense if, as the FEC argues, the agency were merely required to state within 20 working days its future intent lo eventually produce documents and claim exemptions."

And I call your attention to the text at the bottom of page 11 :

"Under the FEC's theory, an agency could respond to a request within 20 working days in terms not susceptible to immediate administrative panel - by simply stating, in essence, that it will produce documents and claim exemptions over withheld documents in the future. Then the agency could process the request at its leisure, free from any timelines."

Sound familiar? It sounds all too familiar to me, substituting NRC for FEC and leaving all the rest the same.

I call your attention to the court's language in the first paragraph on page 16:

"As lo actual production, FOIA requires that the agency make the records promptly available," which depending on the circumstances typically would mean within days or a few weeks of a "determination," not months or years."

4

Produce documents within days or a few weeks, not months or years -- that's what this court ruled agencies are required to do to satisfy their legal obligations under FOIA.

In FOINPA-2013-0008, I sought a single record. I requested that record on October 9, 2012 -- 226 days ago or 32 weeks ago or 7.5 months ago. I have not received the single record I requested.

FOIA/PA-2013-0 I06 was submitted on February 6, 20 I 3 -- I 06 days ago or 15 weeks ago or 3.5 months ago. I have not received any records yet.

I appeal to you to rectify this matter as promptly as possible.

1t certainly appears to me that the NRC is not meeting its legal obligations under the FOIA law. l have bl indcopied the NRC's Office of the Inspector General on this email to make them aware of this apparent NRC wrongdoing.

Sincerely, David Lochbaum Director, Nuclear Safety Project Union of Concerned Scientists PO Box 153 16 Chattanooga, TN 37415 (423) 468-927'> office i ( 423) 488-831 lq::ell 5

Bates, Andrew From: Vietti-Cook, Annette Sent: Friday, May 31 , 2013 12:46 PM To: Remsburg, Kristy Cc: Mike, Linda; Bates, Andrew

Subject:

FW: Appeal regarding FOIAs 2013-0008 and 2013-01 06 Attachments: 2013-0106-FinalResponse pdf

, What is the first item she is referring to?

From: Sealing, Donna Sent: Friday, May 31, 2013 11:30 AM To: Dave Lochbaum (DLochbaum@ucsusa.org)

Cc: Ash, Darren

Subject:

FW: Appeal regarding FOIAs 2013*0008 and 2013-0106 Mr. Lochbaum, I'd like to provide you an update on the status of the FOIA requests you addressed in your May 23, 201 3 e-mail to Mr. Ash.

FOIA/PA 2013-0008: We are still coordinating the release of this document with the Office of the Secretary.

Please be advised that as soon as we receive a releasability determination regarding the record we will provide a response to you.

FOIA/PA 2013-0106: This request was closed on April 1, 2013. The OIG withheld the records in their entirety under Exemption 7A due to their ongoing investigation. A scanned copy of our response is attached.

Please let me know if you have any additional questions regarding tlhese requests Donna Sealing (301) 415-5804 From: Dave Lochbaum [3]

Sent: Thursday, May 23, 2013 3:51 PM To: Ash, Darren

Subject:

Appeal regarding FOIAs 2013-0008 and 2013*0106 May 23, 2013 Darren Ash Deputy Executive Director for Corporate Management U.S. Nuclear Regulatory Commission

Dear Mr. Ash:

NRC website http://www.nrc.gov/reading-rm/foia/foia-privacy.html designates you as the NRC Chief FOIA Officer. I am communicating with you in that capacity.

On October 9, 20 12, I submitted a FOIA request to the NRC that was accepted that day and assigned no.

FOIA/PA-2013-0008. I requested a single record and identified its date, its author, and its addressee. As of this morning, I still have not received that record. Prior to February 6, 2013, I contacted the FOIA officer and was told that this single document had been obtained and had gone to the Commission for detennination whether it

could be released and, if so, under what conditions. The FOIA officer offered to released other records in the meantime with partial responses. I was confused by this offer because I'd requested a single letter and envisioned partial releases being words or sentences thereof. By letters dated February 6, 2013, February 20, 20 13, and April 9, 20 13, 1 received Partial Responses I, 2, and 3 respectively. They turned out to be some of the documents listed as references to the single letter I requested. But I've still not received that single letter or determination why it is being withheld.

On February 6, 201 3, I submitted a FOIA request to the RC that was accepted that day and assigned no.

FOIA/PA-201 3-001106. I sought emails to/from an NRC staffer regarding a specific subject matter. As of this morning, this request remains open.

The aforementioned NRC website states this disclaimer:

"Due to the high volume ofFOIA requests received as a result of the unexpected events in Japan, response times to requests may be longer than normal." My calendar shows me that the "unexpected events" in Japan occurred more than two full years ago. not recently. The RC's ability to hid behind t)lis excuse seems to have faded a long time ago.

I am appealing to you to take whatever actions are needed to get me the records I requested as provided for by the FOIA law.

As to the basis for this appeal, I call your attention to a recent court decision avai lable online at http://www.citizensforethics.org/page/-

/P0f s/Legal/CREW%20v.%20FEC%20%28Commissioners%20Correspondence%29/0pinion CREW vs FEC re correspondence DC Circuit 04 2 20 13.pcir?nocdn= I The NRC did promptly acknowledge my FOIA requests. But I call your attention lo the text in the paragraph at the top of page 11 of this court decision:

"The statutory requirement would not make a lot of sense if, as the FEC argues, the agency were merely required to state within 20 working days its future intent to eventuall y produce documents and claim exemptions."

And I caJI your attention to the text at the bottom of page 11:

"Under the FEC's theory, an agency could respond to a request within 20 working days in terms not susceptible to immediate administrative panel - by simply stating, in essence, that it will produce documents and claim exemptions over withheld documents in the future. Then the agency ,could process the request at its leisure, free from any timelines."

Sound familiar? It sounds all too familiar to me, substituting NRC for FEC and leaving all the rest the same.

2

I call your attention to the court's language in the first paragraph on page 16:

"As to actual production, FOIA requires that the agency make the records "promptly available," which depending on the circumstances typicall y would mean within days or a few weeks of a "determination," not months or years."

Produce documents within days or a few weeks, not months or years -- that's what this court ruled agencies are required to do to satisfy their legal obligations under FOIA.

In FOTA/PA-2013-0008, I sought a single record. J requested that record on October 9, 2012 -- 226 days ago or 32 weeks ago or 7.5 months ago. I have not received the single record I requested.

FOIA/PA-2013-0106 was submitted on February 6, 2013 -- I06 days ago or 15 weeks ago or 3.5 months ago. I have not received any records yet.

I appeal to you to rectify this matter as promptly as possible.

It certainly appears to me that the NRC is not meeting its legal obligations under the FOIA law. I have blindcopied the NRC's Office of the Inspector General on this email to make them aware of this apparent NRC wrongdoing.

Sincerely, David Lochbaum Director, Nuclear Safety Project Union of Concerned Scientists PO Box 15316 Chattanooga, TN 37415 (423) 468-9272 office (423) 488-83 I 8 cell 3

,-.-------------*------------*----------.----------- U.S. NUCLEAR REGULATORY COMMISSION POIA.'P I. RESPONS~ NUM6ER RESPONSE TO FREEDOM OF 201'.--0106 I INFORMATION ACT (FOIA) / PRIVACY ACT (PA) REQUEST RESPONSE TYPE l71 L!'...J FINAL PARTIAL REQUESTER David Lochbaum APR O1-2"3 PART I.** INFORMATION RELEASED 0 No additional agency records subject to the request have been located.

D Requested records are available through another public distribution program. See Comments section APPENOtet:s I Agency records subject to the request that are identified In the listed appendices are already available for I_ public inspection and copying at the NRC Public Document Room 0 1' APPN0tacs I Agency records subject to the request that are identified in the ~sled appendices are bemg made ava~able for

~-_ _ _ __,/ public inspect10n and copying at the NRC Public Document Room O Enclosed is information on how you may obtain access to and the charges for copying records located at the NRC Public Document Room, 11555 Rockville Pike. Rocxville. MD 20852-2738.

IIAPPENOICf.S I Agency records subJect to the request are enclosed I

D Records subIect to the request that contain Information originated by or of lnlerest to another Federal agency have been referred to that agency (see comments section) for a disclosure determination end direct respanse to you.

D We are continuing to process your request.

[Z] See Comments.

PART I.A ** FEES I 0D You D None. Minimum fee threshold not mel.

" M()IJNT' will be billed by NRC for the amount listed.

s* SeeI comment*

tor <1e11,1s You will receive a refund for the amount listed. (2] Fees waived.

PART 1.8 - INFORMATION NOT LOCATED OR WITHHELD FROM DISCLOSURE No agency records subject to the request have been located. For your infomiation, Congress excluded three discrete categories of law enforcement and national security records from the requirements of the FOIA. See 5 U.S.C. § 552(c)

(2006 & Supp. IV (2010). This response ls limited to those records that are :subject to the requirements of the FOIA This Is a standard notification that ls given 10 all our requesters end should not be taken as an indication that excluded records do, or do not. exist.

1Z] Certain information in the requested records Is being withheld from disclosure pursuant to the exemptions described in and for the reasons stated in Part II. /

0 This determinauon may be appealod within 30 days by wnting to the FOINPA Officer. US. Nuclear Regulatory Cornm,ss,on, W2sh1ng1on. DC 20555-0001 Clearly state on the envelope and in the letter that 111s a "FOIA/PA Appeal*

PART I.C COMMENTS ( Use attached Comments continuation page ii required)

Records relating 10 FOIA-20\J-0106 are being withheld in their entirety under Exemption 7A due to an ongoing OIG investigation.

REEO O MR~ ~ NCl AAOP'1VACV~CTOFFlCER fAUl '/ nh~

"""""5 - - ... )

NftC FORM 4114 Po~ I (1~2012)

NRC FORM 464 Part II U.S. NUCLEAR REGULATORY COMMISSION FOIA/PA DATia 1~-20111 RESPONSE TO FREEDOM OF INFORMATION 2013-0 106 R Ol M -

ACT (FOIA) / PRIVACY ACT (PA) REQUEST I PART II.A - APPLICABLE EXEMPTIONS APPENDICES I Records su~ect to the requesl that are descnbed In the enclosed Appendices are being wtthhetd In their entirety or ln pall under the Exemption o.{s) ot the PA and/or the FOIA as lnd,cated below {5 U.S.C. 552a and/or 5 U.S.C. 552(b)).

Exemption 1: The withheld information is properly classified pursuant lo Executive Order 12958.

Exemption 2: The withheld lnformat1on relates solely to the ,ntemal oersonnel rl.lles and practices of NRC.

Exemption 3: The withheld 1nlormatlon Is specifically exempted from publ,c disclosure by statute Indicated Sections 141-145 of the Atomic E,nergy Act. which prohibits the disclosure of Restricted Data or Formerly Restricted Data (42 U.S.C.

2161-2165),

Section 147 of the Atomic Energy Act, which prohibits the disclosure of Unelasslf,ed Safeguards Information (42 U.S.C. 2167).

41 U.S.C.. Section 253b, subsection (m)(1), prohibtts the disclosure or contractor proposals in the possession and control of an executive agency to any person under section 552 of Title 5. U.S.C. (the FOIA), except when incorporated into the contract between the aoency and the submitter of the proposal.

D Exemption : The withheld Information Is a trade secret or commercial or financial informat,on thal is being with held for the reason(~) indicated.

D The info1malion is considered to be confidential business (proprietary) information, The Information is considered to be proprietary because ~ concerns a licensee"s or applicant's physical protection or material control and accounting program for special nuciear material pursuant to 10 CFR 2.390(d)(1).

D The Information was sUbmllted by a foreign source and rec,lveo In confidence pursuant to 10 CFR 2.390(dl(2).

D Disclosure wlll hanm an 1dent1f,ab1e private or governmental Interest.

,emption 5: The wllhhelo lnformabon consists of tnteragency or Intra agency records that are not available through discovery during lltlgaticr,.

Applicable privileges*

Deliberative process: Disclosure of predecislona* info1mat,on would tend to inhibit the open and frank exchange of Ideas essential to tne deij~ratlve pro~ess* Where records are wlthheld m their ent~ety. tne facts are inextricably intertwined with the predecisional iniormatton There also are no reasonably segregable factual portions because the release.of the tacts would permit an indiree1 inquiry into the predec,sional proce:;s of tile agency.

Attorney work-product privilege. (Documents prepared by an attorney In contemplation or litigation)

D Altomey-chent privilege. (Confidential communications between an attorney andl his/her client)

Exemption 6: The wlthheld information Is exempted from publlc disCIOsure because Its disclosure would result in a cleany unwarranted Invasion or personal privacy, 0 Exemption 7: The withheld information consists of records compiled for law enforcement purposes and is being withheld for the reason(s)

Indicated.

[2J (A) Disclosure could reasonably be expect1d to intcrtere with an enforcement proceeding le.g.. It would reveal the scope, direc~on. and D (Cl requirements focus of entorcement efioris. and tnus ~oulo possibly allow rec,p1ents to lake action to shield potential wrong doing or a v,ola!Jon of Nil::

from Investigators).

o,sclosure could constitute an unwarranteo Invasion of personal privacy.

D (DJ The Information consists of names of Individuals and other informat,on the disclosure of which :ould reasonabl)' be expected lo revsat identities of confidential sources.

0 (EJ Disclosure would reveal techniques and procedures for law enforcemenl Investigations or prosecutions, or guldehnes that could reasonably be expected to n;;k circumvention of tne law.

0 (F) Disclosure cou1d reasonably be expected to ondnnpe: tno ltte or phr alcat sa1e:y of an indMdual D OTHER isoecilyl I PART 11.B ** DENYING Oi=FICIALS Pursuant to 10 CFR 9.25(R~ 9.25(h), and/or 9.65/b) of the U.S Nuclear Regulatory Commission regulations ti has bee., determinsci tr.at the information w~hhe ls exempt from oroouct,on or dts:::::sur~. a:id tnat its producuon or disclosure 1s contrarv to tne publi:

interest. The oerson responsible fo: tne deniai are those offdals iaentified oe1ow as danyino oificials and ths 'FOIA/?A Officer fo* any denials that may be appealed to the Executive Dire:tor ior Ocerati,ns I EDO). *

I A0 P::LL;;,s :::,==1: 1,.*

DENYING Or'FICIAL TITLc/Oi=FICE R!:CORDS DENli:u

°E'i>o s::~ [(;

Joseph A. MrMili an .IOIG*ASS!. ln,o~:to:

. G:neral for lnv~qi~ations - :FO)A-20 ! >*0 I 06 all records ICJ -u . ,7 7

__, ~ __,

I i ' I u. n~, -

Appeal m;.ist be made in writing within 30 cays of receipt of this rasCY.>r:se. Appeals should be mailed to the =01A1Privacy A~ Ofi1c,,.

U.S. Nu-:1ear Regulatory Commission, Washington. DC 20555-0001. i or a:t1on by the appropr.ate appellate ofitc1al(S). You shouic ciear!y state on th~ envelope and letter that It Is a "FOIAl?A Appea,"

  • m:: FORM 464 Pan II ,~-20, 1)

Vrahoretis, Susan From: Remsburg, Kristy Sent: Monday, June 03, 2013 2:16 PM To: Vrahoretis, Susan

Subject:

RE: Appeal regarding FO!As 2013-0008 and 2013-0106 Great! Thanks for the update.

Kristy Kristy Remsburg Office of the Secretory U.S. Nuclear Regulatory Commission Office: 301-415-1667 From: Vrahoretis, Susan Sent: Monday, June 03, 2013 2:ll PM To: Remsburg, Kristy

Subject:

RE: Appeal regarding FOIAs 2013-0008 and 2013-0106

Kristy, Thank you, USIIO Susnn JI. Vr11horet1 Legal Coun~el Ol'l kl! of C'hnl11nun Alhson M. Mad arl:ln~

l lniuid ~tOI(*~ Nui.:lrur Regulatory C'o111n11~sion Uflic1:: 0 I 7()07 1*-mail: Sus1111.Vmhorc1is@ilnrc AOv I Ollie-,: (JO I) 415- 1820 I From: Remsburg, Kristy Sent: Friday, May 31, 2013 3:11 PM To: Vrahoretis, Susan

Subject:

RE: Appeal regarding FOIAs 2013-0008 and 2013-0106 Thank you!

Kristy Kristy Remsburg

Office of the Secretory U.S Nucleo, Regulatory Commission 0/Jit:.e: 301-415*1667 From: Vrahoretis, Susan Sent: Friday, May 31, 2013 3:01 PM To: Remsburg, Kristy Cc: Vietti-Cook, Annette; Bates, Andrew

Subject:

RE: Appeal regarding FOIAs 2013-0008 and 2013-0106 Thanks, Susan From: Remsburg, Kristy Sent: Friday, May 31, 2013 1:07 PM To: Vrahoretls, Susan Cc: Vietti-Cook, Annette; Bates, Andrew

Subject:

FW: Appeal regarding FOIAs 2013-0008 and 2013*0106 H1 Susan Forwarding this to you re FOIA 2013 0008.

Thanks, Krist~ Remsburg Oft1re of the Secretory U.S. Nuclear Regulatory Comm1ss1on 0/f,ce. 301-415-1667 From: Vietti-Cook, Annette Sent: Friday, May 31, 2013 12:46 PM To: Remsburg, Kristy Cc: Mike, Linda; Bates, Andrew

Subject:

FW: Appeal regarding FOIAs 2013-0008 and 2013-0106 Whc1t is the first Item she 1s refe1r111g to?

From: Sealing, Donna Sent: Friday, May 31, 2013 11:30 AM To: Dave Lochbaum (Olo- t b~umf!!:_ur c;usa.019)

Cc: Ash, Darren

Subject:

FW: Appeal regarding FOIAs 2013-0008 and 2013-0106 Mr Lochbaum, I'd like to provide \*Ou an update on the status of the FOIA requests you addressed ,n your May 23, 2013 e-mail to Mr Ash 2

FOIA/PA 2013-0008. We are still coordinating the release of this document with the Office of the Secretary. Please be advised that as soon as we receive a releasability determination regarding the record we will provide a response to you.

FOIA/PA 2013-0106: This request was closed on April 1, 2013. The OIG withheld the records in their entirety under Exemption 7A due to their ongoing investigation. A scanned copy of our response is attached.

Please let me know if you have any additional questions regarding these requests.

Donna Sealing (301) 415-5804 From: Dave Lochbaum [mailto:Dlochbaum@ucsusa.orql Sent: Thursday, May 23, 2013 3:51 PM To: Ash, Darren

Subject:

Appeal regarding FOIAs 2013-0008 and 2013-0106 May 23, 2013 Darren Ash Deputy Executive Director for Corporate Management U.S. Nuclear Regulatory Commission

Dear Mr. Ash:

NRC website http://www.nrc.gov/reading-rm/foia/foia-privacy.html designates you as the NRC Chief FOIA Officer. I am communicating with you in that capacity.

On October 9, 2012, I submitted a FOIA request to the NRC that was accepted that day and assigned no.

FOIA/PA-2013-0008. 1 requested a single record and identified its date, its author, and its addressee. As of thi s morning, I still have not received that record. Prior to February 6, 20 13, I contacted the FOIA officer and was told that this single document had been obtained and had gone to the* Commission fo r determination whether it could be released and, if so, under what conditions. The FOIA officer offered to released other records in the meantime with partial responses. 1 was confused by this offer because J'd requested a single letter and envisioned partial releases being words or sentences thereof. By letters dated February 6, 2013, February 20, 2013, and April 9, 2013, I received Partial Responses I, 2, and 3 respectively. They turned out to be some of the documents listed as references to the single letter I requested. But I've still not received that single letter or determination why it is being withheld.

On February 6, 20 I3, I submitted a FOIA request to the NRC that was accepted that day and assigned no.

FOIA/PA-20 I3-001106. l sought emails to/from an NRC staffer regarding a specific subject matter. As of this morning, this request remains open.

The aforementioned NRC website states this disclaimer:

"Due to the high volume of FOJA requests received as a result of the unexpected events in Japan, response times to requests may be longer than normal." My calendar shows me that the "unexpected events" in Japan occurred more than two full years ago, not recently. The NRC's ability to hid behind this excuse seems to have faded a long time ago.

I am appealing to you to take whatever actions are needed to get me the records I requested as provided for by the FOIA law.

As to the basis for this appeal, I call your attention to a recent court decision available online at 3

fill \ I\ nlt/1.'I) ~ till PD l!..!ul l RI 2th .~Kl t1r1111m~111...

111.:.;;..;:.--r'""'"-=c......a.:..;.;.;.:.=-~==-------=-'

h I fi!-9.!!I_i.: L:ll {14 ~ ::!01 lJ1tlf.11tt~d11 I The NRC did promptly ~1cknowledge my FOIA rcqul!sts. But I call your altention to the text in rhc parugruph at the top of page 11 of this eoun decision:

"The statutory req uirement would not make a lot of sense it: as the FEC argues, the agency were merely required to state within 20 working days its future intent to eventually produce documents and claim exemptions."

And I cal I your attention to the text al the bottom of page I I :

"Under the f-'EC's theory, an agency could respond to a request within 20 v. orking days in tenns not susceptible to immediate administrative panel - by simply stating, in essence, that it will produce documents and claim exemptions over withheld documents in the future. Then the agency could process the request at its leisure, free from any timelines."

Sound familiar? It sounds all too familiar to me, substituting NRC for FhC and leaving all the rest the same.

I calI your attention to the court's language in the first paragraph on page 16:

"As to actual production. FOIA requires that the agency make the records "promptly available." which depending on the circumstances typically would mean within days or a few weeks of a "determination," not months or years."

Produce documents within days or a few weeks, not months or years - that's what this court ruled agencies are required to do to satisfy !heir legal ohligations under FOi/\.

In r:O1A/PA-2013-0008, I sought a single record. I requested that record on October<>, 20 I 2 - 226 days ago or 32 weeks ago or 7.5 months ago. I have not rl:!ceivcd the si ngle record I requested.

4

FOIA/PA-20 13-0 106 was submitted on February 6, 2013 -- 106 days ago or 15 weeks ago or 3.5 months ago. I have not received any records yet.

I appeal to you to rectify this matter as promptly as possible.

It certainly appears to me that the NRC is not meeting its legal obligations under the FOIA law. I have blindcopied the NRC's Office of the Inspector General on this email to make them aware of this apparent NRC wrongdoing.

Sincerely, David Lochbaum Director, Nuclear Safety Project Union of Concerned Scientists PO Box 15316 Chattanooga, TN 374 15 (423) 468-9272 office (423) 488-8318 cell 5

Remsburg, Kristy From: Kilgore, Linda Sent: Wednesday, June 05, 2013 8:21 AM To: Remsburg, Kristy Subjed : Q.E: FOIA PA-2013-0008 and Appeal 2013-00lSA Attachments: AMM response_FOIA-13-0008_6 3 13.pdf; NRC 496A SECY referral appeal 2013-00lSA.pdf; NRC 496A 2013-0008 SECY referral.pdf Pat only sent the memo. The memo was addressed to you so you should get a response from the office I assume, but I'll send what I have.

From: Remsburg, Kristy Sent: Wednesday, June 05, 2013 8:11 AM To: Kilgore, Linda

Subject:

RE: FOIA PA-2013-0008 and Appeal 2013-0015A Did she forward the original referral package also? If so, I need a copy of the referral sheet withe response and memo please.

Thanks, Kristy Kristy Remsburg Office of the Secretary U.S. Nuclear Regulatory Commission Office: 301 -415-1667 From: Kilgore, Linda Sent: Wednesday, June 05, 2013 7:13 AM To: FOIAPASECY Resource Cc: Remsburg, Kristy

Subject:

FOIA PA-2013-0008 and Appeal 2013*0015A Good morning, Thanks Linda

(b)(5)

NRC FO RM 496A U.S. NUCLEAR REGULATORY COMMISSION FOIA/PA (10-2012) 2013-0008 NUMBER REFERRAL RELATED TO FOIA/PA REQUEST DATE Ill INITIAL REQU EST APPEAL 01/25/2013 OFFICE TO: FOIA COORDINATOR -- Kristy Remsburg SECY TELEPHONE FROM: FOIA/PA SPECIALIST -- Linda Kilgore (30 I) 41S-5775 We are referring the record(s) identified below or on the attached list for appropriate action, as noted. Please complete the actions indicated and return this referral and the record(s) to this office within ttO days of your receipt of this referral. If you have any questions regarding this matter. telephone the FOIAIPA Specialist.

Provide your office's concurrence or nonconcurrence in the The subject request has been appealed for initial denial of record(sl.

originating office's recommendations for disclosure or A copy of the appeal, denial response (with bracketed recora(s)) and withholding for each identified record. lnttlal request are attached. Please have your office conduct another review of each appealed record and provide a new disclosure Provide a disclosure determination/recommendation for each determination/recommendation or reaffirm the initial determination.

record which was identified by another office as a record for which your office is responsible and whiclh is subject to this request.

The subject request has been appealed for lack of response.

Please provide a prompt response to the initial FOIA request or LJ The attached record(s) andfor bracketed informallor, was referred lo the NRC for review by another agency advise when a response may be expected and explain the reasons for the delay, A copy of the appeal and in~ial request are attached.

( )

1he subject request has been appealed for adequacy of search.

Please have your office ooncluct another search for records 0 Records that you provided this office in response to the FOIA request are being returned to you for further review/ responsive to tllis FOIA. A copy of the appeal letter is attached to assist you In your search for additional records.

clarification for reasons noted In the COMMENTS section below.

The subject request has been appealed for initial denial of fee walver.

A copy of the appeal, denial, and Initial request are aitachecl. When The enclosed records are being returned because ttiey were determined to be outside the scope of this request. or the the appeal response has been signed, please forward it to the request was administratively dosed without providing records FOIA/PA Section for dispatch to the requester.

to the requester.

The subject request has been appealed for initial denial of recorolsl.

A oopy of the appeal, denial response (with bracketed record(s)) and Complete NRC Form 496, ".Report of Staff Resources for Processing FOIA requests." !nitiai request are attached. When the appeal respo~se has been signed, please lorward It to the FOIAfPA Section for dispatch to the requester.

Other required ,action as noted in the COMMENTS section below.

II ns: D CCC DDJ: n DC ,,..

If you have any questions, please contact me. Thanks, Linda OFFICE RESPONSE SIGNATURE - FOIA COORDINATOR DATE NRC FORM 496A (10-2012)

NRC FORM 496A U.S. NUCLEAR REGULATORY COMMISSION FOIA/PA 110-2012) . ....... 2013-00 ISA i .,, NUMBER

'\......¥*~"'*

1 REFERRAL RELATED TO FOIA/PA REQUEST 0 INITIAL REQUEST Ill APPEAL DATE 05/30/2013 OFFICE TO: FOIA COORDINATOR- Kristy Remsburg SECY TELEPHONE FROM: FOIA/PA SPECIALIST - Linda Kilgore (30 I) 415 -5775 We are referring the record(s) identified below or on the attached list for appropriate action. as noted. Please complete the actions indicated and return this referral and the record(s) lo !his office within 10 days of your receipt of this referral. If you have any questions regarding this matter, telephone the FOINPA Specialist.

Provide your office's concurrence or nonconcurrence in the The subject request has been appealed for initial denial of record/s\.

originating office's recommendations for disclosure or A copy of lhe appeal, denial response (with orae11ete<1 recora(s)) and withholding for each identified record. initial request are attached. Please have your office conduct another review of each appealed record and provide a new disclosure Provide a disclosure determination/recommendation for each determlnallonlrecommendallon or reaffirm the initial determination.

record which was identified by another office as a record for which your office is responsible and which is subject to this request.

0 The subject request has been appealed for lack of response.

Please provide a prompt response to lhe initial FOIA request or The attached record(s) and/or braeketed information was referred lo the NRC lor review by another agency advise when a response may be expected and explaln lhe reasons for lhe delay. A copy of the appeal and initial request are attached

( )

The subject request hae been appealed for ad!!!]uacy of search Please he11e your office co11due1 another searchlor records Records Iha! you provided this office In response to the FOIA request are being returned to you for fur1her review/ resp0nsive to this FOIA. A copy of the appeal letter is attacned to clariflcallon for reasons notedln the COMMENTS secllon assist you In your search for additional records.

below, The subject request has been appealed for inillal denljtl of fee waiver A copy of the appeal, denial, and Initial request are altached When The enclosed records are being returned because they were detennined to be outside the scope of !his request, or the the appeal response has been signed, please forward it to the request was admlnlslratlvely closed without p1ovidlng records FOINPA Section for dispatch lo the requester.

to the requester.

The subject request has been appealed for i11illal denial ol recordls\,

A copy of the appeal, denial response (with oracketea recorc:l(S)) and Complete NRC Form 496, "Report of Staff Resources for Processing FOIA requests " initial request are attached. When the appeal response 1"1as been srgned, please forward It 10 the FOIA/PA Section for dispatch to tt,e requester, Other required action as noted In the COMMENTS-section below COMMENTS/DESCRIPTION OF REFERRED RECORDS When the fin>II r..snnntP to FOiA ? O1J.OOOR was in iti~ llv <Pnt to ()(l("' rnr - -- nr.r r,.,nw** ** *ti" few rhonur,* to hr,;,,,k,.,.

rrom thJ(O)(!:>) I l(b)(S) I A referral for re-review of 2013-0008 was sent to SF.CY on 1/25/ 13. Meanwhile, we provided the requester J pama1n:sponst:s pl!rtaining to al I other items. To datt.e we have not received a response from the office regarding the initial referral. Now the requester has lilcd on appeal for luck or response (20I 3-0015A) because he has not yut received nll the n:cords .. A copy of the appeal and initiul request is enclosed, If you have any questions, please contact me. Thanks, Linda OFFICE RESPONSE SIGNATURE ** FOIA COORDINATOR DATE NRC FORM 496A (10-2012)

Remsburg, Kristy From; Kilgore, Linda Sent: Wednesday, June 05, 2013 12:17 PM To: Rem!>burg, Kristy

Subject:

RE: FOIA PA-2013-0008 and Appeal 2013-00lSA question re 6/3 memo re record 2 Attachments: AMM response_FOIA-13-0008_6 3 13.pdf; 9-18-12 letter.pdf Importance: High Hi Kristy, Thanks so much, Linda From: Remsburg, Kristy Sent: Wednesday, June 051 2013 8:37 AM To: KIigore, Linda SUbject: RE: FOIA PA-2013*0008 and Appeal 2013-00lSA Thank you Linda. I haven't gotten it yet from Susan.

  • Thank you for closing us out for 0008 and 0015A.

Have a great day!

Kristy Kristy Remsburg Office of the Secretary U.S. Nuclear Regulatory Commission Office: 301-415-1667 From: Kilgore, Linda Sent: Wednesday, June OS, 2013 8:21 AM To: Remsburg, Kristy

Subject:

RE: FOIA PA-2013-0008 and Appeal 2013-00lSA

Pat on1ly sent the memo. The memo was addressed to you so you should get a response from the office I assume, but I'll send what I have.

From: Remsburg, Kristy ,

Sent: Wednesday, June 05, 2013 8:11 AM To: Kilgore, Linda

Subject:

RE: FOI A PA-2013-0008 and Appeal 2013*0015A Did she forward the original referral package also? If so, I need a c-opy of the referral sheet withe response and memo please.

Thanks, Kristy Kristy Remsburg Office of the Secretary U.S. Nuclear Regulatory Commission Office* 301*415-1667 From: Kilgore, Linda Sent: Wednesday, June OS, 2013 7: 13 AM To: FOlAPASECY Resource CC: Remsburg, Kristy

Subject:

FOIA PA-2013*0008 and Appeal 2013-00lSA

""'6ee ffl8FAi A§,

Thanks Linda 2

,Beas!.,ey, Benjamin From: Criscione,La11UTence Sent: Tuesday, September 18, 2012 7:25 PM To; Macfarlane, AOison: clemer@osc.gov: Bell, Hubert; Lee, David; Zobler, Marian; Wiggins, Jim Cc: matt_buckham@demint.senate.gov; homeland.security@mail.house.gov:

mlchael.kiko@mail.house.gov; peter.spencer@mail.house.gov; vaferie_manak@epw.senate.gov; nathan_mccray@epw.senate.gov; devon.hill@mail.house.gov; gracela.tatane@mall.house.gov; stephen.salsbury@mail.house.gov; ]im_mcgee@hsgac.senate.gov; marty.gelfand@mall.house.gov; vic.edgerton@mall.house.gov; mlchal.freedhoff@mall.house.gov: Bernhard, Rudolph; Ferrante, Fernando; Hanna, John; Kanney, Joseph; Kozak, Laura; Loveless, David; Marksberry, Don; Mitman, Jeffrey: Passehl, Dave; Schmidt, Wayne; Vaughn, Stephen; Wood, Jeffery; Zoulis, Antonlos; Galloway, Melanie; Giitter, Joseph; Leeds. Eric; Wilson, George; Perkins, Richard; Bens!, Michelle; Philip, Jacob; Sancaktar, Selim; Ottenberg, Geoffrey; EUis, Kevin; Beasley, Benjamin:

Demoss. Gary. Coyne, Kevin; Coe, Doug; Correia, Richard

Subject:

Inadequately Sized Flood Wall at Oconee Nuclear Station Could Lead to Fukushima Scenario in the Event o( a Failure of the Lake Jocassee Dam Attachments; Jocassee Dam Failure Concerns.pd!; References.pdf Chairman Macfarlane, Please see the attached letter. I apologize for its length but it is written for a broad audience and concerns some technically complex Issues with six years of regulatory background.

The risk that a core meltdown will occur at the Oconee Nuclear Station (ONS) ls ten times greater than at similarly designed US reactor plants and the risk of a containment breach leading to slgnlflcam public dose ls 500 times greater.

ONS lies eleven mlles downstream of the Lake Jocassee Dam. Since 2006 the NRC has known of a harrowing liability: a failure of Jocassee Dam would lead to all three reactors at ONS melting down within 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> and a potential breach of the containment buildings within 68 hours7.87037e-4 days <br />0.0189 hours <br />1.124339e-4 weeks <br />2.5874e-5 months <br />. This Is very similar to the events which occurred at Fukushima Dal-lchi In 2011.

I am not directly involved with this issue. My involvement stems from concerns of a co-worker that serious safety concerns regarding ONS are being Illegally withheld from the public under the guise of "Security-Related Information".

My knowledge of this issue comes entirely from a cursory review of documents in ADAMS. From that review it is clear that:

  • Despite knowing about the significant risk posed by a failure of Jocassee Dam since 2006, no efforts have yet been taken to substantially lower those risks. Although interim actions are being taken at Duke Energy, they are not of a nature that significantly lowers the risks to a par with typical US reactor plants.
  • Most of the documents pertaining to this safety concern are not publicly available due to being stamped "Security-Related Information#. However, none of these documents discuss security topics at all. Terrorism, sabotage, vandalism or any other Intruder or insider threat are not mentioned. These documents deal wholly with the failure of Jocassee Dam due to natural phenomena or latent engineering/construction flaws.
  • The annual risk of core damage at ONS is on the order of lE-4/ year and the annual risk of core damage followed by containment failure is on the order of lE*S/year.

The Items below are also apparent from the documents I have reviewed, although It is possible these Items have been done and I have merely not located the documents affirming them:

1. After six yea rs, the NRC does not have an accurate risk model of ONS which takes into account the liabilities posed by a failure of Jocassee Dam.
2. After six years, the NRC does not have an accurate assessment of the probability that ONS operators can prevent a containment failure in the 49 to 58 hours6.712963e-4 days <br />0.0161 hours <br />9.589947e-5 weeks <br />2.2069e-5 months <br /> between the recession of the flood waters and the failure of the containment structures.
3. The original due date for constructing adequate flood protection was November 30, 2011. After the Fukushima Dai-ichl accident, Instead of being prioritized this due date has been extended to 2016. That's ten years after we first became aware of the liability.

Please note that the above three items are conjecture on my part as I have not been involved in any of the NRC discussions concerning this issue and it is likely there are many documents In ADAMS which I failed to find and review.

However, from the documents I have reviewed, it is apparent to me that the above statements are true. The technical staff involved in this issue (i,.e. whose names appear on the ADAMS documents) are Eric Leeds, Joseph Giitter, Melanie Galloway, George Wilson, Jeff Mitman as. well as others. I have not spoken to any of these people other than Jeff .

Mitman and my short conversation with Jeff last Thursday was merely to get an understanding of the current status of

  • the Jocassee Dam/ONS flood protection ilssue (i.e. I didn't want to bother writing to you if they have broken ground and actually started installing adequate flood protection). These individuals should be able to inform you of the specifics of the Jocassee Dam issue. I have copied them on this email and encourage them to inform you of any items in my letter which a re not accurate. It is not my intent to misrepresent anybody, but being an outsider on this issue it is possible that I have.

The purpose of the attached letter is to (1) bring to your attention the issues regarding Jocassee Dam, (2) inform our congressional oversight committees of concerns I have that the NRC is not addressing the liabilities at ONS In a timely manner, and (3) bring to your attention that I support Richard Perkins' allegation that the issues surrounding Jocassee Dam have been inappropriately categorized as "Security-Related Information" .

Although as an agency we tend to refer to them in the same breath, security and safety are separate issues. All manmade structures, no matter how well built, can be destroyed by some level of terrorist action if left unprotected.

The solutions to terrorist threats are security measures that assess the credible threat and that guard access to critical areas sufficient to the assessed threat level. Construction margins and "defense-in-depth" modifications are the solutions to safety concerns not security concerns The issues regarding Jocassee Dal'T) are about construction margins -

that is, is the dam constructed to typical margins supporting a 2.BE-4/year failure rate) or to some type of exceptional margins. They have nothing to do with the necessity of whether or not security measures need to be taken to avert a terrorist threat. It the fact that ONS lies 11 miles downstream of Jocassee Dam makes it a security liability, then separate from the safety concerns discu,ssed in my letter the NRC and the Department of Homeland Security need tc secretively address security measures to protect the dam. After six years it is unacceptable to withhold vital safety liabilities from public disclosure solely because there may have been a possibility of a security threat. If there is a security vulnerability, then I would hope that it was addressed within months of us becoming aware of this issue in 2006. If anyone within the NRC believes there is still an unaddressed security liability, then separate from the safety solutions (e.g. building an adequately sized flood wall) the NRC should be e*nsuring that appropriate protective measures are in place to protect Jocassee Dam - merely withholding basic information regarding nuclear safety from public view is not the way to address a security threat.

V/r, Lawrence S. Criscione, PE NRC/RES/DRA/OEGIB 573-230-3959

September 18, 2012 1412 Dial Court Springfield, IL 62704 Chairman Allison Macfarlane US Nuclear Regulatory Commission Mail stop O-16G4 Washington, DC 20555-0001

Dear Dr. Macfarlane:

Admiral Rickover served 63 years as an officer in the United States Navy- longer t han any o ther naval officer in US history and possibly longer than any US government employee. He spent the last half of his career developing the nuclear powered submarine force and commercial nuclear power. He was more experienced than anyone else with regard to the functioning of the United States' military, industrial and governmental institutions when, In 1982, he gave a speech at Columbia University in which he noted:

A major flaw in our system of government, and even in industry, ls the latitude to do less than is necessary. Too often officials ore willing to accept and adapt to situations they know to be wrong. The tendency is to downplay problems instead of actively trying to correct them.

On M arch 11, 2011 an earthquake and tsunami struck the Japanese nuclear facilities at Fukushima Dai-ichi. The flood walls built to protect the reactor plants were too short and the 49 foot wave that hit the plants took out the em ergency electric power. With no way to remove decay heat, over the next several days heat built up in the reactor cores until it melted the fuel, breached the steel reactor vessels, and eventually breached the containment buildings.

The utility owner - TEPCO - was aware of analyses that showed their tsunami walls were not adequately sized. But in t he spirit of Admiral Rickover's quot e, they were willing to accept and downplay situations they knew to be wrong instead of actively trying to correct them.

Why did the utility behave so i rresponsibly? Because it is human nature to focus on Immediate problems and to delay addressing "what if's". And a 49 foot tsunami was a very low probability "what if".

Please note that the reactors .at Fukushima survived both the earthquake and the tsunami. The reactors t hemse lves did not start to fail until hours later. It was the support syst ems for providing emergency cooling to the reactors which were destroyed in the earthquake.

In Oconee County, South Carolina there are three reactor plants in a plain downstream of the Jocassee Lake Dam. These reactors and their containment buildings are designed to withstand floods, tornados and earthquakes. But are their support systems?

About four times a day, each reactor at Oconee produces the equivalent energy as released in t he atomic bomb dropped on Hiroshima. But unlike that A-bomb, instead of releasing this energy in less than a nanosecond, the equivalent energy release occurs over a six hour period allowing plant systems to remove the energy and convert It to electricity.

Following a reactor shutdown, the reactors at Oconee still produce a significant amount of energy due to the inventory of radioactive wast e nuclides stored in their cores. The energy released over the first three days is equivalent to roughly a tenth of the energy released at Hiroshima. As long as this energy is removed, there is no problem. But what if it cannot be removed? What if it builds up in the reactor cores and cont ainment buildings? Then, j ust like at Fukushima, t his energy will! cause the fuel to melt and the containment buildings to breach.

Unlike Fukushima, the fallout of radionuclides released during this accident will not mostly blow out to sea - depending on the wind they will blow towards Knoxville, Charlotte, Colum bia, Atlanta or Huntsville. Any which way they get blown, these radionuclides will fall out over agricultural lands.

The Oconee Nuclear Station (ONS) is equipped with a Standby Shutdown Facility (SSF) which conta ins the emergency equipment necessary to remove the decay heat during an emergency.

Just like at Fukushima, this equ ipment is protected from flooding by a flood wall, and just like at Fukushima that flood wall is Inadequately sized.

A five foot flood wall was installed around the Standby Shutdown Facility in 1984 based on an assessment that, were Jocassee Dam to fail, t he SSF would experience flood levels of 4.71 f eet .

However, according to the NRC's publicly available April 28, 2006 inspection report on Oconee:

...a December 10, 1992 Jocassee Dam Failure Inundation Study (Federal Energy Regulatory Commission Project No. 2503) predicted that a Jocassee Dam failure could result in flood waters of approximately 12.5 to 16.8 feet deep at the Oconee Nuclear Site.

2

So by 1993 Duke Energy was aware that their flood wall at Oconee was 7 to 11 feet too short.

And just like TEPCO, they adapted to a situation they knew to be wrong and, instead of actively correcting the inadequately sized flood wall, they worked to downplay the problem .

On August 13, 2003 the flood wall around Oconee's Standby Shutdown Facility was breach ed in order to run a "temporary" cable. Seven hundred twenty days later (on 2005-08-03) this breach was finally corrected two months after it had been brought to the attention of the plant by the NRC's resident inspector (on 2005-06-02).

The breach of the flood wall caused the NRC Resident Inspectors at Oconee to look into the licensing basis for the flood wall and to become aware of the 1992-12-10 inundation study. The issue eventually was referred to the Office of Nuclear Reactor Regulation (NRR).

On August 15, 2008 the Division of Operating Reactor Licensing (NRR/DORL) sent a letter to Duke Energy requesting "additional information regarding external flooding of the Oconee site, including the consequences of a Jocassee Dam failure." At this point, it appears DORL was refusing to accept a situation they suspected to be wrong and refusing to allow Duke Energy the latitude to do less than is necessary.

For reasons unknown to me, the* 2008-08-15 letter from NRR/DORL to Duke Energy has the following markings:

Limited Interna l Distribution Permitted Official Use Only - Security-Related Information There is nothing in the letter which is classified with regard to national security. There is nothing in the letter which is Safeguards. There is no discussion in the letter about any security related topics. In fact, an electronic word search of the letter only finds the word "security" in the "Security-Related Information" markings.

Why is this document for "Official Use Only"? Why is it "Security-Related Information"? Why is only "Limited Internal Distribution Permitted"? I* see nothing in the 2008-08-15 letter from NRR/DORL to Duke Energy which prevents it from being released to the public. Is "transparency" still something we've committed to?

This is not the only letter regarding Jocassee Dam which NRR has marked as security related. Is there a security concern regarding Jocassee Dam? I have seen nothing in these "security 3

related" letters regarding terrorist t hreats to the dam. All of these letters deal entirely with safety concerns from natural phenomena and latent construction or engineering liabilities.

Duke Energy responded to our 2008-08-15 letter on September 26, 2008. Duke marked its response as "Sensitive Information". Note that t hey do not use the NRC term "Security-Related Information". And just like in t he NRC's 2008-08-15 letter, the word security" does not appear in the Duke 2008-09-26 letter.

However, Duke's letter is without doubt "sensitive information". If I were Duke, I would not want the public to see this information. I would not want the public to know how I allow my nuclear managers the latitude to do less than is necessary, how my corporate officials are willing to accept and adapt to situations they know to be wrong, and how my utility succumbs to the tendency to downplay problems instead of actively trying to correct them. I would be very sensitive about t hese t hings if I were Duke. But I'm not Duke. And neit her are yo u: We're the NRC and as such have an obligation to transparently allow the public to see correspondence with Duke Energy regarding a significant safety concern.

In their 2008-09-26 letter, Duke provides the following scenario and analysis regarding a failure of Jocassee Dam:

Notification from Jocassee would occur before a total failure of the dam; however, for the purposes of this timeline, notification is assumed to be at the time the dam fails.

Following notification from Jocassee, the reactor(s} are shutdown within approximately 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. The predicted flood would reach ONS in approximately 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />, at which time the SSF walls are avertopped. The SSF is assumed to fail, with no time delay, following the flood level exceeding the height of the SSF wall. The failure scenario results are predicted such that core damage occurs in about 8 to 9 hours1.041667e-4 days <br />0.0025 hours <br />1.488095e-5 weeks <br />3.4245e-6 months <br /> following the dam break and containment failure in about 59 to 68 hours7.87037e-4 days <br />0.0189 hours <br />1.124339e-4 weeks <br />2.5874e-5 months <br />. When containment failure occurs, significant dose to the public would result.

The scenario description above does not acknowledge that the postulated flood arrives at the sffe and then recedes rather quickly. In the above scenario, ONS is no longer flooded approximately 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> after the onset of initial flooding (10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> following failure of the dam). At this point, recovery actions can begin to mitigate the loss of AC power and thus extend the time to a potential containment breach.

4

With regard to the first paragr aph, please note that core damage occurs in about 8 to 9 hours1.041667e-4 days <br />0.0025 hours <br />1.488095e-5 weeks <br />3.4245e-6 months <br /> following the dam break and containment failure in about 59 to 68 hours7.87037e-4 days <br />0.0189 hours <br />1.124339e-4 weeks <br />2.5874e-5 months <br />. Also note Duke's assertion that when containment failure occurs, significant dose to the public would result.

With regard to the second paragraph, Duke appears to be suggesting that reinforcements can be sent to the plant and possibly restore equipment before containment failure. Consider the environment they will be working in though. The dam failure will not just impact the nuclear station. Roads and bridges could be washed away or blocked with downed trees and utility poles. A General Emergency will be declared at the nuclear station which will trigger an evacuation of the area. And of course the evacuation of these citizens will be severely impacted by the poor road conditions and the search and rescue operations being conducted due to the flood.

The good news, however, is the " nuclear side of this event will likely not result In any loss of life. Imminent deaths might possibly result from the dam failure, but just like at Fukushima th e nuclear aspect of the incident should be entirely contained to lost property - at least on the "tangible" side.

But probably more tragic than the tangible loss of property are the intangibles. Three reactors melting down and breaching their containments will affect nuclear utilities worldwide. Our nuclear navy, which so far has been unaffected by any loss of public confidence concerning Chernobyl and Fukushima, would likely not be so lucky were an event to occur in the US. And consider "acceptable" levels of radioactive fallout in Columbi a, Charleston or Atlanta. What will that do to home prices? What will it do to local economies? How will it affect people's mental health? Will textile manufacturers want to buy cotton from even minimally contaminated areas? Will cigarette companies buy tobacco from these areas? Will anyone buy their produce and grains? Their hogs and chickens?

Also in their 2008-09-26 Duke Energy states that they do not consider the failure of Jocassee Dam to be a credible event for which the Oconee Nuclear Station must be protected against:

When considering the overall performance history of modern rock-fill dams, there is no evidence to suggest thot a Jocassee dam failure is credible.

There are two general methods for determining "adequate protection" at nuclear plants:

determ inistic and probabilistic. The deterministic method assumes one piece of equipment fails and analyzes whether the remaining equipment can prevent core damage. Per the quote on the previous page, Duke En ergy's deterministic assessment is that a failure of Jocassee Dam 5

Human experience shows that people, not organizations or management systems, get things done.

When she received Mr. Giitter's letter, Ms. Galloway recognized that in the letter we were allowing Duke Energy the latitude to do less than what is, necessary. By his letter, we were accepting and adapting to situations we knew to be wrong. We were succumbing to the human tendency to downplay problems instead of actively trying to correct them. Ms Galloway also recognized that the organizations and management systems within the NRC were not getting done what needed to be done. So she, as a capable and concerned nuclear professional - not due to her significant position in the organization as a deputy division director but merely as a person determined to get things done - filed a Non-Concurrence form with the hope of revising Mr. Giitter's letter into something that actually required Duke Energy to take actions to protect its Standby Shutdown Facility from potential inundation from flood waters in the event of a failure of Jocassee Dam.

In her Non-Concurrence Ms. Galloway provides the following background information:

  • No other potential initiating event at Oconee is as risk significant. The probability of core damage from a Jocassee Dam failure is three times higher than the sum total probability of core damage from all initiating events. Duke has acknowledged that, given a Jocassee Dam failure with subsequent site inundation, all three Oconee units will go to core damage; that is, given a dam failure, the conditional core damage probability (CCDP} is 1.0. Thus, for a Jocassee Dam failure frequency of 2£-4, there is o conditional core damage frequency {CCDF} of 2.0E-4 (CCDF = IEF X CCDP}.
  • For a Jocassee Dam failure, using potentially optimistic assumptions, Duke estimates that containment will foll approximately 59 to 68 hours7.87037e-4 days <br />0.0189 hours <br />1.124339e-4 weeks <br />2.5874e-5 months <br /> after dam failure without mitigating actions.
  • Under the dam break conditions, resultant flood waters and infrastructure damage would affect public evacuation and potentially affect Emergency Operations Facility response capability. Duke has not demonstrated that its radiological emergency plan actions can be adequately implemented under these conditions.

As already mentioned, Melanie Galloway was the Deputy Director of the Division of Risk Assessment in the NRC's Office of Nuclear Reactor Regulation. Hence, the language she used in her Non-Concurrence were the terms of risk professionals; for example: "given a dam failure, the conditional core damage probability (CCDP} is 1.0".

7

Conditional Core Damage Probability (CCDP} is the probability that, given a specific event , the ci rcumstances of the event will lead to damage of the reactor core. Like all probabilities, (CDP must be a number between O and 1. A value of "O" means that given only that specific event there is no chance that core damage w ill occur. A value of "l" means that given that specific event (e.g. a failure of Jocassee Dam) then core damage will certainly occur. For most initiating events {e.g. tornados, loss of offsite power, fires) the CCDP is typically a very small fraction on the order of one t en thousandth to one t enth. "1.0" might not sound big, but it's enormou.s.

The point of the last sentence of Ms. Galloway' s first bullet is that, since core damage is a certainty given a failure of Jocassee Dam, then the probability that all three reactors at Oconee will melt down is equal to the probability of the failure of Jocassee Dam. Since the p robability of failure of Jocassee Dam failing in any given year is 2E-4, the probability of the three readors at ONS melting down is 2E-4 in any given year. As a point of reference, this is a number that is about ten t imes higher than at a typical US nuclear reactor plant. How ever, the risks at Oconee are actually much worse than that due to the uncertainty about containment failure.

A nominal va lue for the probability of containment failure at US Pressurized Water Reactors (PWRs) is l E-2 or 0.01. In other words, containment's survivability is nominally 99% at a US PWR. However, does anyone believe there Is a 99% chance that, after the f lood waters recede, Duke Energy will be able to restore cooling to their flood damaged facilities? Although they do have 49 to 58 hours6.712963e-4 days <br />0.0161 hours <br />9.589947e-5 weeks <br />2.2069e-5 months <br />, <eep in mind that the Infrastructure will have been significantly damaged by the flood waters. There will likely be washouts at roads and bridges and obst ructions from trees and other debris. Having met operators from ONS, I cannot discount their efforts. With luck going their way, there is certainly a chance they can succeed. But I do not have 99%

confidence In them. The operators at Fukushima weren't successful at It.

What Is your confidence in them? If you asked NRR, what would they tell you t heir confidence is? I may be wrong, but I don'lt think NRR has an official position on it. I have see n no estimates in any of the documents I have reviewed . But this is an extremely important number. It is what separates Three M ile Island from Fukushima. At Three Mile Island t he containment structure did not fail whereas at Fukushima at least one of them did. After knowing about this problem fo r over 6 years, it is negligent for the NRC to not possess a formal est imate of the probability that following a failure of Jocassee Dam the ONS employees will be able to restore h eat removal prior to containment failure. Please not e that I am not accusing NRR of negligence because, for all I know, this probability has been analyzed by the NRC and I have just not been able to locate it. However, if NRR cannot provide you a formal estimate at this point (i.e. 6 years after knowing about the ONS issue and 18 months after Fukushima) then they have been n egligent in their dut ies.

8

As feared by Ms. Galloway, the latitude provided by Mr. Giitter's 2009-04-30 letter resulted in further attempts by Oconee to downplay the problem of its inadequately sized flood wall.

By February 2010, the issues regarding Jocassee Dam and the SSF flood wall were still not yet addressed. George Wilson, the NRC's Dam Safety Officer in the Office of Nuclea r Reactor Regulation, was concerned with what he was experiencing regarding Oconee. Mr. Wilson observed that the root of the problem with Oconee was a combination of (1) overlooked items during initial plant licensing and (2) a change in knowledge regarding plant hazards. In the case of Oconee, when the reactors were licensed in the early 1970's it was ove~looked that they required protection from a failure of Jocassee Dam. As knowledge regarding plant hazards improved, it was recognized in the 1980's that a flood wall was required to protect Oconee's Standby Shutdown Facility. However, the flood height was only estimated to be 4.71 feet. As modeling and assessment procedures improved, it was recognized in the 1990's that the 5 foot flood wall was not adequate*. Mr. Wilson had concerns that similar problems might exist at other nuclear facilities and used the Oconee/Jocassee Issue as the basis for a memo requesting a Generic Issue on flooding from upstream dam failures.

Although M r. Wilson's February 2010 memo was nominally sufficient to implement a Generic Issue, the Office of Nuclear Regulatory Research (RES) requested additional Information. On July 19, 2010 the Division of Risk Assessment of NRR (NRR/DRA) submitted a memo to the Division of Risk Assessment of RES (RES/DRA) requesting a Generic Issue on flooding hazards due to upstream dam failures.

This memo exists in the Agencywlde Documents Access and Management System (ADAMS) under Accession Number ML101900305. Like all the other documents produced by NRR regarding Jocassee Dam, this memo is stamped "Official Use Only - Security-Related Information". And like all the other documents, there are no security issues discussed anywhere in the document. The document entirely concerns safety risks associated with natural phenomena or latent hazards resulting from flaws in construction and/or enginee ring.

In August 2010 RES/ORA assembled a team which began producing a screening report for evaluating whether or not there was strong enough basis for generating a Generic Issue.

Meanwhile, NRR' s sparring with Oconee over Jocassee Dam continued. On March 15, 2010 NRR/ DRA completed a study of the Jocassee Dam and analyzed it against other large dams in order to determine a reasonable annual failure probability. Again, like all NRR documents concerning a failure of Jocassee Dam, this study was marked "Security-Related Informat ion" despite being solely concerned with the failure of Jocassee Dam due to environmental 9

phenomena and latent construction/engineering issues. No mention is made of terrorism, sabotage or vandalism. The fact that the Oconee Nuclear Station sits 11 miles downstream of Jocassee Dam is not mentiorned in the report. In fact, the report neither mentions Oconee Nuclear Station, Duke Energy, Oconee County, core damage, radioactivity nor any other indication that a breach of Jocassee Dam could lead to a nuclear accident.

The annual failure probability of Jocassee Dam that was calculated by the study was about 2.SE-4/year. That equates to: a 0.00025 probability, a 0.025% chance, or a chance of 1 in 4000 years.

What exactly is 4000 years? Four thousand years ago Rome was just an outpost along the Neolithic salt trade routes. Wolves still roamed her Seven Hills. Lions roamed the hillside where in a later millennium the Athenians would build the Parthenon. It was before Alexander, Socrates, Homer and even Achilles. The ancestors of Abraham were still eating bacon and living In Ur. Four thousand years is a long time - it is a Biblical length of time. An annual failure probability of 2.SE-4/year suggests that in this 4000 year expanse of history QM external event (e.g. a "5000-year" paleoflood, an earthquake) capable of triggering mechanisms leading to the failure of Jocassee Dam might have occurred in northwest South Carolina.

Compare this to the annual failure probability which Duke Energy uses: l.3E-S/year. That equates to : a 0.000013 probability, a 0.0013 chance, or a chance of 1 In 76923 years.

Seventy-seven thousand years ago modern men had not yet left Africa. Europe was still the domain of mammoths and Neanderthals. South Carolina is not known for its earthquakes and floods, but 77,000 years is a long time - a "Paleolithic length of time. How many risk significant earthquakes and paleofloods have occurred in Oconee County in the last 77,000 years? Duke Energy's numbers suggest only one. The NRC's numbers suggest about 20.

The NRC's annual failure frequency was based on a statistical analysis of all available data on th dams similar to Jocassee. The 5 percentile of their data was l.3E-4/year which is ten times the frequency being used by Duke Energy.

An author of the study pointed out to me that it is quite possible that the failure probability of Jocassee Dam is 1.3E-5/year, b ut from the data he's seen, from the calculations he's done, and from the Duke Energy submittals he's reviewed, he considers Duke's 1.3E-5/year estimate to be indefensible. Although it's possible the Duke number is accurate, the currently available data does not support it. Should we - as an agency - be using a failure probability which was calculated by our own risk experts and which can be defended by the available data, or should 10

we be accepting a failure rate calculated by Duke Energy which is indefensible? It depends: is it our goal to downplay this problem or to actively seek its adequate resolution?

In a June 3, 2010 letter Duke Energy provided the NRC with a summary of fifteen "External Flood Commitments" that it was implementing to mitigate the consequences of a failure of Jocassee Dam. Although all 15 commitments were important actions to take, none of them would have much appreciable impact either on lowering the failure probability of Jocassee Dam or on mitigating the consequences of a failure.

On June 22, 2010 the NRC issued a Confirmatory Action Letter (CAL) directing Oconee to:

1. " ...submit to the NRC by August 2, 2010, of/ documenration necessary to demonstrate to the NRC that the inundation of the Oconee site resulting from the failure of the Jocassee Dam has been bounded." Or, in other words, perform a study and determine the worse case credible conditions that could result in a failure of Jocassee Dam.
2. "... submit by November 30, 2010 a list of all modifications necessary to adequately mitigate the inundation... "
3. "... make all necessary modifications by November 30, 2011."

To my knowledge, this letter is the first t ime the NRC gave Duke Energy a date by which they needed to actively try to correct the deficiently sized flood wall. By item 1 above Duke Energy had until 2010-08-02 to determine the highest credible water height that a failure of Jocassee Dam would produce at Oconee. By item 2 Duke Energy had until 2010-11-30 to list what modifications needed to be constructed or installed to protect the Standby Shutdown Facility from the highest credible water height. By item 3 Duke Energy needed to have the modifications completed . This letter is an example of the NRC finally taking away the latitude for Duke Energy to do less than Is necessary to correct a situation they know to be wrong.

Unfortunately the NRC later relaxed their stance and again succumbed to the tendency to downplay problems instead of actively trying to correct them.

Duke Energy met its 2010-08-02 deadline to provide the NRC with a bounded inundation study.

On November 29, 2010 Duke Energy informed the NRC that they would need more time to compile a list of modifications necessary to adequately mitigate the postulated inundation at Oconee due to a failure of Jocassee Dam. Duke Energy gave themselves a new due date of April 30, 2011 for determining the modifications needed and was silent on whether or not they would get these modifications done by the November 30, 2011 deadline.

11

In January 2011 Eric Leeds was preparing a letter to Oconee concerning the NRC's acceptance of the information contained in Duke Energy's 2010-08-02 Inundation study. Jeff Mitman of NRR/DRA/APOB was on the review chain for Mr. Leeds's letter and filed a Non-Concurrence form against it on 2011-01-10. Mr. Mitman's primary concern was that Duke's analysis was a "sunny day" analysis. For some reason (possibly due to possessing common sense) Mr. Mitman believes that an abnormally large amount of rainfall could Increase the probability of a failure of Jocassee Dam and that the "bounding" case for an inundation study should take the possibllity of dam failure during severe storms into account.

NRR answered Mr. Mitman's concerns in part by saying that an overtopping of Jocassee Dam due to severe rai nfall was not credible. Jocassee Lake has two saddle dikes which are the *same elevation as the top of Jocassee Dam but not as tall. NRR argued reasonably that since t hese saddle dikes are the same height as Jocassee Dam then they would overtop concurrent with Jocassee Dam. Since these saddle dikes are not as well built as Jocassee Dam, NRR postulated they should fail prior to the dam and thereby drain the reservoir by 35 feet at which point water would no longer flow over the main dam. NRR may have a point, but there is something curious about their argument : why is NRR, an office of the I\IRC, making this argument for Duke Energy? It is our role to review and challenge Duke's analysis, not to internally defend it for them. Our focus seems more on downplaying and conceallng the problem Inst ead of act ively working to get Duke Energy to correct it.

On March 10, 2011 the status of the Oconee/Jocassee issue was as follows:

1. In a January 28, 2011 letter to Oconee, Eric Leeds of NRR accepted Oconee's 2010-08-02 inundation study which was based on a "sunny day" failure of Jocassee Dam and did not consider failure modes resultant from severe rainfall or earthquakes.
2. Duke Ener gy had missed Its 2010-11-30 deadline for submitting its list of modifications for adequately protecting the Standby Shutdown Facility at Oconee Nuclear Station from a failure of Jocassee Dam and had committed to, providing this list by 2011-04-30.
3. The screening analysis for a Generic Issue on flooding due to upstream dam failures had been prepared by the Office of Nuclear Regulatory Research and was in "final draft" form and ready for routing.

On March 11, 2011 the Fukushima Dai-ichi nuclear complex in Japan was struck by a beyond design basis earthquake and SO minutes later by a 49 foot tsunami which breached its 19 ft seawall. Within a few days, three of the reactor cores at Fukushima Dai-ich i had melted down, breached their reactor vessels and exploded the buildings housing their cont ainments. The NRC recommended a 50 mile evacuation of US citizens from around the site.

12

In the Office of Nuclear Regulatory Research, we assumed the Fukushima Dai-ichi accidents would be a "big deal" with regard to GI 204 on flooding due to upstream dam failures; yet, incredibly, It still took an additional 10 months for GI 204 to be approved .

Part of the hold up on releasing GI 204 was the fact that many of the references for it (e.g. the correspondence with Duke Energy regarding Jocassee Dam) had been labeled "Security-Related Information" by NRR, but RES could not determine any justification for marking the GI 204 screening report as "Security-Related" since it dealt entirely with safety issues. Every time NRR requested that all "Security-Related Information" be removed from the GI 204 screening report, RES's reply (i.e. the authors) was that nothing in the report was related to security.

Prior to it s release, the screening report for GI 204 was reviewed by the Department of Homeland Security which found that none of the information related to Jocassee Dam and Oconee Nuclear Station was security sensitive. Despite this finding, the decision was made by the NRC to redact the screening report prior to releasing it to the public.

The NRC can redact anything it voluntarily releases without providing any justification.

However, when something is being involuntarily released through a Freedom of Information Act (FOIA} request, the NRC must provide a reason for everything which is exempted from release.

On January 4, 2012 a reporter submitted a Freedom of Information Act request for documents concerning GI 204. In response to this request, the NR C released the GI 204 screening report with heavy redactions. Many of these redactions and their justifications are nonsensical. For example, on page 9 of the report (included in redacted and unredacted form as an enclosure to this letter) t here is the following sentence:

In 2010, NRC staff produced a report that estimates a typical dam failure rate for large rock fill dams similar to the Jocassee Dom to be 2.8(10;-4/year The above sentence was redacted. The justification given for the redaction was FOIA exemption 7(F):

Disclosure could reasonably be expected to endanger the life or physical safety of an individual.

How is anyone' s life or physical safety in jeopardy by disclosing the NRC's estimat ed failure rate for Jocassee Dam? The only possible answer I can come up with is that someone within the 13

NRC believes that Jocassee Dam might be the object of a terrorist threat. But even if this were true (and I have seen no mention of security concerns in any document referenced by the GI 204 screening report), how would knowing the NRC's estimated failure rate help the terrorists?

Our estimated failure rate of Jocassee Dam is based entirely upon natural phenomena and construction/engineering flaws. Terrorist activity and internal sabotage were in no way included in the study that generated this estimation. Does Al Qaeda really care what the NRC's estimated failure rate due to natural phenomena is?

There are some (e.g. me) that believe the 2.SE-4/year failure rate ts being withheld from the public because It is embarrassing to the NRC and embarrassi ng to Duke Energy.

What does a 2.8E-4/year fai lure rate mean? It means that in any given year there is a probability of 0.00028 that Jocassee Dam will fail. Since, as mentioned above, the probability that a failure of Jocassee Dam will lead to the meltdown of all three reactors at Oconee, a 2.SE-4/yea r failure rate of Jocassee Dam equates to an annual probability of 0.00028 that three reactor cores will melt down in Oconee County, South Carolina.

What are the odds that one of the core meltdowns will lead to a failure of its conta inm ent building and the release of a significant amount of radioactivity? I don't have a good answer because I have yet to see a NRC or Duke Energy assessment of the likelihood that the ONS operators can restore cooling to containment within the approximately 21/2 day window pdor to containm ent failure. That's not to say this study doesn't exist, but if it does I have not seen it. I can only make assumptions.

Si nce I personally know some of the ONS operators having served with some in the navy and having met others at functions of the Professional Reactor Operator Society, I am willing to give them better odds than the Fukushima operators. I'll give them 2 to 1 odds. That is, for each reactor they have a 67% chance of being successful in restoring cooling prior to containm ent failure. Please keep in mind the conditions they will be working under. A "tsunami" of water from the dam break has breached their inadequately sized f lood wall and flooded out all their normal equipment. They have no installed electric power an d much of the installed mecha nlcal equipment in unusable due to having their electric motors flooded. Unanticipated equipment that was not st aged before the dam break will need to be brought in over a severely compromised infrastructure and through an evacuating populace.

A 67% chance of success integrated over three reactor plants gives a 70% chance that at least one containment building will fail. This yields an annual frequency of 2E-4/year that a 14

significant release of radioactivity will occur in Oconee County, South Carolina. Those are odds that are about 500 times greater t han at a typical US reactor plant. Yet these are still relatively good odds for the people of Oconee County. They are equivalent to the odds of being dealt a four of a kind. Most poker players have never been dealt a four of a kind and probably never will.

However, these are the annual odds. That is, the people of Oconee County live with these odds every year. Integrated over the 22 years the ONS reactors have left on their licenses, the probability becomes 0.43% or about the chance of being dealt a straight. Being dealt a straight Is rare, but I personally beat twice those odds on the first poker hand I was ever dealt. As a thirteen year old summer camper, my first poker hand ever was a flush. My poker career has gone downhill ever since, but I know from personal experience that being dealt a hand that beats a straight is credible.

Nonetheless, a straight is a really good hand. As long as I had the chips, I'd keep up with the ante if I were holding a straight.

But risk involves more than just probability. Risk also involves hazard. I would be willing to bet a few hundred dollars on a straight, but I certainly wouldn't "bet the farm" on It. And the NRC should not allow Duke Energy to bet all the farms in Oconee County on It.

However, there is more to gambling than risk. There is also reward. And the rewards from Oconee Nuclear Station should not be Ignored.

The greatest rewards from ONS are paid out to the people who hazard the greatest risk: the residents of Oconee County, South Carolina. I have no datai to back up any of the Items below, but based on my professional experience (I have worked at eight rural reactor plants and have visited seven others) I am confident of the following:

1. Oconee Nuclear Station is likely the largest employer in Oconee County and the salaries and wages paid there are likely double the average salary and wage rate for typical residents of the county.
2. ONS likely pays more in property taxes than any other entity in the county and ls responsible for a significant portion of the funding of the county's public schools.
3. For every Duke Energy employee at ONS, there is likely a non-Duke employee in the county who receives a significant portion of their livelihood from either doing business directly with ONS or with the families of employees who work at ONS.

15

Would I be willing to bet my life and the lives of my family on a straight for the rewards mentioned above - or for any rewards for that matter? Of course not. But Oconee Nuclear Station isn't gambling with anyone's life. The accident scenario at Oconee takes over two days to unfold and, even once it occurs, it is unlikely to release significant doses in terms of public health. What is being hazard is people's property. And although Duke Energy could not pay me enough to compensate me for the health of my family, they could certainly pay me for the loss of my home or the loss of my farm.

As a citizen I'm not opposed to Duke Energy not doing anything. As long as the shareholders of Duke Energy, the residents of Oconee County, the citizens of neighboring counties and states, and the elected representatives at the local, state and federal level are all aware of the: risks and are willing to accept them, then I have no problems with them betting their futures. on a

straight". If there are affected people who have an issue with the risks at ONS, there are a variety of means which Duke can employ to lower their risk by "improving their hand" (e.g.

construct a flood berm around the site) or lower their risk by lowering the hazard (e.g. fund an Insurance policy that covers the property losses of an accident). As long as the approach taken is transparent to the citizens involved, I do not care what solutions are implemented - I trust our democratic and republican institutions to more fairly deal with the public than a secretive commission of scientists crunching risk calculations.

However, as a regulator I am very concerned about what has been occurring. The decision to do nothing has not been formally made but rather has occurred by default due to bureaucratic ineptitude. I have encountered no documentation that, after knowing about this problem for six years, the NRC has:

1. Determined a baseline risk for the ON$ reactors which takes into account the NRR/DRA/APOB estimated probability of a failure of Jocassee Dam and an analysis of Duke Energy's ability to restore cooling prior to containment failure.
2. Set a hard and fast due date for Duke Energy to implement modifications at ONS to adequately protect the facility from a failure of Jocassee Dam (other than the 2011-11-30 due date which in the end was not hard and fast)
3. Informed the external stakeholders (e.g. the citizens of Oconee County, the American public, the US Congress, other nuclear utilities, and many other specific groups that would directly suffer from a reactor accident In the US) about the risks they face due to a failure of Jocassee Dam.

Maybe the NRC has done all of the above, but from my research it appears to me the only thing to which the NRC has committed is keeping this issue from public scrutiny.

16

A 2E-4/year annual chance of a reactor accident leading to containment failure is something the NRC must address. "Acceptance sets the standard" and we cannot allow 2E-4/year to be the standard. Integrated over the 104 US Nuclear Power Plants (NPPs), 2E-4/year becomes 2.0E-2/year. That is a 2% annual chance that a core meltdown and containment breach will occur resulting in a significant release of radioactivity to the public (something that has not yet occurred in over fifty years of commercial nuclear power in the United States when one accounts for th~ fact that neither the 1966 core melt at Fermi plant nor the 1979 core melt at Three Mile Island involved a containment breach).

As mea ns of comparison, a 2% annual chance 1s once in every 50 years. Integrated over the 439 operating commercial reactors worldwide, a 2E-4/year probability becomes an 8.3% chance which is once in every 12 years. If you count Fukushima as three separate accidents and add it to Chernobyl, then an accident every 12 years is about what we have experienced in the past fifty years.

Can our national nuclear enterprise accept a core meltdown and cont ainment failure once every 12 years worldwide and once every 50 years in Ameri1ca? It cannot; consider the current decommissioning plans of Japan and Germany as evidence. Consider the post-Chernobyl shutdown orders in Italy. Consider the current state of new reactor construction in America, Britain, Canada and even France.

But even If we-as an agency- cannot accept 2E-4/year across the US industry, we - as a nation

- certainly can accept that risk at one three-unit site in South Carolina. The issue I have, however, is that the actual Commissioners of the US NRC need to be the ones deciding whether or not we - as a nation - accept the risks which Jocassee Dam poses to our nuclear enterprise, and the Commissioners need to be transparently making that decision in front of the external stakeholders:

1. The applicable US congressional oversight committee,s
2. The federal, state and local representatives of Oconee County, the neighboring counties and the neighboring states
3. The shareholders of Duke Energy and all nuclear utilities
4. The venders of reactor plants
5. The residents of Oconee County and the citizenry of the United States
6. The international operators of nuclear reactors whom we expect to adequately mitigate risks to their plants and who thusly expect the same of us.

17

professional engineer and as a public servant I have a duty to the citizens of this country to address my concerns regarding the NRC's handling of the Jocassee Dam issue with the staffs of our congressional oversight committees. There are some who might say it is irresponsible to distribute "Security-Related Information". If there is really a security threat to Jocassee Dam then it needs to be actively addressed; merely withholding safety-related information from Congress and thereby impeding the handling of nuclear safety issues is not an acceptable way of addressing security threats.

Very respectfully, Lawrence S. Criscione, PE Reliability and Risk Engineer Operating Experience and Generic Issues Branch Division of Risk Analysis Office of Nuclear Regulatory Research NRC/RES/DRA/OEGIB 573-230-3959 pages Cc: Sen. Lindsey Graham, South Carolina Sen. Jim DeMint, South Carolina Sen. Joseph Lieberman, US Senate Comm. on Homeland Security & Governmental Affaiirs Sen. Susan Collins, US Senate Committee on Homeland Security & Governmental Affairs Sen. Barbara Boxer, US Senate Committee on Environment & Public Works Sen. James lnhofe, US Senate Committee on Environment & Public Works rd Rep. Jeff Duncan, South Carolina's 3 District Rep. Fred Upton, Energy & Commerce Committee Rep. Henry Waxman, Energy & Commerce Committee Rep. Peter King, Committee on Homeland Security Rep. Bernie Thompson, Committee on Homeland Security Rep. Darrel Issa, Committee on Oversight & Government Reform Rep. Elijah Cummings, Committee on Oversight and Government Reform Carolyn Lerner, US Office of Special Counsel Hubert Bell, Nuclear Regulatory Commission Inspector General Marian Zobler, Nuclear Regulatory Commission General Counsel James Wiggins, NRC Office of Nuclear Security and Incident Response 19

  • -: i r .11 . : :l J ~, :. t ~=J __ -.1.1 ~ £ ...,,.
  • t -- ~

_ :- .. r :.. . L ..

,__ _____________________ _,lDukc 2008, a11 2. p.1O).

In \he Oconee Nuclear Station IPEE!: subMlrtal (ONS 1995. p.5.27), the licensee estimates that the conditional core damage frequency resulting trom llooding dae to failure of I.he Joc-assee Dam ,s i.0(1 o-6J/year (ONS 1995, p. 5-27). The contribu\,on to core darnage frequency from prec,pitation-induced exl~rnat flooding is considered negiigible (ONS 1995, p. 5-18). The licensoe notes lhat this external flood core-damage frequency is ol tne same m1:19nitude as other severe accident events (e.g..

earthquakes, fires). Consequently, in lhe IPEEE. the licensee concluded that external nood1ng doe~

not pose severe ac::ident vulnerability (ONS 1995. p 5-27)

Tilt:: aforementioned estimate of conditional core-damage frequency is based on an eslimc11e (made by the licensee} that the probability of a random failure of Jocassee Dam is 1.3(10- 5 )/ye.ir (ONS 1995, p.

5-21). This failure rato includes fai,ures duo lo seepage, embankment sltdes, .ind structural failure of the foundation or atiutments. II does no1 include failures due 10 earthquakes (not deemed credible) or ovel1opping (ONS 1995, p.5-21). (b)(7)(F)

(b)(7 J(F)

This NRC estimate is w1 or er o magntlude arger ara e es ,ma e repo c , Oconee Nuclear Station IPEEE submittal. The database used by NRC st.>tr to calculate the estimated failure rate inch.ides failures due to ovc*topp1ng, inlernal erosion, and settlement. Due to a lack of ear1hquake-lnduced failures artccling dams with characteristics similar to Jocassee Dam, the database does nol contain failures due to seismic events.

As Illustrated above, seveml uncertainties oxl!il with r~gard to the nsk posed to Oconee Nuclear Station due lo uoslream dam failure. In particular, uncorto1nty e,usls about the flood levels at the silo tnnl would result from failure of Jocassee Dam. Moreover, hazard due lo external flooding was "screened oul" in Iha IPEEE based on a sulf,clenlly small contribulion lo core damage fr&quency as calculated at the time. However, uncertainty exi$tS about the appropriate prooab:llty of darn li\ilure that snould be used in computing the contril>ution of external fiood,ng to core damage frequency. This is 1ltus1rated by the disparate results o' the separate analyses described above that differ l>y an order of magnitude in esltmatlng lhe probability of fa,ture or Jocal:see Dam.

2.3. Applicability of Proposed Generic Issue to Multiple Plants It is notable tnat an exclusive rev*ew of FSAR and IPEEE suorrntta!s would not necessarily indicate a potential probiem due to external flocdi119 hazard in either o! I.he above-described cases (1.1::.. Fort Cc1lhoun S:ation or Oconee Nlrclea~ Station). Problems at Fort Calhoun Slalic.,n were recognized because of an NRC inspection that identified an apparent violation of Technical Specification 5.8.1.a for failure to maintain adequate procecures to protect the plant during external fioodbg events (USNRC 2010b) Al Oconee Nuclear Station, attention was drawn lo the elevated consequence from external nood,ng after staff 1denltfied a performance deficiency during maintenance aclivtlies that involved the installat:on of temporary c/eci:ical cables through an opening in lhe Rood protection wall (USNRC 2006b, p. 1). This performance deficiency wa~ or particular concern when coupled wil11 flooding estimc1tcs that are significantly higher tha11 previously assumed (USNRC 2006a}. Thus, in these two cases, identification of fioc,d-related ,ssL;eS resulted from particular scrutiny and analysts of flood 9

Enclosure, page 1

Not for Public Release The above tirneline assumes that Oconee Nuclear Station is notified at the same time the dam fails.

The licensee considers this assumption to be conservative because the plant expects notification before the darn fails (the dam is monitored 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> a day, 7 days a week). The licensee notes that the, above timeline does not account for the recession of floodwaters, which is postulated to occur 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> following darn failure (5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> following onset of flooding at the site) (Duke 2008, att 2, p.10).

In the Oconee Nuclear Station IPEEE submittal (ONS 1995, p.5.27), the licensee estimates that the conditional core damage frequency resulting from flooding due to failure of the Jocassee Dam is 7.O(10-6)/year (ONS 1995, p. 5-27). The contribution to core damage frequency from precipitation-induced external flooding is considered negligible (ONS 1995, p. 5-18). The licensee notes that this external flood core-damage frequency is of the same magnitude as other severe accident eve111ts (e.g.,

earthquakes, fires). Consequently, in the IPEEE, the licensee concluded that external flooding does not pose severe accident vulnerability (ONS 1995, p. 5-27).

The aforementioned estimate of conditional core-damage frequency is based on an estimate (made by the licensee) that the probability of a random failure of Jocassee Dam Is 1.3(10- 5)/year (ONS 1995, p.

5-21 ). This failure rate includes failures due lo seepage, embankment slides, and structural failure of the foundation or abutments. It does not include failures due to earthquakes or overtopping (ONS 19*95, p.5-21). In 2010, NRC staff produced a report that estimates a typical dam failure rate for la~9~.1 1

rock fill dams similar to the Jocassee Dam to be 2.8(1 o- 4 )/yead (USN RC 201 0c). This NRC estimate Is an order of magnitude larger than the estimate reported in the Oconee Nuclear Station IPEEE submittal. The database used by NRC staff to calculate the estimated failure rate includes failures due to overtopping, Internal erosion, and settlement. Due to a lack of earthquake-induced failures affecting dams with characteristics similar lo Jocassee Dam, the database does not contain failures due to seismic events.

As illustrated above, several uncertainties exist with regard to the risk posed to Oconee Nuclear Station due to upstream dam failure. In particular, uncertainty exists about the flood levels at the site that would result from failure of Jocassee Dam. Moreover, hazard due to external flooding was "screened out" In the IPEEE based on a sufficiently small contribution to core damage frequency as calculated at the time. However, uncertainty exists about the appropriate probability of dam failure that should be used in computing the contribution of external flooding to core damage frequency. This is Illustrated by the disparate results of the separate analyses described above that differ by an order of magnitude in estimating the probability of failure of Jocassee Dam.

2.3. Applicability of Proposed Generic Issue to Multiple Plants It is notable that an exclusive review of FSAR and IPEEE submittals would not necessarily indicate a potential problem due to external flooding hazard in either of the above-described cases (i.e., Fort Calhoun Station or Oconee Nuclear Station). Problems at Fort Calhoun Station were recognized because of an NRC inspection that identified an apparent violation ofTechnical Specification 5.8.1.a for failure to maintain adequate procedures to protect the plant during external flooding events (USNRC 201 Ob). At Oconee Nuclear Station, attention was drawn to the elevated consequence from external flooding after staff identified a performance deficiency during maintenance activities that involved the installation of temporary electrical cables through an opening in the flood protection wall (USNRC 2006b, p. 1). This performance deficiency was of particular concern when coupled with flooding estimates that are significantly higher than previously assumed (USNRC 2006a). Thus, in these two cases, identification of flood-related issues resulted from particular scrutiny and analysis of flood 9

Enclosure, page 2